|
|
Line 3: |
Line 3: |
| | issue date = 07/17/2017 | | | issue date = 07/17/2017 |
| | title = NRC Form 536 Response to Regulatory Issue Summary 2017-03 | | | title = NRC Form 536 Response to Regulatory Issue Summary 2017-03 |
| | author name = Ellis D R | | | author name = Ellis D |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = | | | addressee name = |
|
---|
Category:Letter type:GNRO
MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] |
Text
Entergy Operations, Inc.P.o.Box 756PortGibson,Mississippi39150 David EllisActing-Regulatory Assurance ManagerGrandGulfNuclearStation Tel: 601-437-2489 GNRO-2017/00049July17,2017 u.s.Nuclear Regulatory Commission Attention:
DocumentControlDesk Washington,D.C.20555-0001
SUBJECT:
NRCForm536 Response to Regulatory Issue Summary 2017-03 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
DearSirorMadam:
EntergyOperations,Inc.inaccordancewithNRCRegulatoryIssueSummary(RIS)2017-03,"PreparationandSchedulingofOperatorLicensingExaminations,"issubmittingNRCForm536,"OperatorLicensingExaminationData,"toprovidethe estimated number of candidatestobe examined during calendaryears2019 through 2022.Theupdated informationforGrand Gulf Nuclear Station is providedinthe attachedNRCForm536.This information representsthebest estimate currently available.ThisisarevisionofGNRO2017/00041NRCForm536per discussion and requestofNRCRegionIVChief, Operations Branch.NoInitialLicense examinations are scheduledfor2018andtherearenonew commitments containedinthissubmittal.Ifyouhaveany questionsorrequire additional informationregardingthismatter,please contactMikeRaschat 601-437-2255.
Attachment:
cc:NRCForm536"Operator Licensing Examination Data"(SeeNextPage)
Entergy Operations, Inc.P.o.Box 756PortGibson,Mississippi39150 David EllisActing-Regulatory Assurance ManagerGrandGulfNuclearStation Tel: 601-437-2489 GNRO-2017/00049July17,2017 u.s.Nuclear Regulatory Commission Attention:
DocumentControlDesk Washington,D.C.20555-0001
SUBJECT:
NRCForm536 Response to Regulatory Issue Summary 2017-03 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
DearSirorMadam:
EntergyOperations,Inc.inaccordancewithNRCRegulatory IssueSummary(RIS)2017-03,"PreparationandSchedulingofOperatorLicensingExaminations,"issubmittingNRCForm536,"OperatorLicensingExaminationData,"toprovidethe estimated number of candidatestobe examined during calendaryears2019 through 2022.Theupdated informationforGrand Gulf Nuclear Station is providedinthe attachedNRCForm536.This information representsthebest estimate currently available.ThisisarevisionofGNRO2017/00041NRCForm536per discussion and requestofNRCRegionIVChief, Operations Branch.NoInitialLicense examinations are scheduledfor2018andtherearenonew commitments containedinthissubmittal.Ifyouhaveany questionsorrequire additional informationregardingthismatter,please contactMikeRaschat 601-437-2255.
Attachment:
cc:NRCForm536"Operator Licensing Examination Data"(SeeNextPage)
GNRO-2017/00049Page2of2 cc:NRCSeniorResidentInspectorGrandGulfNuclearStationPortGibson,MS39150U.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001U.S.NuclearRegulatoryCommissionATTN:Ms.Jennifer Bridges1600EastLamarBoulevardArlington,TX76011-4511Mr.VincentGaddyChief,OperationsBranchU.S.NuclearRegulatoryCommission1600EastLamarBoulevardArlington,TX76011-4511 GNRO-2017/00049Page2of2 cc:NRCSeniorResidentInspectorGrandGulfNuclearStationPortGibson,MS39150U.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001U.S.NuclearRegulatoryCommissionATTN:Ms.Jennifer Bridges1600EastLamarBoulevardArlington,TX76011-4511Mr.VincentGaddyChief,OperationsBranchU.S.NuclearRegulatoryCommission1600EastLamarBoulevardArlington,TX76011-4511 NRCFORM536U.S.NUCLEAR REGULATORY COMMISSION APPROVEDBYOMB: NO.3150-0131 EXPIRES: 10/31/2017 (05-2016)..Estimated burden per response to complywiththis voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This">>.information collection is used to plan budgets and resources for operator examinations.
Send00p OPERATOR LICENSING;.comments regarding burden estimatetothe FOIA, Privacy, and Information Collections Branch (T-5..0 F53), U.S.Nuclear Regulatory Commission, Washington, DC20555-0001,orbye-mailto 10 II: EXAMINATION DATA;Infocoliects.Resource@nrc.gov, andtothe Desk Officer, Office of Information and Regulatory Affairs,+" NEOB-10202, (3150-0131), Office of Management and BUdget, Washington, DC 20503.Ifa means........, used to impose an information collection does not display a currently valid OMB control number, the NRCmaynot conduct or sponsor,anda personisnot required to respondto,the information collection.
FACILITYNRCREGIONGRANDGULF NUCLEAR STATION Docket#50-416 IV L A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020CY2021 CY2022--------ESTIMATEDNUMBEROF LICENSEE-PREPARED 0 2 1 0 EXAMINATIONSESTIMATEDNUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBERCY2019 CY2020CY2021 CY2022---------NUMBEROFREACTOR 0 3/3 9 0 OPERATORSNUMBEROFSENIORREACTOR 0 10/10 3 0 OPERATORS-INSTANTNUMBEROFSENIORREACTOR 0 3/3 3 0 OPERATORS-UPGRADENUMBEROF SENIOR REACTOR 0 0 0 0OPERATORS-LIMITED PROPOSED DATESPRIMARYDATE 1/27/20&5/4/20 11/29/21ALTERNATEDATE 2/10/20&5/11/20 12/4/21 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE PROPOSED CY 2019 CY 2020 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATEDNUMBEROF 0 0 12 0 CANDIDATESNRCFORM536(05-2016)NRCFORM536U.S.NUCLEAR REGULATORY COMMISSION APPROVEDBYOMB: NO.3150-0131 EXPIRES: 10/31/2017 (05-2016)..Estimated burden per response to complywiththis voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This">>.information collection is used to plan budgets and resources for operator examinations.
Send00p OPERATOR LICENSING;.comments regarding burden estimatetothe FOIA, Privacy, and Information Collections Branch (T-5..0 F53), U.S.Nuclear Regulatory Commission, Washington, DC20555-0001,orbye-mailto 10 II: EXAMINATION DATA;Infocoliects.Resource@nrc.gov, andtothe Desk Officer, Office of Information and Regulatory Affairs,+" NEOB-10202, (3150-0131), Office of Management and BUdget, Washington, DC 20503.Ifa means........, used to impose an information collection does not display a currently valid OMB control number, the NRCmaynot conduct or sponsor,anda personisnot required to respondto,the information collection.
FACILITYNRCREGIONGRANDGULF NUCLEAR STATION Docket#50-416 IV L A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020CY2021 CY2022--------ESTIMATEDNUMBEROF LICENSEE-PREPARED 0 2 1 0 EXAMINATIONSESTIMATEDNUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBERCY2019 CY2020CY2021 CY2022---------NUMBEROFREACTOR 0 3/3 9 0 OPERATORSNUMBEROFSENIORREACTOR 0 10/10 3 0 OPERATORS-INSTANTNUMBEROFSENIORREACTOR 0 3/3 3 0 OPERATORS-UPGRADENUMBEROF SENIOR REACTOR 0 0 0 0OPERATORS-LIMITED PROPOSED DATESPRIMARYDATE 1/27/20&5/4/20 11/29/21ALTERNATEDATE 2/10/20&5/11/20 12/4/21 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE PROPOSED CY 2019 CY 2020 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATEDNUMBEROF 0 0 12 0 CANDIDATESNRCFORM536(05-2016)