Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "WC-2013-07 Draft Operating Test". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML101200202  + (WBN-2 PSI, Revision 2, Preservice Inspection Program Plan, Enclosures 2, 3, 4, 5 and 6)
  • IR 05000391/1986060  + (WBRD-50-391/86-60 - Final Report and Revised Completion Schedule)
  • ML14212A603  + (WBRD-50-391/86-60 - Final Report and Revised Completion Schedule)
  • ML11322A101  + (WBT-D-3548, Closure of WNA-CN-00157-WBT Open Items, Watts Bar 2 Dated October 2011)
  • ML12034A166  + (WBT-D-3753 NP-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT)
  • ML12073A359  + (WBT-D-3769 Np, Common Q Pams Secure Development and Operational Environment Sser 23 Appendix Hh Action Item 98 Requests for Additional Information)
  • ML23067A237  + (WB_2023-02_RP_inspection_doc_request)
  • ML060880188  + (WC-03-2006 - Draft - Final - Outline - Includes Rejected KAs)
  • ML060880205  + (WC-03-2006 - Draft - Written Exam)
  • ML060880213  + (WC-03-2006 - Draft - Written Exam Comments)
  • ML060880360  + (WC-03-2006 - Final Operating Exam)
  • ML060880270  + (WC-03-2006 - Licensee Post Exam Comments)
  • ML060880194  + (WC-03-2006-DRAFT Outline Comments)
  • ML072950365  + (WC-10-2007-Examination Approval Letter)
  • ML092330070  + (WC-2009-08- Examination Approval Letter)
  • ML093200408  + (WC-2009-08-Public Forms)
  • ML102300438  + (WC-2009-12-Draft Operating Test)
  • ML102300436  + (WC-2009-12-Draft Operating Test Comments)
  • ML102300441  + (WC-2009-12-Draft Outline Comments)
  • ML102300443  + (WC-2009-12-Final Operating Test)
  • ML102300640  + (WC-2009-12-Public Forms)
  • ML112700888  + (WC-2011-08-Final Operating Test)
  • ML120180160  + (WC-2012-01- Examination Approval)
  • ML120470486  + (WC-2012-01-Draft Outline Comments)
  • ML120470436  + (WC-2012-01-Final OP Test)
  • ML13248A600  + (WC-2013-07 Draft Operating Test Comments)
  • ML13248A593  + (WC-2013-07 Draft Outlines.Pdf)
  • ML13252A029  + (WC-2013-07 Draft Written Examination Comments)
  • ML13248A594  + (WC-2013-07 Final Outlines)
  • ML13252A030  + (WC-2013-07 Public Forms)
  • ML16027A319  + (WC-2015-11 - Final Written Exams)
  • ML20055E113  + (WC2019006 Annual Assessment Letter)
  • ML16343A474  + (WCAP-11595,Rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology Diablo Canyon Units 1 & 2 24 Month Fuel Cycle Evaluation)
  • ML20113F640  + (WCAP-11916:Loss of RHR Sys Cooling While RCS Partially Filled, Technical Evaluation Rept)
  • ML19261A198  + (WCAP-12012, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Sequoyah Units 1 and 2)
  • ML20044C347  + (WCAP-12522, Inconel Alloy 600 Tubing-Matl Burst & Strength Properties)
  • ML073270507  + (WCAP-12655, Rev. 2, Emergency Diesel Generator Loading Study, Indiain Point Unit 2)
  • ML20073H818  + (WCAP-12920, Analysis of Southern California Edison Co San Onofre Unit 3 Reactor Vessel Surveillance Capsule Removed from 97 F Location)
  • ML022100438  + (WCAP-13515, Revision 1, Analysis of Capsule U from Indiana Michigan Power Company D. C. Cook, Unit 2 Reactor Vessel Radiation Surveillance Program)
  • ML022110339  + (WCAP-13517, Revision 1, Evaluation of Pressurized Thermal Shock for D.C. Cook Unit 2)
  • ML20064M452  + (WCAP-13948, Evaluation of Pressurized Thermal Shock for McGuire Unit 1)
  • ML20078P898  + (WCAP-14123, Beaver Valley Unit 1 Steam Generator Tube Plugging Criteria for Indications at Tube Support Plates, July 1994)
  • NRC 2003-0105, WCAP-14439-NP, Rev. 0, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the Point Beach Nuclear Plant, Units 1 and 2 for the Power Uprate and License Renewal Program  + (WCAP-14439-NP, Rev. 0, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the Point Beach Nuclear Plant, Units 1 and 2 for the Power Uprate and License Renewal Program)
  • ML18312A151  + (WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination)
  • ML091250571  + (WCAP-14788, Rev. 3, Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach 1 & 2, Power Uprate (1775 Mwt - Core Power with Feedwater Venturis, or 1800 Mwt - Core Power with LEFM on Feedwater Header))
  • ML20141C934  + (WCAP-14800, AP600 PRA Thermal/Hydraulic Uncertainty Evaluation for Passive Sys Reliability)
  • ML16342D535  + (WCAP-14826, Instrumentation Calibr & Drift Evaluation Process for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation)
  • ML031570508  + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Abstract Through Section 35)
  • ML031570501  + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Sections 9 Through 23)
  • ML031570274  + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Table of Contents Through Figure 8-34)