W3P83-3264, Application to Amend CPPR-103,extending Const Completion Date to 840930.Delay Due to Exhaustive Prerequisite Testing, Preoperational Testing,Troubleshooting & Retesting to Meet Acceptance Criteria

From kanterella
Jump to navigation Jump to search
Application to Amend CPPR-103,extending Const Completion Date to 840930.Delay Due to Exhaustive Prerequisite Testing, Preoperational Testing,Troubleshooting & Retesting to Meet Acceptance Criteria
ML20080P588
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/29/1983
From: Leddick R
LOUISIANA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
W3P83-3264, NUDOCS 8310070247
Download: ML20080P588 (4)


Text

____- __ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

LOUISIANA 44 0 - o~oeernEe1 . go wx eOue POWER & LIGHT NEW ORLE ANS LoulSIANA 7017443000 . [*O4)366-2345 Eu $ DOS $

September 29, 1983 W3P83-3264 Q-3-A28.11 Darrell C. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Coinmission Washington, D. C. 20555

SUBJECT:

Louisiana Power & Light Company Waterford SES Unit 3 Docket No. 50-382 Request for Extension of Construction Permit

Dear Mr. Eisenhut:

Pursuant to 10CFR50.55(b), Louisiana Power & Light hereby requests that the Commission extend the latest construction completion date, October 30, 1983, for Waterford SES Unit No. 3 set forth in the Construction Permit, CPPR-103, to September 30, 1984.

As a result of an extensive review of our construction, startup testing and system transfer progress, Waterford 3 is now scheduled to be placed in commercial operation in November 1984. This is based on an official scheduled fuel load date of May 31, 1984. It should be noted that project completion planning is targeted upon loading fuel by March 31, 1984. This target date is considered to be achievable and LP&L will request the NRC Safety Review to be based upon that date. As you are aware, Louisiana Power & Light has recently strengthened the Waterford 3 project by the addition of a number of key managers with extensive commercial nuclear experience, giving confidence to the achievability of the target date.

The schedule delay is due in part to factors unanticipated at the time of the last CP extension request, and in part to factors whose scope and impact were underestimated. The startup test program is being conducted using the guidelines of Revision 2 to Regulatory Guide 1.68 (Initial Test Program for Water Cooled Nuclear Power Plants). The exhaustive prerequisite testing, preoperational testing, troubleshooting and retesting necessary to meet the exacting acceptance criteria enntinues to affect systems turnover to the LP&L startup group, and then to the plant staff. Although the problems identified via testing are all resolvable and generally on a par with current industry norms, the magnitude and documentation requirements are vider in scope than originally anticipated.

Although fuel load schedule has been impacted, the net result will be a safer and more reliable plant.

0310070247 830929 1\

i PDR ADOCK 05000382 PDR A

In the same time period, LP&L has been implementing major improvements in the Fire Protection program at Waterford 3 to meet the requirements of Appendix R to 10CFR50 (Sept., 1981). Large areas of the plant have been added to the automatic sprinkler and thermal / smoke detection coverage (see FSAR Figures 9.5A-1 thru 9.5A-9). Installation of the required piping and cabling through already congested areas has made completion of these systems slow and difficult. LP&L has also significantly improved fire barrier integrity by providing rated fire dampers in HVAC ductwork, sealing conduit entries through fire zones, and installing fire walls and radiant shields. Safe shutdown in the event of fire i

, has been assured by rerouting and wrapping cable in one-hour barriers where

necessary, and enhancing the remote shutdown panel.

This time period has also seen major parts of the TMI Action Plan requirements installed. Again, in certain cases, the scope of work required to meet the aims of.the post-TMI improvements was not known at the time of our last request. An example, is the method of meeting the need to provide information on core cooling (NUREG-0737 II.F.2). Adequate designs in this area have only evolved within the industry over the last two years.

Lastly, cash flow restraints discussed in our August 1980 request extended through October of that year affecting schedule recovery.

In summary, the official schedule fuel load date of May 31, 1984 recognizes all known station improvement and licensing related design changes and testing requirements, as well as schedule contingency beyond the target date of March 31, 1984 The requested Construction Permit expiration date reflects, however, six additional months from the target date to account reasonably for the possibility of additional licensing requirements or construction related problems.

Ver truly yours,

! R. . Leddick Senior Vice President - Nuclear Operations RSL/KWC/pjl cc: E. Blake, M. Stevenson, J. Wilson, L. Constable

\

Before the UNITED STATES NUCLEAR REGULATORY COMMISSION Docket No. 50-382

. In the Matter of LOUISIANA POWER & LIGHT COMPANY Construction Permit Extension Request L,uisiana Power & Light Company, Applicant in the above captioned proceeding, hereby files a request to extend the Construction Permit, CPPR-103, for Waterford SES Unit No. 3.

Respectfully submitted, LOUISIAN OWER & LIGHT COMPA!W h1 R. S. Leddick Senior Vice President Nuclear Operations DATE: 29 September 1983

= _ - . .-. . .. - . - ._-. . _ . - - . ... . . - - . . . . _ _ . . . . . - .

STATE OF LOUISIANA)

) SS PARISH OF ORLEANS )

4 i

R. S. Leddick, being duly sworn, states that he is Senior Vice President -

Nuclear Operations of Louisiana Power & Light Company and that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission this Construction Permit extension request.

i 1

R. S. Leddick i

SUBSCRIBED AND SWORN to before me, a Notary Public, in and for the Parish and State above named, thiq/,W// day of _fMMf//Byt,1983.

l / //

j '

w Nota '

lic [ /

1 l MY COMMISSION EXPIRES:

1

/

I t

4 e-- - .- - , .e.,n, ., - - - , ,-- .,.n -, ,_,..,n , , , ,. , , . ._e, , .., , , , . _ . ,.

,_.7,. . _ , , . . . , , . . , _ , . . _ . . ,,,