| #REDIRECT [[LR-N18-0124, Hope Creek Generating Station - Correction to In-Service Inspection Activities - 90 Day Report, Nineteenth Refueling Outage]] | | {{Adams |
| | | number = ML18318A291 |
| | | issue date = 11/14/2018 |
| | | title = Hope Creek Generating Station - Correction to In-Service Inspection Activities - 90 Day Report, Nineteenth Refueling Outage |
| | | author name = Casulli E T |
| | | author affiliation = PSEG Nuclear, LLC |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000354 |
| | | license number = NPF-057 |
| | | contact person = |
| | | case reference number = LR-N18-0124 |
| | | document type = Inservice/Preservice Inspection and Test Report, Letter |
| | | page count = 5 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:LR-N18-0124 NOV 14 2018 PSEG Nuclear LLC P.O. Box 236, Han cocks Bridge, New Jersey 08038-0236 0PSEG Nuclear LLC ASME Code Case N-532-5 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 |
| | |
| | ==Subject:== |
| | |
| | ==Reference:== |
| | |
| | Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354 Correction to In-Service Inspection Activities |
| | -90 Day Report, Nineteenth Refueling Outage LR-N15-0157, "In-Service Inspection Activities |
| | -90 Day Report, Nineteenth Refueling Outage," dated July 30, 2015. This letter submits the corrected Owner's Activity Report (Attachment |
| | : 1) for In-service Inspection (ISi) activities conducted at the Hope Creek Generating Station during the nineteenth refueling outage. The original report, (Reference |
| | : 1) omitted the use of Code Case N-613-1. This report correction is submitted in accordance with Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission Section XI, Division1 |
| | ." There are no regulatory commitments in this correspondence. |
| | If you have any questions regarding this correspondence, please contact Mr. Thomas MacEwen at (856) 339-1097. |
| | Sincerely, Edward T Casulli Plant Manager -Hope Creek ttm Attachment 1: Form OAR-1, Owner's Activity Report LR-N18-0124 Document Control Desk Page 2 cc: Mr. David Lew, Acting Regional Administrator |
| | -USNRC Region I Mr. James Kim, USNRC Project Manager -Hope Creek Mr. Justin Hawkins, USNRC Senior Resident Inspector |
| | -Hope Creek (X24) Mr. Patrick Mulligan, Manager IV, NJ Bureau of Nuclear Engineering Mr. Thomas MacEwen, Hope Creek Commitment Coordinator (H02) Mr. Lee Marabella, Corporate Commitment Coordinator (N21) |
| | LR-N18-0124 Attachment 1 Form OAR-1 Owner's Activity Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number HCRF019 Revision 1 Plant Hope Creek Generating Station Unit No. _1,__ _____ Commercial service date December 20, 1986 Refueling outage no. _1 __ 9 ________ _ Of applicable) |
| | Current inspection interval ISi -Third (3rd), GISI -Second (2"d) (151, 2nd, 3nl, 4th, other) Current inspection period ISi -Third (3rd), GISI -Third (3rd) (1st, 2nd, 3rd) Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition. 2003 Addenda Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ___ _ Same as ISi Plans |
| | ("If applicable, Including cases modified by Case N-532 and later revisions) |
| | CERTIFICATE OF CONFORMANCE I certify that {a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of HCRFO 19 Conform to the requirements of Section XI. (refueling outage number) Signed Donnamarie Bush/ ISi Program Owner Date \. \ JS \8 owner or owner's Oeslgnee, TIUe CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any person or prop amage or a loss of any kind arising from or connected with this inspection. |
| | Christopher M Miski Inspector's Signature (National Boanl Number and Endorsement) |
| | Date \ \ j S / Zed i FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number None None None None None }} |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARLR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N21-0059, In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage2021-08-13013 August 2021 In-Service Inspection Activities - 90 Day Twenty-Third Refueling Outage LR-N20-0011, In-Service Inspection Activities - 90 Day Report Twenty Second Refueling Outage2020-02-0303 February 2020 In-Service Inspection Activities - 90 Day Report Twenty Second Refueling Outage LR-N18-0124, Correction to In-Service Inspection Activities - 90 Day Report, Nineteenth Refueling Outage2018-11-14014 November 2018 Correction to In-Service Inspection Activities - 90 Day Report, Nineteenth Refueling Outage LR-N18-0079, In-Service Inspection Activities - 90 Day Report Twenty First Refueling Outage2018-08-0808 August 2018 In-Service Inspection Activities - 90 Day Report Twenty First Refueling Outage LR-N17-0127, Request to Use a Later Edition of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants, 2012 Edition with No Addenda, for the Fourth Inservice Test Interval2017-08-17017 August 2017 Request to Use a Later Edition of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants, 2012 Edition with No Addenda, for the Fourth Inservice Test Interval LR-N16-0238, In-Service Inspection Activities - 90 Day Report Twentieth Refueling Outage2017-01-11011 January 2017 In-Service Inspection Activities - 90 Day Report Twentieth Refueling Outage LR-N15-0250, Lnservice Testing (IST) Program - Fourth Ten-Year Interval2015-12-18018 December 2015 Lnservice Testing (IST) Program - Fourth Ten-Year Interval LR-N15-0157, Inservice Inspection Activities - 90 Day Report Nineteenth Refueling Outage2015-07-30030 July 2015 Inservice Inspection Activities - 90 Day Report Nineteenth Refueling Outage LR-N14-0037, Inservice Inspection Activities - 90 Day Report Eighteenth Refueling Outrage2014-02-0707 February 2014 Inservice Inspection Activities - 90 Day Report Eighteenth Refueling Outrage LR-N12-0292, Submittal of Program for Hope Creek Third Ten-Year Interval Inservice Testing Program2012-08-30030 August 2012 Submittal of Program for Hope Creek Third Ten-Year Interval Inservice Testing Program LR-N12-0218, Inservice Inspection Activities - 90 Day Report Seventeenth Refueling Outage2012-07-19019 July 2012 Inservice Inspection Activities - 90 Day Report Seventeenth Refueling Outage LR-N11-0043, Inservice Inspection Activities - 90 Day Report Sixteenth Refueling Outage2011-02-0303 February 2011 Inservice Inspection Activities - 90 Day Report Sixteenth Refueling Outage LR-N11-0035, Refueling Outage R16 Steam Dryer Inspection Results2011-02-0101 February 2011 Refueling Outage R16 Steam Dryer Inspection Results LR-N09-0163, Submittal of Inservice Inspection Activities - 90 Day Report Fifteenth Refueling Outage2009-07-30030 July 2009 Submittal of Inservice Inspection Activities - 90 Day Report Fifteenth Refueling Outage LR-N08-0266, Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) Interval2008-12-11011 December 2008 Submittal of Relief Request Associated with the Second Inservice Inspection (ISI) Interval LR-N08-0012, Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage2008-02-14014 February 2008 Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage LR-N07-0284, Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) Interval2007-12-12012 December 2007 Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) Interval LR-N06-0337, Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage2006-08-0808 August 2006 Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage LR-N05-0194, Twelfth Refueling Outage (RFO12), Ninety Day Report for Inservice Inspection Activities2005-04-26026 April 2005 Twelfth Refueling Outage (RFO#12), Ninety Day Report for Inservice Inspection Activities ML0325303912003-09-0303 September 2003 Request for Additional Information Response - Relief Request HC-RR-B12 ML0324100652003-08-21021 August 2003 Inservice Inspection Activities - 90 Day Report, Eleventh Refueling Outage ML0316309732003-06-0505 June 2003 Inservice Inspection Program Relief Request HC-RR-A10 ML0314005742003-05-0909 May 2003 Inservice Inspection Program, Revision to Relief Request HC-RR-B11, Hope Creek Generating Station ML0310704402003-04-0909 April 2003 Inservice Inspection Program Relief Request Hope Creek Station ML0306901772003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-F02 ML0210102412002-04-0101 April 2002 Inservice Inspection Program Relief Request SH-RR-W01 for Salem Generating Station, Units 1 and 2, Hope Creek Station 2024-09-10
[Table view] Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] |
Text
LR-N18-0124 NOV 14 2018 PSEG Nuclear LLC P.O. Box 236, Han cocks Bridge, New Jersey 08038-0236 0PSEG Nuclear LLC ASME Code Case N-532-5 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Reference:
Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354 Correction to In-Service Inspection Activities
-90 Day Report, Nineteenth Refueling Outage LR-N15-0157, "In-Service Inspection Activities
-90 Day Report, Nineteenth Refueling Outage," dated July 30, 2015. This letter submits the corrected Owner's Activity Report (Attachment
- 1) for In-service Inspection (ISi) activities conducted at the Hope Creek Generating Station during the nineteenth refueling outage. The original report, (Reference
- 1) omitted the use of Code Case N-613-1. This report correction is submitted in accordance with Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission Section XI, Division1
." There are no regulatory commitments in this correspondence.
If you have any questions regarding this correspondence, please contact Mr. Thomas MacEwen at (856) 339-1097.
Sincerely, Edward T Casulli Plant Manager -Hope Creek ttm Attachment 1: Form OAR-1, Owner's Activity Report LR-N18-0124 Document Control Desk Page 2 cc: Mr. David Lew, Acting Regional Administrator
-USNRC Region I Mr. James Kim, USNRC Project Manager -Hope Creek Mr. Justin Hawkins, USNRC Senior Resident Inspector
-Hope Creek (X24) Mr. Patrick Mulligan, Manager IV, NJ Bureau of Nuclear Engineering Mr. Thomas MacEwen, Hope Creek Commitment Coordinator (H02) Mr. Lee Marabella, Corporate Commitment Coordinator (N21)
LR-N18-0124 Attachment 1 Form OAR-1 Owner's Activity Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number HCRF019 Revision 1 Plant Hope Creek Generating Station Unit No. _1,__ _____ Commercial service date December 20, 1986 Refueling outage no. _1 __ 9 ________ _ Of applicable)
Current inspection interval ISi -Third (3rd), GISI -Second (2"d) (151, 2nd, 3nl, 4th, other) Current inspection period ISi -Third (3rd), GISI -Third (3rd) (1st, 2nd, 3rd) Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition. 2003 Addenda Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ___ _ Same as ISi Plans
("If applicable, Including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that {a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of HCRFO 19 Conform to the requirements of Section XI. (refueling outage number) Signed Donnamarie Bush/ ISi Program Owner Date \. \ JS \8 owner or owner's Oeslgnee, TIUe CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any person or prop amage or a loss of any kind arising from or connected with this inspection.
Christopher M Miski Inspector's Signature (National Boanl Number and Endorsement)
Date \ \ j S / Zed i FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number None None None None None