Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML070730128 + (Wisconsin Butterflies - Leonards Skipper)
- ML22133A209 + (Wisconsin Cross Reference)
- ML22136A181 + (Wisconsin DHS Chapter 157 App O Draft)
- ML19233A155 + (Wisconsin Depart of Natural Resources Endangered Resources Preliminary Assessment for Shine Operating License)
- ML20205N717 + (Wisconsin Electric Power Co 1985 Annual Rept & Certified Financial Statements)
- ML20084S541 + (Wisconsin Electric Power Co Annual Rept 1983 & Annual Financial Statement)
- ML20079B732 + (Wisconsin Electric Power Co Point Beach Nuclear Plant Emergency Preparedness Exercise,941206)
- ML20082D465 + (Wisconsin Electric Power Co Point Beach Nuclear Plant Simulator Certification Rept - Jul 1991)
- ML20245J109 + (Wisconsin Electric Power Co Point Beach Nuclear Plant Unit 1 Cycle 17 Startup May 1989)
- ML20080D834 + (Wisconsin Electric Power Co,Point Beach Nuclear Plant Units 1 & 2 Semiannual Monitoring Rept,Jan-June 1983)
- ML063540174 + (Wisconsin Energy Corporation to Sell Point Beach Plant)
- ML22277A800 + (Wisconsin FY22 Impep Periodic Scheduling Letter)
- ML23041A042 + (Wisconsin FY23 Impep Periodic Meeting Summary)
- ML18316A012 + (Wisconsin Final Regulations to Rats IDS 2011-1, 2011-2, 2012-1,2012-2, 2012-3, 2012-4, 2013-1, 2013-2, 2013-3- 2015-4 and 2015-5)
- ML25197A705 + (Wisconsin Part 37-71-73)
- ML25196A237 + (Wisconsin Part 37-71-73)
- ML21161A012 + (Wisconsin Proposed Legally Binding Requirements, I.E., License Conditions to Rats Ids 2018-1, 2018-2, and 2018-3)
- ML22133A195 + (Wisconsin Proposed Regulations to Rats Ids 2018-1, 2018-2, 2018-3, 2019-1, 2019-2, 2020-1, 2020-2, 2020-3, and 2021-1)
- ML22133A213 + (Wisconsin Regulations Subchapter 1 157 01 to 06 Draft)
- ML19176A496 + (Wisconsin Response to FY19 Impep Questionnaire)
- ML17040A022 + (Wisconsin State Notification (LAR259-L53082))
- ML22133A215 + (Wisconsin Subchapter II 157 09-15 Draft)
- ML22136A038 + (Wisconsin Subchapter III 157 20 to 33 Draft)
- ML22136A020 + (Wisconsin Subchapter IV 157 35 to 48 Draft)
- ML22136A151 + (Wisconsin Subchapter V 157 51 to 56 Draft)
- ML22136A153 + (Wisconsin Subchapter VI 157 59 to 72 Draft)
- ML22136A167 + (Wisconsin Subchapter VII 157 73 Draft)
- ML22136A170 + (Wisconsin Subchapter XIII 157 92 to 94 Draft)
- ML22136A176 + (Wisconsin Subchapter Xv 157 9700 to 9718 Draft)
- ML20204C963 + (Wishes Counsel to Be Prepared to Discuss in Detail During 781206 Oral Argument the Basis for Proposing Water Quality Monitoring Condition & Consequences That Will Follow If It Is Not Imposed)
- ML19282C372 + (Wishes Recipient Success in New Position)
- ML19256A640 + (Wishes the FBI a Merry Christmas & Happy New Year)
- ML19206A684 + (Wishes to Assure That IR Finfrock Is Added to Distribution List of All NRC Correspondence Re Facility)
- ML19282C389 + (Wishes to Confirm Recipient as Luncheon Speaker on 790328 at ALI-ABA Course on Nuclear Export Regulation)
- ML20209H953 + (Wishes to Ensure That Violations Noted in Insp Repts 50-454/84-51 & 50-455/84-35 Re Failure to Implement Piping Dimensional Insp Measurement Program Becomes Part of Official Record & Will Serve to Demonstrate Concerns)
- ML19224A600 + (Wishes to Intervene in Matter of Const & Operation of Proposed Facility.Concerned Specifically W/Impact of Const on Safe Transportation of Children & Impact on Change in School Population)
- 05000335/LER-2076-044, With 1B Diesel Generator Out of Service for Preventive Maintenance on Air Line Lubricators, 1A Diesel Generator Failed to Start During Surveillance Test + (With 1B Diesel Generator Out of Service for Preventive Maintenance on Air Line Lubricators, 1A Diesel Generator Failed to Start During Surveillance Test)
- 05000335/LER-2076-039, With Reactor Critical at 0.01 Percent Power, Shield Building Access Door Was Found Open Which Is Contrary to Technical Specification 3.6.6.2 + (With Reactor Critical at 0.01 Percent Power, Shield Building Access Door Was Found Open Which Is Contrary to Technical Specification 3.6.6.2)
- 05000335/LER-2076-038, With Reactor Critical at 0.01 Percent Power, Power Supply to Digital Data Processor Was Momentarily Deenergized + (With Reactor Critical at 0.01 Percent Power, Power Supply to Digital Data Processor Was Momentarily Deenergized)
- 05000335/LER-2076-037, With Reactor Critical at 0.01 Percent Power, Control Element Assembly 50 Dropped + (With Reactor Critical at 0.01 Percent Power, Control Element Assembly 50 Dropped)
- 05000335/LER-2076-042, With Reactor Shutdown for Fuel Inspection, Containment Purge Fan Was Started and Sufficient Vacuum Was Obtained to Cause Containment Vacuum Release Valve to Open + (With Reactor Shutdown for Fuel Inspection, Containment Purge Fan Was Started and Sufficient Vacuum Was Obtained to Cause Containment Vacuum Release Valve to Open)
- 05000335/LER-2077-006, With the Plant Operating at Power, Control Element Assembly 60 Dropped, Initiating Turbine Run Back and Giving a Rod Bottomed Indication + (With the Plant Operating at Power, Control Element Assembly 60 Dropped, Initiating Turbine Run Back and Giving a Rod Bottomed Indication)
- ML25142A179 + (Withdraw Letter and FRN - Vogtle Unit 4 Expedited Ves LAR - EPID L-2025-LLA-0078)
- ML20092F001 + (Withdraw Letter to Technetics Group Columbia XCOM1287)
- L-2003-190, Withdraw Proposed License Amendment - Contingency Change to the Definition of Steam Generator Tube Inspection + (Withdraw Proposed License Amendment - Contingency Change to the Definition of Steam Generator Tube Inspection)
- ML25142A183 + (Withdraw of FRN - Vogtle Unit 4 - Ves LAR - EPID L-2025-LLA-0078)
- ML22027A531 + (Withdraw of Fee Waiver Request from EPRI Letter MRP 2021-018 Dated October 21, 2021)
- ML052850385 + (Withdraw of License Amendment Request for Reactor Building Auxiliary Cooler Isolation Circuitry, Technical Specification 3.3.29 Technical Specification Change (TSC) Number 2003-06)
- CNL-18-114, Withdraw of Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to Tennessee Valley Authority + (Withdraw of Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to Tennessee Valley Authority)
- ML053050421 + (Withdraw of Request to Use Alternate to ASME Boiler & Pressure Vessel Code, Section XI & 10 CFR 50.55a(g)(4)(ii) in Accordance with 10 CFR 50.55a(a)(3)(i) Relief Request 05-GO-001)
- Regulatory Guide 8.14 + (Withdrawal)