| issue date = 04/03/2018 | | issue date = 04/03/2018 | ||
| title = Shine Operating License Pre-Application Meeting (Environmental Presentation Slides) | | title = Shine Operating License Pre-Application Meeting (Environmental Presentation Slides) | ||
| author name = Moser M | | author name = Moser M | ||
| author affiliation = NRC/NRR/DMLR/MENB | | author affiliation = NRC/NRR/DMLR/MENB | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000608 | | docket = 05000608 | ||
| license number = CPMIF-001 | | license number = CPMIF-001 | ||
| contact person = Moser M | | contact person = Moser M, NRR/DMLR, 415-6509 | ||
| document type = Slides and Viewgraphs | | document type = Slides and Viewgraphs | ||
| page count = 10 | | page count = 10 |
Revision as of 13:23, 17 June 2019
ML18096A455 | |
Person / Time | |
---|---|
Site: | SHINE Medical Technologies |
Issue date: | 04/03/2018 |
From: | Michelle Moser NRC/NRR/DMLR/MENB |
To: | |
Moser M, NRR/DMLR, 415-6509 | |
References | |
Download: ML18096A455 (10) | |
Text
Pre-application Meeting Regarding the SHINE Medical Technologies Operating License Application: EnvironmentalOffice of Nuclear Reactor RegulationU.S. Nuclear Regulatory CommissionApril 3, 2018 Agenda*Regulatory background
- Consideration of new information
- Best practices
- Format 2 Regulatory Background
- 10 CFR 51.95 (b) requires the NRC staff to prepare a supplemental environmental impact statement (EIS)
- The supplemental EIS will:
- update the prior staff review for the construction permit
- describe matters that differ or that reflect significant new information since publication of the final EIS
- The supplemental EIS does not need to include:*a discussion of matters that are the same or that have not changed since publication of the final EIS 3
Regulatory Background
- 10 CFR 51.53(b) requires an applicant to prepare an environmental report*The environmental report should:
- discuss matters that differ or that reflect new information since publication of the final EIS*The environmental report does not need to include:*a discussion of matters that are the same or that have not changed 4
Consideration of New or Different Information
- The applicant should consider all matters described in: *10 CFR 51.45, 51.51, and 51.52*Interim Staff Guidance Augmenting NUREG
-1537, Chapter 19, "Environmental Report."
- The level of detail for each new or different matter should:
- be similar to the level of detail in the construction permit final EIS*be commensurate with the likelihood of impacts, especially in situations where new or different information could lead to a different conclusion 5
Consideration of New or Different Information
- Changes to the facility design that could affect the environment, for example:
- building footprint
- excavation depth
- stack height
- construction activities that could affect operations or decommissioning
- Changes to facility operation that could affect the environment, for example:
- number of workers
- new or revised production activities that could change air emissions or dose exposures 6
Consideration of New or Different Information
- Changes to the natural or physical environment, for example:
- clearing or grading on site
- new activities or facilities surrounding the site
- threatened or endangered species listed or new cultural resource identified since publication of the final EIS*change in air quality designation
- Changes to the regulatory environment, for example:
- new permits required
- new air quality regulations issued
- New environmental information or studies, for example:
- new environmental studies conducted by the applicant or another organization 7
Best Practices
- Request pre
-application meetings with the NRC staff
- If no change has occurred, provide a brief basis for that conclusion, such as:
- no new regulations published
- no change to the building design
- no change in the physical or natural environment on and surrounding the site
- Include copies of correspondence with any Federal, State, or local agencies since publication of the final EIS 8 Format*Length of environmental report and supplemental EIS commensurate with the number and extent of changes.
- Following a similar format of the previous environmental report may help to ensure completeness, consistency, and accuracy.9 Discussion