ML18081A074: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18081A074
| number = ML18081A074
| issue date = 05/07/2018
| issue date = 05/07/2018
| title = Duane Arnold Energy Center - Correction of Error to Implementation Date Associated with License Amendment No 303
| title = Energy Center - Correction of Error to Implementation Date Associated with License Amendment No 303
| author name = Chawla M L
| author name = Chawla M L
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII

Revision as of 14:57, 5 April 2019

Energy Center - Correction of Error to Implementation Date Associated with License Amendment No 303
ML18081A074
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/07/2018
From: Chawla M L
Plant Licensing Branch III
To: Dean Curtland
NextEra Energy Duane Arnold
Haskell R S
References
CAC MF9494, EPID L-2017-LLA-0190
Download: ML18081A074 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Dean Curtland NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 WASHINGTON, D.C. 20555-0001 May 7, 2018

SUBJECT:

CORRECTION LETTER: DUANE ARNOLD ENERGY CENTER -ISSUANCE OF LICENSE AMENDMENT NO. 303 RE: REVISION TO TECHNICAL SPECIFICATION TABLE 3.3.2.1-1, CONTROL ROD BLOCK INSTRUMENTATION (CAC NO. MF9494, EPID L-2017-LLA-0190)

Dear Mr. Curtland:

By letter dated March 7, 2018, 1 the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 303 to Renewed Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC). The license amendment request (LAR) revised technical specification (TS) Table 3.3.2.1-1, "Control Rod Block Instrumentation." The revised TS relocates specific minimum critical power ratio (MCPR) values specified in footnotes (a) through (e) for Function 1, Rod Block Monitor, from TS Table 3.3.2.1-1 to the DAEC core operating limits report (COLR). It also corrected a typographical error and added TS requirement item a.4 to the DAEC TS 5.6.5, COLR, which addresses the relocation of the MCPR values. Shortly following a post-issuance review by a member of your staff, the NRC project manager assigned to DAEC, was informed that the implementation requirement included in the amendment does not align with what NextEra requested in the LAR dated March 24, 2017 2* Specifically, the 180 days the NRC granted for implementation of the amended change does not meet DAEC's schedule to complete the next Core Operating Limits Report (COLR). The following corrected implementation requirement is included in the enclosure to this letter: 3. This license amendment is effective as of its date of issuance and shall be implemented by September 27, 2018. The guidance in SECY-96-238 allows for use of an administrative letter to correct an error provided that: 1) the error was introduced inadvertently in a particular license amendment, and 2) the erroneous change was not addressed in the notice to the public nor reviewed by the NRC staff. The NRC staff determined that the error occurred when the licensee's requested implementation date was not correctly included in the amendment issuance package. This satisfies the first requirement.

The incorrect implementation date was not included in the original submittal, was not identified in the notice on the amendment published in the Federal Register (82 FR 23627, dated May 23, 2017), and was not the subject of any specific part of the staffs safety evaluation that was issued with the license amendment.

This satisfies the second requirement.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18011A059.

2 ADAMS Accession No. ML 17086A442.

D. Curtland Based on our review, as set forth above, we have determined that the use of a letter to correct the typographical error is acceptable.

Additionally, a corrected Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. If you have any questions regarding this matter, please contact me at (301) 415-8371.

Docket No. 50-331

Enclosure:

Sincerely, Mahesh Chawl , Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected DAEC license amendment authorization pages associated with License Amendment No. 303 cc: ListServ w/enclosure

/4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NEXTERA ENERGY DUANE ARNOLD, LLC DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 303 Renewed License No. DPR-49 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by NextEra Energy Duane Arnold, LLC dated March 24, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-49 is hereby amended to read as follows: (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 303, are hereby incorporated in the license. NextEra Energy Duane Arnold, LLC shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented by September 27, 2018.

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance:

March 7, 2018 FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By: David J. Wrona David J. Wrona, Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation D. Curtland

SUBJECT:

CORRECTION LETTER: DUANE ARNOLD ENERGY CENTER -ISSUANCE OF LICENSE AMENDMENT NO. 303 RE: REVISION TO TECHNICAL SPECIFICATION TABLE 3.3.2.1-1, CONTROL ROD BLOCK INSTRUMENTATION (CAC NO. MF9494, EPID L-2017-LLA-0190)

DATED MAY 7, 2018 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsRgn3MailCenter Resource RidsNrrPMDuaneArnold Resource RidsNrrLASRohrer Resource ADAMS Accession No.: ML 18081A074 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME RHaskell SRohrer DATE 4/5/2018 4/5/2018 NRR/DORL/LPL3/BC DWrona 5/7/2018 OFFICIAL RECORD COPY NRR/DORL/LPL3/PM MChawla (RHaskell for) 5/7/2018 UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Dean Curtland NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 WASHINGTON, D.C. 20555-0001 May 7, 2018

SUBJECT:

CORRECTION LETTER: DUANE ARNOLD ENERGY CENTER -ISSUANCE OF LICENSE AMENDMENT NO. 303 RE: REVISION TO TECHNICAL SPECIFICATION TABLE 3.3.2.1-1, CONTROL ROD BLOCK INSTRUMENTATION (CAC NO. MF9494, EPID L-2017-LLA-0190)

Dear Mr. Curtland:

By letter dated March 7, 2018, 1 the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 303 to Renewed Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC). The license amendment request (LAR) revised technical specification (TS) Table 3.3.2.1-1, "Control Rod Block Instrumentation." The revised TS relocates specific minimum critical power ratio (MCPR) values specified in footnotes (a) through (e) for Function 1, Rod Block Monitor, from TS Table 3.3.2.1-1 to the DAEC core operating limits report (COLR). It also corrected a typographical error and added TS requirement item a.4 to the DAEC TS 5.6.5, COLR, which addresses the relocation of the MCPR values. Shortly following a post-issuance review by a member of your staff, the NRC project manager assigned to DAEC, was informed that the implementation requirement included in the amendment does not align with what NextEra requested in the LAR dated March 24, 2017 2* Specifically, the 180 days the NRC granted for implementation of the amended change does not meet DAEC's schedule to complete the next Core Operating Limits Report (COLR). The following corrected implementation requirement is included in the enclosure to this letter: 3. This license amendment is effective as of its date of issuance and shall be implemented by September 27, 2018. The guidance in SECY-96-238 allows for use of an administrative letter to correct an error provided that: 1) the error was introduced inadvertently in a particular license amendment, and 2) the erroneous change was not addressed in the notice to the public nor reviewed by the NRC staff. The NRC staff determined that the error occurred when the licensee's requested implementation date was not correctly included in the amendment issuance package. This satisfies the first requirement.

The incorrect implementation date was not included in the original submittal, was not identified in the notice on the amendment published in the Federal Register (82 FR 23627, dated May 23, 2017), and was not the subject of any specific part of the staffs safety evaluation that was issued with the license amendment.

This satisfies the second requirement.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18011A059.

2 ADAMS Accession No. ML 17086A442.

D. Curtland Based on our review, as set forth above, we have determined that the use of a letter to correct the typographical error is acceptable.

Additionally, a corrected Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. If you have any questions regarding this matter, please contact me at (301) 415-8371.

Docket No. 50-331

Enclosure:

Sincerely, Mahesh Chawl , Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected DAEC license amendment authorization pages associated with License Amendment No. 303 cc: ListServ w/enclosure

/4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NEXTERA ENERGY DUANE ARNOLD, LLC DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 303 Renewed License No. DPR-49 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by NextEra Energy Duane Arnold, LLC dated March 24, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 2. Accordingly, the license is amended by changes to the Operating License and Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-49 is hereby amended to read as follows: (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 303, are hereby incorporated in the license. NextEra Energy Duane Arnold, LLC shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented by September 27, 2018.

Attachment:

Changes to the Operating License and Technical Specifications Date of Issuance:

March 7, 2018 FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By: David J. Wrona David J. Wrona, Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation D. Curtland

SUBJECT:

CORRECTION LETTER: DUANE ARNOLD ENERGY CENTER -ISSUANCE OF LICENSE AMENDMENT NO. 303 RE: REVISION TO TECHNICAL SPECIFICATION TABLE 3.3.2.1-1, CONTROL ROD BLOCK INSTRUMENTATION (CAC NO. MF9494, EPID L-2017-LLA-0190)

DATED MAY 7, 2018 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsRgn3MailCenter Resource RidsNrrPMDuaneArnold Resource RidsNrrLASRohrer Resource ADAMS Accession No.: ML 18081A074 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME RHaskell SRohrer DATE 4/5/2018 4/5/2018 NRR/DORL/LPL3/BC DWrona 5/7/2018 OFFICIAL RECORD COPY NRR/DORL/LPL3/PM MChawla (RHaskell for) 5/7/2018