Pages that link to "05000313/LER-1987-001"
Jump to navigation
Jump to search
The following pages link to 05000313/LER-1987-001:
Displayed 44 items.
- 05000313/LER-2015-001 (← links)
- 05000313/LER-2016-004 (← links)
- 05000313/LER-2016-003 (← links)
- 05000313/LER-2016-002 (← links)
- 05000313/LER-2016-001 (← links)
- 05000313/LER-2017-002 (← links)
- 05000313/LER-2017-001 (← links)
- 05000313/LER-1990-004 (← links)
- 05000313/LER-1982-012, Forwards LER 82-012/03L-0 (← links)
- 05000313/LER-1982-011, Forwards LER 82-011/03L-0 (← links)
- 05000313/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000313/LER-1982-009, Forwards LER 82-009/01T-0 (← links)
- 05000313/LER-1982-019, Forwards LER 82-019/03L-0 (← links)
- 05000313/LER-1982-025, Forwards LER 82-025/03L-0 (← links)
- 05000313/LER-1982-026, Forwards LER 82-026/03L-0 (← links)
- 05000313/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- 05000313/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000313/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000313/LER-1982-008, Forwards LER 82-008/03L-0 (← links)
- 05000313/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000313/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000313/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000313/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000313/LER-1982-013, Forwards LER 82-013/03L-0 (← links)
- 05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria (← links)
- 05000313/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000313/LER-1982-024, Forwards LER 82-024/03L-0 (← links)
- 05000313/LER-1983-008, Forwards LER 83-008/03L-0 (← links)
- 05000313/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000313/LER-1990-021, Submits Synopsis of LER 90-021-00 Re 901222 Discovery of Potential RCS Leak in Area of Pressurizer Upper Level Instrumentation Nozzle.Caused by Pure Water Stress Corrosion Cracking.Deferral of Repair Under Review (← links)
- 05000313/LER-1983-023, Updated LER 83-023/03X-6:on 830916-1120,fire Protection Deficiencies Discovered.Caused by Inadequate Original Installation Specs & Acceptance Criteria.Walkdown Insp in Progress.Insp Program Being Developed (← links)
- 05000313/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000313/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000313/LER-1983-009, Forwards LER 83-009/03L-0 (← links)
- 05000313/LER-1983-007, Revised LER 83-007/03X-1:on 830308 & 21,reactor Bldg Pressure Switches PS-2403 & PS-2401 Found to Be Out of Tolerance,Opening at 18.9 Psia.Pressure Switches Reset at 18.5 Psia Per Calibr Procedure (← links)
- 05000313/LER-1950-313, Responds to NRC 920505 Request for Addl Info Re Offsite Power Supplies,Delineated in LER 50-313/91-010-01.Long-range Plans to Ensure That 161 Kv Offsite Power Source Will Meet GDC 17 & 5 Requirements Also Provided (← links)
- 05000313/LER-1995-005, Forwards Review of NRC Preliminary Accident Sequence Precursor Analysis of LER 95-005-00 as Requested in Ltr Dtd 960423.Procedures Encl (← links)
- 05000313/LER-1983-002, Forwards Revised LER 83-002/03X-1 (← links)
- 05000313/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000313/LER-1978-028, Forwards LER 78-028/03L-0 (← links)
- 05000313/LER-1988-029, Forwards LER 88-029-00 Re Seismic Qualification of RCS Letdown.Rept Date in Relation to Date of Determination Discussed W/Nrc in 890714 & 0721 Ltrs (← links)
- 05000313/LER-1989-030, Forwards LER 89-030-00 Re Piping Support Discrepancies Caused by Use of Unacceptable Modeling Techniques.Ler Date, Versus Date of Determination of Potential Inoperability of Piping,Discussed in Util 890714 & 21 Ltrs (← links)
- 05000313/LER-1986-002, Requests Extension Date of 860930 to Allow Time to Update LER 86-002-00 Re Inadequate 10CFR50.59 Design Change Review (← links)
- 05000313/LER-1982-018, Responds to Requesting Addl Info Re Fire Barrier Penetration Seals Per LER 82-018/03L-0.All Penetrations & Conduits Properly Sealed (← links)