Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML101200202 + (WBN-2 PSI, Revision 2, Preservice Inspection Program Plan, Enclosures 2, 3, 4, 5 and 6)
- IR 05000391/1986060 + (WBRD-50-391/86-60 - Final Report and Revised Completion Schedule)
- ML14212A603 + (WBRD-50-391/86-60 - Final Report and Revised Completion Schedule)
- ML11322A101 + (WBT-D-3548, Closure of WNA-CN-00157-WBT Open Items, Watts Bar 2 Dated October 2011)
- ML12034A166 + (WBT-D-3753 NP-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT)
- ML12073A359 + (WBT-D-3769 Np, Common Q Pams Secure Development and Operational Environment Sser 23 Appendix Hh Action Item 98 Requests for Additional Information)
- ML23067A237 + (WB_2023-02_RP_inspection_doc_request)
- ML060880188 + (WC-03-2006 - Draft - Final - Outline - Includes Rejected KAs)
- ML060880205 + (WC-03-2006 - Draft - Written Exam)
- ML060880213 + (WC-03-2006 - Draft - Written Exam Comments)
- ML060880360 + (WC-03-2006 - Final Operating Exam)
- ML060880270 + (WC-03-2006 - Licensee Post Exam Comments)
- ML060880194 + (WC-03-2006-DRAFT Outline Comments)
- ML072950365 + (WC-10-2007-Examination Approval Letter)
- ML092330070 + (WC-2009-08- Examination Approval Letter)
- ML093200408 + (WC-2009-08-Public Forms)
- ML102300438 + (WC-2009-12-Draft Operating Test)
- ML102300436 + (WC-2009-12-Draft Operating Test Comments)
- ML102300441 + (WC-2009-12-Draft Outline Comments)
- ML102300443 + (WC-2009-12-Final Operating Test)
- ML102300640 + (WC-2009-12-Public Forms)
- ML112700888 + (WC-2011-08-Final Operating Test)
- ML120180160 + (WC-2012-01- Examination Approval)
- ML120470486 + (WC-2012-01-Draft Outline Comments)
- ML120470436 + (WC-2012-01-Final OP Test)
- ML13248A596 + (WC-2013-07 Draft Operating Test)
- ML13248A600 + (WC-2013-07 Draft Operating Test Comments)
- ML13248A593 + (WC-2013-07 Draft Outlines.Pdf)
- ML13252A029 + (WC-2013-07 Draft Written Examination Comments)
- ML13248A594 + (WC-2013-07 Final Outlines)
- ML13252A030 + (WC-2013-07 Public Forms)
- ML16027A319 + (WC-2015-11 - Final Written Exams)
- ML20055E113 + (WC2019006 Annual Assessment Letter)
- ML16343A474 + (WCAP-11595,Rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology Diablo Canyon Units 1 & 2 24 Month Fuel Cycle Evaluation)
- ML20113F640 + (WCAP-11916:Loss of RHR Sys Cooling While RCS Partially Filled, Technical Evaluation Rept)
- ML19261A198 + (WCAP-12012, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Sequoyah Units 1 and 2)
- ML20044C347 + (WCAP-12522, Inconel Alloy 600 Tubing-Matl Burst & Strength Properties)
- ML073270507 + (WCAP-12655, Rev. 2, Emergency Diesel Generator Loading Study, Indiain Point Unit 2)
- ML20073H818 + (WCAP-12920, Analysis of Southern California Edison Co San Onofre Unit 3 Reactor Vessel Surveillance Capsule Removed from 97 F Location)
- ML022100438 + (WCAP-13515, Revision 1, Analysis of Capsule U from Indiana Michigan Power Company D. C. Cook, Unit 2 Reactor Vessel Radiation Surveillance Program)
- ML022110339 + (WCAP-13517, Revision 1, Evaluation of Pressurized Thermal Shock for D.C. Cook Unit 2)
- ML20064M452 + (WCAP-13948, Evaluation of Pressurized Thermal Shock for McGuire Unit 1)
- ML20078P898 + (WCAP-14123, Beaver Valley Unit 1 Steam Generator Tube Plugging Criteria for Indications at Tube Support Plates, July 1994)
- NRC 2003-0105, WCAP-14439-NP, Rev. 0, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the Point Beach Nuclear Plant, Units 1 and 2 for the Power Uprate and License Renewal Program + (WCAP-14439-NP, Rev. 0, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the Point Beach Nuclear Plant, Units 1 and 2 for the Power Uprate and License Renewal Program)
- ML18312A151 + (WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination)
- ML091250571 + (WCAP-14788, Rev. 3, Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach 1 & 2, Power Uprate (1775 Mwt - Core Power with Feedwater Venturis, or 1800 Mwt - Core Power with LEFM on Feedwater Header))
- ML20141C934 + (WCAP-14800, AP600 PRA Thermal/Hydraulic Uncertainty Evaluation for Passive Sys Reliability)
- ML16342D535 + (WCAP-14826, Instrumentation Calibr & Drift Evaluation Process for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation)
- ML031570508 + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Abstract Through Section 35)
- ML031570501 + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Sections 9 Through 23)
- ML031570274 + (WCAP-14936, Code Qualification Document for Best Estimate Small Break LOCA Analysis, Revision 0, August 2001 and WCAP-14936-NP, Revision 0, April 2003, Table of Contents Through Figure 8-34)