Pages that link to "ARDI"
← ARDI
Jump to navigation
Jump to search
The following pages link to ARDI:
Displayed 46 items.
- ML20133K216 (← links)
- ML20154A234 (← links)
- ML20153B273 (← links)
- ML20151Z105 (← links)
- ML20151Y138 (← links)
- ML20149M192 (← links)
- ML20195C782 (← links)
- ML20199A111 (← links)
- ML20198G228 (← links)
- ML20197D224 (← links)
- ML20197A490 (← links)
- ML20204H601 (← links)
- IR 05000317/1999004 (← links)
- ML20209C139 (← links)
- ML20212H024 (← links)
- ML20212H018 (← links)
- ML20212G985 (← links)
- ML20239A072 (← links)
- ML20249A644 (← links)
- ML20236W513 (← links)
- ML20215H863 (← links)
- ML20236N589 (← links)
- ML21278A304 (← links)
- ML21278A298 (← links)
- ML21278A301 (← links)
- ML20217M999 (← links)
- ML20212G960 (← links)
- ML20207M835 (← links)
- ML20207K490 (← links)
- ML20206M062 (← links)
- ML20205F885 (← links)
- ML20204H591 (← links)
- ML20204H454 (← links)
- ML20202J227 (← links)
- ML20196A182 (← links)
- ML20195E658 (← links)
- ML20151K114 (← links)
- IR 05000237/2024010 (← links)
- IR 05000254/2024010 (← links)
- 05000366/LER-1995-008, :on 951102,RV Inventory Loss Resulted in Unplanned ESF Sys Actuations.Revised Procedures & Drawings, Corrected Label,Reset LS-14,checked Limit Switches & Tested Valve Interlock Logic (← links)
- 05000269/LER-1993-010, :on 931103,manual Reactor Trip at 13% Full Power Was Initiated at 0100 Hours After Plant Transient. Caused by Equipment Failure.Corrective Actions:Repairing Wires & Cleaning Test Solenoid Valves (← links)
- 05000366/LER-1994-002-01, :on 940301,during Monthly Operability Test of HPCI Thrust Bearing Temp Increased to 437 F & Decreased Below 200 F.Caused by Mfg Error in Thrust Bearing Housing. Failed Bearing & Gear Coupling Replaced (← links)
- 05000456/LER-1993-007-07, :on 931213,both Trains of Control Room Ventilation Declared Inoperable Due to Equipment Failure & Procedural Deficiency.Failed Hydramotor Replaced & Frequency of Loop Calibr Will Be Increased (← links)
- 05000321/LER-1993-016, :on 931207,loss of FW Pump & Failure of Recirculation Pump Runback Resulted in Automatic Reactor Shutdown.Suppl Breaker to MCC Powering Lube Oil Sys Pump Inspected (← links)
- 05000457/LER-1993-007-06, :on 931003,unit 2 Tripped.Caused by Combination of Equipment Failure & Mgt/Qa Deficiency.Positioners on Unit 2 Fwrvs Replaced Prior to Unit Startup (← links)
- 05000321/LER-1994-004, :on 940416,discovered That Surveillance Frequency for Sp 34SV-SUV-008-1S Not Correct for Seven Primary Containment Vent & Purge Valves Due to Personnel Error.Surveillance Brought Up to Date (← links)