|
|
Line 3: |
Line 3: |
| | issue date = 07/14/2006 | | | issue date = 07/14/2006 |
| | title = D. C. Cook Unit 1: Draft Question Re Proposed RTD Bypass Amendment | | | title = D. C. Cook Unit 1: Draft Question Re Proposed RTD Bypass Amendment |
| | author name = Tam P S | | | author name = Tam P |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1 |
| | addressee name = Scarpello M, Waters J | | | addressee name = Scarpello M, Waters J |
Line 23: |
Line 23: |
| D. C. Cook Unit 1: Draft Question re. Propsoed RTD Bypass Amendment(TAC MD2106)Michael, Joe: | | D. C. Cook Unit 1: Draft Question re. Propsoed RTD Bypass Amendment(TAC MD2106)Michael, Joe: |
| This is regarding your 5/31/06 application for amendment. We have developed the followingdraft question, and would like to discuss it with you in a conference call: The amendment request involves the removal of the resistance temperature detector (RTD)bypass manifolds. This will affect the RTD response time, which is used in the OTT tripfunction. The OTT trip initiates automatic protective actions to mitigate the consequences ofthe following events, and therefore would be affected by the change in RTD response time:1. Loss of electrical load/turbine trip2. Uncontrolled rod cluster control assembly (RCCA) bank withdrawal at power | | This is regarding your 5/31/06 application for amendment. We have developed the followingdraft question, and would like to discuss it with you in a conference call: The amendment request involves the removal of the resistance temperature detector (RTD)bypass manifolds. This will affect the RTD response time, which is used in the OTT tripfunction. The OTT trip initiates automatic protective actions to mitigate the consequences ofthe following events, and therefore would be affected by the change in RTD response time:1. Loss of electrical load/turbine trip2. Uncontrolled rod cluster control assembly (RCCA) bank withdrawal at power |
| : 3. Chemical Volume Control System (CVCS) malfunction that results in a decrease in the boron concentration in the reactor coolant | | : 3. Chemical Volume Control System (CVCS) malfunction that results in a decrease in the boron concentration in the reactor coolant |
| : 4. Inadvertent opening of a pressurizer safety or relief valveFor each event, show that OTT will continue to provide adequate protection from departurefrom nucleate boiling following the requested change in RTD response time.This e-mail aims solely to prepare you and others for the requested conference call. Thise-mail does not convey a formal NRC staff position, and does not formally request for additional information. We will discuss disposition of this question in the requestedconference call.Peter S. Tam, Senior Project ManagerPlant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulatione-mail: pst@nrc.gov Tel.: 301-415-1451 CC:Miranda, Samuel; Nakoski, John; Somers, ChristopherMail Envelope Properties(44B7B4A0.E11 : 12 : 35330) | | : 4. Inadvertent opening of a pressurizer safety or relief valveFor each event, show that OTT will continue to provide adequate protection from departurefrom nucleate boiling following the requested change in RTD response time.This e-mail aims solely to prepare you and others for the requested conference call. Thise-mail does not convey a formal NRC staff position, and does not formally request for additional information. We will discuss disposition of this question in the requestedconference call.Peter S. Tam, Senior Project ManagerPlant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulatione-mail: pst@nrc.gov Tel.: 301-415-1451 CC:Miranda, Samuel; Nakoski, John; Somers, ChristopherMail Envelope Properties(44B7B4A0.E11 : 12 : 35330) |
|
| |
|
Revision as of 14:57, 13 July 2019
Letter Sequence Draft Other |
---|
|
|
MONTHYEARML0616004492006-05-31031 May 2006 Application for Amendment to Revise Technical Specification Surveillance Requirement for Channel Calibration of Overtemperature Differential Temperature and Overpower Differential Temperature Reactor Protection System Functions Project stage: Request ML0616003742006-06-16016 June 2006 Quick Turnaround for Review of a Proposed Amendment Project stage: Approval ML0617900742006-06-26026 June 2006 Draft RAI for Proposed Amendment - RTD Modification for DC Cook 1 Project stage: Draft RAI ML0619804782006-07-14014 July 2006 Draft Question Re Proposed RTD Bypass Amendment Project stage: Draft Other ML0624803282006-10-0606 October 2006 D.C. Cook, License Amendment 296, Regarding Elimination of the Resistance Temperature Detector (RTD) Bypass Loop Project stage: Approval ML0628303132006-10-0606 October 2006 D.C. Cook, Tech Spec Pages for Amendment 296, Regarding Elimination of the Resistance Temperature Detector (RTD) Bypass Loop Project stage: Other 2006-06-16
[Table View] |
Similar Documents at Cook |
---|
Category:E-Mail
MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
From: Peter TamTo:Scarpello, Michael; Waters, JoeDate: 07/14/2006 11:13:36 AM
Subject:
D. C. Cook Unit 1: Draft Question re. Propsoed RTD Bypass Amendment(TAC MD2106)Michael, Joe:
This is regarding your 5/31/06 application for amendment. We have developed the followingdraft question, and would like to discuss it with you in a conference call: The amendment request involves the removal of the resistance temperature detector (RTD)bypass manifolds. This will affect the RTD response time, which is used in the OTT tripfunction. The OTT trip initiates automatic protective actions to mitigate the consequences ofthe following events, and therefore would be affected by the change in RTD response time:1. Loss of electrical load/turbine trip2. Uncontrolled rod cluster control assembly (RCCA) bank withdrawal at power
- 3. Chemical Volume Control System (CVCS) malfunction that results in a decrease in the boron concentration in the reactor coolant
- 4. Inadvertent opening of a pressurizer safety or relief valveFor each event, show that OTT will continue to provide adequate protection from departurefrom nucleate boiling following the requested change in RTD response time.This e-mail aims solely to prepare you and others for the requested conference call. Thise-mail does not convey a formal NRC staff position, and does not formally request for additional information. We will discuss disposition of this question in the requestedconference call.Peter S. Tam, Senior Project ManagerPlant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulatione-mail: pst@nrc.gov Tel.: 301-415-1451 CC:Miranda, Samuel; Nakoski, John; Somers, ChristopherMail Envelope Properties(44B7B4A0.E11 : 12 : 35330)
Subject:
D. C. Cook Unit 1: Draft Question re. Propsoed RTD BypassAmendment (TAC MD2106)
Creation Date 07/14/2006 11:13:36 AMFrom: Peter TamCreated By:PST@nrc.govRecipientsActionDate & Timeaep.comTransferred07/14/2006 11:14:30
AM jrwaters (Joe Waters) mkscarpello (Michael Scarpello) nrc.gov TWGWPO01.HQGWDO01Delivered07/14/2006 11:13:43
AM JAN1 CC (John Nakoski)Opened07/14/2006 11:15:33
AM SXM1 CC (Samuel Miranda)Opened07/14/2006 1:37:26
PMnrc.gov TWGWPO02.HQGWDO01Delivered07/14/2006 11:13:37
AM CMS3 CC (Christopher Somers)Opened07/14/2006 11:13:47
AMPost Office DeliveredRouteaep.com TWGWPO01.HQGWDO0107/14/2006 11:13:43 AMnrc.gov TWGWPO02.HQGWDO0107/14/2006 11:13:37 AMnrc.govFilesSizeDate & Time MESSAGE268207/14/2006 11:13:36 AMOptions Auto Delete:
No Expiration Date:None Notify Recipients:Yes Priority:Standard ReplyRequested:
No Return Notification:None Concealed
Subject:
No Security:Standard To Be Delivered:Immediate Status Tracking:Delivered & Opened