Pages that link to "66s-s000"
← 66s-s000
Jump to navigation
Jump to search
The following pages link to 66s-s000:
Displayed 50 items.
- ML20101F559 (← links)
- ML20100A686 (← links)
- ML20099B795 (← links)
- ML20096H502 (← links)
- ML20093M778 (← links)
- ML20093M649 (← links)
- ML20106D253 (← links)
- ML20117C750 (← links)
- ML20114D185 (← links)
- ML20137U382 (← links)
- ML20134G633 (← links)
- ML20133B532 (← links)
- ML20128Q015 (← links)
- ML20128K985 (← links)
- ML20128D438 (← links)
- ML20126M298 (← links)
- ML20126C432 (← links)
- ML20155B058 (← links)
- IR 05000423/1985099 (← links)
- ML20198H209 (← links)
- ML20203B267 (← links)
- ML20238C245 (← links)
- ML20237B995 (← links)
- ML20236N059 (← links)
- ML20235U558 (← links)
- ML20211Q046 (← links)
- B12636, Submits Addl Info Re IGSCC Insp Methods & Personnel Used During Exams,Orientation of Flaws,Overlay Design & Surface Condition of Weld RMBJ-1 & Jet Pump Instrumentation Nozzle Assembly Replacements & Inconel 182 Buttering (← links)
- B12712, Discusses License Condition Re SPDS Per NRC 851125 & 860131 Requests & Suppl 1 to NUREG-0737.Physical Location of Primary SPDS & Current Containment Isolation Display Retained.Commitments Will Be Implemented Prior to start-up (← links)
- B12722, Forwards Millstone Unit 3 Natural Circulation Sys Comparison, Per NUREG-1031 (SER) Requirements.Plant Meets Testing Comparison Requirement of Branch Technical Position Rsb 5-1, Design Requirements for RHR Sys & Ser.Fee Paid (← links)
- B12625, Forwards Results of 1987 Refueling Outage IGSCC Insp Plan & Discussion of Jet Pump Instrumentation Nozzle Assembly Replacements.Investigations Into Use of Acoustic Emissions Techniques to Detect Leakage from Pipe Welds Also Discussed (← links)
- B12613, Informs That Annual Emergency Preparedness Exercise Scheduled for 871008.NRC Personnel Participating in Exercise Requested to Include Listed Info W/Comments by 870810.Scope & Purpose of Exercise,Objectives & Schedule of Events Encl (← links)
- B12602, Requests Issuance of Amends to License DPR-21 Requested on 870521 & 22 W/O Allowing Full 30 Days for Public Comment. Amends Required Prior to Startup from Current Refueling Outage (← links)
- A06635, Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl (← links)
- A06752, Responds to NRC Re Violations Noted in Unannounced Insp Conducted on 870706-10 to Review Radiation Protection Activities.Corrective Actions:All Radiologically Controlled Areas Toured to Ensure That Containers Labeled (← links)
- B12547, Comments on 860415 Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2 Re Achieving Safe Shutdown in Event of Fire in Any Area.Requests That Comments Be Reviewed to Ensure Accuracy in Docketed Info (← links)
- A06281, Forwards Requested Info to Sufficiently Demonstrate Adequacy of Alternate Rod Insertion Sys,Reactor Coolant Recirculation Pump Trip & Standby Liquid Control Sys,Per 10CFR50.62 (← links)
- B12280, Forwards Pages 3-6,3-15,3-18 & 3-25 Omitted from Section 3 & Isap Topics 1.02,1.16.1,2.06 & 2.07 Omitted from App C of 860731 Isap Final Rept (← links)
- B12137, Discusses Results of Evaluation,Per IE Info Notice 83-69, Identifying Deficiencies in Certain Fire Barriers.List of Fire Damper Deficiencies & Planned Mods Encl (← links)
- B11882, Responds to NRC Re Unresolved Item Noted in Insp Rept 50-336/83-17.Use of Recent ASME Code Editions W/O Prior NRC Concurrence Justified.Nrc Approval Will Be Obtained Prior to Use of Subsequent Editions or Addenda (← links)
- B12393, Forwards Probabilistic Safety Study Update Re Isap.Major Program Element Involves Development,Maint & Use of PRA Models in Evaluating Potential Plant Backfits & Operating Procedure Mods.Amended Text Pages & Analysis Encl (← links)
- B12368, Forwards Application for Amend to License DPR-65,extending Duration of License to 40 Yrs from Date of Issuance of Ol. Fee Paid (← links)
- B12054, Forwards Radiological Environ Monitoring Program Annual Environ Operating Rept,Part B,1985. Since Unit 3 Did Not Achieve Initial Criticality Until 860123,text of Rept Only Addresses Operation of Units 1 & 2 (← links)
- B12493, Application for Amend to License NPF-49,changing Tech Specs to Increase ESF Response Time for Low Steam Line Pressure to 27 W/Offsite Power & 37 W/O Offsite Power.Fee Paid (← links)
- A05322, Advises That Emergency Contingency Procedure EOP ECA-3.1, Steam Generator Tube Rupture W/Loss of Coolant - Subcooled Recovery Desired, Revised Per NRC .Licensed Operators Trained Re NRC Concerns & Procedure Changes (← links)
- A05743, Advises That Automatic Purge/Vent Valve Closure on High Radiation Signal,Per NUREG-0737,Item II.E.4.2,unjustified Based on Low Probability of RCS Leak When Purge Valves Open, in Response to SER Open Item (← links)
- B11838, Forwards Review of Integrated Safety Assessment Program Topic 1.09, Reg Guide 1.97 Instrumentation, Per 850517 Commitment (← links)
- B12240, Application to Amend License DPR-65,revising Tech Specs to Reduce Frequency of Surveillance Requirement for Determining Reactor Coolant Flow Rate.Fee Paid (← links)
- B12078, Forwards Rept Containing Brief Description of Change to Initial Test Program Covering Main Feedwater Sys Testing Including Summary of Safety Evaluation.Change Will Be Included in Amend to FSAR (← links)
- B12049, Submits Addl Info Supporting 860307 Fire Protection Schedular Exemption Request W/Respect to Criteria Specified in SECY-85-306,per 860401 Meeting.Info Addresses Status of Engineering Analysis & Design Work Re Switchgear Room (← links)
- B11956, Forwards Updated Weld Overlay Thickness Measurements,Per Re Results of IGSCC Insps During 1985 Refueling Outage (← links)