Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18074A297 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Vol. 3, Chapter 21, Survey Area Release Record for Land Survey Area 08, Survey Units 09, 12 and 13, Rev. 1, LSA 08-09 Fssde Worksheets - 3-Layer)
- ML18205A419 + (Westinghouse Hematite Decommissioning Project - Request for NRC Review of Final Status Survey Final Report Volume 3, Chapter 23, Survey Area Release Record for Land Survey Area 03, Survey Units 01 and 02, LSA-03-01 FSS Plan)
- ML18074A292 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Vol. 3, Chapter 21, Survey Area Release Record for Land Survey Area 08, Survey Units 09, 12 and 13, Rev. 1, J16635-1 Uds Level 2 Report, Final Report)
- ML18010A249 + (Westinghouse Hematite Decommissioning Project - Request for NRC Review of Final Status Survey Final Report Volume 3, Chapter 6, Survey Area Release Record for Land Survey Area 10, Survey Units 05, 06, 07, 08, 09, and 10)
- ML18019A680 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Volume 3, Chapter 16, Survey Area Release Record for Land Survey Area 05, Survey Units 01, 02, 03 and 04, Revision 1, J3571-1 Uds Level 2 Report Final Report)
- ML18019A728 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Volume 3, Chapter 16, Survey Area Release Record for Land Survey Area 05, Survey Units 01, 02, 03 and 04, Revision 1, J16779-2 Uds Level 2 Report)
- ML18019A660 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Volume 3, Chapter 16, Survey Area Release Record for Land Survey Area 05, Survey Units 01, 02, 03 and 04, Revision 1, LSA-05-04 FSS Plan)
- ML18019A739 + (Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Volume 3, Chapter 16, Survey Area Release Record for Land Survey Area 05, Survey Units 01, 02, 03 and 04, Revision 1, LSA-05-02, 3084 C 130814)
- ML20154J520 + (Westinghouse Improved Thermal Design Procedure Instrument Uncertainty Methodology)
- ML19254E793 + (Westinghouse Inadequate Core Cooling Analysis Performed to Meet Requirements Set Forth in NUREG-0578, Nonproprietary Version)
- ML12027A042 + (Westinghouse Input to NRC Frapcon Models Related to the Turkey Point Unit 3 & 4 Extended Power Uprate (EPU) License Amendment Request (LAR) (Cover Letter))
- ML12076A229 + (Westinghouse Input to NRC Frapcon Models Related to the St. Lucie Unit 2 Extended Power Uprate (EPU) License Amendment Request (LAR))
- ML12054A103 + (Westinghouse Input to NRC Frapcon Models Related to the St. Lucie Unit 2 Extended Power Uprate (EPU) License Amendment Request (LAR))
- ML22230D078 + (Westinghouse Inspection Document Request (IR 2022-003))
- ML20022A337 + (Westinghouse January 2020 Updated Integrated Safety Analysis (ISA))
- ML21027A190 + (Westinghouse January 2021 Updated Integrated Safety Analysis (ISA) Summary)
- ML070720300 + (Westinghouse LLC, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 - SG-CDME-07-02P)
- 05000280/LER-1980-009-01, Westinghouse LOCA-ECCS Reanalysis Indicated Residual Penalty of 0.007 in Fq Exists from Fuel Rod Burst Model.Caused by Reduction in Clad Heatup Rate Which Shifts Fuel Clad Burst Curve + (Westinghouse LOCA-ECCS Reanalysis Indicated Residual Penalty of 0.007 in Fq Exists from Fuel Rod Burst Model.Caused by Reduction in Clad Heatup Rate Which Shifts Fuel Clad Burst Curve)
- CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds + (Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds)
- ML16057A310 + (Westinghouse LTR-PAFM-16-8 Attachment B - Responses to the NRC RAIs Re Comanche Peak Unit 1 Extension of Required Inspection Frequency for Reactor Vessel Inlet Nozzle Dissimilar Metal Welds from 7 to 9 Calendar Years)
- ML060040019 + (Westinghouse LTR-RCDA-873-NP Attachment Point Beach, Unit 1 - Reactor Vessel Upper Closure Head Volume Best-Estimate Mean Fluid Temperature (Non-Proprietary))
- ML101730391 + (Westinghouse LTR-SGMP-09-100 NP-Attachment, Response to NRC Request for Additional Information on H*; Model F and Model D5 Steam Generators)
- ML101730384 + (Westinghouse LTR-SGMP-09-109 NP-Attachment, Response to NRC Request for Additional Information on H*: RAI 4; Model F and Model D5 Generators)
- ML022130256 + (Westinghouse Lead Fuel Assemblies - Temporary Exemption Request & License Amendment Request)
- ML18341A055 + (Westinghouse Lessons Learned Closeout Report with Enclosure)
- ML18100B195 + (Westinghouse Lessons Learned Project Timeline (Updated 03/31/2018))
- ML18198A201 + (Westinghouse Letter LTR-NRC-17-77, Response to Revised November 21, 2016, NRC for Additional Information for Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Corr)
- ML15317A425 + (Westinghouse Letter Re Non-Disclosure Agreement)
- ML080870275 + (Westinghouse Letter Requesting License Termination Letter for TR-2 Recognize That CBS Letters of Credit Have Been Returned to CBS)
- ML23094A157 + (Westinghouse License Amendment Hematite Ash Part 1)
- ML22252A128 + (Westinghouse License Possession Limits Email)
- ML22157A348 + (Westinghouse License Renewal)
- ML20121A259 + (Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017)
- ML18308A008 + (Westinghouse License Renewal - RAIs for the Reopened Environmental Review)
- ML22033A070 + (Westinghouse License Renewal RAIs (Environmental))
- ML22033A071 + (Westinghouse License Renewal RAIs (Environmental) Memo (Public))
- ML21306A364 + (Westinghouse License Renewal Schedule Change Letter)
- ML18025B978 + (Westinghouse License Renewal and Related Environmental Assessment -Status Update - Conference Call Summary)
- ML18141A834 + (Westinghouse License Transfer Application Conference Call)
- ENS 52310 + (Westinghouse Life Line D Type Lac Induction Motor Failure)
- ML19249B831 + (Westinghouse Long-Term Ice Condenser Containment Code, LOTIC-3 Code, Suppl 2,nonproprietary Version.Proprietary Version Withheld (Ref 10CFR2.790))
- ML24075A079 + (Westinghouse Lpr 4-10-24 NRC Slides)
- ML18130A252 + (Westinghouse Lpr Presentation 2018)
- ML102390096 + (Westinghouse Ltr. Re; Change in Hematite Licensing Manager)
- ML20151Y734 + (Westinghouse MT-SME-186, Background & Technical Basis for Handbook on Flaw Evaluation for Jm Farley Nuclear Plant, Units 1 & 2 Reactor Vessel Beltline & Nozzle to Shell Welds)
- ML18030B132 + (Westinghouse Meeting Notice - Closed Meeting February 2, 2018)
- ML20024D424 + (Westinghouse Model Boiler-2 Steam Generator Test Program, Supplementary Scaling Info.Related Info Encl)
- ML15302A291 + (Westinghouse Motion for Leave to Appear Specially Regarding Additional Proprietary Documents)
- ML15132A518 + (Westinghouse Motion to Appear Specially in Connection with State of Ny Motion to Strike Proprietary Designations of Westinghouse and PWROG Proprietary Documents)
- ML19316B225 + (Westinghouse Multiple Aperture Small Break ECCS Analyses)
- ML17352B151 + (Westinghouse Nonproprietary Class 3 W Revised Thermal Design Procedure Instrument Uncertainty Methodology, for Plant)