Request for: Approved, Closed | |
Results Other: A01657, Forwards Revised Pages for Inservice Insp & Testing Program Submitted in for 10-yr Interval 801228-901228. Revised Program for Pumps Will Continue to Be Implemented Unless Informed Otherwise, A02327, Forwards Revised Page 4 to 790625 Inservice Insp & Test Program for Pumps,Valves & Pressure Tests, in Response to NRC 820226 Request, B10202, Discusses Proposed Revision to Inservice Insp Program Whereby Exam of Primary Reactor Coolant Sys Piping Would Be Conducted Using Exam Techniques in ASME Code.Revision Found Necessary During 1980 Refueling Outage, ML19241B658, ML19246A684, ML19261E233, ML19261E236, ML19270F351, ML20002D636, ML20009B884, ML20009B885, ML20028A679, ML20040C965, ML20062B950, ML20062B955, ML20083K659 | |
| From | |
MONTHYEARML20083K6591979-01-25025 January 1979
[table view]Forwards Updated Inservice Insp & Testing Program Describing Operational Readiness Testing for Essential Pumps & Valves & Program of Periodic Pressure Tests.Program Will Be Implemented on or About 790426 ML19270F3511979-01-31031 January 1979 Forwards Page Accidentally Omitted from Recent Submittal on Inservice Insp Program ML19246A6821979-05-11011 May 1979 Discusses Preliminary Review of 781026 & 790125 Submittals Re Proposed Inservice Insp & Testing Tech Specs & Request for Relief from Selected ASME Code Requirements.Notice of Relief Encl ML19246A6841979-05-11011 May 1979 Notice Granting Relief from ASME Section XI Inservice Insp & Testing Requirements ML19241B6581979-06-0707 June 1979 Requests Addl Info on Inservice Insp Program Re Hydraulic Snubers,Closure Head Welds,Thread Roots & nozzle-to-vessel Welds of Shutdown Heat Exchangers ML19261E2331979-06-25025 June 1979 Forwards Inservice Insp & Test Program for Pumps,Valves & Pressure Tests, for 790426-801226 ML19261E2361979-06-25025 June 1979 Inservice Insp & Test Program for Pumps,Valves & Pressure Tests, for 790426-801226 ML20002D6361981-01-13013 January 1981 Ro:On 801209,inservice Insp Revealed That Required Valve Operability Tests Not Performed During Third Calendar Quarter 1980.Valves Successfully Tested.Action Taken to Assure Timely Review of Valve Test Data B10202, Discusses Proposed Revision to Inservice Insp Program Whereby Exam of Primary Reactor Coolant Sys Piping Would Be Conducted Using Exam Techniques in ASME Code.Revision Found Necessary During 1980 Refueling Outage1981-05-0101 May 1981 Discusses Proposed Revision to Inservice Insp Program Whereby Exam of Primary Reactor Coolant Sys Piping Would Be Conducted Using Exam Techniques in ASME Code.Revision Found Necessary During 1980 Refueling Outage ML20009B8851981-07-0101 July 1981 Notice of Issuance & Availability of Amend 70 to License DPR-65 ML20009B8841981-07-0101 July 1981 Amend 70 to License DPR-65,revising Tech Specs to Incorporate Inservice Insp & Inservice Test Requirements & Remove Outmoded Requirements A01615, Notifies That Util Will Submit Status of Compliance W/ NUREG-0313,Revision 1 Re BWR Coolant Pressure Boundary Piping & Necessary Tech Spec Change Requests by 811001,in Response to NRC1981-07-0101 July 1981 Notifies That Util Will Submit Status of Compliance W/ NUREG-0313,Revision 1 Re BWR Coolant Pressure Boundary Piping & Necessary Tech Spec Change Requests by 811001,in Response to NRC A01657, Forwards Revised Pages for Inservice Insp & Testing Program Submitted in for 10-yr Interval 801228-901228. Revised Program for Pumps Will Continue to Be Implemented Unless Informed Otherwise1981-09-30030 September 1981 Forwards Revised Pages for Inservice Insp & Testing Program Submitted in for 10-yr Interval 801228-901228. Revised Program for Pumps Will Continue to Be Implemented Unless Informed Otherwise ML20040C9651982-01-22022 January 1982 Forwards Revised Figures 1-4 Which Define Affected Areas of Steam Generator Tube Bundle to Which Util Proposed to Limit Cycle 5 Refueling Outage Steam Generator eddy-current Exams. Revised Figures Part of Proposal to Limit Inservice Insp ML20041E8601982-02-26026 February 1982 Forwards Request for Addl Info Re Inservice Insp Program. Response Requested within 30 Days of Receipt of Ltr A02327, Forwards Revised Page 4 to 790625 Inservice Insp & Test Program for Pumps,Valves & Pressure Tests, in Response to NRC 820226 Request1982-04-14014 April 1982 Forwards Revised Page 4 to 790625 Inservice Insp & Test Program for Pumps,Valves & Pressure Tests, in Response to NRC 820226 Request A02260, Forwards Response to NRC 820125 Request for Addl Info Required to Complete Evaluation of SEP Topic III-3.C, Inservice Insp of Water Control Structures1982-05-28028 May 1982 Forwards Response to NRC 820125 Request for Addl Info Required to Complete Evaluation of SEP Topic III-3.C, Inservice Insp of Water Control Structures ML20062B9551982-06-0404 June 1982 Inservice Insp Rept IR-ISI-010, Fourth Refueling Outage Inservice Insp Rept for Northeast Utils Millstone Point, Unit 2. Class 1 Piping Inspected ML20062B9501982-07-16016 July 1982 Forwards Inservice Insp Rept IR-ISI-010, Fourth Refueling Outage Inservice Insp Rept for Northeast Utils Millstone Point,Unit 2 ML20028A6791982-11-0404 November 1982 Grants Relief from Inservice Insp Requirements of Section XI of ASME Boiler & Pressure Vessel Code.Grant Will Not Result in Significant Environ Impact.Ser & Fr Notice Encl 1981-07-01 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:8320&oldid=4546817"