Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25204A245 + (Westinghouse Columbia Fuel Fabrication Facility January 2025 Semiannual Groundwater Monitoring Report)
- ML22200A247 + (Westinghouse Columbia Fuel Fabrication Facility 2022002 Final Report)
- ML20294A056 + (Westinghouse Columbia Fuel Fabrication Facility Hf Spiking Station 1 Assessment Report)
- ML21102A069 + (Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments)
- ML23296A036 + (Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003)
- ML22049A302 + (Westinghouse Columbia Fuel Fabrication Facility - Request for Additional Information - LRA)
- ML25329A005 + (Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2025003)
- ML22298A043 + (Westinghouse Columbia Fuel Fabrication Facility – Integrated Inspection Report 07001151/2022003)
- ML25176A208 + (Westinghouse Columbia Fuel Fabrication Facility - Inspection Schedule for Calendar Year 2026)
- ML21022A127 + (Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 0701151/2020004)
- ML26008A141 + (Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2025004)
- ML20134P508 + (Westinghouse Comments on DSI-13, Direction Setting Issue Papers from NRC Strategic Assessment & Rebaselining Initiative)
- ML20134P564 + (Westinghouse Comments on DSI-20, Direction Setting Issue Papers from NRC Strategic Assessment & Rebaselining Initiative)
- ML20134P511 + (Westinghouse Comments on DSI-4 Re NRC Strategic Assessment Rebaselining)
- ML20134P604 + (Westinghouse Comments on DSI-6 Re NRC Strategic Assessment & Rebaselining)
- ML20063M239 + (Westinghouse Completion of Confirmatory Order Commitments Under EA-16-173)
- ML18087A401 + (Westinghouse Consolidated Responses to Request for Additional Information with Revised SNM-1107 License Renewal Application)
- ML18087A400 + (Westinghouse Consolidated Responses to Request for Additional Information with Revised SNM-1107 License Renewal Application)
- ML18354A487 + (Westinghouse Corporation Topical Report WCAP 13348 Palisades Nuclear Plant Reactor Vessel Fluence Analysis)
- L-04-153, Westinghouse Document Number ITS2898, Revision 0, 7300 NRA 6D30262, Time Response Failure Analysis + (Westinghouse Document Number ITS2898, Revision 0, 7300 NRA 6D30262, Time Response Failure Analysis)
- ML20092H973 + (Westinghouse ECCS Evaluation Model for Analysis of CE-NSSS & Results of Large & Small Break LOCA Analyses for Fort Calhoun Unit 1)
- ML19209A107 + (Westinghouse ECCS Evaluation Model for Analyzing N-1 Loop Operation of Plants W/Loop Isolation Valves, Nonproprietary Version.Safety Evaluation of Rept Encl)
- ML19259B265 + (Westinghouse ECCS Small Break Oct 1975 Model (non-proprietary Version))
- ML21138A926 + (Westinghouse EIS Schedule Letter)
- ML073440022 + (Westinghouse Eagle - 21 Process Protection System)
- ML082410088 + (Westinghouse Eagle-21 Process Protection System)
- ML23181A112 + (Westinghouse Effluent Incoming Email Question)
- ML22363A015 + (Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151))
- PMNS20240478, Westinghouse Electric Co - Meeting Regarding the Principal Design Criteria Topical Report + (Westinghouse Electric Co - Meeting Regarding the Principal Design Criteria Topical Report)
- ML24155A076 + (Westinghouse Electric Co - Meeting Summary Evinci Principal Design Criteria TR on April 22, 2024)
- ML20295A528 + (Westinghouse Electric Co - NRC Integrated Inspection Report Number 07001151/2020-003)
- ML20267A652 + (Westinghouse Electric Co - Revision Request to Certificate of Compliance USA/9297/AF-96 Revision 12 for Model No. Traveller Std, Xl, and Vver Packages)
- PMNS20240570, Westinghouse Electric Co - TRISO Fuel Analysis and Testing Technical Exchange Meeting + (Westinghouse Electric Co - TRISO Fuel Analysis and Testing Technical Exchange Meeting)
- ML18158A535 + (Westinghouse Electric Co, LLC - Compliance Audit Example)
- ML21054A141 + (Westinghouse Electric Co, LLC - Event Report, Certificate of Compliance USA/9291/B(U)F-96, Liqui-Rad (Lr) Transport Unit Package)
- ML21046A066 + (Westinghouse Electric Co, LLC - NRC Semi-Annual Discharge Report, July - December 2020)
- ML20255A270 + (Westinghouse Electric Co, LLC - NRC Semi-Annual Discharge Report, July - December 2019, Annual Assessment of Public Dose Due to Liquid and Gaseous Effluents)
- ML042870607 + (Westinghouse Electric Co, LLC, Withholding from Public Disclosure, St. Lucie Unit 2, Proposed License Amendment, Request for Additional Information Response, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Li)
- ML23244A650 + (Westinghouse Electric Co, LLC- Audit Plan for Topical Reports on the Advanced Logic System Version 2 Digital Plataform and Development Process)
- ML042650471 + (Westinghouse Electric Co, Withholding from Public Disclosure, WCAP-16193-P)
- ML043010603 + (Westinghouse Electric Co, Withholding from Public Disclosure, WCAP-16219-P, Development and Qualifications of a GOTHIC Containment Evaluation Model for the Prairie Island Nuclear Generating Plants, Revision 0, April 2004)
- ML043370367 + (Westinghouse Electric Co, Withholding from Public Disclosure, for South Texas Project Unit 1, Response to RAI - Attachment 1 to October 6, 2004, Letter & Response to RAI - Attachment 1 to November 30, 2004 Letter Re a Change in Analytical M)
- ML18116A673 + (Westinghouse Electric Co. - Application for Consent to Indirect Change of Control with Respect to Materials Licenses and Export Licenses and Notification Regarding Quality Assurance Program Approvals, Certificates of Compliance, and Design)
- PMNS20230968, Westinghouse Electric Co. - Closed Meeting Regarding the Principal Design Criteria Topical Report for the Evinci Microreactor + (Westinghouse Electric Co. - Closed Meeting Regarding the Principal Design Criteria Topical Report for the Evinci Microreactor)
- ML24093A121 + (Westinghouse Electric Co. - December 6, 2023 Summary Meeting of Pre-submittal Advanced Logic System v2 Surveillance Elimination Topical Report)
- ML23009B610 + (Westinghouse Electric Co. - Event Report - Docket 71-9291, Certificate of Compliance USA/9291/B(U)F-96, Liqui-Rad (Lr) Transport Unit Package)
- ML25209A359 + (Westinghouse Electric Co. - Integrated Inspection Report 07001151/2025002)
- ML24158A222 + (Westinghouse Electric Co. - May 22 2024, TRISO Fuel Analysis and Testing Technical Exchange Meeting Summary)
- ML19023A349 + (Westinghouse Electric Co. - NRC Integrated Inspection Report 07001151/2018005)
- ML15259A524 + (Westinghouse Electric Co. - Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21)
- PMNS20240593, Westinghouse Electric Co. - Pre-submittal Meeting Regarding Nuclear Design Methodology Topical Report + (Westinghouse Electric Co. - Pre-submittal Meeting Regarding Nuclear Design Methodology Topical Report)