Pages that link to "05000301/LER-1980-001"
Jump to navigation
Jump to search
The following pages link to 05000301/LER-1980-001:
Displayed 50 items.
- 05000301/LER-2012-001 (← links)
- 05000301/LER-2011-004 (← links)
- 05000301/LER-2011-003 (← links)
- 05000301/LER-2011-002 (← links)
- 05000301/LER-2011-001 (← links)
- 05000301/LER-2010-004 (← links)
- 05000301/LER-2010-003 (← links)
- 05000301/LER-2010-002 (← links)
- 05000301/LER-2010-001 (← links)
- 05000301/LER-2004-002 (← links)
- 05000301/LER-2004-001 (← links)
- 05000301/LER-2003-003 (← links)
- 05000301/LER-2003-002 (← links)
- 05000301/LER-2003-001 (← links)
- 05000301/LER-2002-002 (← links)
- 05000301/LER-2002-001 (← links)
- 05000301/LER-2006-002 (← links)
- 05000301/LER-2005-001 (← links)
- 05000301/LER-2004-003 (← links)
- 05000301/LER-2003-005 (← links)
- 05000301/LER-2003-004 (← links)
- 05000301/LER-2001-002 (← links)
- 05000301/LER-2001-001 (← links)
- 05000301/LER-1982-004, Forwards LER 82-004/01T-0 (← links)
- 05000301/LER-1982-003, Forwards LER 82-003/03L-0 (← links)
- 05000301/LER-1982-007, Forwards LER 82-007/03L-0 (← links)
- 05000301/LER-1982-005, Updated LER 82-005/01T-1:on 820727,discovered 2 of 3 Level Instruments on C Boric Acid Storage Tank Powered from Common Source.Cause Not Determined Due to Poor Early Maint of Documents.Wiring Corrected (← links)
- 05000301/LER-1982-006, Forwards LER 82-006/03L-0 (← links)
- 05000301/LER-1989-010, Forwards LER 89-010-00 Describing Generation of Containment High Pressure Signal During Leak Testing of Containment Penetrations for Facility (← links)
- 05000301/LER-1993-004, Forwards LER 93-004-00 for Pbnp Re Operability Concern for Containment Accident Fan Bearing (← links)
- 05000301/LER-1983-002, Forwards LER 83-002/01T-0 (← links)
- 05000301/LER-1982-009, Forwards LER 82-009/01T-0 (← links)
- 05000301/LER-1995-003, Forwards LER 95-003 Re Rt Due to Turbine Generator Eg Control Sys Oil Leak (← links)
- 05000301/LER-1995-001, Forwards LER 95-001 Re Inadvertent EDG Start.Rept Describes Situation That Caused Normal Power Supply Breaker for Unit 2 Train A,4160 Volt Safeguards Bus to Open (← links)
- 05000301/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000301/LER-1983-001, Forwards LER 83-001/03L-0 (← links)
- 05000301/LER-1991-004, Revises Commitment in LER 91-004-00 Re Failure of Containment Isolation Valve 2-CC-767 to Pass Seat Leakage Tests in 10CFR50,App J,Per 911108 Insp.Entire Valve Will Not Be Replaced,Based on Adequate Overall Performance (← links)
- 05000301/LER-1992-001, Forwards LER 92-001-00.Rept Initially Submitted on 920317 as Improperly Numbered LER 92-003-00.Requests That LER 92-003-00 Be Withdrawn & Replaced W/Encl (← links)
- 05000301/LER-1992-005, Forwards LER 92-005-00,per TS 15.4.2.A.7(a) After Each ISI, Number of Tube Plugged or Repaired in Each SG Shall Be Reported to Commission as Soon as Practical. Rept Also Reported Per TS Table 15.4.2-1 & TS 15.4.2.A.7(b) (← links)
- 05000301/LER-1982-011, Forwards LER 82-011/03L-0 (← links)
- 05000301/LER-1997-001, Forwards LER 97-001-00,re Containment Structure Where Internal Containment Structural Members Could Have Damaged Containment Liner During Safe Shutdown Earthquake (← links)
- 05000301/LER-1992-007, Forwards LER 92-007-00 for Point Beach Nuclear Plant Re Automatic Starting of Emergency DG G02 Following de-energization of 4,160 Volt Safeguards Bus (← links)
- 05000301/LER-1992-006, Forwards LER 92-006-00 for Point Beach Nuclear Plant,Unit 2, Re Inadvertent Actuation of non-safeguards Equipment Lockout (← links)
- 05000301/LER-1981-002, Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps (← links)
- 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs (← links)
- 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic (← links)
- 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics (← links)
- 05000301/LER-1998-004, Forwards LER 98-004-00,which Describes Operation of Unit W/Eight Hour Average Reactor Thermal Output in Excess of Licensed Limit.Commitments Made within Ltr Encl (← links)
- 05000301/LER-1998-001, Forwards LER 98-001-00,describing Mispositioning Event Which Resulted in SG Venting Steam Outside Containment During Plant Heatup.Commitments Are Encl in Rept in Italics (← links)
- 05000301/LER-1998-002, Forwards LER 98-002-00 Re Serious Degradation of Reactor Coolant Pump Component Cooling Water Return Line Check Valve Which May Prevent Closure (← links)