|
|
Line 3: |
Line 3: |
| | issue date = 12/05/2006 | | | issue date = 12/05/2006 |
| | title = LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access | | | title = LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access |
| | author name = Stinson L M | | | author name = Stinson L |
| | author affiliation = Southern Nuclear Operating Co, Inc | | | author affiliation = Southern Nuclear Operating Co, Inc |
| | addressee name = | | | addressee name = |
Similar Documents at Hatch |
---|
Category:Letter type:NL
MONTHYEARNL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 2024-07-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEARNL-20-0230, Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2020-03-0202 March 2020 Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) 05000366/LER-2020-0012020-03-0202 March 2020 LER 2020-001-00 for Edwin I. Hatch Nuclear Plant, Unit 2, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) 05000321/LER-2017-0042017-08-24024 August 2017 Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications, LER 17-004-00 for Edwin I. Hatch Regarding Safety Relief Valves' as Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria 05000366/LER-2017-0022017-04-13013 April 2017 Emergency Diesel Generator Start Due to Inadvertent Electrical Bus De-Energization, LER 17-002-00 for Edwin I. Hatch, Unit 2, Regarding Emergency Diesel Generator Start Due to Inadvertent Electrical Bus De-Energization 05000366/LER-2017-0032017-04-13013 April 2017 LER 17-003-00 for Edwin I. Hatch, Unit 2, Regarding Primary Containment Isolation Penetration Exceeded Overall Allowable Technical Specification Leakage Limits 05000321/LER-2017-0022017-04-0707 April 2017 High Pressure Coolant Injection System Declared Inoperable Due to Degraded Inverter, LER 17-002-00 for Edwin I. Hatch, Unit 1, Regarding High Pressure Coolant Injection System Declared Inoperable Due to Degraded Inverter 05000366/LER-2016-0042017-01-0303 January 2017 Condition Prohibited by Technical Specifications Due to Inoperable PCIV, LER 16-004-00 for Edwin I. Hatch Nuclear Plant, Unit 2, Regarding Condition Prohibited by Technical Specifications Due to Inoperable PCIV 05000366/LER-2016-0022016-07-13013 July 2016 Group I Isolation Received During Turbine Testing, LER 16-002-00 for Edwin I. Hatch, Unit 2, Regarding Group 1 Isolation Received During Turbine Testing 05000366/LER-2016-0012016-06-0808 June 2016 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability, LER 16-001-00 for E.I. Hatch, Unit 2, Regarding 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability 05000321/LER-2016-0042016-05-26026 May 2016 Safety Relief Valves As Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria, LER 16-004-00 for Edwin I. Hatch Nuclear Plant Unit 1 RE: Safety Relief Valves as Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria 05000321/LER-2016-0032016-04-14014 April 2016 Reactor Coolant System Piping Has Unacceptable Weld Indication Discovered During Refueling Outage, LER 16-003-00 for E.I. Hatch, Unit 1, Regarding Reactor Coolant System Piping Has Unacceptable Weld Indication Discovered During Refueling Outage 05000321/LER-2016-0022016-04-11011 April 2016 Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment, LER 16-002-00 for E.I Hatch, Unit 1, Regarding Performance of Operations With the Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment 05000321/LER-2016-0012016-04-0808 April 2016 Performance of Fuel Movement with Inoperable Rod Position Indication System in Violation of Technical Specifications, LER 16-001-00 for Edwin I. Hatch, Unit 1, Regarding Performance of Fuel Movement With Inoperable Rod Position Indication System in Violation of Technical Specifications NL-08-1906, LER 08-S01-00, for Edwin I. Hatch, Failure to Report Arrest Results in Inappropriate Access to Protected and Vital Areas2008-12-19019 December 2008 LER 08-S01-00, for Edwin I. Hatch, Failure to Report Arrest Results in Inappropriate Access to Protected and Vital Areas ML1019404552008-05-0808 May 2008 Southern Nuclear Plant E. I. Hatch - Actions for Potential Groundwater Contamination Events NL-06-2726, LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access2006-12-0505 December 2006 LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access ML17252B4401976-04-15015 April 1976 LER 76-026-00 for Hatch, Unit 1 Regarding an Occurrence of Open Links in Panel H11-P601 Defeating the Starting of All RHR Pumps After They Had Been Stopped 2020-03-02
[Table view] |
Text
L M. Stinson (Mike) Southern Nuclear Vice President Operating Company, Inc. 40 lnverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel205.992.5181 Fax 205.992.0341 December 5, 2006 Energy to Sewe Your World' Docket Nos.: 50-321 50-366 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Licensee Event Report 1 -2006-SO1 Contract Employee Failure to Self-Disclose Material Information for Unescorted Access Ladies and Gentlemen: In accordance with the requirements of 10 CFR 50.73, Southern Nuclear Operating Company hereby submits an Edwin I. Hatch Nuclear Plant licensee event report for a condition that was determined to be reportable on October 1 1,2006. This letter contains no NRC commitments.
If you have any questions, please advise.
Sincerely, &MA L. M. Stinson
Enclosures:
LER 1 -2006-SO1 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, General Manager - Plant Hatch RTYPE: CHA02.004 U. S. Nuclear Rewlatorv Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch Enclosure Edwin I. Hatch Nuclear Plant Licensee Event Report 1 -2006-SO 1 Contract Employee Failure to Self-Disclose Material Information for Unescorted Access timated burden per response to comply with this mandatory collection request: hours. Reported lessons learned are incorporated into the licensing process d fed back to industry. Send comments regarding burden estimate to the LICENSEE EVENT REPORT (LER) cords and FOlAlPrivacy Service Branch (T-5 F52), U.S. Nuclear Regulatory mmission, Washington, DC 205554001, or by internet e-mail to ollects@nn.gov, and to the Desk Officer, Office of Information and 31504104), Office of Management and means used to impose an information (See reverse for required number of y valid OMB control number, the NRC may digitstcharacters for each block) n is not required to respond to, the On October 1 1,2006 at approximately 1725 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.563625e-4 months <br /> (EDST), Southern Nuclear Operating Company (SNC) determined that a contract employee failed to self-disclose material information in applying for unescorted access. The contract employee had been charged with aggravated assault on June 26,2005 but failed to self-disclose this information prior to being granted unescorted access to Hatch Nuclear Plant (HNP) in February 2006.
The subject contract employee had been badged at another nuclear plant less than 365 days before arriving at HNP and was not due for a background reinvestigation, which would have included a criminal history check. Based on the requisite Reinstatement review and issuance of a Certificate of Reliability, the contract employee was granted unescorted access at HNP from February 02,2006 to February 25,2006. A detailed investigation by SNC Nuclear Fleet Security was performed on October 1 1,2006 and determined that the contract employee failed to disclose the assault charge. Had this information been disclosed during the background screening process, unescorted access would not have been granted.
A) REQUIREMENT FOR REPORT The report is submitted pursuant to 10 CFR 73.7 1 Section (b)(l) and Appendix G(I)(b). B) UNIT STATUS AT TIME OF EVENT At the time of this event, Unit 1 was in Mode 1 at 99.8 % rated thermal power and Unit 2 was in Mode 1 at 99.7
% rated thermal power.
C) DESCRIPTION OF EVENT Personnel access authorization activities for Hatch Nuclear Plant (HNP) are performed by Southern Nuclear Operating Company (SNC) Nuclear Fleet Security located in Birmingham, Alabama. As part of the background investigation, a Personnel History Questionnaire (PHQ) must be completed by an individual applying for an unescorted access authorization (UAA). The PHQ requires the individual to list any criminal charges pending. All individuals granted UAA are also made aware of their continuing reporting responsibility through the "Plant Access Training" program. A contract employee, charged with aggravated assault on June 26,2005, failed to self-disclose this information prior to being granted unescorted access (UA) to HNP in February 2006. The subject contract employee completed a PHQ and signed a SNC background investigation consent form on January 25,2006. Since the subject contract employee had been badged at another nuclear plant less than 365 days before arriving at HNP, he was not due for a background reinvestigation, which would have included a criminal history check. Rather, the approved, UAA self-screening contractor performed the background screening for reinstatement, and issued SNC a Certificate of Reliability on February 02,2006, certifying the individual met the UAA Reinstatement requirements.
Upon review by SNC Nuclear Fleet Security, the individual was granted UAA on February 02,2006, and HNP site Security granted UA on February 02,2006 to February 25,2006. On October 11,2006, Turkey Point security personnel discovered that the subject contract employee had not self-disclosed material information regarding his assault charge prior to having UA to three nuclear facilities, two of which were SNC's HNP and Vogtle Electric Generating Plant.
In turn, SNC Nuclear Fleet Security conducted a detailed investigation on October 11,2006 and determined that the subject contract employee failed, at both SNC nuclear facilities, to disclose the charge.
Had this information been disclosed during the background screening process, UA to SNC's sites would not have been granted. At approximately 1725 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.563625e-4 months <br /> (EDST), on October 1 1,2006, SNC Nuclear Fleet Security contacted HNP site Security regarding the failure of the subject contract employee to self-disclose the material information.
A one-hour telephone notification to the NRC was made on October 1 1,2006 at D. CAUSE OF EVENT The contract employee failed to disclose the criminal charge in order to gain UA. A review of SNC's and its approved contractor's access authorization process concluded that requirements and established processes were followed regarding the granting of authorization for UA in this case. The cause of this event was the omission or falsification of material information by the contract employee. E. ANALYSIS OF EVENT Based on investigation of this event, no plant equipment or systems were harmed due to the failure of the contract employee to self-disclose the charge. During the time the contract employee had UA, no aberrant behavior was observed.
There was no safety significance associated with this event, as there were no releases of radioactive materials, no personnel injuries, and no reportable equipment or system failures resulting from this event. F. CORRECTIVE ACTIONS The subject individual has been denied UA at all SNC nuclear plants and has been identified in the shared, industry-sponsored Personnel Access Data System (PADS). G. ADDITIONAL INFORMATION Since this event involved the action of an individual applicant, previous corrective actions involving individual employees would not have prevented this event.
A review of plant documentation revealed no previous similar events occurred in the past 3 years. This event is not considered reportable under the Equipment Performance and Information Exchange