L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations

From kanterella
Jump to navigation Jump to search
Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations
ML16330A236
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/29/2016
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16330A191 List:
References
L-2016-198
Download: ML16330A236 (4)


Text

TABLE OF CONTENTS

Section Title Page 12 CONDUCT OF OPERATIONS 12-1

12.1 Organization and Responsibility 12-1

12.2 Training 12-1

12.3 Procedures 12-1

12.4 Records 12-1

12.5 Administrative Control 12-1

12.6 Plant Security Plan 12-1

12.7 Deleted 12-2

12.8 Deleted 12-2

12.9 Deleted 12-2

12.10 Process Control Program (PCP) 12-2

12.11 Emergency Planning 12-3

12-i Revised 04/17/2013 C26 12-1 Rev. 17

12. CONDUCT OF OPERATIONS 12.1 Organization and Responsibility

This section covered the positions and personnel at the time of initial plant startup and operation. This information can be found in the original

docketed FSAR and this is also addressed in the plant operating license (Technical Specifications).

12.2 Training

This section covered the training program at the time of initial plant startup and operation. This information can be found in the original

docketed FSAR and this is also addressed in the Technical Specifications.

12.3 Procedures

The operating procedures for startup, normal operations, and anticipated emergency operating conditions is addressed in the original docketed FSAR and current requirements indicated in the Technical Specifications and in this chapter. The Emergency Plan in effect for Turkey Point is issued as a separate document.

12.4 Records

The procedure for maintaining plant operating, maintenance, QA, personnel, training, and instrumentation and control record is addressed in the original docketed FSAR and current requirements indicated in the Technical Specifications and in this chapter.

12.5 Administrative Control

The necessary administrative procedures are addressed in the original docketed FSAR and current requirements indicated in the Technical Specifications and in this chapter.

12.6 Plant Security Plan

Turkey Point maintains a Plant Security Plan and is issued as a separate document.

12-2 Revised 10/11/2007 The FPL Quality Assurance Program is described by FPL Quality Assurance Topical Report (QATR) FPL-1. This corporate level document was supplemented by UFSAR Sections 12.7 through 12.10 which contained plant specific details of the FPL QA program related to Administrative Controls. These sections were originally located in the Technical Specifications and were relocated to the UFSAR by Technical Specification Amendment No. 201/195 (NRC Safety Evaluation report related to Amendment No. 201/195, dated October 6, 1999). These sections are subject to the regulatory requirements of 10 CFR 50.54 (a) with respect to changes to the approved QA program description. Sections 12.7, 12.8, and 12.9 were subsequently relocated from the UFSAR and placed into the QATR in accordance with the QATR Change Management Plan, NRC SER dated December 29, 2006, and Condition Report 2006-12055.

12.7 Deleted 12.8 Deleted 12.9 Deleted 12.10 Process Control Program (PCP)

12.10.1 The Process Control Program (PCP) shall contain the current formulas, sampling, analyses, tests and determinations to ensure that processing and

packaging of solid radioactive wastes based on demonstrated processing of

actual or simulated wet solid wastes will be accomplished in such a way as

to assure compliance with 10 CFR Parts 20, 61, and 71, State regulations, burial ground requirements, and other requirements governing the disposal

of solid radioactive waste.

12.10.2 Licensee-initiated changes to the PCP:

a. Shall be documented and records of reviews performed shall be retained as required by the QTAR. This documentation shall contain:
1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and 2) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable

regulations.

b. Shall become effective after review and acceptance by the PNSC and the approval of the Plant Manager.

C23C23 12.11 Emergency Planning The Emergency Plan describes Florida Power & Light Company's plans for responding to emergencies that may develop at the Turkey Point Plant. The plan has been prepared to meet the requirements of 10 CFR 50.47(b), 10 CFR 50.72, and 10 CFR50 Appendix E. The purpose of this plan is to define and assign authority and responsibility in order to protect the health and safety of the public and plant personnel.

This plan applies to all plant emergencies which have resulted in, or which increase the risk of the accidental release of radioactive materials.

The Emergency Plan defines emergency conditions and delineates the responsibilities and duties of the FPL Emergency Response Organization.

Associated with this Emergency Plan are implementing procedures which provide a detailed source of pertinent information and data required by the response organization during an emergency.

An Onsite Technical Support Center (TSC), an Onsite Operations Support Center (OSC), and an Offsite Emergency Operations Facility (EOF) have been established. Emergency support facilities meet the requirements of NUREG 0737, Item III.A.1.2 The Offsite Emergency Operations Facility (EOF) is located at the FPL General Office Building (9250 W. Flagler in Miami).

This facility is approximately 25 miles north of Turkey Point station.

The Technical Support Center is located in a separate building at the back of the property near the Circulating Water Inlet Bay. The Operations Support Center is located in the Maintenance Building.

12-3 Revised 04/17/2013 C26