- 05000219/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Encl (← links)
- ML20069G255 (redirect page) (← links)
- 05000219/LER-1983-009 (redirect page) (← links)
- 05000219/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-014, Forwards LER 83-014/01T-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-008, Forwards LER 83-008/03L-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-013, Forwards LER 83-013/01T-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-012, Forwards LER 83-012/01T-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-010, Forwards LER 83-010/01T-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Encl (← links)
- 05000219/LER-1983-018-03, /03L Submittal Delayed Due to Need for Plant Operations Review Committee Investigation Into Cause & Corrective Actions.Ro Will Be Submitted by 831108 (← links)
- 05000219/LER-1983-007-03, /03L-0:on 830418,during Monthly 10 H Operability Test of Standby Gas Treatment Sys Ii,High Differential Pressure Across Both HEPA Filters Observed.Caused by Plugging of Filters.Filters Replaced (← links)
- 05000219/LER-1983-025-03, /03L-0:on 831201,maint & Surveillance Procedures Identified as Not Adequately Verifying Excess Flow Check Valves Open Following Operations.Caused by Inadequate Maint & Surveillance Procedures.Procedures Revised (← links)
- 05000219/LER-1983-019-03, /03L-0:on 831114,during Surveillance of Standby Gas Treatment Sys,Reactor Bldg Ventilation Valve V-28-22 Failed to Close on Isolation Initiation Signal.Caused by Piece of Piston Breaking Off.Piston Repaired (← links)
- 05000219/LER-1983-021-03, /03L-0:on 831012,loss of Main Bus 1A & Emergency Bus 1C Rendered One Standby Gas Treatment Sys Train Inoperable.Stack Gas Sampling Capability Lost for Approx 3 Had Pump a Shutdown Due to Loss of Power (← links)
- 05000219/LER-1983-020-03, /03L-0:on 830916,svc Water Pump 1-2 Breaker Failed to Trip When Undervoltage Device Deenergized.Caused by Component Failure Due to Burr on Latch Surface.Preventive Maint Done on Breaker & Burr removed.w/831019 Ltr (← links)
- 05000219/LER-1983-017-01, /01T-0:on 830826,arming Relay for Diesel Generator Protective Relay Set at Value Possibly Causing Breaker to Open During Fast Start.Caused by Design Deficiency.Setting Changed (← links)
- 05000219/LER-1983-015-03, /03L-0:on 830609,electricians Found Wire Wrapped Around Armature of Undervoltage Trip Device.Caused by Personnel Error in Installation of Wire Gag.Tripcoil,Blown Fuses & Static Time Delay Box Replaced (← links)
- 05000219/LER-1983-004-03, /03L-0:on 830331,during Preventive Maint,Control Rod Drive Feed Pump NC08A Circuit Breaker Mechanically Closed Per Procedure.Investigation Revealed Breaker Should Not Have Closed.Caused by Binding Trip Shaft (← links)
- 05000219/LER-1983-014-01, /01T-0:on 830406,design Deficiency Discovered in Heating Coil Control Circuitry for Standby Gas Treatment Sys Trains.Temporary Redundant Power Feed Provided Until Permanent Mod Installed During Current Maint Outage (← links)
- 05000219/LER-1983-008-03, /03L-0:on 830314,incorrect Undervoltage Trip Coil Installed on Core Spray Booster Pump Breaker,Preventing Manual Start.Caused by Personnel Error.Coil Replaced (← links)
- 05000219/LER-1983-013-01, /01T-0:on 830327,both Doors of Reactor Bldg Personnel Access Airlock Opened Simultaneously.Caused by Personnel Error.Incident Reviewed W/Personnel & Appropriate Disciplinary Action Taken (← links)
- 05000219/LER-1983-012-01, /01T-0:on 830319,door to Main Steam Line Trunnion Room Found Open During Refueling Checkoff.Caused by Design Deficiency,Personnel Error & Failure to Post Sign Identifying Door as Secondary Containment.Door Closed (← links)
- 05000219/LER-1983-010-01, /01T-0:on 830307,design Deficiency Discovered When Standby Gas Treatment Sys (SGTS) II Racked Out for Maint. SGTS II Inlet & Outlet Valves Opened,Allowing Recirculation During Sys I Operation.Procedures Revised (← links)
- 05000219/LER-1983-011-03, /03L-0:on 830306,during Standby Gas Treatment Sys 10 H Operability Test in Sys II Preferential Mode,All Automatic Valves Not Lined Up Properly.Caused by Melted Sensing Line for Fan 1-9 Low Flow Switch.Lines Repaired (← links)
- 05000219/LER-1983-003-03, /03L-0:on 830118,during Maint of Control Rod Drive Pump A,Pump Vent Line Broke Off.Core Spray Pump Nzoia Wetdown & B Pump Inadvertently Tripped.Cause Not Stated. Pump Removed from Svc & Motor Tested (← links)
- 05000219/LER-1983-006-03, /03L-0:on 830206,all Automatic Valves Not Lined Up Properly During Execution of Standby Gas Treatment Sys 10 H Operability Test.Caused by Condensation in Fan 1-9 Low Flow Sensing Lines.Lines Cleaned (← links)
- 05000219/LER-1983-002-03, /03L-0:on 830123,startup Banks Removed from Svc Due to Dilution Plant Main Breaker Cable Termination Failure.Cause Under Investigation.Dilution Pump Power Feed Terminations Replaced (← links)
- 05000219/LER-1983-005-03, /03L-0:on 830126,while Performing Containment Spray Sys Automatic Actuation Test,High Drywell Pressure Switches IP15A,B & C Tripped at Value Greater than Tech Spec Limit.Cause Not Determined.Pressure Switches Readjusted (← links)