Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML070530083 + (Wat - Init Exam - 11/2006 - Draft Operating Exam)
- ML070530072 + (Wat - Init Exam - 11/2006 - Draft Written Exam)
- ML070530092 + (Wat - Init Exam - 11/2006 - Final Operating Exam)
- ML070530105 + (Wat - Init Exam - 11/2006 - Final Outline)
- ML040710185 + (Wat - Init Exam - 8/2003 - Draft Written Exam Comments ES-401-9)
- ML112430553 + (Wat 2011-08 Retake Draft OP Test (JPMs Only). Calculation of Containment Pressure)
- ML112430557 + (Wat 2011-08 Retake Draft OP Test Comments)
- ML112430550 + (Wat 2011-08 Retake Draft Outline Comments)
- ML112430546 + (Wat 2011-08 Retake Draft Outlines)
- ML21125A652 + (Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information)
- ML21196A530 + (Wat 2021010 RFI Letter 21N_05 Gap)
- ML22083A059 + (Wat 2022-02 Draft Op Test Comments)
- ML22083A060 + (Wat 2022-02 Draft Operating Test)
- ML22083A061 + (Wat 2022-02 Draft Outlines)
- ML22083A062 + (Wat 2022-02 Draft Written Comments)
- ML22083A063 + (Wat 2022-02 Draft Written Exam)
- ML22083A064 + (Wat 2022-02 Final Outlines)
- ML22041B109 + (Wat 2022301 Exam Approval Lrt Kdc (1))
- W3F1-2002-0075, Wat 3 - Retake Exam - 07/2002 - Post Examination Comments + (Wat 3 - Retake Exam - 07/2002 - Post Examination Comments)
- ML12214A280 + (Wat3 Followup Assessment Letter (Report 05000382-12-011))
- ML16251A500 + (Watch & Co-Petitioners Request for Hearing Regarding Entergys Request for Extension to Comply with NRC Order EA-13-109, Section IV Requirements Regarding Implementation of Phase 1 and Phase 2 Severe Accident Capable Vents.)
- ML102090024 + (Watch 2.206 Petition Regarding Inadequacy of Entergys Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station)
- ML111010613 + (Watch Answer to Entergys and NRC Staffs Reply to Pilgrim Watch Post-Hearing Memorandum Filed April 7, 2011)
- ML091950452 + (Watch Brief in Response to Entergys Response to CLI-09-11(Requesting Additional Briefing))
- ML18058A486 + (Watch Comments: Regulatory Analysis for Regulatory Basis: Regulatory Improvements for Power Reactors Transitioning to Decommissioning NRC (January 2018))
- ML081090242 + (Watch Exhibit List)
- ML110630442 + (Watch Findings of Fact Conclusions of Law Sama Remand)
- ML12254A869 + (Watch Information - 04-02-12 Pw Hearing Request)
- CY-12-011, Watch Information - Economic Consequences within NRC Regulatory Framework + (Watch Information - Economic Consequences within NRC Regulatory Framework)
- ML103340327 + (Watch Memo to Gauklers Request for Citations and Copies of Specified Documents in Disclosures 6 and 7)
- ML111741447 + (Watch Memorandum Re Submerged Cables)
- ML110710002 + (Watch Memorandum Regarding Fukushima)
- ML19227A290 + (Watch Memorandum in Support of Emergency Motion of the Commonwealth of Massachusetts for Clarification of the Commissions August 14, 2019 Memorandum and Order)
- ML111010612 + (Watch Memorandum-Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation)
- ML111020401 + (Watch Memorandum-Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation-Video Supplement)
- ML102730042 + (Watch Motion Regarding ASLB Refusal to Respond to Pilgrim Watchs Motion for Clarification ASLB Order (Sept 2, 2010))
- ML081350057 + (Watch Motion Regarding the Cumulative Usage Factor (CUF))
- ML081140409 + (Watch Motion Requesting the Record Be Held Open So That the Board May Address a New and Significant Issue (Method to Calculate Cumulative Usage Factors (Cuf)) Sua Sponte and Provide Pilgrim Watch an Opportunity for Hearing)
- ML19246A033 + (Watch Motion Under 10 C.F.R 2.1327 to Stay Staff Order of August 22, 2019)
- ML102580318 + (Watch Motion for Clarification ASLB Order (Sept. 02, 2010))
- ML100950489 + (Watch Motion for Reconsideration of CLI-10-11)
- ML083170829 + (Watch Motion to Clarify Date for Filing Petition for Review or Alternatively to Extend Date)
- ML19197A330 + (Watch Motion to File a New Contention)
- ML081560330 + (Watch Motion to Include as Part of the Record Exhibits Attached to Pilgrim Watch Motion to Strike Incorrect and Misleading Testimony from the Record of May 15, 2008)
- ML080930528 + (Watch Motion to Permit Late Filled Exhibits)
- ML100970768 + (Watch Motion to Reschedule Setting Telephone Conference)
- ML19246A032 + (Watch Motion to Stay Staff Order of August 22, 2019 Granting Exemption)
- ML081490553 + (Watch Motion to Strike Incorrect and Misleading Testimony from the Record)
- ML19329B324 + (Watch Motion to Supplement Its February 20, 2019 Motion to Intervene and Request for Hearing, Its April 1, 2019 Reply to Petitioners, and Its May 3, 2019 Motion to Supplement)
- ML19116A162 + (Watch Motion to Supplement Its Motion to Intervene and Request for Hearing. New Information)
- ML19129A473 + (Watch Motion to Supplement Its Motion to Intervene and Request for Hearing, Biodiversity (05.09.19))