Letter Sequence Request |
---|
TAC:MD6547, Control Room Habitability (Approved, Closed) |
|
|
|
---|
Category:Letter type:W
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0025, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0013, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. 2024-09-03
[Table view] Category:Technical Specification
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML11224A0102011-07-20020 July 2011 License Amendment Request, Technical Specification Change Regarding Steam Generator Tube Integrity W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers2008-09-18018 September 2008 License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements2007-07-0303 July 2007 License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 ML0624201532006-08-29029 August 2006 Amendment Technical Specification Pages, Moderator Temperature Coefficient W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation2006-02-15015 February 2006 License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown2005-10-27027 October 2005 License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown ML0513003032005-05-0909 May 2005 Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS Index W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2005-03-17017 March 2005 Supplement to Amendment Request NPF-38-249, Extended Power Uprate 2024-10-16
[Table view] Category:Bases Change
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 20042004-02-26026 February 2004 Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 20032003-07-24024 July 2003 TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 20032003-01-15015 January 2003 Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 20022002-10-14014 October 2002 Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.22002-01-31031 January 2002 Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 20022002-01-16016 January 2002 Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 ML18053A6971991-05-0808 May 1991 License Amendment Request Technical Specification Change Request NPF-38-114 2024-10-16
[Table view] Category:Technical Specifications
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis ML21116A1432021-04-26026 April 2021 (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML20148M1062020-06-22022 June 2020 Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-03-0303 March 2016 Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15244B3862015-09-0303 September 2015 Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 Years ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink2012-10-0808 October 2012 Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train2012-05-22022 May 2012 Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML1125103192011-09-20020 September 2011 Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits Report ML1109501232011-04-0404 April 2011 Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License Page ML1021001582010-09-13013 September 2010 Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and Actions ML1021504662010-09-13013 September 2010 Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear Fuel W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.2010-07-20020 July 2010 License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System. 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References ML1011100352010-04-22022 April 2010 Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function ML1005504632010-02-22022 February 2010 Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program2010-02-22022 February 2010 License Amendment Request, Technical Specification Change Regarding Steam Generator Program W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-12009-10-22022 October 2009 License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1 W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-06-0303 June 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 ML0819904722008-07-30030 July 2008 License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis ML0803800062008-04-16016 April 2008 License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis ML0804401272008-02-12012 February 2008 2/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability2007-08-16016 August 2007 License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability ML0711603482007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod Cladding 2024-08-07
[Table view] |
Text
Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Killona, LA 70057 Tel 504 739 6660 Fax 504 739 6678 kwalshl @entergy.com Kevin T. Walsh Vice President, Operations Waterford 3 W3F1-2008-0051 January 8, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Entergy's Response to NRC's Request for Additional Information (RAI)
Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
References:
- 1. Entergy letter dated August 16, 2007, "License Amendment Request NPF-38-273 To Modify Requirements Regarding Control Room Envelope Habitability"
- 2. NRC letter dated July 11, 2008, "Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability"
Dear Sir or Madam:
By letter dated August 16, 2007 (Reference 1), Entergy Operations, Inc. (Entergy) proposed changes to the Waterford 3 Technical Specifications (TSs) consistent with NRC approved Industry/Technical Specification Task Force traveler TSTF-448, Revision 3, "Control Room Habitability." On July 11, 2008, Entergy received an NRC request for additional information (RAI) regarding Entergy's proposed License Amendment Request. In addition to the response to the RAI, Entergy has updated the License Condition as submitted in Reference 1 to reflect the latest date of the Control Room pressure boundary test. This change is documented on attachment 2 as insert 4. The specific change is indicated by revision bar.
The response includes additional TS changes that better align the Waterford 3 TS with TSTF-448. The original no significant hazards consideration included in Reference 1 is not affected by any information or changes proposed by this supplemental letter. provides marked-up TS pages that show proposed modifications to the original changes submitted by Reference 1. Attachment 3 provides additional TS Bases changes for your information which, in part, address the NRC RAI. contains the new commitments for this submittal. ,4jO2..
W3F1-2008-0051 Page 2 Please contact Robert J. Murillo at (504) 739-6715 if you have any questions or require additional information.
I declare under penalty of perjury that the foregoing is true and correct. Executed on January 8, 2009.
Since KTW/GCS/ssf Attachments:
- 1. Response to Request for Additional Information (RAI) Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability
- 2. Marked up TS Pages
- 3. Changes to Technical Specification Bases 3/4.7.6.1
- 4. List of Regulatory Commitments
W3F1-2008-0051 Page 3 cc: Mr. Elmo E. Collins, Jr.
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-381.7 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004
Attachment 1 W3F1-2008-0051 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability to W3F1-2008-0051 Page 1 of 4 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability
RAI 1
Please explain how partial adoption of U.S. Nuclear Regulatory Commission (NRC) approved Technical Specification Task Force (TSTF)-448, Rev. 3, will ensure that the Technical Specifications (TS) will contain adequate Surveillance Requirements (SR) per Title 10 of the Code of Federal Regulations (10 CFR) 50.36(d)(3).
Background:
10 CFR 50.36(d)(3) states that TS will include SR which "are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met."
Proposed SR 4.7.6.1 .g is equivalent to SR 3.7.11 4 (CE Plants) in NRC approved TSTF-448, Rev. 3, "Control Room Habitability." SR 3.7.11.4 in TSTF-448, Rev. 3 contains a Bases discussion that provides amplifying information on the evaluation criteria used for the SR and also provides amplifying information on the TS actions that are carried out when the evaluation criteria is not met. This amplifying information ensures that the SR is conducted in a manner such that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met per 10 CFR 50.36 (d)(3). The proposed SR 4.7.6.1 .g does not contain the Bases discussion as found in TSTF-448, Rev. 3, therefore it is unclear how SR 4.7.6.1 g will meet 10 CFR 50.36(d)(3).
Entergy Response:
The proposed License Amendment Request (LAR) fully adopts the Technical Specification Task Force (TSTF)-448, Revision 3, for the proposed change to Surveillance Requirement (SR) 4.7.5.1.g. Consistent with the TSTF, proposed TS 6.5.17, "Control Room Envelope Habitability Program," prescribes the testing method, testing frequency, and the unfiltered inleakage limit associated with SR 4.7.6.1 .g. The evaluation criteria that will be used for SR 4.7.6.1.g along with amplifying information on the TS actions to be completed when the evaluation criteria is not met will be included in the TS Bases and will incorporate the Bases information in TSTF-448, Revision 3. The Bases will be changed concurrent with the implementation of the LAR via the Bases Control Program. Attachment 3 provides a proposed change for the TS Bases.
RAI 2
Describe which portions of the Control Room Air Conditioning System are applicable to the limiting conditions of operations (LCO) 3.7.6.1, "Control Room Emergency Air Filtration Trains (S-8)," and which portions are applicable to proposed LCO 3.7.6.5, "Control Room Air Isolation and Intake Valves," in order to ensure that actions listed in the LCOs continue to meet 10 CFR 50.36(d)(2)(i).
Background:
10 CFR 50.36(d)(2)(i) states TS will include LCO which "are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee to W3F1-2008-0051 Page 2 of 4 shall shut down the reactor or follow any remedial action permitted by the TS until the condition can be met." LCO 3.7.6.1, "Control Room Emergency Air Filtration Trains (S-8)"
and LCO 3.7.6.5, "Control Room Isolation and Pressurization Boundaries," are retained in the TS in order to ensure that 10 CFR 50.36{d)(2}(i) is met.
LCO 3.7.6.1, "Control Room Emergency Air Filtration Trains (S-8)" currently applies to only the Control Room Emergency Air Filtration Trains (S-8) of the Control Room Air Conditioning System. LCO 3.7.6.5, "Control Room Isolation and Pressurization Boundaries," applies to the Control Room Envelope (CRE) and also applies to portions of the Control Room Air Conditioning System that provide isolations for the CRE.
The LAR proposes to modify LCO 3.7.6.5, "Control Room Isolation and Pressurization Boundaries," by changing it to LCO 3.7.6.5, "Control Room Air Isolation and Intake Valves,"
and moves the CRE operability requirements (except the isolation valves) to LCO 3.7.6.1, "Control Room Emergency Air Filtration Trains (5-8)." LCO 3.7. 6.1, "Control Room Emergency Air filtration Trains (S-8)," now has operability requirements for the CRE, but the LCO still only states "two Control Room Emergency Air Filtration Trains (S-8) shall be operable." Based on LCO 3.7.6.1 remaining the same, it is unclear if the portion of the Control Room Air Conditioning System that consists of the Control Room Emergency Air Filtration Train (S-8) has now been expanded. Referring to FSAR figure 9.4-3, "Reactor Auxiliary Building Ventilation Systems," or figure 6.4-1, "Control Room Air conditioning System Normal Operating Mode," discuss which portions of the Control Room Air Conditioning System are applicable to LCO 3.7.6.1, "Control Room Emergency Air Filtration Trains (8-8)," and which portions are applicable to LCO 3.7. 6. 5, "Control Room Air Isolation and Intake Valves." Having an understanding of how portions of the Control Room Air Conditioning System are divided between LCOs 3.7.6.1 and 3.7.6.5 is needed in order to ensure that actions listed in the LCO are appropriate, thereby ensuring that the lowest functional capability or performance levels of equipment required for safe operation of the facility is met per 10 CFR 50.36(d)(2)(i).
Entergy's Response:
Entergy's License Amendment Request (LAR) for the Control Room Habitability Technical Specification change, as documented in letter W3F1-2007-0033 dated August 16, 2007, did not clearly communicate which portions of the Control Room Air Conditioning System are applicable to the limiting conditions of operations (LCO) 3.7.6.1, "Control Room Emergency Air Filtration Trains (S-8)," and which portions are applicable to proposed LCO 3.7.6.5, "Control Room Air Isolation and Intake Valves. Following discussions with the NRC staff, Entergy is proposing to revise the LAR by deleting LCO 3.7.6.5 and incorporating those requirements into LCO 3.7.6.1 to be more consistent with TSTF-448. Based on this changes, the specific questions of the RAI are no longer applicable to the LAR as all portions of the Control Room Air Condition System are applicable to LCO 3.7.6.1.
The following modifications are proposed (added text is bolded to indicate changes).
- 1. TS 3.7.6.5 is deleted in its entirety.
- 2. New action d.1 of TS 3.7.6.1(INSERT 1 on page 9 of Attachment 2 to Reference 1) is modified as:
Attachment 1 to W3F1-2008-0051 Page 3 of 4 Immediately place OPERABLE control room emergency air filtration train in emergency radiation protection mode (or toxic gas isolation mode if automatic transfer to toxic gas isolation mode is inoperable); or The change is consistent with TSTF-448 and is needed because the isolation function for toxic gas protection is relocated from TS 3.7.6.5.
- 3. SR 4.7.6.1.d.2 is modified as:
Verifying that on a safety injection actuation test signal or a high radiation test signal, the train automatically switches into a recirculation mode of operation with flow through the HEPA filters and charcoal adsorber banks and the normal outside air flow paths are isolated.
The change is added to clarify that in the recirculation mode, the normal outside air flow paths are isolated. This specific verification was previously included with SR 4.7.6.5.c which is being deleted.
- 4. New SR 4.7.6.1.d.4 is added as:
Verifying that on a toxic gas detection signal, the system automatically switches to the isolation mode of operation.
The change is needed because the isolation function for toxic gas protection is relocated from TS 3.7.6.5 to TS 3.7.6.1. This surveillance was previously listed as SR 4.7.6.5.b which is being deleted.
RAI 3
It is unclear as to whether approval of this amendment would ensure that 10 CFR 50.36(d)(2)(i) would continue to be met. Explain how actions a, b, and c of LCO 3.7.6.5 will result in immediate or steady state conditions with unfiltered air inleakage lower than the assumed flow rate in the licensing basis analyses of DBA consequences.
L
Background:
The LAR proposes to modify LCO 3.7.6.5, "Control Room Isolation and Pressurization Boundaries," by changing it to LCO 3.7 6 5, "Control Room Air Isolation and Intake Valves," and modifies and moves the CRE operability requirements (except the isolation valves) to LCO 3.7.6.1, "Control Room Emergency Air Filtration Trains (S-8)". The proposed actions for an inoperable CRE that are modified and relocated to LCO 3.7.6.1 are consistent with TSTF-448, Rev. 3. The proposed actions and SR verify that the unfiltered air inleakage into the CRE is no greater than the flow rate assumed in the licensing basis analyses of DBA consequences. When unfiltered air inleakage is greater than the assumed flow rate, mitigating actions are taken. However, actions a, b, and c of LCO 3.7.6.5 remain the same. It is unclear if actions a, b, and c will result in immediate or steady state conditions with unfiltered air inleakage greater than the assumed flow rate in the licensing basis analyses of design basis accidents (DBA) consequences, which could result in the lowest functional capability or performance levels of equipment required for safe operation of the facility not being met per 10 CFR 50.36(d)(2)(i).
to W3F1-2008-0051 Page 4 of 4 Enterqy's Response As discussed in the response to Question 2, Entergy is proposing to delete LCO 3.7.6.5 and incorporate those requirements into LCO 3.7.6.1.
The control room normal flow path isolation valves and the emergency intake isolation valves are considered to be part of the CRE boundary. Thus, the inoperability of any of these valves will require action b of TS 3.7.6.1 to be met. These actions ensure that unfiltered inleakage will remain within limits.
Attachment 2 W3F1-2008-0051 Additional Marked up Changes to Technical Specifications to W3F1-2008-0051 Page 1 of 5 PLANT SYSTEMS CNROL o06ISOLTION ADPEsu TIO IT T 0 3.7.6.5 The control room enve e isolation and pressurization boundaries shall be OPERABL .
APPLICABILITY: All M S and during movement of irradiated fuel asse ies.
AUIO With either control room envelope isolatio Ile in a normal outside air flow path inoperable, maintain at lea one isolation valve in the flowpath OPERABLE, and eithe store the inoperable valve to OPERABLE status with 7 days solate the affected flow path within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. With any Control Roo mergency Fitter Outside Air Intake v (s) inoperable, mainta at least one of the series isolation valv in a flowpath OPE LE, and either restore the inoperable ve(s) to OPERABL atus within 7 days or isolate the affec flow path within th llowing 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. W' more than one Control Room Emerg cy Filter Outside Air Intake ow path inoperable, maintain at least , flow path per intake operable and restore an additional e path to operable status within 7 days or, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the folio g 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- d. With the control room velope inoperable as a result of causes other than those addres by ACTION (a), (b), or (c) above:
- 1. Withi hour and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter wh' th ontrol room envelope is inoperable, verify that the mergency Breathing Airbanks pressure is greate an or equal to 1800 psig.
- 2. MODES 1-4:
- a. Ifthe cause of control r envelope inoperability is due to a known breach. he envelope of less than or equal to one square fo otal area or the breach is associated with a perman sealing mechanism (e.g., blocking open or remo ia door) then operation may continue for up to 7 ys after the control room envelope is declared inoperable. Otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ERFORD - UNIT 3 3/4 7-18c AMENDMENT NO. q15,-I49, 188 to W3F1-2008-0051 Page 2 of 5
- b. If a cause of control room envelope i perability is -
J of the failure Is due to a breach Ithn the allowable S limits of ACTION d.2. th en* ration may continue for up
.... . .. . .. J .. . . to 7days after the contro ,~ m envelope is-declared ...... . ...
~~inoperable. Othe=iJ~~ aI HOT STANDBY within the next
- 6 or n O TON within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
C. Sol oIgseetocr. take Immediate-steps to/,
J _ , .. _ restore rtrol room envelope integrity. .
- 3. MODES ,6 n uin oeeto irdae u ssemblies:
a upn l prtosivlving COR IILTERATIONS and S movemn firaitdfe assem :*s, and Ifda toxic gas event occurs aeimdaesest soe control room envelope
.6. The control room envelope iso/l iOnon and pressurization boundaries shall be demonstrated OP*F BLE at least once per. 18 months by:.
- a. Verifying th a*H control room envelope can be maintained at a positive s*dsure of greater than or equal to 1/8 Inch water goe outside atmosphere with a make-up air floate less o the to 200 cfm during system operation.
rrelat or equal *
. /,th, b.j Verifying that on a toxic gas detection test si 1,the system J ~automatically switches to the isolation m aeof operation.
C. Vrfibta nasft Inec lcuon test signal or a high WATERFORD - UNIT 3 "3/4 7-1 8d Amendment No. 4+15349 to W3F1 -2008-0051 Page 3 of 5 Insert 1
- a. With one control room emergency air filtration train inoperable for reasons other than ACTION b, restore the inoperable train to OPERABLE status within 7 days.
- b. With one or more control room emergency air filtration trains inoperable due to inoperable control room envelope boundary in MODES 1, 2, 3, or 4, then perform the following:
.1. Immediately initiate action to implement mitigating actions; and
- 2. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify mitigating actions ensure control room envelope occupant exposures to radiological, chemical, and smoke hazards will not exceed limits; and
- 3. Within 90 days, restore the control room envelope boundary to OPERABLE status.
- c. If the required ACTION and associated allowable outage times of ACTION a or b are not met in MODES 1, 2, 3, or 4, then be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- d. Ifthe required ACTION and the associated allowable outage time of ACTION a is not met in MODES 5 or 6, or during movement of irradiated fuel assemblies, then perform the following:
- 1. Immediately place OPERABLE control room emergency air filtration train in emergency radiation protection mode;or
- 2. Immediately suspend movement of irradiated fuel assemblies and operations involving CORE ALTERATIONS.
- e. With one or more control room emergency air filtration trains inoperable due to an inoperable control room envelope boundary in MODES 5 or 6, or during movement of irradiated fuel assemblies, immediately suspend movement of irradiated fuel assemblies and operations involving CORE ALTERATIONS.
- f. With two control room emergency air filtration trains inoperable in MODES 1, 2, 3, or 4 for reasons other than ACTION b, immediately enter LCO 3.0.3.
- g. With two control room emergency air filtration trains inoperable in MODES 5 or 6 or during movement of irradiated fuel assemblies, immediately suspend movement of irradiated fuel assemblies and operations involving CORE ALTERATIONS.
0)A/ r Oi I to W3F1 -2008-0051 Page 4 of 5 PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- 2. Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5% when tested in accordance with ASTM D3803-1989at a temperature of 30'C and a relative humidity of 70%.
- 3. Verifying a system flow rate of 4225 cfm 1:10% during train operation when tested in accordance with ANSI N510-1975.
- c. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5% when tested in accordance with ASTM D3803-1989 at a temperature of 30'C and a relative humidity of 70%.
- d. At least once per 18 months by:
I. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.8 inches water gauge while operating the train at a flow rate of 4225 cfm +/-10%.
- 2. Verifying that on a safety injection actuation test signal or a high radiation test signal, the train automatically switches into a recirculation mode of operation with flow through the HEPA filters and charcoal adsorber ba n k & t-j r. M A 03 % lor-' P ,34 k s
- 3. Verifying that heaters dissipate 10 +1.0, -1.0 kW when tested in accordance with ANSI N510-1975.
- e. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/-10%.
- f. After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/-1 0%.
WATERFORD - UNIT 3 3/4 7-17 AMENDMENT NO. q 45,7 194 M d 1 r( tt Slciv 1)1 e --pf' At'A MI'al J/I 5 'J tcie5 foie to W3F1-2008-0051 Page 5 of 5 Insert 4 Upon implementation of Amendment No. xxx adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 6.5.17, in accordance with TS 6.5.17.c.(i), the assessment of CRE habitability as required by Specification 6.5.17.c.(ii), and the measurement of CRE pressure as required by Specification 6.5.17.d, shall be considered met. Following implementation!
(a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i),
shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
(b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
(c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously.
'Attachment 3 W3FI-2008-0051 Changes to Technical Specifications Bases 3 / 4.7.6.1 to W3F1 -2008-0051 Page 1 of 3 3/4.7.6,1 Control Room Emeren cyAirFiltration System Surveillance Requirements
- g. This SR verifies the OPERABILITY of the CRE boundary by testing for unfiltered air inleakage past the CRE boundary and into the CRE. The details of the testing are specified in the Control Room Envelope Habitability Program.
The CRE is considered habitable when the radiological dose to CRE occupants calculated in the licensing basis analyses of DBA consequences is no more than 5 rem TEDE and the CRE occupants are protected from hazardous chemicals and smoke. This SR verifies that the unfiltered air inleakage into the CRE is no greater than the flow rate assumed in the licensing basis analyses of OBA consequences. When unfiltered air inleakage is greater than the assumed flow rate, Action b must be entered. Action b.3 allows time to restore the CRE boundary to OPERABLE status provided mitigating actions can ensure that the CRE remains within the licensing basis habitability limits for the occupants following an accident. Compensatory measures are discussed in Regulatory Guide 1.196, Section C.2.7.3, (Ref. 1) which endorses, with exceptions, NEI 99-03, Section 8.4 and Appendix F (Ref. 2). These compensatory measures may also be used as mitigating actions as required by Action b.2. Temporary analytical methods may also be used as compensatory measures to restore OPERABILITY (Ref. 3). Options for restoring the CRE boundary to OPERABLE status include changing the licensing basis DBA consequence analysis, repairing the CRE boundary, or a combination ofthese actions. Depending upon the nature of the problem and the corrective action, a full scope inleakage test may not be necessary to establish that the CRE boundary has been restored to OPERABLE status.
References
- 1. Regulatory Guide 1.196
- 2. NEI 99-03, "Control Room Habitability Assessment," June 2001.
- 3. Letter from Eric J. Leeds (NRC) to James W. Davis (NEI) dated January 30, 2004, "NEI Draft White Paper, Use of Generic Letter 91-18 Process and Alternative Source Terms Inthe Context of Control Room Habitability." (ADAMS Accession No. ML040300694).
to W3F1-2008-0051 Page 2 of 3 BASES 314.7.8.3 and 314,71.4 CONTROL ROOM AIR TEMPERATURE Maintaining the control room air temperature letss han or equal to 80F ensures that (1) the ambile air temperahune does not exceed the allowable air temperature for continuous duty rating for the equipment and instrumentation in the control room, and (2) the control room will remain habitablefor operations personnel durIng plant opratlon.
The Air Condltioning Systm i dewned to cool 1the outlet air to approximate* ,.F. Then, non-sal-related ner-room healem add enough Mest to the air stream to keep ite rooms betweom 70 and 75-F. AWnugh 70 b 75OF is ft normal control bond, itwould be too restrictive as an LCO. Control Room equipment was speciffed fora morm general twmnperatumu range to 45 to 1206F. Aprovision for fthCPC ncirocomputeru which might be more sensitive to heat, is not requad hem. Since maximum outslde 4r make-uploaw in Otw nora veatlon mode comprises less than Mta pecen of.the air flow from an AH-12 unf, oultse air temperature has i aMfect on the A U-ls coolng coI heat load. Therefore, the ability of an AH-12 unit to maka*a control room temperature Inthe normal mode gives adequate assurance of its capability for emergency siuatlion&
The ACTION to suspend ad operatons involving movement of irnadlated fuel assembles shall not precludeem oonltl of movement to a safe conservativ posM~ton, BEx-r-5
~
I~ ,,pc MCI d AR0NTATEMENTSf Ion ound Inoperable (O)
The comPonen M ringC edýo'*fo Operation the control (LCO) room van .*s nd to W3F1-2008-0051 Page 3 of 3 COTfLD 77A T3/41 NTILTOproARF thepJro 1e, ae ae e .. )OMain o IIII v i eon v arg roomol~ y tm ansuosition -durcing ouldf~g WOA fts abitrm nisitei raktghe envoloipmn ath a iratisprof this eroste in rnam9.reun ebcfounafdtadsgnwInw ~l~assme orsaft!!E o breach
Attachment 4 W3F1-2008-0051 List of Regulatory Commitments to W3F1 -2008-0051 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (check One)
ONE-SC SCHEDULED E U E TIME CONTINUING COMPLETION DATE COMMITMENT ACTION COMPLIANCE (If Required)
The evaluation criteria that will be used x 120 days following for the SR along with amplifying approval of the information on the TS actions to be License Amendment.
completed when the evaluation criteria is not met will be included in the TS Bases and will be consistent with TSTF-448. The TS Bases will be changed concurrent with the implementation of the LAR and changed via the TS Bases Control Program.