ML061380571: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML061380571
| number = ML061380571
| issue date = 06/15/2006
| issue date = 06/15/2006
| title = Oconee Nuclear Station, Units 1, 2, and 3, Issuance of Amendments Regarding Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool
| title = Issuance of Amendments Regarding Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool
| author name = Olshan L N
| author name = Olshan L N
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL

Revision as of 21:13, 10 February 2019

Issuance of Amendments Regarding Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool
ML061380571
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/15/2006
From: Olshan L N
Plant Licensing Branch III-2
To: Hamilton B H
Duke Power Co
Olshan L N, NRR/DORL, 415-1419
Shared Package
ML061500172 List:
References
TAC MC0238, TAC MC0239, TAC MC0240
Download: ML061380571 (20)


Text

June 15, 2006Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, ISSUANCE OFAMENDMENTS REGARDING CRITICALITY REQUIREMENTS FOR LOADING AND UNLOADING DRY SPENT FUEL STORAGE CANISTERS IN THE SPENT FUEL POOL (TAC NOS. MC0238, MD0239, AND MD0240)

Dear Mr. Hamilton:

The Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 351, 353, and352 to Renewed Facility Operating Licenses DPR-38, DPR-47, and DPR-55, respectively, forthe Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to theTechnical Specifications (TSs) in response to your application dated March 1, 2006, supplemented April 26, 2006.These amendments revise the TSs to reconcile the criticality requirements of Title 10 of theCode of Federal Regulations (10 CFR), Part 50, and 10 CFR Part 72 for loading and unloadingspent fuel pool dry storage canisters in the spent fuel pool.A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be incl udedin the Commission's biweekly Federal Register notice. Sincerely,/RA/Leonard N. Olshan, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. Amendment No. 351 to DPR-38
2. Amendment No. 353 to DPR-47
3. Amendment No. 352 to DPR-55
4. Safety Evaluationcc w/encls: See next page June 15, 2006Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, ISSUANCE OFAMENDMENTS REGARDING CRITICALITY REQUIREMENTS FOR LOADING AND UNLOADING DRY SPENT FUEL STORAGE CANISTERS IN THE SPENT FUEL POOL (TAC NOS. MC0238, MD0239, AND MD0240)

Dear Mr. Hamilton:

The Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 351, 353, and352 to Renewed Facility Operating Licenses DPR-38, DPR-47, and DPR-55, respectively, forthe Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to theTechnical Specifications (TSs) in response to your application dated March 1, 2006, supplemented April 26, 2006.These amendments revise the TSs to reconcile the criticality requirements of Title 10 of theCode of Federal Regulations (10 CFR), Part 50, and 10 CFR Part 72 for loading and unloadingspent fuel pool dry storage canisters in the spent fuel pool.A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be incl udedin the Commission's biweekly Federal Register notice. Sincerely,/RA/Leonard N. Olshan, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. Amendment No. 351 to DPR-38
2. Amendment No. 353 to DPR-47
3. Amendment No. 352 to DPR-55
4. Safety Evaluationcc w/encls: See next pageDISTRIBUTION:

PublicRidsAcrsAcnwMailCenter Bsingal, Dorl DprLPLII-1 R/FGHill(6 hard copies)RidsOgcRpRidsNrrDorlLpc(EMarinos)RidsNrrDirsItsb(TBoyce)RidsNrrLAMO'Brien(hard copy) RidsNrrPMLOlshan(hard copy)KWood, NRRRidsRgn2MailCenter(MErnstes)Package No. ML061500172License Amendment No. ML061380571Tech Spec No. ML061710304 NRR-058OFFICENRR/LPL2-1/PMNRR/LPL2-1/LAOGCNRR/LPL2-1/BC1NRR/SPWB/BCNAMELOlshanMO'BrienSTurkEMarinosJNakoski DATE6/15/066/16/066/15/066/15/065/25/06OFFICIAL RECORD COPY DUKE POWER COMPANY LLCDOCKET NO. 50-269OCONEE NUCLEAR STATION, UNIT 1AMENDMENT TO RENEWED FACILITY OPERATING LICENSEAmendment No. 351Renewed License No. DPR-381.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment to the Oconee Nuclear Station, Unit 1 (thefacility) Renewed Facility Operating License No. DPR-38 filed by the Duke PowerCompany LLC (the licensee) dated March 1, 2006, supplemented April 26, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations set forth in 10 CFR Chapter I;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is hereby amended by page changes to the TechnicalSpecifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-38 is hereby amended to read asfollows:B. Technical SpecificationsThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 351, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications. 3.This license amendment is effective as of its date of issuance and shall be implementedwithin 90 days of issuance. FOR THE NUCLEAR REGULATORY COMMISSION/RA by L Raghavan for/Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes and License No. DPR-38 ChangesDate of Issuance: June 15, 2006 DUKE POWER COMPANY LLCDOCKET NO. 50-270OCONEE NUCLEAR STATION, UNIT 2AMENDMENT TO RENEWED FACILITY OPERATING LICENSEAmendment No. 353Renewed License No. DPR-471.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment to the Oconee Nuclear Station, Unit 2 (thefacility) Renewed Facility Operating License No. DPR-47 filed by the Duke PowerCompany LLC (the licensee) dated March 1, 2006, supplemented April 26, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations set forth in 10 CFR Chapter I;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is hereby amended by page changes to the TechnicalSpecifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-47 is hereby amended to read asfollows:B.Technical SpecificationsThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 353, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications. 3.This license amendment is effective as of its date of issuance and shall be implementedwithin 90 days of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA by L Raghavan for/Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes and License No. DPR-47 ChangesDate of Issuance: June 15, 2006 DUKE POWER COMPANY LLCDOCKET NO. 50-287OCONEE NUCLEAR STATION, UNIT 3AMENDMENT TO RENEWED FACILITY OPERATING LICENSEAmendment No. 352Renewed License No. DPR-551.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment to the Oconee Nuclear Station, Unit 3 (thefacility) Renewed Facility Operating License No. DPR-55 filed by the Duke PowerCompany LLC(the licensee) dated March 1, 2006, supplemented April 26, 2006, complies with the standardsand requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations set forth in 10 CFR Chapter I;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; and E.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is hereby amended by page changes to the TechnicalSpecifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-55 is hereby amended to read asfollows:B.Technical SpecificationsThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 352, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications. 3.This license amendment is effective as of its date of issuance and shall be implementedwithin 90 days of issuance.FOR THE NUCLEAR REGULATORY COMMISSION/RA by L Raghavan for/Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes and License No. DPR-55 ChangesDate of Issuance: June 15, 2006 ATTACHMENT TO LICENSE AMENDMENT NO. 351RENEWED FACILITY OPERATING LICENSE NO. DPR-38DOCKET NO. 50-269ANDTO LICENSE AMENDMENT NO. 353RENEWED FACILITY OPERATING LICENSE NO. DPR-47DOCKET NO. 50-270ANDTO LICENSE AMENDMENT NO. 352RENEWED FACILITY OPERATING LICENSE NO. DPR-55DOCKET NO. 50-287Replace the following pages of the Operating Licenses and the Appendix A TechnicalSpecifications (TSs) with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. RemoveInsertLicense PagesLicense PagesLicense No. DPR-38, Pg 3License No. DPR-38, Pg 3License No. DPR-47, Pg 3License No. DPR-47, Pg 3 License No. DPR-55, Pg 3License No. DPR-55, Pg 3TSsTSsiviv3.7.12-13.7.12-1

--3.7.18-1

--3.7.18-2

--4.0-3 iv (Bases)iv B 3.7.12-1B 3.7.12-1 B 3.7.12-2B 3.7.12-2 B 3.7.12-3B 3.7.12-3 B 3.7.12-4B 3.7.12-4 B 3.7.12-5--

--B 3.7.18-1

--B 3.7.18-2

--B 3.7.18-3

--B 3.7.18-4 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TOAMENDMENT NO. 351 TO RENEWED FACILITY OPERATING LICENSE DPR-38AMENDMENT NO. 353 TO RENEWED FACILITY OPERATING LICENSE DPR-47AND AMENDMENT NO. 352 TO RENEWED FACILITY OPERATING LICENSE DPR-55DUKE POWER COMPANY LLCOCONEE NUCLEAR STATION, UNITS 1, 2, AND 3DOCKET NOS. 50-269, 50-270, AND 50-28

71.0 INTRODUCTION

By letter dated March 1, 2006 (Ref. 1), and supplemented by letter dated April 26, 2006(Ref. 2), Duke Power Company LLC (Duke, the licensee) requested amendments to the Technical Specifications (TS) for Oconee Nuclear Station, Units 1, 2, and 3 (Oconee), with respect to loading and unloading spent fuel dry storage canisters (DSC) in the spent fuel pool (SFP).The supplement dated April 26, 2006, provided clarifying information that did not change thescope of the original application and the initial proposed no significant hazards consideration determination.In March 2005, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary(RIS) 2005-05, "Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations," (Ref. 3), to (1) alert addressees to findings at pressurized-water reactor (PWR) facilities suggesting that the SFP licensing and design basesand applicable regulatory requirements may not be met during loading, unloading, and handling of DSCs in the SFPs; (2) emphasize the importance of maintaining subcritical conditions for spent fuel storage in a moderated environment; and (3) encourage addressees to review the current SFP and independent spent fuel storage installation (ISFSI) licensing and design bases at their facilities to ensure compliance of regulations during DSC loading, unloading, andhandling operations. In response to RIS 2005-05, the licensee determined a license amendment was required to reconcile the requirements of Title 10 of the Code FederalRegulations (10 CFR), Part 50, Section 50.68, and 10 CFR Part 72.

2.0 REGULATORY EVALUATION

While in the SFP for wet loading operation, both 10 CFR 50.68 and 10 CFR Part 72 requirements pertaining to criticality control apply to DSC loading operations. General DesignCriterion (GDC) 62 in Appendix A to 10 CFR Part 50 specifies that criticality in the fuel storage and handling system shall be prevented by physical systems or processes, preferably by use ofgeometrically safe configurations. The acceptance criteria specified in 10 CFR Section 50.68(b)(1) and (4) for criticality preventionin the SFP that are applicable to the licensee's proposed amendment are, respectively: (1) Plant procedures shall prohibit the handling and storage at any one time of more fuel assemblies than have been determined to be safely subcritical under the most adverse moderation conditions feasible by unborated water; and(4) If no credit for soluble boron is taken, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with unborated water. If credit is taken for soluble boron, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 percent confidence level, if flooded with unborated water.Under 10 CFR 72.124, "Criteria for nuclear criticality safety," the NRC regulates DSC storageactivities to ensure that subcriticality is maintained during the handling, packaging, transfer, and storage of spent fuel assemblies. The NRC regulations for DSC criticality prevention rely onfavorable geometric configurations and fixed neutron absorbers. However, unlike 10 CFR 50.68, the 10 CFR Part 72 regulations for criticality prevention in DSCs allow licensees to credit the SFP soluble boron for maintaining subcritical conditions during DSC loading, unloading, and handling operations in the SFP. Therefore, many DSC designs have incorporated soluble boron credit in lieu of a burnup credit as a means of increasing DSC storage capacity while maintaining subcritical conditions. Duke's license amendment request (LAR) proposes to demonstrate that it can satisfy the applicable 10 CFR 50.68 criticality prevention requirements,with a burnup credit, during DSC loading, unloading, and handling operations in the SFP.The NRC defines acceptable methodologies for performing criticality analyses in the followingdocuments:1.NUREG-0800, Standard Review Plan, Section 9.1.2, Draft Revision 4, "Spent Fuel Storage," (Ref. 4).2. NRC Memorandum from L. Kopp to T. Collins, "Guidance on the RegulatoryRequirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants," August 19, 1998, (Ref. 5).The NRC staff used these documents to assist in its review of the licensee's LAR to ensurecompliance with GDC 62 and 10 CFR 50.68.

3.0 TECHNICAL EVALUATION

3.1Spent Fuel Cask System DescriptionOconee uses the NUHOMS dry spent fuel storage system at its ISFSI. Forty NUHOMS-24P DSCs have been loaded under Duke's specific license (SNM-2503). Another forty-four NUHOMS-24P DSCs have been loaded under Duke's general license. Certificate ofCompliance (CoC) 72 -1004 is applicable to the DSCs loaded under the general license. For future loadings, Oconee will use the NUHOMS

-24PHB, which has been approved by the NRCas Amendment 6 to CoC 72 -1004 (ML040128014). The NUHOMS-24P and NUHOMS-24PHB DSCs will hold 24 fuel assemblies. Neither contain any fixed neutron absorber. Figure1 of Enclosure 3 to Reference 1 shows the configuration of the fuel assembly loading into the NUHOMS-24P and NUHOMS-24PHB DSCs.3.2 Description of Proposed TS Changes to the March 1, 2006, (Ref. 1) letter provided a mark-up of the TSs andcorresponding bases pages. The following is the descriptive list of the changes proposed by the LAR:1.Modification of the Applicability of TS 3.7.12, "Spent Fuel Pool Boron Concentration"The modification makes the TS applicable during DSC loading activity. The acceptability of the modified TS Limited Condition for Operation 3.7.12 isdemonstrated by the licensee's criticality analysis for compliance with the subcriticality criteria of GDC 62 and 10 CFR 50.68. The NRC staff's evaluation of the criticalityanalysis is described in Section 3.3 below.2.Addition of TS 3.7.18, "Dry Spent Fuel Storage Cask Loading and Unloading"The licensee proposed to add TS 3.7.18, "(Dry Spent Fuel Storage Cask Loading and Unloading," specifying burnup versus enrichment curve (TS Table 3.7.18-1) for fuel assemblies located in the dry spent fuel storage DSC in the SFP. TS 3.7.18 alsoincludes required actions when these LCOs are not met.The acceptability of the new TS 3.7.18 is demonstrated by the licensee's criticalityanalysis for compliance with the subcriticality criteria of GDC 62 and 10 CFR 50.68.

The NRC staff evaluation of the criticality analysis is described in Section 3.3 below.3.Addition of TS 4.4, "Dry Spent Fuel Storage Cask Loading and Unloading"The licensee proposed to add TS 4.4, "(Dry Spent Fuel Storage Cask Loading and Unloading," to specify that the spent fuel casks are designed and shall be maintained with:a. Fuel assemblies having a maximum (nominal) U-235 enrichment of 5.0 weight percent (w/o);

b. keff < 1.0 if fully flooded with unborated water, which includes an allowance for uncertainties as described in Section 9.1 of the (Updated Final Safety Analysis Report) UFSAR; c. keff
  • 0.95 if fully flooded with borated water
  • 430 ppm, which includes an allowance for uncertainties as described in Section 9.1 of the UFSAR. Maintaining the normal spent fuel pool boron concentration within the TS limits assures keff
  • 0.95 for any accident condition;d. Dry spent fuel storage cask designs limited to NUHOMS-24P and NUHOMS- 24PHB. Added Section 4.4 describes characteristics of the spent fuel DSC loading in the SFP. Items band c specify the commitment to meet 10 CFR 50.68 reactivity limits. Items a and d specify the requirements regarding enrichment limit, and spacing of fuel assemblies loaded in the spent fuel DSC to assure compliance with the subcriticality requirements. Therefore, added TS 4.4 is acceptable.3.3Criticality Analysis 3.3.1Criticality Analysis Codes The main neutronics codes employed in the licensee's NUHOMS-24P/24PHB DSC criticalityanalysis are SCALE 4.4/KENO V.a and CASMO-3/SIMULATE-3. KENO V.a is a 3-D Monte Carlo criticality module in the SCALE 4.4 package. The licensee used SCALE 4.4/KENO V.a for an explicit 3-D evaluation of the NUHOMS

-24P/24PHB DSC loaded with unirradiated fuelassemblies. The SCALE 4.4/KENO V.a computations are performed to confirm the conservatism of a simplified uniform-array DSC model.CASMO-3 is a 2-D transport code that performs fuel criticality and depletion calculations, usinga 70-group cross-section library that is based on ENDF/B-IV. CASMO-3 also produces nodal macro-group cross-sections that can be used by SIMULATE-3, its counterpart 3-D nodal diffusion code, for applications involving arrays of fuel assemblies with varying enrichments or burnups. CASMO-3/SIMULATE-3 is used for all DSC irradiated-fuel cases.

These codes are well-suited to wet fuel storage criticality applications and have been extensively benchmarked to critical experiments and reactor operational data. Their use by Duke for the Oconee dry spent fuel storage DSC loading and unloading LAR is consistent with how Duke employed them for the Oconee SFP amendment (Ref. 6), and the more recent McGuire SFP amendment (Ref. 7).3.3.2 Bias and Uncertainty The NRC SFP criticality analysis guidance (Ref. 5) specifies that the maximum keff value forthe criticality analysis should be the summation of the calculated nominal keff, the bias incriticality analysis methods, manufacturing and calculational uncertainties, and the correction for the effect of the axial distribution in burnup when credit for burnup is taken. It further provides that uncertainties should be determined for proposed storage facilities and fuelassemblies to account for tolerances in the mechanical and material specifications. An acceptable method for determining the maximum reactivity may be either (1) a worst-case combination with mechanical and material conditions set to maximize keff, or (2) a sensitivitystudy of the reactivity effects of tolerance variations. If used, a sensitivity study should indicate all possible significant variations (tolerances) in the material and mechanical specifications of the racks; the results may be statistically combined provided they are independent variations. Combinations of the two methods may also be used. The licensee's modeling approach for the NUHOMS-24P/24PHB DSC criticality analysis is a combination of the two methods.SCALE 4.4/KENO V.a Bias and Uncertainty As described in the letter dated March 1, 2006 (Ref. 1), and supplemented by letter dated April 26, 2006, (Ref. 2), Duke determined SCALE 4.4/KENO V.a calculational biases and uncertainties for both the 44-group and 238-group cross-section libraries included with the SCALE 4.4 package. The licensee's biases and uncertainties were determined by benchmarking against 58 critical experiments carried out by Pacific Northwest Laboratories.

These are the same methods and experiments the licensee used to determine the bias anduncertainties for the Oconee SFP criticality analysis (Ref. 6). The resultant bias and uncertainty are slightly different, which is attributed to updated computer codes. By comparison, these are also the same method and experiments the licensee used to determine the bias anduncertainties for the McGuire SFP criticality analysis (Ref. 7). The resultant bias and uncertainty are identical. The licensee determined the SCALE 4.4/KENO V.a calculational biasto be +0.0064 *k and the uncertainty to be +/-0.0066 *k.CASMO-3/SIMULATE-3 Bias and Uncertainty As described in the letter dated March 1, 2006 (Ref. 1), and supplemented by letter dated April 26, 2006 (Ref. 2), Duke determined a CASMO-3/SIMULATE-3 calculational bias and uncertainty for the 70-group cross-section library included with the CASMO-3/SIMULATE-3 package. The licensee's bias and uncertainty were determined by benchmarking CASMO-3/SIMULATE-3 against 10 Babcock & Wilcox (B&W) critical experiments. These are the same methods and experiments the licensee used to determine the bias and uncertainties for the Oconee SFP criticality analysis (Ref. 6). The resultant bias and uncertainty are slightly different, which is attributed to updated computer codes. Similarly, these are the same methods and experiments the licensee used to determine the bias and uncertainties for the McGuire SFP criticality analysis (Ref. 7). The resultant bias and uncertainty are identical. The licensee determined the CASMO-3/SIMULATE-3 calculational bias to be -0.00142 *k and the uncertainty to be +/-0.0121 *k.Spent Fuel Burnup Uncertainties In the burnup credit analyses, biases are added to the bounding criticality safety predictions toaccount for the uncertainties associated with (1) the axial burnup distribution in the active fuel length, and (2) the assembly burnup accuracy. The dominant bias is from the axial burnup effects.

The burnup credit calculations were performed assuming a uniform burnup profile throughout the active fuel length that results in the over-prediction of burnup at the ends of the fuelassembly and under-prediction of burnup in the fuel mid-region. The "axial end-effect" bias, i.e., the difference of the keff values between the axial burnup profile and the uniform burnupassumption, needs to be applied to the burnup credit calculations to account for the increase in reactivity. Generic analyses confirmed minor and generally negative reactivity effects of the axially distributed burnup at values less than 20,000 MWD/MTU. As a result, CASMO-3/SIMULATE-3 calculations with less than 20,000 MWD/MTU do not contain an axial bias. The highest burnup evaluated in the effort was 43.77 GWD/MTU, to which the axial biasuncertainty of +0.0245 *k is applied.Another major contributor to the bounding uncertainty is the bias in the assembly burnup toaccount for the uncertainty in the fuel depletion calculations. The NRC guidance document(Ref. 5) stated an uncertainty equal to 5 percent of the reactivity decrement to the burnup of interest is an acceptable assumption. The licensee applied this option and then applied the largest uncertainty to all cases.Fuel Mechanical Uncertainty To determine the fuel mechanical uncertainty, the licensee performed an analysis thatevaluated all of the fuel designs that are currently licensed to be loaded into its NUHOMS-24P/24PHB DSCs to determine a bounding set of mechanical parameters. The tolerances for those parameters were then used to calculate an associated reactivity uncertainty. Those uncertainties were then statistically combined into the fuel mechanical uncertainty. Two fuel mechanical uncertainties were determined, one with the moderator unborated and one with the moderator borated to 430 ppm.DSC Mechanical Uncertainty To determine the DSC mechanical uncertainty, the licensee performed an analysis thatidentified the applicable mechanical parameters associated with the NUHOMS-24P/24PHBDSCs. The mechanical tolerances for those parameters were then used to calculate an associated reactivity uncertainty for each parameter. Those uncertainties were then statistically combined into the DSC mechanical uncertainty. Two DSC mechanical uncertainties were determined, one with the moderator unborated and one with the moderator borated to 430 ppm.3.3.3 DSC Loading Criticality Analysis To simplify the analysis, the licensee performed all criticality analyses using CASMO-3/SIMULATE-3. In order to use the 2-D CASMO-3/SIMULATE-3 computer code, the licensee performed a comparison analysis with the 3-D SCALE 4.4/KENO V.a computer code. The licensee performed SCALE 4.4/KENO V.a computer code cases for unirradiated fuel assemblies at both high and low enrichments and moderator temperatures while explicitly modeling the 3-D NUHOMS

-24P/24PHB DSC. The licensee also performed SCALE4.4/KENO V.a computer code cases for unirradiated fuel assemblies at both high and lowenrichments and moderator temperatures while modeling the simplified 2-D NUHOMS-24P/24PHB DSC model used in the subsequent CASMO-3/SIMULATE-3 computer code cases.

The high and low enrichments and moderator temperatures used in the analyses are sufficient to encompass expected conditions in the SFP. The analyses showed that in each instance the 2-D CASMO-3/SIMULATE-3 computer code predicted the highest keff, thereby providing reasonable assurance that the use of the 2-D CASMO-3/SIMULATE-3 computer code to perform the NUHOMS

-24P/24PHB DSC SFP loading and unloading criticality analyses at Oconee would provide appropriately conservative results.To demonstrate compliance with the reactivity criteria of GDC 62 and 10 CFR 50.68, thelicensee performed the criticality analyses of the NUHOMS-24P/24PHB DSC loading andunloading in the SFP for both normal and accident conditions. Consistent with the methodology of using bounding parameters, the criticality analyses were performed with theconservative assumptions that tend to maximize the reactivity. These assumptions include: *Ignoring the negative CASMO-3/SIMULATE-3 calculational bias. *Not taking credit for any burnable poison rod assemblies (BPRA) that might be loaded into the DSC. This assumption is conservative with respect to any negative reactivity impact the remaining burnable poison would have. However, the NUHOMS-24P/24PHB DSC is over-moderated. The NRC staff asked the licensee if loading theNUHOMS-24P/24PHB DSC with BPRAs would increase the overall reactivity due tothe moderator they would displace. The licensee was able to show there was a net decrease in reactivity with the NUHOMS

-24P/24PHB DSC loaded with the maximumnumber of BPRAs possible, even if the BRPAs were fully depleted not taking credit for the negative reactivity effect of the fuel assembly grid spacers. *The use of conservative parameters when determining fuel assembly burnup.

  • Full DSC reflection in the radial direction.To demonstrate compliance with the subcriticality criteria of 10 CFR 50.68 that keff < 1.0 ifflooded with unborated water, the licensee set a target total 95/95 keff of 0.9980. The licenseethen subtracted the various biases and uncertainties from the targeted total 95/95 keff toestablish a nominal keff. The nominal keff was then used to determine a correspondingenrichment/burnup combination that would result in the nominal keff. The results are shown inTable 6 and Figure 4 of Reference 1. By this method, the licensee was able to demonstrate that by following these limits the DSC keff will remain < 1.0 if flooded with unborated water.To demonstrate compliance with the subcriticality criteria of 10 CFR 50.68 that keff be less thanor equal to 0.95 if flooded with borated water, the licensee performed analyses with the same enrichment/burnup combinations as above, but with the DSC borated to 430 ppm. In this analysis the licensee substituted the fuel and DSC mechanical uncertainties for the moderator borated to 430 ppm. The other biases and uncertainties remained the same. The licensee concluded that the 5.0 wt % U-235 with 43.77 GWD/MTU of burnup and 430 ppm of soluble boron, will have the highest Total keff at 0.9264. In paragraph 3 of Section 6.5 of Reference 1,the licensee makes the statement, "Using the fuel assembly burnup requirements shown in Table 6, DSC calculations with 430 ppm boron yield the highest nominal keff (0.8645) at 5.0 wt% U-235 (as expected per the Reference 15 report)." However, NUREG/CR-6683 (Reference15 of the licensee's LAR) would indicate that calculations with 430 ppm boron yield the highest total, rather than nominal, keff at 5.0 wt % U-235 with 43.77 GWD/MTU of burnup. Since the total keff is the value of interest, the licensee's overall conclusion remains valid, and since that total keff is less than 0.95, the results are acceptable. 3.3.4 Accident Analysis In Reference 1 the licensee identified that the most limiting accident was the misloading of anunirradiated 5.0 w/o U-235 fuel assembly into the DSC. In response to a question from the NRC staff, the licensee provided additional details in Reference 2 to support the NRC staff 'sreview. In performing the accident analysis the licensee utilized the double contingencyprinciple from Reference 5, wherein a licensee may credit the amount of soluble boron normally in the SFP (for Oconee, this value is 2200 ppm). For the misloading event described above the licensee evaluated all fuel types currently in useat Oconee, including those not currently licensed for storage in the NUHOMS-24P/24PHBDSC at Oconee. The licensee determined the maximum boron concentration required to maintain keff
  • 0.95 was 630 ppm. In Reference 2 the licensee described the controls in place to ensure that the misloading of onlyone fuel assembly need be considered. In Reference 2 the licensee provided a discussion of other potential accident scenarios and a justification for why they are bounded by themisloading event.The NRC staff evaluated the licensee's criticality analyses methodology, and concluded that theuse of these bounding parameters to produce the Maximum keff is consistent with the NRCcriticality analyses guidance, and is acceptable.The NRC staff reviewed the licensee's LAR to reconcile the criticality control requirements of 10CFR 50.68 and 10 CFR 72.124. That reconciliation has led to the revision of existing TSs tomake the SFP soluble boron concentration applicable during DSC loading and unloading, the addition of new TSs to prescribe a burnup verses enrichment curve for fuel assemblies currently licensed to be stored in the NUHOMS

-24P/24PHB DSC, and the addition of TSs todescribe the characteristics of the DSC loading in the SFP. Based on its review of the licensee's criticality analyses, provided in References 1 and 2, the NRC staff concludes that theproposed changes for the spent fuel cask loading operations in the SFP meet appropriate subcriticality requirements of 10 CFR 50.68 and GDC 62. The NRC staff f ound that thelicensee's amendment request provides reasonable assurance that under both normal and accident/upset conditions, the licensee would be able to safely operate the plant and comply with NRC regulations. Therefore, the staff finds the LAR acceptable.

4.0STATE CONSULTATION

In accordance with the Commission's regulations, the South Carolina State official was notifiedof the proposed issuance of the amendments. The State official had no comments.

5.0ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve nosignificant increase in the amounts and no significant change in the types of any effluents thatmay be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been nopublic comment on such finding (71 FR 18373). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR51.22(b), no environmental impact statement or environmental assessment need be preparedin connection with the issuance of the amendments.

6.0CONCLUSION

The NRC staff has concluded, based on the considerations discussed above, that (1) there isreasonable assurance that the public health and safety will not be endangered by operation inthe proposed manner, (2) such activities will be conducted in compliance with the Commission'sregulations, and (3) issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public.

7.0 REFERENCES

1.Letter from Bruce Hamilton, Duke Power Company LLC, (Duke), USNRC, "Oc oneeNuclear Site, Units 1, 2, and 3, Docket Numbers 50-269, 50-270, and 50-287, License Amendment Request to Reconcile 10 CFR 50 and 10 CFR 72 Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool, License Amendment Request No. 2005-009," dated March 1, 2006 (ADAMS ML060720030).2.Letter from Bruce Hamilton, Duke, USNRC, "Duke Power Company LLC d/b/a DukeEnergy Carolinas, LLC, Oconee Nuclear Site, Units 1, 2, and 3, Docket Numbers 50-269, 50-270, and 50-287, License Amendment Request to Reconcile 10 CFR 50 and 10 CFR 72 Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool - Duke Response to NRC Request for Additional Information, LicenseAmendment Request (LAR) No. 2005-009," dated April 26, 2006 (ADAMS ML061240463 &

ML061240464).3.NRC Regulatory Issue Summary 2005-05, "Regulatory Issues Regarding CriticalityAnalyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations,"

March 23, 2005 (ADAMS ML043500532).4.NUREG-0800, Standard Review Plan, Section 9.1.2, Draft Revision 4, "Spent FuelStorage."5.NRC Memorandum from L. Kopp to T. Collins, "Guidance on the Regulatory Requirementsfor Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants," August 19, 1998 (ADAMS ML003728001). 6.Letter from L. Olshan, USNRC, to W. McCollum, Duke, "Oconee Nuclear Station Units 1,2, and 3 Re: Issuance of Amendments (TAC Nos. MB0894, MB0895, and MB0896),"

April 22, 2002 (ADAMS ML020930470).7.Letter from J. Shea, USNRC, to G. Peterson, Duke, "McGuire Nuclear Station, Units 1 and2 Re: Issuance of Amendments (TAC Nos. MC0945 and MC0946)," March 17, 2005 (ADAMS ML050280409).Principal Contributor: K. Wood Date: June 15, 2006 Oconee Nuclear Station, Units 1, 2, and 3 cc:

Ms. Lisa F. VaughnDuke Power Company LLC 526 South Church Street P. O. Box 1006 Mail Code EC07H Charlotte, North Carolina 28201-1006Manager, LISNUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035Senior Resident InspectorU.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672Mr. Henry Porter, DirectorDivision of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708Mr. Michael A. SchoppmanFramatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209Mr. B. G. DavenportRegulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672Ms. Karen E. LongAssistant Attorney General NC Department of Justice

P.O. Box 629 Raleigh, NC 27602Mr. R. L. Gill, Jr.Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202Division of Radiation ProtectionNC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210Mr. Henry BarronGroup Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006