ML20128D438
| ML20128D438 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/28/1985 |
| From: | Opeka J NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20128D443 | List: |
| References | |
| B11567, NUDOCS 8507050113 | |
| Download: ML20128D438 (2) | |
Text
V l
.qs e
NORTHEAST UTILITIES ceneai omces. seioen street. Bemn. connecticut l
I bs$a P.d. BOX 270 ss cow x ce.ce. w aca "
HARTFORD. CONNECTICUT 06141-0270 k
L J [ (('
(203) 66s-s000 June 28,1985 Docket No. 50-336 Bil567 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1)
W. G. Counsil letter to H. R. Denton, dated July 20,1982.
(2)
W. G. Counsil letter to H. R. Denton, dated June 29,1984.
(3)
W. G. Counsil letter to Dr. T. E. Murley, dated March 1, 1985.
Gentlemen:
Millstone Nuclear Power Station, Unit No. 2 Revision 3 to the Updated Final Safety Analysis Report in Reference (1), Northeast Nuclear Energy Company (NNECO) submitted the initial updated Final Safety Analysis Report (FSAR) for Millstone Unit No. 2 in fulfillment of 10CFR50.71(e).
This rule further requires that subsequent revisions of the FSAR shall be filed no less frequently than annually, and shall reflect all changes up to a maximum of 6 months prior to the date of filing.
Pursuant to 10CFR50.71(e)(4), in Attachment i NNECO hereby presents the Staff with Revision 3 to the FSAR in the form of replacement pages as required by 10 CFR 50.71(e)(5).
This revision presents changes completed since the previous submittal (Reference (2)), necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements as of December 31,1984. Changes to the emergency plan, which is Appendix 12A to the FSAR, have been submitted to the NRC within thirty (30) days of their implementation, pursuant to the requirements of 10CFR50.54(q).
It is noted that 10CFR50.71(e)(2)(li) stipulates that "the submittal shall include an identification of changes made under the provisions of 50.59 but not previously submitted to the Commission."
Pursuant to 10CFR50.59(b) and Section 6.9.5.1 of Millstone Unit No. 2 Technical Specifications, the latest 50.59 report was submitted in Reference (3) for the period of January 1,1984 through December 31, 1984. All changes to the facility through December 31, 1984, which fall under the provisions of 50.59, have been previously submitted to the Commission.
85070501 PDR 850628 M
ADOCK 05000336 ig PDR L
l
.. e.e We trust that this information satisfies the requirements of 10CFR50.71(e).
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY S 0ub,-
- 3. F. Opekd U
Senior Vice President STATE OF CONNECTICUT )
) ss. Berlin COUNTY OF HARTFORD
)
Then personally appeared before me 3. F. Opeka, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.
s
@lAhd/n[
(YtMW Notary Public/
f My Commission fagres March 31.1982 m