Vogtle Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:20:56 Report 22 3
PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 1 Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/18/2006 09/22/2006 1, 2 71151 IP Performance Indicator Verification 2
PB2TI169
- MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1
EB3-ISI
- UNIT 1 INSERVICE INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3TI150
- 2515/150 UNIT 1: RPV & VHP NOZZLES Safety Issues 10/02/2006 10/06/2006 1
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 2 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK 2 Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/02/2006 10/06/2006 1, 2 71151 IP Performance Indicator Verification 1
EB3SGISI
- UNIT 1 STEAM GENERATOR ISI Baseline Inspections 10/10/2006 10/13/2006 1
7111108P IP Inservice Inspection Activities - PWR 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Safety Issues 10/15/2006 10/20/2006 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
4 PB2-PI&R
- BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/12/2007 02/16/2007 1, 2 71152B IP Identification and Resolution of Problems 3
EB1-MODS
- MODIFICATIONS - 10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111117B IP Permanent Plant Modifications 1
EB3-ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 03/19/2007 03/23/2007 2
7111108P IP Inservice Inspection Activities - PWR 2
EB3TI150
- 2515/150 UNIT 2: RPV & VHP NOZZLES Safety Issues 03/19/2007 03/23/2007 2
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 PS2-EP
- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Vogtle Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:20:56 Report 22 1
PS2-EP
- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/19/2007 03/23/2007 1, 2 71151 IP Performance Indicator Verification 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 04/01/2007 04/06/2007 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
5 EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/23/2007 04/27/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111121 IP Component Design Bases Inspection 1
PSB1-RP
- RP PUBLIC PRE-INSPECTION VISIT Baseline Inspections 07/16/2007 07/18/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 3
OL PREP
- INITIAL EXAM PREPARATION Not Applicable 07/16/2007 07/20/2007 1
V23264 VOGTLE/AUGUST 2007 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM Not Applicable 08/06/2007 08/17/2007 1
V23264 VOGTLE/AUGUST 2007 EXAM AT POWER FACILITIES 4
PSB1-RP
- RP PUBLIC BASELINE INSPECTION Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION - INFO TRIP Baseline Inspections 09/11/2007 09/13/2007 1, 2 7111105T IP Fire Protection [Triennial]
- REQUALIFICATION INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111111B IP Licensed Operator Requalification Program 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111105T IP Fire Protection [Triennial]
1 EB3-HS
- HEAT SINK INSPECTION Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111107B IP Heat Sink Performance 1
EB3-ISI
- UNIT 1 INSERVICE INSPECTION Baseline Inspections 03/17/2008 03/21/2008 1
7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.