ML062430055: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062430055
| number = ML062430055
| issue date = 08/31/2006
| issue date = 08/31/2006
| title = Vogtle 2006 Mid Cycle Report 22 (Inspection/Activity Plan)
| title = Mid Cycle Report 22 (Inspection/Activity Plan)
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II

Revision as of 13:37, 13 July 2019

Mid Cycle Report 22 (Inspection/Activity Plan)
ML062430055
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/31/2006
From:
NRC/RGN-II
To:
Shared Package
ML062430047 List:
References
Download: ML062430055 (2)


Text

Vogtle Inspection / Activity Plan 09/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:20:56 Report 22 3 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/18/2006 09/22/2006 1, 2 71151 IP Performance Indicator Verification 2 PB2TI169-MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1 EB3-ISI-UNIT 1 INSERVICE INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1 7111108P IP Inservice Inspection Activities - PWR 1 EB3TI150-2515/150 UNIT 1: RPV & VHP NOZZLES Safety Issues 10/02/2006 10/06/2006 1 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 2 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/02/2006 10/06/2006 1, 2 71151 IP Performance Indicator Verification 1 EB3SGISI-UNIT 1 STEAM GENERATOR ISI Baseline Inspections 10/10/2006 10/13/2006 1 7111108P IP Inservice Inspection Activities - PWR 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 10/15/2006 10/20/2006 1 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02

]4 PB2-PI&R-BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/12/2007 02/16/2007 1, 2 71152B IP Identification and Resolution of Problems 3 EB1-MODS-MODIFICATIONS - 10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111117B IP Permanent Plant Modifications 1 EB3-ISI-UNIT 2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-UNIT 2 STEAM GENERATOR ISI Baseline Inspections 03/19/2007 03/23/2007 2 7111108P IP Inservice Inspection Activities - PWR 2 EB3TI150-2515/150 UNIT 2: RPV & VHP NOZZLES Safety Issues 03/19/2007 03/23/2007 2 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 PS2-EP-EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111402 IP A lert and Notification System Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Vogtle Inspection / Activity Plan 09/01/2006

-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:20:56 Report 22 1 PS2-EP-EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/19/2007 03/23/2007 1, 2 71151 IP Performance Indicator Verification 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 04/01/2007 04/06/2007 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02

]5 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/23/2007 04/27/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111121 IP Component Design Bases Inspection 1 PSB1-RP-RP PUBLIC PRE-INSPECTION VISIT Baseline Inspections 07/16/2007 07/18/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 3 OL PREP-INITIAL EXAM PREPARATION Not Applicable 07/16/2007 07/20/2007 1 V23264 VOGTLE/AUGUST 2007 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM Not Applicable 08/06/2007 08/17/2007 1 V23264 VOGTLE/AUGUST 2007 EXAM AT POWER FACILITIES 4 PSB1-RP-RP PUBLIC BASELINE INSPECTION Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification 5 EB2-TFP-TRIENNIAL FIRE PROTECTION - INFO TRIP Baseline Inspections 09/11/2007 09/13/2007 1, 2 7111105T IP Fire Protection [Triennial]

2 OL RQ-REQUALIFICATION INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111111B IP Licensed Operator Requalification Program 5 EB2-TFP-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111105T IP Fire Protection [Triennial]

1 EB3-HS-HEAT SINK INSPECTION Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111107B IP Heat Sink Performance 1 EB3-ISI-UNIT 1 INSERVICE INSPECTION Baseline Inspections 03/17/2008 03/21/2008 1 7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.