Letter Sequence Meeting |
---|
|
|
MONTHYEARML20244A4711978-07-15015 July 1978 Comments on Subj Facil Soil Study of Category I Struc. Studies 1-4 Conclude That Liquefaction Should Not Occur During the Simultaneous Occurrence of the SSE & the 25 Year Flood.Agrees W/Studies & Suggests a Portion Be Amplified Project stage: Other ML20245C3251979-01-25025 January 1979 Response to Questions 362.1,362.2 & 362.3 of NRC Ltr Project stage: Other ML20244A6391979-04-0202 April 1979 Summary of 790126 Meeting W/S&W to Discuss Soils Study & Site Liquefaction.Submits Util Responses to Questions 362.1,362.2 & 362.3 of NRC & Other Supporting Documentation Project stage: Meeting ML20244A6111979-05-0202 May 1979 Forwards Response to Questions 362.1,362.2 & 362.3 of NRC .Also Forwards Soil Analysis of Turbine Bldg & Northern Yard Area, ,in Response to Question 362.4 Project stage: Other 1979-01-25
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl 1999-06-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl ML20132C7381985-02-21021 February 1985 Summary of 841210-14 Site Visit 5 to Observe INPO Accreditation Team Evaluation of Adequacy of INPO Accreditation Process in Meeting Intent of Policy Statement on Training & Qualifications for Power Plants 1999-06-16
[Table view] |
Text
- _ _ _ - - - - _ _ - _ __
I q - 3 f
y%
UNITED STATES
/4 NUCLEAR REGULATORY COMMISSION 3.ji#l j WASHINGTON, D. C. 20555 4, f N o,,,,
- APRIL 2 1979 i Docket No. 50-334 LICENSEE: Duquesne Light Company FACILITY: Beaver Valley Power Station, Unit No.1
SUBJECT:
MEETING
SUMMARY
- CATEGORY I S0ILS STUDY The NRC staff met with the licensee and its architect engineer for Beaver Valley Power Station Unit No.1, (BVPS-1) the Stone and Webster (S&W) Company, on January 26, 1979 to discuss the soils 1 study and site liquefaction at BVPS-1, (see Attachment 1 for list of attendees).
BACKGROUND l
In early December,1978, the Geosciences Branch of the Division of Site Safety and Environmental Analysis performed a review of the BVPS-1 soils study, Supplement No. 2 (May 1, 1978). The soil study is further documented as follows:
- 1. Summary of Meeting with Duquesne Light Company on November 15, 1977, to discuss the Soil Study Program at Beaver Valley Power Station - Unit No.1 (issued 12/22/77);
- 2. Soils Study-Category I Structures (Response to NRC letter of 11/17/76) Beaver Valley Power' Station - Unit No.1.
Duquesne Light Company, DLC letter dated February 14, 1977;
- 3. Supplement to Soil Study-Category I Structures (Response to NRC Meeting of 11/15/77) Beaver Valley Power Station -
Unit No. 1. Shippingport, PA. , DLC letter dated January 13, 1978;
- 4. Supplement No. 2 to Soil Study-Category I Structures (Response to NRC Meeting on 11/1S/77), Beaver Valley Power Station -
Unit No. 1, Shippingport, PA, DLC letter dated May 1, 1978.
A review of the above information was also performed by Dr. F. E. Richart, consultant to Advisory Comittee on Reactor Safeguards, and his findings ,
confirmed those of the licensee and staff that, subject to clarifying j some details of soils testing program, the safety factors against the i potential for liquefaction are adequate.
hD52A0%8 L DR \
i
f '
]
The calculations and analyses were performed on the soils and areas beneath seismic Category 1 structures which house safety related equip-ment and systems. Dr. Richart's findings were presented in his letter to the ACRS dated July 15, 1978.
In the staff's December 1978 review, the liquefaction potential immediately adjacent to the Category 1 structures was investigated to determine the potential for liquefaction and loss of stability in adjoining areas which might affect Category 1 structures. Preliminary staff calculations during this review indicated a liquefaction potential beneath the turbine building and in plant area just riverward of the turbine building. These calculations were based on the 25 year flood (690 mean sea level), the Safe Shutdown Earthquake (SSE), lower confining pressures in this area due to reduced overburden loading ,
and laboratory soils data developed in March and April 1978 on samples recovered in the foundation of the BVPS Unit No. 2. Our ,
preliminary calculations also showed that the safety factor against liquefaction was dependent upon water level. Allowing for a margin of safety against liquefaction of 1.1 on a temporary basis and acepting an SSE ground acceleration of 0.125g, we calculated the water level in the turbine building area could rise to elevation 676. The licensee was advised of these calculations on December 21, 1978.
By NRC letter en January 9,1979 the licensee was requested to provide additional information and details of the completed soils testing program, as identified earlier by Dr. Richart and the staff review comments, and to conduct a liquefaction analysis of the affected a reas . A meeting date of January 23 or 24 was established to discuss the results of the requested liquefaction analysis and the need for a stability analysis.
MEETING
SUMMARY
Duquesne Light Company's Consultant, Stone & Webster Engineering Corporation (S&W), presented responses to information requests 362.1, 362.2 and 362.3 (see attachment 2). These requests were fomarded by our letter of January 9,1979, Duquesne Light Company. The ,
stability analysis of request 362.4 was underway; the results were to )
be forwarded to the NRC. l A copy of a Stone and Webster interoffice memorandum dated l January 24, 1979, which was provided, contained the results of a study ]
defining the stage and duration of flood events f rom 1972 to the present l at the Beaver Valley site (see attachment 3). These data show that, !
although the river occasionally has had high levels the time the level has been above 675 feet has been relatively short, on the order of 24 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in most cases.
l
______________a
l t '
i There was considerable discussion on the methods and basis being used to compute cylic shear stresses induced by the design earthquake. Stone and Webster has essentially use Fig. 2.6-7 from Volume 1 of the FSAR for Unit 1 which has a peak ground acceleration of 0.10g. The NRC staff used the maximum ground surface acceleration of 0.125g, established for the Safe Shutdown Earthquake (SSE), as input to the Seed and Idriss analytical method and adopted an average value for rd (a stress reduction factor that allows for the deformable nature of the soil). For foundation conditions near the turbine building, the difference between the 0.125g and 0.10g acce-1eration levels is significant on the results of the liquefaction analysis. Duquesne Light Company representative requested that NRC accept their basis and method and recommended design acceleration level of 0.109, at least on an interim basis, until current foundation evalua-tion studies are completed. There was no agreement reached on this issue at this meeting and this difference was to be further discussed with the NRC reviewing seismologist at the Bethesda office.
There was agreement between Duquesne Light Company and the NRC staff that, for an SSE (0.125g) an acceptable margin of safety against liquefaction in the turbine building area would not;be available 3 under the water level predicted for 25-year flood. This conclusion is based on considering both the records of completed borings for Unit 1 and on completed cyclic triaxial laboratory test data.
There was also agreement that both settlement and lateral dis-placement of foundation soils caused by dynamic loading must be addressed.
Conceptual approaches for improving the foundation stability of the turbine building area were briefly discussed and included schemes of permanent dewatering and grouting, (either chemical or combination of chemical-cement grout) .
Duquesne Light Company, DLC, plans to drill additional borings in the plant area just north of the turbine building beginning the week of February 5, 1979. These borings were originally intended for the founda-tion investigation of the proposed Condensate Polishing Building. The original boring program will be modified to investigate the loose granular zone which has been indicated in completed borings 108 and 109. Discussions were held on the importance of good sampling pro-cedures and addressing the impact of gravel particles on the recorded Standard Penetration Test. The DLC onsite quality assurance group will closely monitor the borings to assure quality of the results. Tenta-l tive arrangements were established to have a Region I inspector visit the site and monitor the OA activities during the time of actual driliing. Expansion of the exploration program to include borings in the actual turbine building foundation is a possibility depending on the significance of findings in the initial borings.
l l
L _- _ _
e Based on the S&W calculations and the review by the Offsite Review Comittee for the BVPS Unit No.1, DLC imposed an administrative control on the operation of the reactor that should the river level exceed 680 feet mean sea' level as measured at the main water intake structure, I the reactor would be shutdown, (see attachment 4). The IE inspector l verified that this administrative control was already operational and the shift operators were being made aware of_this change. !
l I['
Dave Wigginton, Project Manager ;
j Operating Reactors Branch #1 i Division of Operating Reactors l
Attachments:
l l
- 1. List of Attendees
- 2. Duquesne Light Company January 25, 1979, responses to requests for additional information 362.1, 362.2, and 362.3 made by NRC letter dated January 9,1979.
- 3. Stone and Webster Interoffice Memorandum from N. B. Lemieux to D. S. Campbell, subject "Recent Flood History Beaver Valley i Power Station" dated January 24, 1979. )
- 4. Administrative Control 3/4 7.6 Flood Protection, imposed l' January 26, 1979 and signed by J. A. Erling, Station Superintendent.
l cc: Next page l
I I
I l
l
_ _ _ - - _ - - _ - - - - - _ - - - - . - - - - - - - - . ]
I a >
I Meeting Sunmary for j l Matters Relating to March 13, 1979 '
Show Cause Orders Docket Files Program Support Branch P-428 NRC POR Principal Staff Participants i Local PDR )
ORB Rdg i NRR Rdg C. Kammerer J. Fouchard H. Denton ,
E. Case l V. Stello l R. Mattson l R. Boyd j R. DeYoung ]
- 0. Eisenhut l R. Vollmer 1 R. Denise !
J. P. Knight {
A. Schwencer l
- 0. Ziemann '
j T. Ippolito i R. Reid P. Check .
J G. Lainas 1
- 0. Davis B. Grimes V. Noonan F. Shauer j R. Bosnak l L. Heller l K. Eichman D. Brinkman C. Nelson )j D. Neighbors P. Polk l D. Wigginton I OELD J. Scinto 1 J. Soucer (LPD? - acvance copy)
III (3' )
". .. F e ra r i c.s , III C3: (?
- . 5. owe. III I. Jer:c.". III j
- . Ferr w
\
["Qr37
- . 4ro:::cr
' raunc ' '"
Frile, . i.3 : ( ;
2^C2 TOC 10- - Tr SettinC: PE3 U C ~.P S 3 c i
i e: .
Attachment 1 o LIST OF ATTENDEES Nuri T. Georges Stone & Webster W. F. Swiger Stone & Webster J. J. Moran Stone & Webster Licensing J. Bajuszik DLC R. J. McAllister DLC W. G. Logan DLC D. A. Beckman USNRC IE/ Reg. I J. J. Carey DLC D. L. Wiggintob6# USNRC D. S. Campbell Stone & Webster J. D. Kane NRC, Geotech. Engr.