IR 05000255/2017301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/26/2017
| issue date = 04/26/2017
| title = NRC Initial License Examination Report 05000255/2017301 (Rdb)
| title = NRC Initial License Examination Report 05000255/2017301 (Rdb)
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Arnone C
| addressee name = Arnone C
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:April 26, 2017
-4352 April 26, 2017 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, In Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043
 
-9530 SUBJECT: PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/201 7301 Dear Mr. Arnone
==SUBJECT:==
PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/201 7301  
 
Dear Mr. Arnone
: On March 13, 201 7 , the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Palisades Nuclear Plan The enclosed report documents the results of those examination Preliminary observations noted during the examination process were discussed on February 22, 201 7 , with you and other members of your staff
: On March 13, 201 7 , the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Palisades Nuclear Plan The enclosed report documents the results of those examination Preliminary observations noted during the examination process were discussed on February 22, 201 7 , with you and other members of your staff
. An exit meeting was conducted by telephone on March 16, 201 7 , between M W. Nelson, Training Manager, and Mr. R. Baker, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicant During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolutio The NRC examiners administered an initial license examination operating test during t he wee ks of February 1 3 and February 20, 201 The written examination was administered by the NRC, with the assistance of the Palisades Nuclear Plant Training Department personnel , on February 21, 201 A total of eight Senior Reactor Operator (SRO) and two Reactor Operator (RO) applicants were administered license examination The results of the examinations were finalized on April 1 1, 201 One of the SRO applicants failed a portion of the operating test and was issued a proposed license denial lette The remaining seven SRO and two RO applicants passed all sections of their respective examinations and were issued applicable Licenses
. An exit meeting was conducted by telephone on March 16, 201 7 , between M W. Nelson, Training Manager, and Mr. R. Baker, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicant During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolutio The NRC examiners administered an initial license examination operating test during t he wee ks of February 1 3 and February 20, 201 The written examination was administered by the NRC, with the assistance of the Palisades Nuclear Plant Training Department personnel , on February 21, 201 A total of eight Senior Reactor Operator (SRO) and two Reactor Operator (RO) applicants were administered license examination The results of the examinations were finalized on April 1 1, 201 One of the SRO applicants failed a portion of the operating test and was issued a proposed license denial lette The remaining seven SRO and two RO applicants passed all sections of their respective examinations and were issued applicable Licenses
Line 30: Line 33:
Sincerely,
Sincerely,
/RA/
/RA/
Robert J. Orlikowski , Chief Operations Branch Division of Reactor Safety Docket No. 50
Robert J. Orlikowski , Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 Enclosure s: 1. OL Examination Report 05000 255/20 1 7301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV W. Nelson, Training Manager , Palisades Nuclear Plant
-255 License No. DPR
-20 Enclosure s: 1. OL Examination Report 05000 255/20 1 7301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV W. Nelson, Training Manager , Palisades Nuclear Plant


C. Arnone -3- Letter to Charles Arnone from Robert J. Orlikowski dated April 26, 2017 SUBJECT: PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/2017301 DISTRIBUTION
C. Arnone -3- Letter to Charles Arnone from Robert J. Orlikowski dated April 26, 2017 SUBJECT: PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/2017301 DISTRIBUTION
Line 76: Line 77:
: (1) Written Examination During the validation of the written examination, several questions were modified or replaced. All changes made to the written examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented on Form ES-401-9, "Written Examination Review Worksheet."
: (1) Written Examination During the validation of the written examination, several questions were modified or replaced. All changes made to the written examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented on Form ES-401-9, "Written Examination Review Worksheet."


The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examination s , will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months.  (ADAMS Accession Numbers ML17037C873, ML17037C879, ML17037C881, and ML17037C8 72, respectively.) On March 13, 201 7 , the licensee submitted documentation noting that there were no post-examination commen ts for consideration by the NRC examiners when grading the written examination.
The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examination s , will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months.  (ADAMS Accession Numbers ML17037C873, ML17037C879, ML17037C881, and ML17037C872, respectively.) On March 13, 201 7 , the licensee submitted documentation noting that there were no post-examination commen ts for consideration by the NRC examiners when grading the written examination.


The NRC examiners graded the written examination on March 1 5 , 201 7 , and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
The NRC examiners graded the written examination on March 1 5 , 201 7 , and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
Line 82: Line 83:
4
4
: (2) Operating Test During the validation of the operating test, modifications were made to several JPMs, and some modifications were made to the dynamic simulator scenarios. All changes made to the operating test were made in accordance with NUREG
: (2) Operating Test During the validation of the operating test, modifications were made to several JPMs, and some modifications were made to the dynamic simulator scenarios. All changes made to the operating test were made in accordance with NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented in a document titled, "Operating Test Comments,"  The "Operating Test Comments" document, the operating test outlines (ES 1 , ES-301-2, and ES-D-1s), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months.  (ADAMS Accession Numbers ML17037C873 , ML17037C879, ML17037C881, and ML1 7037C872 respectively.
-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented in a document titled, "Operating Test Comments,"  The "Operating Test Comments" document, the operating test outlines (ES 1 , ES-301-2, and ES-D-1s), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months.  (ADAMS Accession Numbers ML17037C873 , ML17037C879, ML17037C881, and ML17037C872 respectively.


) During the administration of the walk
) During the administration of the walk

Revision as of 15:03, 19 June 2019

NRC Initial License Examination Report 05000255/2017301 (Rdb)
ML17116A589
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/26/2017
From: Robert Orlikowski
Operations Branch III
To: Arnone C
Entergy Nuclear Operations
Shared Package
ML17037C875 List:
References
ER 2017301
Download: ML17116A589 (11)


Text

April 26, 2017

SUBJECT:

PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/201 7301

Dear Mr. Arnone

On March 13, 201 7 , the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Palisades Nuclear Plan The enclosed report documents the results of those examination Preliminary observations noted during the examination process were discussed on February 22, 201 7 , with you and other members of your staff

. An exit meeting was conducted by telephone on March 16, 201 7 , between M W. Nelson, Training Manager, and Mr. R. Baker, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicant During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolutio The NRC examiners administered an initial license examination operating test during t he wee ks of February 1 3 and February 20, 201 The written examination was administered by the NRC, with the assistance of the Palisades Nuclear Plant Training Department personnel , on February 21, 201 A total of eight Senior Reactor Operator (SRO) and two Reactor Operator (RO) applicants were administered license examination The results of the examinations were finalized on April 1 1, 201 One of the SRO applicants failed a portion of the operating test and was issued a proposed license denial lette The remaining seven SRO and two RO applicants passed all sections of their respective examinations and were issued applicable Licenses

. The written examination and operating tests, as well as other related written examination and operating test documentation, will be withheld from public disclosure for 24 month However, because one of your applicants failed a portion of the job performance measure (JPM) section of the operating test, the applicant has have been provided a cop y of that portion of the tes You should consider that portion of the JPM section of the operating test as publicly availabl In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection

C. Arnone -2- in the NRC's Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski , Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 Enclosure s: 1. OL Examination Report 05000 255/20 1 7301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV W. Nelson, Training Manager , Palisades Nuclear Plant

C. Arnone -3- Letter to Charles Arnone from Robert J. Orlikowski dated April 26, 2017 SUBJECT: PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION REPORT 05000255/2017301 DISTRIBUTION

Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado

Colleen Schmidt

ADAMS Accession Number: ML17116A589 OFFICE RIII RIII RIII RIII NAME RBaker:jw ROrlikowski DATE 04/26/17 04/26/17 OFFICIAL RECORD COPY

Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Docket No:

5 0-25 5 License N o: DPR-20 Report No:

05000 255/201 7 301 Licensee: Entergy Nuclear Operations, In Facility: Palisades Nuclear Plant Location: Covert, MI Dates: February 13 through March 13, 2017 Inspectors:

R. Baker, Operations Engineer, Chief Examiner R. K. Walton, Senior Operations Engineer, Examiner J. Kellum, Senior Reactor Engineer, Examiner B. Bergeon, Operations Engineer, Examiner Certification Approved by:

R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2

SUMMARY

Examination

Report 0500 0255/201 7 301; 0 2/1 3/201 7 - 0 3/13/2017; Entergy Nuclear Operations, Inc.; Palisades Nuclear Plant; Initial License Examination Report.

The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Examination Summary Eight Senior Reactor Operator (SRO) and two Reactor Operator (RO) applicants were administered license examinations. One SRO applican t failed a portion of the operating test and was issued a proposed license denial letter. The remaining seven SRO and two RO applicants were issued Licenses. (Section 4OA5.1).

3

REPORT DETAILS

4OA5 Other Activities

.1 Initial Licensing Examinations

a. Examination Scope

The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensee's staff used the guidance prescribed in NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, to develop, validate, administer, and grade the written examination and operating test. NRC examiners prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination

, with the assistance of members of the facility licensee's staff, during the week of January 1 6, 201 7. During the on

-site validation week, the examiners audited all of the license applicatio ns for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures (JPMs) and dynamic simulator scenarios, during the period of February 13 through February 22 , 201 7. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the written examination on February 21, 2017.

b. Findings

(1) Written Examination During the validation of the written examination, several questions were modified or replaced. All changes made to the written examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented on Form ES-401-9, "Written Examination Review Worksheet."

The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examination s , will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months. (ADAMS Accession Numbers ML17037C873, ML17037C879, ML17037C881, and ML17037C872, respectively.) On March 13, 201 7 , the licensee submitted documentation noting that there were no post-examination commen ts for consideration by the NRC examiners when grading the written examination.

The NRC examiners graded the written examination on March 1 5 , 201 7 , and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

4

(2) Operating Test During the validation of the operating test, modifications were made to several JPMs, and some modifications were made to the dynamic simulator scenarios. All changes made to the operating test were made in accordance with NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented in a document titled, "Operating Test Comments," The "Operating Test Comments" document, the operating test outlines (ES 1 , ES-301-2, and ES-D-1s), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months. (ADAMS Accession Numbers ML17037C873 , ML17037C879, ML17037C881, and ML17037C872 respectively.

) During the administration of the walk

-through portion of the operating test, one of the senior reactor operator (SRO) administrative JPMs required the use of an administrative procedure which contained inaccurate information. Use of the inaccurate information resulted in the applicants' inability to successfully complete the task standard. Although the applicants did not accomplish the task standard, the applicant's performance was judged to be satisfactory for this JPM because follow-up questioning revealed that the failure was caused by the deficiency in Administrative Procedure 4.11, "Safety Function Determination Program,"

a factor beyond applicant's control, as annotated above. The facility has placed the procedural issue into their corrective action program , as document CR

-PLP-2017-00652, dated February 23, 2017, for resolution.

The NRC examiners completed operating test grading on April 11, 201 7.

(3) Examination Results The eight applicants at the SRO level and the two applicants at the reactor operator (RO) level were administered written examinations and operating tests.

One SRO applicant failed a portion of the operating test and was issued a proposed license denial letter. The remaining seven SRO and two RO applicants passed all portions of their examinations and were issued their respective operating licenses on April 1 1, 201 7.

.2 Examination Security

a. Scope

The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests.

" The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors

," to determine acceptability of the licensee

's examination security activities.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Debrief The chief examiner presented the examination team's preliminary observations and findings on

February 22, 201 7 , to Mr. C. Arnone , Site Vice President

, and other members of the Palisades Operations and Training Department staff.

.2 Exit Meeting

The chief examiner conducted an exit meeting on March 16, 201 7 , with Mr. W. Nelson , Training Manager , by telephone. The NRC confirmed there were no post

-examination comments. The chief examiner confirmed that n o proprietary or sensitive information was identified during the examination or debrief/exit meetings.

It was also confirmed that although the written examination, operating tests

, outlines, and other related documentation, will be withheld from public disclosure for 24 months, since one of your applicants failed a portion of the JPM section of the operating test, the applicant had been provided a copy of that portion of the test. The licensee should consider that portion of the operating test as publicly available.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC

T Licensee

C. Arnone, Site Vice President
B. Baker, Operations Manager

- Shift

T. Davis, Regulatory Assurance
W. Nelson, Training Manager
F. Korfius, Operations Training Supervisor
V. Moceri, Operations Support Staff
S. Botimer, Initial License Examination Author

U.S. Nuclear Regulatory Commission

A. Nguyen, Senior Resident Inspector
R. Baker, Chief Examiner

ITEMS OPENED, CLOSED, AND DISCUSSE

D Opened, Closed, and Discussed

None

LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Admin 4.11

Safety Function Determination Program
Revision 6

CR-PLP-2017-00652; During the 2017 LOI examination operating test , a potential interpretation issue with use of Administrative Procedure 4.11, Attachment 2, Support

/ Supported LCO Listing, arose

Dated February 23, 2017

LIST OF ACRONYMS USE

D ADAMS Agencywide Document Access and Management System

JPM Job Performance Measure

NRC U.S. Nuclear Regulatory Commission

RO Reactor Operator

SRO Senior Reactor Operator

SIMULATION FACILITY

FIDELITY REPORT Facility Licensee:

Palisades Nuclear Plant

Facility Docket No:

50-255 Operating Tests Administered:

February 1 3 - February 2 2, 201 7 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non

-compliance with Title 10 of the Code of Federal Regulations, Section

55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations.

No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION