ML11256A210: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/13/2011
| issue date = 09/13/2011
| title = PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
| title = PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
| author name = Post J K, Repka D A
| author name = Post J, Repka D
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| addressee name = Abramson P B, Karlin A S, Trikouros N G
| addressee name = Abramson P, Karlin A, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000275, 05000323
| docket = 05000275, 05000323

Revision as of 09:16, 29 June 2019

PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
ML11256A210
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/13/2011
From: Post J, Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21001, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML11256A210 (3)


Text

September 13, 2011 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel

U.S. Nuclear Regulatory Commission Two White Flint North

11545 Rockville Pike Mail Stop: T-3F23

Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Status Report

Dear Administrative Judges:

As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP.

See Attached Schedule. PG&E appreciates that, in the absence of definite dates for completing the milestones related to the seismic studies, the Licensing Board is unable to establish a meaningful adjudicatory schedule pursuant to 10 C.F.R. § 2.332(c). For this reason, PG&E will continue to provide specific dates in the monthly reports to the extent practi cable, recognizing that these dates will be modified as more accurate information becomes available.

PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process. For example, PG&E is working with the relevant State and federal agencies to accelerate efforts to obtain permits needed to complete the 3D seismic studies.

While PG&E expects the seismic studies to be completed and a report issued no later than December 2015, any actual delay to this proceeding may be less than the 52 months referenced in the June 7, 2011 Order.

Executed in accord with 10 CFR 2.304(d),

/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company

77 Beale St., B30A

San Francisco, CA 94105

(415) 973-9809 jklm@pge.com

/s/ signed electronically by David A. Repka Winston & Strawn LLP

1700 K Street, NW

Washington, DC 20006

(202) 282-5726

drepka@winston.com

cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)

Pacific Gas and Electric Company Best Estimate Schedule for Seismi c Studies as of September 1, 2011 Description of Activity Date Shoreline Fault Submit Final Report to the NRC January 2011 (a) NRC Review Complete December 2011 Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands Commission (CSLC)

May 6, 2011 (a) Permits Issued November 2011 Installation Complete December 2011 2D/3D Low Energy Marine Studies Permits Issued N/A Surveys Complete(b) December 2011 Seismic Data Processing Including Preliminary Report June 2012 2D Onshore High Energy Studies Permit Pre-Application Meeting May 4, 2011 (a) Use Permits Issued Not Required Surveys Complete December 2011 Seismic Data Processing/Preliminary Report June 2012 3D High Energy Marine Studies Permit Application Submitted to California State Lands Commission April 29, 2011 (a) CSLC Environmental Impact Report (EIR) Scoping Meeting July 21, 2011(a) Permits Issued August 2012 Surveys Complete December 2012 Preliminary Evaluation April 2013 Issue Final Seismic Report August 2013 CZMA or Coastal Consistency File Coastal Development Permit April 2013 Coastal Consistency Issued December 2014 Note: (a) - Actual Date Completed (b) - Activity is in Progress SF:316175.1