TAC:6605
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results Other: ML19207B765, ML19207B986, ML19259B236, ML20041E173, ML20244A471, ML20244A611, ML20245C325 | |
| From | |
MONTHYEARML20244A4711978-07-15015 July 1978
[table view]Comments on Subj Facil Soil Study of Category I Struc. Studies 1-4 Conclude That Liquefaction Should Not Occur During the Simultaneous Occurrence of the SSE & the 25 Year Flood.Agrees W/Studies & Suggests a Portion Be Amplified ML19259B2361979-01-0909 January 1979 Request Addl Info on Suppl 2 to Soil study-Category 1 Structures for Completion Review.Requests Liquefaction Analysis of Area Northwest of Category 1 Structures & Should Be Completed by Mid Jan 1979 ML20245C3251979-01-25025 January 1979 Response to Questions 362.1,362.2 & 362.3 of NRC Ltr ML19259B5081979-02-0606 February 1979 Documents Info Which Has Been Developed Since 790126 Site Meeting W/Util.Request by Util to Adopt & Design Ground Acceleration of 0.10 G on Unit 1 on an Interim Basis Is Acceptable ML19263C3951979-02-12012 February 1979 As Result of 790125-26 Meeting,Core Boring Program Is Underway to Obtain Addl Soil Samples for Liquefaction Analysis.Will Develop Program for Stability Improvement If Necessary.Will Complete Activities by 790430 ML20244A6391979-04-0202 April 1979 Summary of 790126 Meeting W/S&W to Discuss Soils Study & Site Liquefaction.Submits Util Responses to Questions 362.1,362.2 & 362.3 of NRC & Other Supporting Documentation ML20244A6111979-05-0202 May 1979 Forwards Response to Questions 362.1,362.2 & 362.3 of NRC .Also Forwards Soil Analysis of Turbine Bldg & Northern Yard Area, ,in Response to Question 362.4 ML19207B7651979-08-29029 August 1979 Submits Errata Sheets 1 & 2 for Rept on Soil-Structure Interaction in Development of Amplified Response Spectra ML19207B9861979-08-30030 August 1979 Requests Approval to Eliminate Administrative Control Described in Re Min River Water Elevation for Operation.Core Boring & Liquefaction Analyses Reveal No Potential for Liquification ML19320C8801980-06-20020 June 1980 Recommends That Analysis Be Made of Impact of Estimated Average Dynamic Settlement on Equipment & Pipe Connections within Turbine Bldg.Info Needed for Review of Util 790502 Soil Analysis of Turbine Bldg & Northern Yard Area ML19351G4591981-01-27027 January 1981 Responds to 790830 Request to Eliminate Administrative Control Implementing Tech Spec 3.7.6.1A App a Action Statement.Partial Review of 790502 Submittal Verified Control No Longer Required & May Be Removed ML20041E1731982-02-17017 February 1982 Forwards Info Per 800620 Request Re 790502 Soil Analysis of Turbine Bldg & Northern Yard Area. Soil Sys Interaction Amplified Response Spectra Considered Design Basis for Plant Re Seismic Accelerations 1979-04-02 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:6605&oldid=3220027"