ML17212A086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17212A086
| number = ML17212A086
| issue date = 06/29/2017
| issue date = 06/29/2017
| title = Millstone Power Station Unit 3 Final Safety Analysis Report, Rev. 30, Chapter 16, Technical Specifications
| title = Final Safety Analysis Report, Rev. 30, Chapter 16, Technical Specifications
| author name =  
| author name =  
| author affiliation = Dominion Nuclear Connecticut, Inc
| author affiliation = Dominion Nuclear Connecticut, Inc

Revision as of 13:56, 2 April 2019

Final Safety Analysis Report, Rev. 30, Chapter 16, Technical Specifications
ML17212A086
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/2017
From:
Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17212A038 List:
References
17-208
Download: ML17212A086 (3)


Text

MPS-3 FSARMillstone Power Station Unit 3 Safety Analysis Report Chapter 16 MPS-3 FSAR 16-i Rev. 30CHAPTER 16 - TECHNICAL SPECIFICATIONS Table of ContentsSection Title Page16.1MILLSTONE UNIT 3 TECHNICAL SPECIFICATIONS......................16.1-1 MPS3 UFSAR16.1-1Rev. 30CHAPTER 16 - TECHNICAL SPECIFICATIONS16.1MILLSTONE UNIT 3 TECHNICAL SPECIFICATIONSThe Technical Specifications were submitted to the NRC for review and were issued by NRC as part of the full power license on January31, 1986.