ML13263A153: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML13263A153
| number = ML13263A153
| issue date = 10/07/2013
| issue date = 10/07/2013
| title = Cooper Nuclear Station - Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report
| title = Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report
| author name = Wilkins L E
| author name = Wilkins L E
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV

Revision as of 02:38, 4 April 2019

Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report
ML13263A153
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/07/2013
From: Wilkins L E
Plant Licensing Branch IV
To: Limpias O A
Nebraska Public Power District (NPPD)
Wilkins L E
References
TAC MF0692
Download: ML13263A153 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 October 7, 2013 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 COOPER NUCLEAR STATION -SAFETY EVALUATION CORRECTIONS TO AMENDMENT NO. 247 RE: MODIFICATION OF RENEWED OPERATING LICENSE CONDITION 2.E (TAC NO. MF0692)

Dear Mr. Limpias:

By letter dated September 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13191A1 05), the U.S. Nuclear Regulatory Commission (NRC, the Commission) issued Amendment No. 247 to Renewed Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment modified the Cooper Nuclear Station license condition

2. E to require incorporation of the commitments listed in Appendix A of NUREG-1944, "Safety Evaluation Report Related to the License Renewal of Cooper Nuclear Station," dated October 2010, in the updated safety analysis report to be managed in accordance with Section 50.59 of Title 10 of the Code of Federal Regulations.

Administrative errors regarding the environmental consideration and conclusion were identified subsequent to issuance of Amendment No. 247. These errors are administrative in nature and do not affect the NRC staff's overall conclusions associated with Amendment No. 247. Enclosed are the corrected pages 26 and 27 of the safety evaluation to be included with the issued amendment, with revision bars indicating the changed areas of text. We regret any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea.wilkins@nrc.gov. Sincerely,d . ynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

As stated cc w/encl: Distribution via Listserv ENCLOSURE CORRECTED PAGES 26-27 OF SAFETY FOR AMENDMENT NO. 247 DATED SEPTEMBER 12, NEBRASKA PUBLIC POWER COOPER NUCLEAR DOCKET NO.

-Per the licensee's request in this LAR, the NRC staff concludes that it is acceptable to incorporate the actions in the commitments as part of the USAR for the reasons described in Section 3.2 of this SE, rather than treating the commitments referenced in license condition

2. F as license conditions.

Therefore, the commitments can be listed in license condition 2.E The NRC staff concludes that that the following wording for license condition 2.E is acceptable:

The Updated Safety Analysis Report (USAR) supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the USAR required by 10 CFR 50.71 (e)(4), as appropriate, following the issuance of this renewed operating license. Commitment Numbers NLS2008071-01 (Revision 1), NLS2008071-02 through 04. NLS2008071-05 (Revision 1), NLS2008071-06 (Revision 1), NLS2008071-07, NLS2008071-08 (Revision 3), NLS2008071-09, NLS2008071-10, NLS2008071-11 (Revision 1), NLS2008071-12 through 15, NLS2008071-16 (Revision 2), NLS2008071-17 through 22, NLS2008071-23 (Revision 1), NLS2008071-24, NLS2008071-25 (and Supplement 1), NLS2008071-26, NLS2009100-1 (Revision 1), NLS20091 00-2, NLS20091 00-3, NLS201 0019-01, NLS2010019-02, NLS2010044-01, NLS2010050-01 through NLS2010050-03, NLS2010050-04 (Revision 1), NLS2010050-05 (Revision 1), NLS2010050-06, NLS2010062-01, and NLS2010062-02 shall be incorporated in the first update to the USAR required by 10 CFR 50.71 (e)(4) following incorporation of the original USAR supplement.

Until these respective updates are complete, the licensee may not make changes to the information in the supplement, or the above commitments.

Following incorporation of the supplement and commitments into the USAR, the need for Commission approval of any changes will be governed by 10 CFR 50.59.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment.

The State official had no comments.

5.0 ENVIRONMENTAL

CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.

The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on July 5, 2013 (78 FR 40519). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

-

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:

H. Jones, NRR/DLR/RSRG Date: September 12, 2013 October 7,2013 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 COOPER NUCLEAR STATION -SAFETY EVALUATION CORRECTIONS TO AMENDMENT NO. 247 RE: MODIFICATION OF RENEWED OPERATING LICENSE CONDITION 2.E (TAC NO. MF0692)

Dear Mr. Limpias:

By letter dated September 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13191A105), the U.S. Nuclear Regulatory Commission (NRC, the Commission) issued Amendment No. 247 to Renewed Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment modified the Cooper Nuclear Station license condition 2.E to require incorporation of the commitments listed in Appendix A of NUREG-1944, "Safety Evaluation Report Related to the License Renewal of Cooper Nuclear Station," dated October 2010, in the updated safety analysis report to be managed in accordance with Section 50.59 of Title 10 of the Code of Federal Regulations.

Administrative errors regarding the environmental consideration and conclusion were identified subsequent to issuance of Amendment No. 247. These errors are administrative in nature and do not affect the NRC staff's overall conclusions associated with Amendment No. 247. Enclosed are the corrected pages 26 and 27 of the safety evaluation to be included with the issued amendment, with revision bars indicating the changed areas of text. We regret any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea.wilkins@nrc.gov. Sincerely, IRA! Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPLIV rtf RidsNrrPMCooper Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLA.IBurkhardt Resource ADAMS Accession No ML13263A153 OFFICE NRRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDORLlLPL4/BC NRRlDORLlLPL4/PM NAME LWilkins JBurkhardt MMarkley LWilkins DATE 9/26/13 9/23/13 10/7/13 10/7/13 OFFICIAL RECORD COPY