Line 2: |
Line 2: |
| | number = ML12093A367 | | | number = ML12093A367 |
| | issue date = 04/02/2012 | | | issue date = 04/02/2012 |
| | title = Susquehanna - Request to Expedite Approval of Ppl'S Proposed Amendment Number 281 to Unit 2 | | | title = Request to Expedite Approval of Ppl'S Proposed Amendment Number 281 to Unit 2 |
| | author name = Helsel J M | | | author name = Helsel J M |
| | author affiliation = PPL Susquehanna, LLC | | | author affiliation = PPL Susquehanna, LLC |
Letter Sequence Request |
---|
|
|
MONTHYEARPLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 Project stage: Request ML12068A4222012-03-0909 March 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML12068A4192012-03-0909 March 2012 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing Project stage: Other NRC-2012-0063, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing2012-03-0909 March 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Approval PLA-6828, Eleam Electric Station, Response to E-mail (Dated March 16, 2012) Request for Additional Information on Proposed Amendment Number 281 to Unit 2 Operating License No. NPF-222012-03-23023 March 2012 Eleam Electric Station, Response to E-mail (Dated March 16, 2012) Request for Additional Information on Proposed Amendment Number 281 to Unit 2 Operating License No. NPF-22 Project stage: Request ML1208703622012-03-27027 March 2012 ME8152, Additional RAI from Sbpb to Licensee LAR for Temporary Change to SSES TS 3.7.1 and TS 3.8.7, to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Project stage: RAI ML12090A1552012-03-29029 March 2012 Response to E-mail (Dated March 27, 2012) Request for Additional Information on Proposed Amendment Number 281 to Unit 2 Operating License No. NPF-22 Project stage: Request PLA-6841, Request to Expedite Approval of Ppl'S Proposed Amendment Number 281 to Unit 22012-04-0202 April 2012 Request to Expedite Approval of Ppl'S Proposed Amendment Number 281 to Unit 2 Project stage: Request ML12096A1582012-04-19019 April 2012 Issuance of Amendment Temporary Change to Unit 2 Technical Specifications 3.8.7 and 3.7.1 to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1, 4160 V Buses Project stage: Approval ML1211701292012-04-27027 April 2012 Correction to Issuance of Amendment Project stage: Approval 2012-03-08
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] |
Text
\ I I Jeffrey M. Helsel Nuclear Plant Manager PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3510 Fax 570.542.1504 jmhelsel@pplweb
.com \ ' I I I \***/ ,' ****** # "' . . .,,
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION REQUEST TO EXPEDITE APPROVAL OF PPL'S PROPSED AMENDMENT NUMBER 281 TO UNIT 2 OPERATING LICENSE NO. NPF-22 PLA-6841 Docket No. 50-388
References:
I. Letter (PLA-68I7) from R. A. Kearney (PPL) to USNRC (Document Control Desk) Titled "Proposed Amendment Number 28I to Unit 2 Operating License No. NPF-22 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit I 4I 60 v Buses: Technical Specifications 3.8. 7 and 3. 7. I", Dated March 8, 20I 2 2. Email from B. Vaidya (USNRC) to PPL , Titled "Susquehanna Unit 2 , ME8I 52, Draft Request for Additional Information (RAJ) from Balance of Plant Branch" , Dated March I6, 20I2. 3. Letter (PLA-6828) from J M Helsel (PPL) to USNRC (Document Control Desk) Titled "Response to Email (Dated March I6, 20I2) Request for Additional Information Proposed Amendment Number 28I to Unit 2 Operating License No. NPF-22" , Dated March 23, 20I2. 4. Email from B. Vaidya (USNRC) to PPL, Titled "Susquehanna Unit 2, ME8I 52, Additional Request for Additional Information (RAJ) from Balance of Plant Branch" , Dated March 27, 20I 2. 5. Letter (PLA-6834) from J M Helsel (PPL) to USNRC (Document Control Desk) Titled "Response to Email (Dated March 27, 2012) Request for Additional Information Proposed Amendment Number 28I to Unit 2 Operating License No. NPF-22", Dated March 29, 20I2. 6. Email from B. Vaidya (USNRC) to PPL , Titled " Susquehanna Unit 2 LAR-Clarification of Susquehanna RAJ Response dated Mar 23, FW: RAJ Clarification, Susquehanna Unit 2 LAR ", Dated March 30 , 20 I 2. 7. Letter (PLA-6842) from J M Helsel (PPL) to USNRC (Document Control Desk) Titled "Response to Email (Dated March 30 , 20I2) Requestfor Additional Information Proposed Amendment Number 28I to Unit 2 Operating License No. NPF-22", Dated April2, 20I2. The purpose of this letter is to provide supplemental information to the NRC staff regarding PPL's proposed amendment request No. 281. This proposed amendment was submitted on March 8, 2012, and supplemental information in response to NRC's request for additional information (RAI) was provided on March 23, 2012, March 29, 2012 and April 02 , 2012. PPL requested this amendment to be processed as an exigent amendment.
However, your letter dated March 9, 2012 indicated that the staff found that PPL had not provided sufficient justification for an exigent amendment.
It is our understanding that the basis for this decision was the duration of time PPL took in submitting its application for amendment.
' TM Document Control Desk PLA-6841 During the time between initial discovery of the need for the modification and the amendment submittal, PPL finalized the scope of the modifications through plant walkdowns, engineering meetings, etc. and maintained contact with the NRC to ensure that we were providing NRC Staff the information necessary for their review. Until the modification scope was finalized, PPL could not define the temporary LCO extension needed. The original one-time extension was for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />; however, through reengineering and detailed planning this time was reduced to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Since the Unit outages at Susquehanna SES are scheduled every two years, the scheduled Unit 1 outage in the spring of 2012 provided the first opportunity to implement the required Multiple Spurious Operations (MSO) modifications.
Regulatory Guide 1.189 was issued on November 2, 2009. The next scheduled Unit 1 outage was in March 2010. The time between the issuance of Regulatory Guide 1.189 and the Unit 1 Spring 2010 outage did not provide sufficient time to develop the corrective actions and design any modifications for implementation in the Spring 2010 outage, which was concluded in May 2010. PPL' s corrective actions were entered into the corrective action program in May 20 10 with the design and implementation of the modifications scheduled for the Spring of2012 outage which was concluded in April2010.
Implementing the modifications while both Unit 1 and Unit 2 were on line presents unique issues and additional requests for extension of completion times. First, completion of the modifications requires the performance of Surveillance Requirement (SR) 3 .8.1.8 which requires the verification of automatic and manual transfer of unit power supply from the normal offsite circuit to the alternate offsite circuit. This SR is amended by a NOTE that states, "The automatic transfer of the unit power supply shall not be performed in MODE 1 or 2." Justification for not performing the transfer in MODES 1 or 2 is provided in the Technical Specification Bases for this SR. The Bases read in part: "This SR is modified by a Note. The reason for the Note is that, during operation with the reactor critical, performance of the automatic transfer of the unit power supply could cause perturbations to the electrical distribution systems that could challenge continued steady state operation and, as a result, plant safety systems. The manual transfer of unit power supply should not result in any perturbation to the electrical distribution system; therefore, no mode restriction is specified.
This Surveillance tests the applicable logic associated with Unit 1. The comparable test specified in Unit 2 Technical Specifications tests the applicable logic associated with Unit 2. Consequently, a test must be performed within the specified Frequency for each unit. As the Surveillance represents separate tests, the Note specifying the restriction for not performing the test while the unit is in MODE 1 or 2 Document Control Desk PLA-6841 does not have applicability to Unit 2. The NOTE only applies to Unit 1, thus the Unit 1 Surveillance shall not be performed with Unit 1 in MODE 1 or 2." Unit 2 SR 3 .8.1.8 contains the same note. Second, the presently requested Unit 2 Technical Specification completion time extensions would also apply. Third, Unit 1 Technical Specification
3.7.1 would
require extensions for the completion time to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> for a RHRSW loop out of service. In addition, Technical Specification
3.8.7 would
require an extension for the completion time for a bus to be out of service from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />. Based upon the above restrictions, possible safety system challenges and additional completion time requests, it is not prudent to perform these modifications while Unit 1 and Unit 2 are online. PPL has expeditiously responded to the NRC Staffs questions and it is our understanding that we have satisfactorily resolved all the staffs questions.
In addition, PPL understands that the Commonwealth of Pennsylvania did not object to the proposed amendment.
When there is a finding of no significant hazards, 10 C.P.R. § 50.91(a)(5) allows for an amendment to be issued without notice to the public on an emergency basis when failure to act would result in derating or a shutdown of a unit and 10 C .F .R. 50.91 (a)( 6) allows for a limited comment period where an exigent circumstance exists. An exigent situation is something "short of an emergency" i.e., short of an immediate shutdown or derate. ( 48 Federal Register 14876) In this case, use of an exigent amendment is appropriate, as there is not an immediate risk of shutdown thus allowing a limited public comment period. PPL recognizes that these provisions should be used when there is a net increase in safety or reliability and in this case, performing the MSO modification without unnecessarily shutting down Unit 2 will result in increased safety to Unit 1 without jeopardizing safety at Unit 2 or reliability for our customers.
Based on the above, PPL respectfully requests that NRC process this amendment as an exigent amendment or in the alternative, if necessary as an emergency amendment.
There are no regulatory commitments associated with the proposed changes. PPL Susquehanna, LLC is providing the Commonwealth of Pennsylvania with a copy of this letter. Document Control Desk PLA-6841 If you have any questions or require additional information, please contact Mr. Cornelius T. Coddington at (610) 774-4019.
Sincerely, J. M. Helsel Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. R. R. Janati, DEP/BRP Mr. B. K. Vaidya, NRC Project Manager Mr. G. A. Wilson, NRR/DORL/LPL1-1/BC