13.0 INITIAL TESTS AND OPERATIONS 13.1 Initial Preparation Before Fuel Loading The organization of the startup group and the tests to be performed prior to reactor refueling at the time of initial plant startup can be found in the original docketed FSAR.
13.2 Final Unit Preparation The procedures for core loading and post loading tests can be found in the original docketed FSAR.
13.3 Initial Testing of the Operating Reactor Tests that will be performed from initial core loading to rated power can be found in the original docketed FSAR.
13.4 Operating Restrictions Restrictions on tests to be performed during normal operations at power are addressed in the original docketed FSAR.
13.5 Reload Physics Testing Startup physics testing will be performed in accordance with ANSI/ANS 19.6.1-2011, "Reload Startup Physics Tests for Pressurized Water Reactors," (per EC 293042).