| title = | | title = Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations | ||
| author name = | | author name = | ||
| author affiliation = Florida Power & Light Co | | author affiliation = Florida Power & Light Co | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:13.0 INITIAL TESTS AND OPERATIONS | {{#Wiki_filter:13.0 INITIAL TESTS AND OPERATIONS | ||
13.1 Initial Preparation Before Fuel Loading | 13.1 Initial Preparation Before Fuel Loading | ||
The organization of the startup group and the tests to be performed prior to reactor refueling at the time of initial plant startup can be found in the original docketed FSAR. | The organization of the startup group and the tests to be performed prior to reactor refueling at the time of initial plant startup can be found in the original docketed FSAR. | ||
13.2 Final Unit Preparation | 13.2 Final Unit Preparation | ||
The procedures for core loading and post loading tests can be found in the original docketed FSAR. | The procedures for core loading and post loading tests can be found in the original docketed FSAR. | ||
13.3 Initial Testing of the Operating Reactor | 13.3 Initial Testing of the Operating Reactor | ||
Tests that will be performed from initial core loading to rated power can be found in the original docketed FSAR. | Tests that will be performed from initial core loading to rated power can be found in the original docketed FSAR. | ||
13.4 Operating Restrictions | 13.4 Operating Restrictions | ||
Restrictions on tests to be performed during normal operations at power are addressed in the original docketed FSAR. | Restrictions on tests to be performed during normal operations at power are addressed in the original docketed FSAR. | ||
13.5 Reload Physics Testing | 13.5 Reload Physics Testing | ||
Startup physics testing will be performed in accordance with ANSI/ANS 19.6.1-2005, "Reload Startup Physics Tests for Pressurized Water Reactors." | Startup physics testing will be performed in accordance with ANSI/ANS 19.6.1-2005, "Reload Startup Physics Tests for Pressurized Water Reactors." | ||
13-1 Revised 03/11/2016 C28 | 13-1 Revised 03/11/2016 C28}} | ||
}} |
Latest revision as of 10:24, 16 March 2019
Text
13.0 INITIAL TESTS AND OPERATIONS
13.1 Initial Preparation Before Fuel Loading
The organization of the startup group and the tests to be performed prior to reactor refueling at the time of initial plant startup can be found in the original docketed FSAR.
13.2 Final Unit Preparation
The procedures for core loading and post loading tests can be found in the original docketed FSAR.
13.3 Initial Testing of the Operating Reactor
Tests that will be performed from initial core loading to rated power can be found in the original docketed FSAR.
13.4 Operating Restrictions
Restrictions on tests to be performed during normal operations at power are addressed in the original docketed FSAR.
13.5 Reload Physics Testing
Startup physics testing will be performed in accordance with ANSI/ANS 19.6.1-2005, "Reload Startup Physics Tests for Pressurized Water Reactors."