INITIAL LICENSE EXAM OPERATING TEST #1 SCENARIO #1 Revision 1 Week of March 6, 2006

OP-TEST # 1 SCENARIO # 1 Page 2 of 43 Facility: Wolf Creek NRC Scenario No.: 1 Op-Test No.: 1 Source:

New X Bank - Significantly Modified . Bank - Initial Condition Change .

See page 3 for Examiner/student assignments Initial Conditions: 55% power, B Main Feed Pump (MFP) rolling at 1100 rpm Turnover: _Place 2nd MFP on line, maintain current power for flux map Event Malf. Event Event No. No. Type* Description 1 N/A N-BOP Place 2nd MFP on line 2 mPCS02 R-ATC Turbine Impulse Pressure AC PT-505 fails low causing control rod A insertion.

3 mMSS0 I-BOP C SG Pressure Instrument fails low, affecting Steam Flow 1C2 indication and MFP Speed Control.

4 mCCW1 C-ATC Component Cooling Water System (CCW) Leak in the B Train 8B C-BOP Safety Loop. Requires removing B Train CCW and ECCS pumps from service.

5 mRCS07 M Small Break LOCA, Safety Injection B

6 mCCW0 C-ATC A Train CCW pump A trips on SI and the C pump fails to auto 6A start.

r19064B 7 mPSC10 C-ATC Containment Isolation Phase A fails to automatically actuate C

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

OP-TEST # 1 SCENARIO # 1 Page 3 of 43 SCENARIO MISCELLANEOUS INFORMATION SCENARIO

SUMMARY

The objective of this scenario is to mitigate a small break Loss Of Coolant Accident, complicated by the loss of one train of Emergency Core Cooling System (ECCS). The scenario begins at 55% power with the crew placing the second Main Feed Pump in service. Two instrument failures occur requiring operator action to stabilize the plant and evaluation of Technical Specifications.

A leak in the operating Component Cooling Water (CCW) train requires swapping to the standby train and subsequent shutdown of the CCW train. Procedural requirements place all ECCS pumps served by the affected train out of service. This will also require the SRO to evaluate Technical Specifications.

Following the small break LOCA, operator actions are required. The running CCW pump in the only available train, trips and the standby pump does not autostart. Containment Isolation Signal Phase A also fails to actuate automatically challenging containment integrity. Both failures can be corrected by manual actions.

CRITICAL PARAMETERS:

The following parameters may be of value in evaluating crew performance when the scenario is completed:

  • RCP Temperatures
  • RCS and PZR Pressures
  • PZR Level
  • Containment Pressure
  • RCS Tavg OPERATOR ACTIONS TABLE NOTES:
1. Critical Tasks are indicated by "C" in the position column and indicated in bold type.
2. Actions required throughout the event are indicated as continuous (cont) in the position column.
3. Shaded cells indicate procedural entry points.

OP-TEST # 1 SCENARIO # 1 Page 4 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 1 Event

Description:

Place second Main Feed Pump B in service. SYS AE-121 TURBINE DRIVEN MAIN FEED WATER PUMP STARTUP procedure in progress at step 6.2.23.

Time Position Applicant's Actions or Behavior Notes Provide RO a band to maintain for Tavg and Power during pump startup. Direct SRO BOP to place B MFP on line using the procedure.

RO Maintain Rx power and Tavg within band cont provided by SRO Verifies oil temperature > 110 degrees by BOP contacting local operator.

BOP Monitor SG levels and running A MFP cont to ensure secondary remains stable.

Increase MFP speed to 3600 rpm and transfer control to auto.

BOP Perform actions to null the signal match between the GE and Westinghouse controllers.

BOP Contact local operator and verify seal dP.

Increase B MFP speed till it indicates 0-BOP 100 rpm above A and place control on the Master Speed Controller.

Inform SRO that the procedure is BOP complete.

The Master Speed Controller is controlling Termination Criteria: both MFPs. All SG levels are stable at or trending to program level (50%).

OP-TEST # 1 SCENARIO # 1 Page 5 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 2 Event

Description:

Turbine Impulse Pressure AC PT-505 fails low causing control rod insertion.

Time Position Applicant's Actions or Behavior Notes Note and Communicate that control rods are stepping in. Place rod control in Rods should be taken to manual RO manual after confirmation that a loss of in time to prevent a Rx Trip.

load is not in progress.

Confirm that a turbine loss of load is not BOP occurring.

Monitor/acknowledge communications.

SRO Direct above actions be performed if not already done.

Note and communicate that AC PT-505 Monitor for entry into DNB T.S.

RO/BOP has failed low. Two hours to restore.

Enter and direct OFN SB-008, SRO INSTRUMENT MALFUNCTIONS, Attachment D.

Identifies failed channel as AC PT-505.

RO/BOP Ensure rods in manual.

BOP Select out failed channel Conduct reactivity brief with RO to return SRO/RO rods to the pre-event position and restore Tavg. Return rods to Automatic.

Place Steam Dump Interlocks to OFF Set AB PK-507 pot to 7.28 BOP Place Steam Dumps in Steam Pressure Mode.

Place Steam Dump Interlocks to ON Contact Work Week Manager (WWM) for SRO INC assistance in tripping bi-stables and troubleshooting.

Check C-16 Lo Tavg NOT LIT BOP Check HOLD light NOT LIT

OP-TEST # 1 SCENARIO # 1 Page 6 of 43 AMSAC is not modeled. Booth BOP Place AMSAC in proper state Operator will meet BOP at door with cue.

Review and comply with T.S. 3.3.1, SRO Function 18.f, Condition T. Verify P-13 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Control Rods in Auto.

Termination Criteria: Tavg within 1 degree of Tref.

T.S. Identified

OP-TEST # 1 SCENARIO # 1 Page 7 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 3 Event

Description:

C SG Pressure Instrument fails low, affecting Steam Flow indication and MFP Speed Control.

Time Position Applicant's Actions or Behavior Notes Note and communicate alarm 110C, C BOP SG Level is decreasing or C MFRV is closing.

Place C MFRV in manual and restore This action should be taken in BOP feed flow. time to prevent a Rx Trip.

Monitor/acknowledge communications.

SRO Direct above actions be performed if not already done.

Enter and direct Alarm Response ALR 00- SRO may enter the OFN SRO 110C directly Check SG C instrumentation. Note and RO communicate that Steam Pressure Channel AB PT-535 has failed low.

Note: Steam Flow is an input to the MFP Speed Control and will force the MFPs to continue slowing down till the affected channel is selected out.

Perform RNO column. Direct BOP to SRO select out failed channel.

Direct BOP to return MFRV to Automatic SRO Should provide a band or value.

when SG level is restored.

BOP Restore SG level to program and place cont MFRV in Auto per SRO directive.

If SRO entered the OFN Enter and direct OFN SB-008, directly based on Steam Flow, SRO INSTRUMENT MALFUNCTIONS, Attach. A will direct them to Attachment C Attach. C.

SRO/RO Identify failed channel

OP-TEST # 1 SCENARIO # 1 Page 8 of 43 Check if channel selected for control.

May have already been SRO/BOP Place MFRV in manual completed.

Select Alternate Channel Contact Work Week Manager (WWM) for SRO INC assistance in tripping bi-stables and troubleshooting.

Monitor and comply with T.S.s T.S 3.3.2 contains the only 3.3.2 Function required actions.

1.e., 3.a.(3), 4.d.(1) and (2), 5.c, 6.e, and 7.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to trip Bi-stables.

SRO 3.3.3 and 3.3.4 - No Action Required 3.3.6 and 3.3.7 should be referenced, however no actions 3.3.6, Table 3.3.6-1, Function 4 are required.

3.3.7, Table 3.3.7-1, Function 4 Ensure C MFRV back in auto and SRO/BOP controlling SG level.

C SG level stable at or trending to Termination Criteria: program (50%). C MFRV back in Auto.

T.S.s identified.

OP-TEST # 1 SCENARIO # 1 Page 9 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 4 Event

Description:

Component Cooling Water System (CCW) Leak in the B Train Safety Loop.

Requires removing B Train CCW and ECCS pumps from service.

Time Position Applicant's Actions or Behavior Notes At any point, the SRO may Various CCW Alarms annunciate and enter the OFN directly and the ALL clear. Crew should investigate alarms. following diagnostics may not be performed.

No audible alarm. Crew may Recognize Auto make-up has initiated RO/BOP not recognize make-up in from Demin Water system (AN).

progress.

Recognize CCW B surge tank level is RO/BOP decreasing.

Annunciator 104D for RHR Pump Room ALL Sump Level high alarms.

At some point, the Building Direct Local Operator to be dispatched to SRO Watch will report a leak on investigate sump level alarm.

CCW Train B Safety Loop.

Enter and Direct OFN EG-004, CCW SRO MALFUNCTIONS.

SRO Direct starting an A Train CCW pump.

Make Announcement and start an A RO/BOP Train CCW pump.

Check CCW inventory.

Isolate CCW to Radwaste.

Ensure DI water Make-up. SRO should assign continuous RO/BOP Start second AN pump. action to one of the board cont Cycle B ESW make-up valves to B operators.

CCW as required to maintain level between 40 and 60%.

Identify CCW leak.

Building Watch will report leak (RHR sumps increasing)

SRO is on the B Safety Loop and Check Location of Leak.

cannot be isolated.

(B Safety Loop)

OP-TEST # 1 SCENARIO # 1 Page 10 of 43 Determine Leak not on Service Loop in Containment and go to step 12.

SRO Determine Leak not on Service Loop outside Containment and go to step 19 Direct Service Loop be swapped to A SRO Train CCW and Shutdown B CCW Train.

Swap Service Loop to A Train CCW.

Place both B Train CCW pumps in Pull to Lock (PTL).

Recognize leak cannot be isolated and direct building watch to close EG-V148 RO/BOP for DI water make-up.

Place ECCS pumps in PTL.

CCP SI RHR Stop the B SFP Cooling pump.

Direct board operator to co-ordinate with SRO the Bldg Watch and place SFP Cooling on A CCW Train.

May attempt to re-establish Thermal RO/BOP Barriers to RCPs and restore Radwaste back to service.

Identify Tech Specs.

3.7.7 CCW One Train inoperable, 72 Hours to restore.

SRO 3.5.2 ECCS Operating Determine Safety function is not lost and it would be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore.

May apply or request an evaluation to apply 3.0.6 and not enter 3.5.2.

CCW Service Loop aligned to A Train.

All B Train ECCS pumps and CCW Termination Criteria:

pumps are in PTL.

Tech Specs Identified.

OP-TEST # 1 SCENARIO # 1 Page 11 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 5 Event

Description:

Small Break LOCA, Safety Injection Time Position Applicant's Actions or Behavior Notes SRO/RO Note and communicate RCS pressure is BOP decreasing.

Monitor RCS pressure for entry into DNB SRO/RO Tech. Spec. at < 2220 psig.

BOP T.S. 3.4.1, two hours to restore.

As RCS pressure decreases, may energize RO Monitor for DNB T.S.

PZR B/U heaters.

Note and communicate that PZR level is RO decreasing.

Enter and direct OFN BB-007 RCS SRO Leakage.

Checks PZR Level - decreasing.

Increase charging flow.

RO Isolate Letdown.

Check Charging Pump Suction.

SRO/RO Check PZR pressure - stable.

Check S/G Tubes - intact.

SRO/BOP

  • Dispatch HP
  • Contact Chemistry.

Fold Out Page criteria are met when charging is maximized, letdown isolated and PZR level continues to decrease OR SRO/RO SRO determines they cannot maintain PZR Pressure.

Auto Actuation may occur Direct a Reactor Trip and Initiate Safety SRO before the SRO can order Injection. Transition to EMG E-0.

manual actuation.

Reactor is tripped and Safety Injection Termination Criteria:

Actuated.

OP-TEST # 1 SCENARIO # 1 Page 12 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 6 and 7 Event

Description:

Upon Reactor trip and Safety Injection, the running CCW pump trips and the standby pump fails to auto start. Containment Isolation Phase A (CIS-A) fails to auto actuate.

Time Position Applicant's Actions or Behavior Notes Enter and Direct actions of EMG E-0, SRO Reactor Trip or Safety Injection.

RO/BOP Perform Immediate Actions of EMG E-0.

Verify Rx Trip

  • Rod Bottom Lights Lit.
  • Rx Trip and Bypass Bkrs open.
  • Neutron Flux decreasing (Intermediate Range & Gamma metrics)
  • Transfer NR-45 recorder to RO Intermediate Range Verify Vital AC Power
  • Both NB buses - normal voltage /

aligned to off site power.

Verify SI actuated Determine SI is actuated. Annunciators 30A and 31A are lit.

Verify Turbine trip.

BOP

  • Main Stop valves all closed.

At completion of Immediate Actions SRO determine if there are any immediate concerns.

Notes that no CCW pump is running in the RO only available Train and informs SRO.

One person from the crew should recognize adverse containment values have Adverse Containment may not ALL been exceeded and communicate this to the occur at this break size.

rest of the crew.

OP-TEST # 1 SCENARIO # 1 Page 13 of 43 SRO/RO CRITICAL TASK: The Start the standby A Train CCW standby pump must be started "C" pump.

prior to the end of Attach. F.

Notes that CIS-A, CRVIS and CPIS has SRO/RO failed to actuate on Status Panels SB066X and 66Y.

CRITICAL TASK: The CIS-A Manually Actuate CIS-A.

signal must be actuated prior to SRO/RO CRVIS and CPIS will actuate on the the end of Attach. F.

manual CIS-A, operator may actuate C Only one train is required to be CRIVS or CPIS separately prior to the actuated to meet the critical CIS-A.

task.

Read steps and confirm Immediate Actions SRO Complete.

SRO /RO Check if SI is required - YES Perform EMG E-0 Attach. F for Automatic SRO /RO Signal verification.

If not previously started then during RO performance of Attach. F., start the C

standby CCW pump RO If not previously actuated, then during the C performance of Attach. F., actuate CIS-A.

Verify AFW > 270 Klbm/hr.

Close AC HIS-134 SRO/BOP Reduce AFW to 270 Klbm/hr Establish S/G Pressure Control Check PORV/Block Valves.

Check PZR Spray Valves.

SRO /BOP Check PZR Safety Valves.

Check if RCPs should be stopped.

Direct Monitoring Critical Safety Function SRO Status Trees using EMG F-0.

Check if S/Gs are not faulted.

Check if S/G Tubes are intact.

SRO /RO

  • Dispatch HP Check S/G levels - controlled increase SRO/RO Check if RCS Intact in Containment

OP-TEST # 1 SCENARIO # 1 Page 14 of 43 NO Ensure BIT inlet and outlets open.

Transition to EMG E-1 Enter and Direct EMG E-1, LOSS OF SRO REACTOR OR SECONDARY COOLANT.

SRO Conduct Transition Brief for EMG E-1.

Depending on the timeline of the crew response, RCP trip Check if RCPs should be stopped. criteria may exist. If RCS SRO/RO pressure decreases to < 1400 psig it would require the crew to trip all RCPs.

Check SG Pressures.

SRO/BOP Check SG Levels.

Reset SI.

SRO/RO Reset CIS-A and CIS-B.

The Scenario may be terminated after Termination Criteria:

transition to EMG E-1 and SI is reset.

OP-TEST # SCENARIO #

PAGE 15 OF 43 CRITICAL TASK

SUMMARY

POSITION EXPECTED RESPONSE ACCEPTANCE CRITERIA SAT/

UNSAT RO Start the Standby CCW pump Prior to the end of EMG E-0, Attach. F.

RO Manually actuate CIS-A Prior to the end of EMG E-0, Attach. F.

Only one train is required to be actuated to meet the critical task However if only one train of CRVIS is actuated the other train has to be isolated within 90 minutes..

OP-TEST # SCENARIO #

PAGE 16 OF 43 INITIAL LICENSE EXAM OPERATING TEST #1 SCENARIO # 2 Revision 1 Week of March 6, 2006

OP-TEST # 1 SCENARIO #2 Page 17 of 43 Facility: Wolf Creek Generating Station Scenario No.: 2 (Mod) Op-Test No.: 1 Examiners: __________________________ Operators: __________________________

Initial Conditions: 100% power, Normal Operations Turnover: , A Emergency Diesel Generator (EDG) is Out of Service. .

Block Valve BB HV-8000A closed and power removed. .

due to PORV blowing fuses . .

Event Malf. No. Event Event No. Type* Description 1 mWAT06 R-ATC Circ Water Pump A trips causing a Main Turbine Setback to 80%.

A C-BOP 2 mFWM02 I-BOP C SG Level Channel fails high.

C4 3 P24100C C-ATC Instrument Air to Containment, KA HV-29, fails closed causing a loss of P24100D normal charging and letdown.

4 mRCS02A M 330 gpm Steam Generator Tube Rupture on A 5 P19019B C-ATC Both Essential Service Water Pumps fail to automatically start on Safety P19028B Injection 6 mMSS07D C-BOP D SG Atmospheric Relief Valve fails open on Rx Trip.

7 rPRS07 C-ATC Block Valve BB HV-8000B fails to open, affecting RCS depressurization.

Requires entry into contingency procedure EMG C-33 for SGTR with Loss of Pressure Control.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

OP-TEST # 1 SCENARIO #2 Page 18 of 43 SCENARIO MISCELLANEOUS INFORMATION SCENARIO OBJECTIVE:

The objective of this scenario is to mitigate a Steam Generator Tube Rupture (SGTR) with a loss of Pressure control requiring the use of a Contingency Procedure..

The SRO will evaluate Technical Specifications for the SG Level channel and the Rod Insertion Limit resulting from the Main Generator Setback. The setback also caused a greater than 15% power change in one hour. This requires T.S. surveillance 3.4.16.2 to be run 2 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following the power change.

The scenario begins with a trip of a running Circulating Water Pump causing a Turbine Setback. Following the setback is a failure of a SG level instrument. Both require operator actions to stabilize the plant and the use of Off Normal procedures. Prior to the trip there is a Loss of Instrument Air to Containment, also requiring use of an Off Normal Procedure. The crew will have to mitigate the effects on charging and Pressurizer pressure for the loss of air to Containment.

Post trip failures include both Essential Service Water pumps fail to auto start on the Safety Injection. The operator must start at least one pump prior to the end of the scenario. When the crew prepares to de-pressurize the RCS as part of the SGTR mitigation, the PZR Block valve for the only available PORV fails while in the closed position. With Instrument Air already lost to containment and no available means to de-pressurize the RCS, the crew must transition to EMG C-33, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL, contingency procedure.

Success path in EMG C-33 is to secure ECCS pumps.

The following is the expected major procedure flow path:

  • OFN SB-008, INSTRUMENT MALFUNCTIONS
  • OFN KA-019, LOSS OF INSTRUMENT AIR
  • EMG C-33, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL CRITICAL PARAMETERS:

The following parameters may be of value in evaluating crew performance when the scenario is completed:

  • RCS Pressure and Temperatures
  • SG Levels and Pressures
  • PZR Level and Pressure

OP-TEST # 1 SCENARIO #2 Page 19 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 1 Event

Description:

Circ Water Pump trip, Main Turbine Setback.

Time Position Applicant's Actions or Behavior Notes Notes and Communicates annunciator RO 08A, Circ Water Pump Trip is in Alarm.

Verifies CWP A has tripped.

Direct placing CWP A handswitch in This action should be SRO STOP position to start closing discharge performed in time to prevent a valve. Unit trip on low vacuum.

Direct dispatching Site Watch to locally SRO close CWP A discharge valve remaining 25%.

Confirm Setback has occurred.

ALL Generator MW load decreasing.

Control rods inserting in Auto.

Enter and Direct OFN MA-001. LOAD SRO REJECTION OOOR TURBINE TRIP Check Turbine Not Tripped.

BOP Checks Stator Cooling - Normal Verify Control Rods inserting in Auto in RO response to Temperature mis-match.

Checks CWPs - all Running Use RNO Ensure Handswitch in stop and Site Watch BOP Should already be performed.

dispatched.

Reference plant procedures for Circ Water System Operation.

Check PZR Pressure and Level stable or RO trending to program. Make adjustments as required.

Check SG Levels stable or trending to BOP program. Make adjustments as required.

BOP Confirm Load Rejection has stopped.

Recognize that at current core life MTC SRO would be negative.

OP-TEST # 1 SCENARIO #2 Page 20 of 43 Verify SG Atmospherics are closed.

Reset C-7 signal to steam dumps by BOP placing Steam Dump Selector switch in reset and return to Tavg mode.

RO/BOP Close FW HTR Bypass Valve AE HV-038. Use Open Procedure.

Direct crew to maintain stable plant SRO conditions.

If power decreased to <70%, Contact SRO Work Week Manager (WWM) to request INC assistance.

Refer to Tech Specs.

3.1.6 Control Rod Insertion Limits RIL LO and LO-LO annunciators may The SRO may direct the RO to SRO alarm. Direct boration of the RCS to borate per the 10% down restore rods within two hours. power pre-shift brief.

3.2.3 Axial Flux Difference Determine SG Safeties remained closed SRO/BOP during load rejection.

T.S. requirement to sample 2 to Determine Thermal Power change was 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following the transient.

SRO >15% in one hour and notify Chemistry for The SRO needs to contact sampling.

chemistry.

Reset Load Limiter by slowly reducing SRO/BOP Load Potentiometer till the Load Limit light extinguishes.

Contact System Operations for Load SRO Requirements.

Unit Stable at approximately 80%, Tech Termination Criteria:

Specs identified.

OP-TEST # 1 SCENARIO #2 Page 21 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 2 Event

Description:

C S/G Controlling Level Channel fails high.

Time Position Applicant's Actions or Behavior Notes Notes and communicates annunciator 00-110B, and that C MFRV is going closed.

Stabilize S/G level to prevent a BOP Takes manual control of C MFRV and Rx Trip.

stabilizes level at program level (50%).

Acknowledges communications, enters and CRS may enter OFN SB-008 SRO directs Alarm Response (ALR 00-110B) directly.

Notes and communicates that level RO indicator AE LI-553 is failing high.

Manually controls MFRV to establish S/G level at program.

BOP Select out failed channel.

Returns MFRV controller to auto.

Enter and direct actions of OFN SB-008, SRO Instrument Malfunctions, Attach. F.

Confirms failed channel, channel has been selected out, monitors S/G level to ensure BOP proper control.

Contact Work Week Manager (WWM) to have I&C troubleshoot and trip bi-stables.

SRO Recognize channel does affect AMSAC.

OP-TEST # 1 SCENARIO #2 Page 22 of 43 OPERATOR ACTIONS Event 2 Continued Refer to and comply with T.S. Actions.

Table 3.3.1-1 Function 14 All are 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to trip bi-SRO T.S. 3.3.1, Condition E stables.

Table 3.3.2-1, Functions 5b and 6d.

T.S. 3.3.2, Conditions I and D Review Attach. S, determine instrument SRO does not affect T.S. 3.3.3 or 3.3.4 for Post Accident or Shutdown Monitoring.

S/G level stable or trending to 50%.

Termination Criteria: MFRV back in auto and Tech Specs identified.

OP-TEST # 1 SCENARIO #2 Page 23 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 3 Event

Description:

KA-HV-029, Instrument Air to Containment Isolation valve fails closed.

Time Position Applicant's Actions or Behavior Notes Plant response is approximately 60 seconds after KA HV-029 fails.

  • PZR Spray valves fail closed.
  • Letdown Isolates RO/BOP
  • Charging flow to the RCS isolates.
  • CCW alarms occur due to flow imbalance.
  • Letdown HX temperature alarms Identify plant response is indicative of a loss of instrument air.

RO/BOP Identify KA HV-029 has closed.

Dispatch Building Watch to investigate.

Place PZR B/U Heaters in Auto to SRO/RO minimize pressure rise.

Enter and Direct OFN KA-019, LOSS OF SRO INSTRUMENT AIR.

Make Plant Announcement.

SRO Check Instrument Air Pressures.

Ensure can still maintain plant control.

Check PZR Level - stable.

  • Start A CCP Should recognize the need to
  • Establish Alternate Seal Injection.

SRO/RO start an A Train CCW pump

  • Stop the NCP prior to starting the CCP.
  • Establish Excess Letdown to the PRT.

Continue procedure steps to check for SRO/BOP proper operation of Instrument Air system.

Contact WWM for assistance with KA SRO HV-029.

Charging aligned to Alternate Seal Termination Criteria:

Injection, Excess Letdown in Service.

OP-TEST # 1 SCENARIO #2 Page 24 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 4 Event

Description:

Steam Generator Tube Rupture Time Position Applicant's Actions or Behavior Notes SRO/RO Note and communicate RCS pressure is BOP decreasing.

Monitor RCS pressure for entry into DNB SRO/RO Tech. Spec. at < 2220 psig. Monitor for DNB T.S.

BOP T.S. 3.4.1, two hours to restore.

As RCS pressure decreases, may energize RO PZR B/U heaters.

Note and Communicates that A SG level BOP is increasing.

Note and communicate that PZR level is RO decreasing.

Note and communicate Annunciator 061A RO/BOP and B, Process Rad Hi and Hi-Hi.

Determine from RM-11 panel that GE RE-SRO 92, Condenser Off-gas is in alarm.

Enter and direct OFN BB-07A Steam SRO Generator Tube Leakage.

Checks PZR Level - decreasing.

Increase charging flow.

RO should increase charging RO May Re-Start the NCP flow and isolate letdown.

Isolate Letdown.

Check Charging Pump Suction.

SRO/RO Check PZR pressure - stable.

Check S/G Tubes - intact.

SRO/BOP

  • Dispatch HP
  • Contact Chemistry.

Fold Out Page criteria is met when charging is maximized and PZR level The crew may not perform all SRO/RO continues to decrease OR SRO determines steps listed for OFN BB-07A.

they cannot maintain PZR Pressure.

OP-TEST # 1 SCENARIO #2 Page 25 of 43 Direct Reactor Trip and Safety Injection.

SRO Transition to EMG E-0 Reactor Tripped and Safety Injection Termination Criteria:

Actuated.

OP-TEST # 1 SCENARIO #2 Page 26 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 5 and 6 Event

Description:

Reactor Trip Safety Injection due to SGTR, ESW pumps fail to start and D SG ARV fails open.

Time Position Applicant's Actions or Behavior Notes Enter and Direct actions of EMG E-0, SRO Reactor Trip or Safety Injection.

RO/BOP Perform Immediate Actions of EMG E-0.

Verify Rx Trip

  • Rod Bottom Lights Lit.
  • Rx Trip and Bypass Bkrs open.
  • Neutron Flux decreasing (Intermediate Range & Gamma metrics)
  • Transfer NR-45 recorder to Intermediate Range RO Verify Vital AC Power
  • Both NB buses - normal voltage /

aligned to off site power.

Verify SI actuated

  • Determine SI is actuated.

Annunciators 30A and 31A are lit.

Verify Turbine trip.

BOP

  • Main Stop valves all closed.

At completion of Immediate Actions SRO determine if there are any immediate concerns.

Notes that no ESW pump is running in RO either Train and informs SRO.

CRITICAL TASK: Start at SRO/RO Start at least one ESW pump. least one ESW pump prior to C

the end of Attach. F.

OP-TEST # 1 SCENARIO #2 Page 27 of 43 Determine Cooldown is continuing, Note BOP and communicate D SG ARV is indicating Open.

CRITICAL TASK: D ARV must be manually closed or SRO / BOP locally isolated prior to a Take Manual control and close D ARV.

C needless orange path occurring or SG pressures less than 275 psi.

Read steps and confirm Immediate Actions SRO Complete.

SRO / RO Check if SI is required - YES Perform EMG E-0 Attach. F for Automatic SRO / RO Signal verification.

If not previously started then during RO performance of Attach. F., start at least one C

ESW pump.

Verify AFW > 270 klbm/hr.

Close AC HIS-134 May discover D ARV open SRO / BOP Reduce AFW to 270 klbm/hr here.

Establish S/G Pressure Control Monitor Fold Out Page. When A SG SRO / BOP level exceeds 6% Narrow Range, Isolate cont all AFW flow to A SG.

Check PORV/Block Valves.

Check PZR Spray Valves.

SRO / BOP Check PZR Safety Valves.

Check Id RCPs should be stopped.

Direct Monitoring Critical Safety Function SRO Status Trees using EMG F-0.

Check if S/Gs are not faulted.

Check if S/G Tubes are intact.

SRO / BOP

  • Dispatch HP Check S/G levels - controlled increase.

Check BIT Inlet and Outlet valves open.

SRO / RO Transition to EMG E-3 Transition to EM E-3,STEAM TERMINATION:

GENERATOR TUBE RUPTURE.

OP-TEST # 1 SCENARIO #2 Page 28 of 43 Op-Test No.: # 1 Scenario No.: 2 Event No.: 7 Event

Description:

EMG C-33, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL Time Position Applicant's Actions or Behavior Notes A Transition Brief is not Enter and Direct EMG E-3, Steam SRO desired nor required when in Generator Tube Rupture.

SGTR procedures.

Check if RCPs should be stopped. Verify SRO/RO RCS pressure >1400.

Identify A SG is ruptured.

Isolate A SG.

  • ARV set at 1125 Critical Task: Isolate steam flow from the ruptured SG in SRO/BOP
  • Steamline drain isolated time to prevent a transition to C
  • Blowdown and Sampling isolated EMG C-31, SUBCOOLED
  • Close MSIV RECOVERY.
  • Ensure Steam Bypass closed
  • Isolate AFW when Level is >6%.

Establish SG Pressure Control.

SRO/RO Place Steam Dumps in Steam Pressure Mode.

All Verify Ruptured SG isolated. Hold Point till MSIV is closed.

SRO/BOP Check Ruptured SG >275 psi RO Block Low Steam Line Pressure SI when cont RCS pressure <1970 psi Determine Target Conditions Initiate RCS Cooldown

  • Slowly lower setpoint to open Group 1 Steam Dump Valves SRO/BOP
  • When Tavg <P-12, place Steam Dumps in Bypass interlock
  • Increase AFW flow to intact SGs Monitor cooldown; ensure steam dumps BOP begin closing as target temperature is cont approached.

OP-TEST # 1 SCENARIO #2 Page 29 of 43 Check PZR PORVs and Block Valves Check PZR Safeties.

SRO/RO Reset SI Reset CIS-A and CIS-B Recognize can not be SRO/RO Establish Instrument Air to Containment performed.

SRO/RO Stop both RHR pumps.

cont RO monitor RCS pressure for restart.

Check if Cooldown should be stopped.

Ensure steam dumps close when target is reached. Adjust controller to maintain SRO/BOP below target.

Check Ruptured SG Pressure stable or increasing.

SRO/RO Check Subcooling >50 degrees Depressurize RCS using spray SRO/RO

  • Normal Spray not available - RNO Depressurize RCS using PORVs When Attempt is made to open the block SRO/RO valve the breaker will trip.

SRO use RNO Depressurize RCS using Aux Spray in SRO/RO Attach D of EMG E-3.

Attach D, step 1, if KA HV-029 is closed then use RNO.

SRO Transition to EMG C-33, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL>

EMG E-3 completed to Attach D.

Termination Criteria: Transition to EMG C-33

OP-TEST # 1 SCENARIO #2 Page 30 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 2 Event No.: 7 Event

Description:

EMG C-33, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL Time Position Applicant's Actions or Behavior Notes A Transition Brief is not SRO Enter and Direct EMG C-33 desired nor required when in SGTR procedures.

If level has not reached 78% at this time the crew will work Check Ruptured SG Level <78%

SRO/BOP through the RNOs of the RNO go to step 13 procedure and eventually end up at step 13.

Check if SI can be Terminated.

  • Subcooling >30 degrees SRO/RO/
  • Ruptured SG level Stop ECCS pumps. Critical Task: ECCS pumps must be secured prior to the SG SRO/RO
  • All but one CCP Safety on the Ruptured SG C
  • Stop both SI pumps lifting due to water solid
  • Stop both RHR pumps conditions.

The Scenario may be terminated when all Termination Criteria: ECCS pumps are secured except for one CCP.

OP-TEST # SCENARIO #

PAGE 31 OF 43 CRITICAL TASK

SUMMARY

POSITION EXPECTED RESPONSE ACCEPTANCE CRITERIA SAT/

UNSAT RO Start Both ESW pumps. At Least one ESW pump must be started to supply cooling to an ECCS train prior to the end of EMG E-0 Attach. F.

BOP Close or Isolate D SG ARV Manually close or locally isolate prior to a needless orange path occurring or SG pressures less than 275 psi.

BOP Isolate Ruptured SG Isolate steam flow from the ruptured SG in time to prevent a transition to EMG C-31 RO Secure ECCS pumps. ECCS pumps must be secured prior to the SG Safety on the Ruptured SG lifting due to water solid conditions.

OP-TEST # SCENARIO #

PAGE 32 OF 43 INITIAL LICENSE EXAM OPERATING TEST # 1 SCENARIO # B/U Revision 0 Week of March 06, 2006

OP-TEST #1 SCENARIO #B/U Page 33 of 43 Facility: Wolf Creek NRC Scenario No.: B/U Op-Test No.: 1 Revision 0 Source:

New _ Bank - Significantly Modified X Bank - Initial Condition Change____

Initial Conditions: 100% Power, MOL, A MDAFWP is OOS for bearing replacement.

A Safety Injection Pump is OOS for oil change.

Turnover: Maintain current plant conditions. Severe Thunderstorms western Kansas.

Event Malf. Event Event No. No. Type* Description mPRS0 1 C-ATC Pzr Spray Valve fails full open in Automatic.

3A mEPS0 R-ATC 2 Rapid Down power due to loss of one 345 Kv line.

3F N-BOP mMSS1 3 I-BOP Steam Header Pressure Channel fails low. (Affects both MFPs) 3 mFWM 4 M-ALL Main Feed Line break in Turbine Building 20 mAFW 5 C BOP TDAFW pump fails to autostart.

02B IOR 6 P01055 C-ATC A CCP fails to Auto Start on Safety Injection.

B

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

OP-TEST #1 SCENARIO #B/U Page 34 of 43 SCENARIO MISCELLANEOUS INFORMATION SCENARIO OBJECTIVE:

The objective for this scenario is to mitigate a Loss of Heat Sink event by initiating feed and bleed using plant procedures. Initial conditions have one Aux Feedwater (AFW) pump and one Safety Injection (SI) pump out of service for maintenance. The scenario contains a steam header pressure instrument failure and failure of the controller for one PZR spray valve. All will require operator action to prevent a reactor trip.

The SRO will evaluate technical specifications associated with DNB during the Spray Valve Failure and the Projected Degraded Grid Voltage.

The major event is a feed line break in the turbine building and a subsequent loss of the Turbine Driven AFW pump. This places the crew in a red path, Loss of Heat Sink, functional recovery procedure. The crew will meet requirements to initiate bleed and feed to the reactor coolant system (RCS). The crew must realize that the only available high head injection pump did not autostart and manually start it to establish a feed path to the RCS. The scenario terminates when the crew has completed the bleed and feed portion of the functional recovery procedure.

The following is the expected major procedure flow path:

  • OFN SB-008, INSTRUMENT MALFUNCTIONS
  • OFN AF-025, UNIT LIMITATIONS
  • OFN MA-038, RAPID PLANT SHUTDOWN
  • OFN SB-008, INSTRUMENT MALFUNCTIONS
  • EMG FR-H1, LOSS OF HEAT SINK CRITICAL PARAMETERS:

The following parameters may be of value in evaluating crew performance when the scenario is completed:

  • S/G Wide Range Levels
  • RCS and PZR pressure
  • Hot Leg/Incore Temperatures
  • High head injection flow (BIT)
  • PZR PORV and block valve status.
  • RCS Tavg and Turbine Tref
  • SG NR levels

OP-TEST #1 SCENARIO #B/U Page 35 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: B/U Event No.: 1 Event

Description:

PZR Spray Valve A fails full open in Automatic. BB PCV-455B.

Time Position Applicant's Actions or Behavior Notes RO/BOP/ Note and Communicate that RCS pressure SRO is decreasing.

Monitor RCS pressure for entry into DNB RO/BOP/

Tech. Spec. at < 2220 psig. T.S. 3.4.1, two hours to restore.

SRO As RCS pressure decreases to < 2220, the SRO/RO crew may energize 2nd set of PZR back-up heaters.

Note and communicate A Spray valve is A spray controller must be failing open.

RO placed in Manual and closed in Place A spray controller in Manual and time to prevent a Rx Trip.

close A spray valve.

Enter and direct OFN SB-008, Instrument SRO Malfunctions, Attachment V.

Verify A Spray Valve controller failed RO open in auto and is now in manual/closed.

Contact WWM to request I&C repair SRO failed channel.

A Spray Valve Controller in Termination Criteria: manual/closed. RCS pressure stable at or trending to program (2235).

OP-TEST #1 SCENARIO #B/U Page 36 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: B/U Event No.: 2 Event

Description:

Rapid Power Reduction due to Loss of 345 Kv Line and Predicted Degraded Grid Voltage (Cue may be provided from Shift Manager to reduce power at 1% per minute.)

Time Position Applicant's Actions or Behavior Notes Receive call from WESTAR Transmission Services that the Benton Line has failed.

SRO Determine this is an entry condition for OFN AF-025.

SRO Enter OFN AF-025, UNIT LIMITATIONS Determine from OFN, Attach. A, page 3 SRO that maximum generator load is 950 MWE net, (995 MWE gross)

Enter and direct actions of OFN MA-038. Crew should commence 10%

Conduct Reactivity Brief with board downpower from pre-shift brief SRO operators. Pre-Shift brief for reduction to then determine remaining 90%. actions.

RO Calculate Boration required. 155 gallons at 15.4 gpm.

SRO/BOP Check AE HV-038 - Closed Establish 1% per minute power decrease on the Load Set potentiometer.

  • Press Decrease Load till Load BOP Limit light is out.

(Continuous)

  • Select 1%/Minute ON.
  • Decrease Loading Rate - ON.
  • Decrease Load Set, maintain within 200 MW of actual load.
  • Use rods to maintain Tavg/Tref error between 0 and +5 RO (Continuous)
  • Energize both PZR B/U heaters.
  • Borate and adjust rods as necessary to maintain rods above RIL.
  • Check PZR PORV / Block Valves RO/BOP
  • Check PZR Pressure
  • Check PZR Level

OP-TEST #1 SCENARIO #B/U Page 37 of 43 OPERATOR ACTIONS EVENT 2 Continued.

BOP Control S/G levels to maintain 45-55%.

(Continuous)

Check Reactor Power < 60%. Recognize SRO hold point in procedure Receive call from WESTAR Transmission SRO Services that predicted grid voltage from the model is 98%.

Recognize entry condition to OFN AF-SRO 025.

Determine from step 8 to refer to Attach. E of the OFN. Per the note on the Attach.

SRO Declare both Off Site sources in-operable and refer to T.S 3.8.1 Determine T.S. 3.8.1 Condition C applies.

Will have to return A AFW and A SI pumps to service within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or declare the B AFW and B SI in-operable SRO requiring entry into T.S. 3.0.3.

AND Restore at least one offsite source within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Power Reduction in Progress. Rods have Termination Criteria: automatically stepped in. T.S. 3.8.1 Condition C identified.

OP-TEST #1 SCENARIO #B/U Page 38 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 3 Event

Description:

Steam Header Pressure Channel fails low. (Affects both MFPs)

Time Position Applicant's Actions or Behavior Notes Notes and communicates that level is BOP decreasing in all four S/Gs.

Master Speed Controller must Communicate and takes manual control of be placed in manual and SG SRO/BOP the Master MFP Speed controller. levels stabilized in time to prevent a Rx Trip.

Identify Steam Header Pressure channel RO/BOP 507 has failed low.

Enter and direct OFN SB-008, Instrument SRO Malfunctions, Attachment B.

Verify Steam Header Pressure channel malfunction.

RO/BOP Check Steam Dump select switch NOT in Steam Pressure Mode.

Manually control MFP speed.

At 100% power Main Feed Establish dP IAW Figure 1.

BOP header pressure should read (Operator may match steam and feed (Continuous) ~165 psi higher than S/G flows, then adjust MFP speed to maintain pressure.

FRVs positioned at ~ 80%.)

Place Steam Header Pressure Controller in BOP manual.

Contact WWM to request I&C repair SRO failed channel.

MFP speed controller in manual, all S/G Termination Criteria: levels stable or trending to program level (50%).

OP-TEST #1 SCENARIO #B/U Page 39 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: 1 Event No.: 4 Event

Description:

Main Feed Line break in Turbine Building.

Time Position Applicant's Actions or Behavior Notes Note and communicate level decreasing in BOP all four S/Gs.

BOP Acknowledge and communicate alarms RO/BOP Note S/G Levels are approaching Rx Trip SRO setpoint.

Direct a Rx Trip or respond to a Rx Trip SRO and enter EMG E-0.

Verify Rx Trip

  • Rod Bottom Lights Lit.
  • Rx Trip and Bypass Bkrs open.
  • Neutron Flux decreasing (Intermediate Range & Gamma metrics)
  • Transfer NR-45 recorder to RO Intermediate Range Verify Vital AC Power
  • NB01 normal voltage / off site power.
  • Determine SI is NOT actuated.

Verify Turbine Trip

  • Main Stop valves all closed.

BOP

Verify SI NOT required

  • All S/G Press > 615 psig RO
  • Ctmt Press < 3.5 psig
  • RCS Subcooling > 30 degrees
  • PZR Level > 6%

OP-TEST #1 SCENARIO #B/U Page 40 of 43 OPERATOR ACTIONS Event 4 (Continued)

SRO Ensure Immediate Actions complete.

Identify any immediate concerns.

Note and Communicate that B AFW BOP pump has tripped and the TDAFW pump has failed to auto start.

CRITICAL TASK: The TDAFW pump must be started SRO/BOP prior to tripping all RCP in Manually start the TDAFW pump.

C EMG FR-H1, LOSS OF HEAT SINK. Crew may use ALR 00-128B.

Management Expectation is to NOT perform any other actions Secure all Condensate Pumps and Heater till the immediate actions are SRO/BOP Drain Pumps after Immediate actions are complete. With a feed break in complete. the Turbine Building it is expected to secure running secondary pumps.

SRO/RO Using procedure verify Immediate Actions BOP of EMG E-0 complete Direct Operator to Monitor CSFSTs and SRO Transition to EMG ES-02 from Step 4 RNO.

EMG E-0 Immediate Actions completed, Termination Criteria:

transition is made to EMG ES-02.

OP-TEST #1 SCENARIO #B/U Page 41 of 43 OPERATOR ACTIONS Op-Test No.: # 1 Scenario No.: B/U Event No.: 5 and 6 Event

Description:

Loss of Heat Sink, failure of high head Injection.

Time Position Applicant's Actions or Behavior Notes Crew may enter EMG FR-H1 Conduct Transition Brief for entry to EMG SRO directly based on timing of ES-02.

report of red path.

RO Perform EMG F-0 for CSFST SRO/RO Monitor CSFST on NPIS computer screen BOP after 1st verification with the procedure.

(Continuous)

Note that AFW flow is zero to all S/Gs.

  • May attempt to open all AFW BOP valves. TDAFW pump trips.
  • Note and report that zero flow is indicated to all S/Gs.

After transition to FR-H1 the Recognize that entry conditions are met for crew will be watching for Fold SRO RED path on EMG FR-H1, Loss of Heat Out Page Criteria to go to the Sink. Transition to EMG FR-H1.

steps for Feed and Bleed.

Try to establish AFW Flow. If Fold Out page is met the SRO Determine from Building reports that No crew will go directly to step 27 AFW pump is available. and initiate bleed and feed.

BOP Close all AFW valves Reduce heat input to RCS.

RO/BOP Stop all RCPs Turn off all PZR heaters (3)

IF MSIVs are open, align Steam Dumps.

Place PK-507 in Manual, setpoint at 7.28, BOP select Steam Pressure Mode, return PK-507 to auto.

IF MSIVs are closed, then use ARVs.

Ensure ARV setpoints at 1125 psig.

OP-TEST #1 SCENARIO #B/U Page 42 of 43 OPERATOR ACTIONS Events 5 and 6 (Continued)

Verify Condensate/Feedwater systems available.

SRO Based on Building reports, determine the Main Feedwater header is unavailable.

Recognize to use the RNO and this places the crew in a loop from step 1 to step 9.

Conduct Quick Brief with crew.

SRO In a procedure loop till the Fold Out Page is met or meet a step criterion.

Monitor S/G WR levels. As level reaches Perform Step for Bleed and Crew 26% proceed to step 29 and initiate bleed Feed.

and feed.

RO/BOP Stop all RCPs May have already performed.

Turn off all PZR heaters Actuate Safety Injection RO Recognize that B CCP and B SI have tripped and A CCP failed to auto start.

Manually start A CCP.

RO Checks BIT flow indicated on EM FI- Ensures Feed Path Established (C) 917A.

ARM both Cold Overpressure RO/BOP Protection circuits. Ensures Bleed Path Established (C) Ensure Both Block Valves open.

Open both PZR PORVs.

RO/BOP Verifies BOTH Block valves and BOTH PORVs are open.

Scenario may be terminated Bleed and Feed established per steps 29-Termination Criteria: anytime after bleed and feed 33 of EMG FR-H1.

has been established.

OP-TEST #1 SCENARIO #B/U Page 43 of 43 CRITICAL TASK

SUMMARY

POSITION EXPECTED RESPONSE ACCEPTANCE CRITERIA SAT/

UNSAT The TDAFW pump must be started prior to tripping all RCP BOP Manually start the TDAFW pump in EMG FR-H1, LOSS OF HEAT SINK.

Initiate SI and manually start A Bleed and Feed must be RO/BOP Centrifugal Charging Pump to ensure established prior to S/G dry out.

a Feed path, (3 S/Gs < 8% WR)

Bleed and Feed must be Ensure PORVs/Block valves open for RO/BOP established prior to S/G dry out.

a Bleed path.

(3 S/Gs < 8% WR)

Administrative RO A1.a JOB PERFORMANCE MEASURE JPM NO: RO A1.a K/A NO: 2.1.20 COMPLETION TIME: 20 Minutes K/A RATING: 4.3 JOB TITLE: RO REVISION: 0 TASK TITLE: Perform STS BG-001, Born Injection Flowpath Ability to execute procedure steps.

Verification.

DUTY: Conduct of Operations The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006

Administrative SRO.A.1.a JOB PERFORMANCE MEASURE JPM NO: SRO-A.1.a K/A NO: 2.1.5 COMPLETION TIME: 10 Minutes K/A RATING: 3.4 JOB TITLE: SRO REVISION: 0 TASK TITLE: Shift Staffing, Work Hour Limitations Ability to locate and use procedures and directives related to shift staffing and activities.

DUTY: Conduct of Operations The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

AP 13-001, Guidelines for WCGS Staff Working Hours TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006

SRO A.1.a Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1.

Initiating Cues: You are the Control Room Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 7th (0600), based on their work hour history evaluate whether any of the following 5 ROs could perform safety-related functions until 1900 without advanced approval. Assume the work hours will start at 0630 and 1/2 hour will be considered turnover time. For each candidate indicate whether the answer is yes or no.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide cue sheet.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have determined the correct status for at least 4 of the 5 RO and not select an RO that could not work.

START TIME:

STOP TIME:

Page 1 of 3

SRO A.1.a TASK NUMBER - ELEMENT CUE STANDARD SCORE

1. Provide candidate with Candidate should locate completed copy of the procedure AP 13-001, initiating cue Guidelines for WCGS Staff Working Hours and review JPM initiating cue Pass criteria is 4 of the 5 S U
2. *Review work hour ROs work hour status history and determine being correctly Comments:

that only 2 of the 5 ROs determined and not could work without select an RO that could advanced approval. not work RO1 - no, would work 16.5 hrs straight RO2 - Yes, would work 24 hrs in 48 hrs RO3 - No, would be 17.5 hrs in 24 and less than 8 THE JPM IS hours between work COMPLETE periods RECORD STOP TIME RO4 - Yes, would work ON PAGE 1 70 hrs in 7 days RO5 - No, would work 24.5 hrs in 48 hrs Page 2 of 3

SRO A.1.a Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1.

Initiating Cues: You are the Control Room Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 7th (0600), based on their work hour history evaluate whether any of the following 5 ROs could perform safety-related functions until 1900 without advanced approval. Assume the work hours will start at 0630 and 1/2 hour will be considered turnover time. For each candidate indicate whether the answer is yes or no.

Operator Feb 28 March 1st March 2nd March 3rd March 4th March 5th March 6th March 7th RO1 0630 - 0630 - OFF OFF OFF 0700 - 0700 - On at 1900 1900 1530 1530 0000 RO2 OFF OFF OFF 0630 - 0630 - 0630 - 0630 -

1900 1900 1900 1900 RO3 OFF 0630 - 0630 - 0630 - OFF OFF 1300-1900 1900 1900 2400 RO4 Off 0630 - 0630 - 0630 - 0630 - OFF OFF 1900 2230 2230 2030 RO5 0630 - OFF OFF OFF 0630 - 0630 - 0630 -

1900 1900 1900 1930

1. RO1
2. RO2
3. RO3
4. RO4
5. RO5 Page 3 of 3

Administrative SRO A.1.b JOB PERFORMANCE MEASURE JPM NO: SRO-A1B K/A NO: 2.1.25 COMPLETION TIME: 20 Minutes K/A RATING: 3.1 JOB TITLE: SRO REVISION: 0 TASK TITLE: Determine Time to Boil and Core Uncovery Ability to obtain and interpret station based on a loss of Shutdown Cooling. reference materials such as graphs, monographs, and tables which contain performance data.

DUTY: Conduct of Operations The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN EJ-015 TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 4 of 3

SRO A.1.b Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Today is March 17th. You are a spare licensed operator in the Control Room for Outage Support. The plant is in Mode 5 with water level in the reactor vessel at 3.5 feet below the vessel flange. Train A Residual Heat Removal (RHR) is in operation cooling the reactor core. Train B RHR System is in Standby. Reactor Coolant System temperature is 180°F. The reactor was shutdown on March 8th after operating at 100% power for the last 100 days.

Initiating Cues: Train A Residual Heat Removal pump tripped. Attempts to start B RHR pump are unsuccessful. The Control Room staff has entered procedures to mitigate the event. The Control Room Supervisor directs you to determine the following using the appropriate procedure:

1. the time to boiling
2. the time to start of core uncovery.
3. the time to complete core uncovery.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes:

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have determined from OFN EJ-015, LOSS OF SHUTDOWN COOLING, the answers for the above questions.

START TIME:

STOP TIME:

Page 1 of 26

SRO A.1.b TASK NUMBER - ELEMENT CUE STANDARD SCORE

3. Locate Copy of OFN Must determine that the crew would EJ-015, and step 30. be in OFN EJ-015 and step 30 refers to the graphs.

Recognize the initiating cues stated

4. Check plant - IN the water level in the reactor vessel REDUCED is 3.5 feet below the vessel flange.

INVENTORY Answer: YES CONDITION.

Locate Figure 5 of OFN EJ-015.

5. *Estimate time to Recognize it has been 9 days since boiling using FIGURE 5 shutdown and that the vessel is not pressurized. Answer: 14 minutes +/- 1.

Locate Figure 6 of OFN EJ-015.

6. *Estimate time to onset Recognize it has been 9 days since of core uncovery using shutdown. Utilize the ONSET OF FIGURE 6. CORE UNCOVERY graph line.

Answer: 127 minutes +/- 5.

S U Locate Figure 6 of OFN EJ-015.

7. *Estimate time to Recognize it has been 9 days since Comments:

complete core uncovery shutdown. Utilize the COMPLETE using FIGURE 6. CORE UNCOVERY graph line.

Answer: 268 minutes +/- 5.

THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates Critical Task Page 2 of 26

SRO A.1.b Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Today is March 17th. You are a spare licensed operator in the Control Room for Outage Support. The plant is in Mode 5 with water level in the reactor vessel at 3.5 feet below the vessel flange. Train A Residual Heat Removal (RHR) is in operation cooling the reactor core. Train B RHR System is in Standby. Reactor Coolant System temperature is 180°F. The reactor was shutdown on March 8th after operating at 100% power for the last 100 days.

Initiating Cues: Train A Residual Heat Removal pump tripped. Attempts to start B RHR pump are unsuccessful. The Control Room staff has entered procedures to mitigate the event. The Control Room Supervisor directs you to determine the following using the appropriate procedure:

1. the time to boiling
2. the time to start of core uncovery.
3. the time to complete core uncovery.

Page 3 of 26

Administrative SRO A.2 JOB PERFORMANCE MEASURE JPM NO: SRO-A2 K/A NO: 2.2.13 COMPLETION TIME: 15 Minutes K/A RATING: 3.8 JOB TITLE: SRO REVISION: 0 TASK TITLE: Review a Clearance Order for approval and Knowledge of tagging and clearance identify the critical errors. procedures.

DUTY: Equipment Control The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

Drawings: M-12EN01, M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04 Procedure: AP 21E-001 CLEARANCE ORDERS TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 4 of 26

SRO A2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is Mode 1. You are the Work Controls SRO. Containment Spray Pump B has a developed a serious leak on its discharge flow element EN FE-011. The on shift crew has prepared a Clearance Order and the Shift Manager requests you perform the tagging authority review.

Initiating Cues: The Control Room Supervisor has sent the clearance over for you to release for hanging.

Review the clearance order and identify three critical errors.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Have copies of the following drawings to replace any marked up by the examinee.

M-12EN01, M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have rejected the clearance order based on the three critical errors.

START TIME:

STOP TIME:

Page 1 of 5

SRO A2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

8. Locates the proper May locate in any drawings. sequence. Comments:

M-12EN01 M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04 S U Can be identified in any

9. *Identifies the 3 critical sequence. Comments:

errors on the clearance order. 1. Breaker listed for BN HV-03 is for BN HV-04.

2. Breaker listed for EN HV-07 is actually the cubicle for a relay and not the breaker.
3. EN V-024, RWST Test line valve is for wrong train. Should be EN V-025.

THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates Critical Task Page 2 of 5

SRO A2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is Mode 1. You are the Work Controls SRO. Containment Spray Pump B has a developed a serious leak on its discharge flow element EN FE-011. The on shift crew has prepared a Clearance Order and the Shift Manager requests you perform the tagging authority review.

Initiating Cues: The Control Room Supervisor has sent the clearance over for you to release for hanging.

Review the clearance order and identify three critical errors.

Page 3 of 5

Administrative SRO A.3 APF 21E-001-01, Rev. 02 WOLF CREEK GENERATING STATION CLEARANCE ORDER Clearance Number: S-EN-9000 Date/Time:Today Component Desired: EN FE-011 Work To Be Done: Shift Manager request Reason For Clearance Requestor Date/Time Tags Estimated Date/Time Fire System(s) to be Hung by of completion Effected Excessive leakage SM Today N/A Shift Managers Approval To Remove Equipment From Service And Hang Tags Prepared By:

Tagging Authority Review:

Shift Manager:

Date/Time:________/________ Effective Date/Time:________/________

Clearance Work Order Phone ACAD Date/Tim Groun Clearance Date/Time Ground Date/Tim Order and Step Ext e d Tag Order Release Tag e Ground Acceptance Issued Retrnd. Removed Shift Managers Approval To Remove Tags Restoration Section Prepared By:

Restoration Review (SR Only):

Shift Manager: Date/Time:______/______ EOL REVIEWED FOR RETEST:

Special Instructions/Reference Documents/Clearance Order Summary Change To Clearance Form Made?

Yes / No Page 4 of 5

Administrative SRO A.3 FORM APF 21E-001-02 REV 01 CLEARANCE ORDER CONTINUATION SHEET Clearance Number: S-EN-9000 Page: __1 0f 1 Components Required to Clear Equipment Placement Section Restoration Component Tagged Component Description Position Seq. Tagged Verefied Position Seq. Removed Verified By By By By EN HIS-09 CTMT SPRAY PUMP B PULL TO 1 LOCK BN HIS-03 RWST to CTMT SPRAY CLOSED 2 PUMP B EN HIS-12 CTMT SPRAY PUMP B CLOSED 2 DISCHARGE EN HIS-07 CTMT SUMP TO CTMT CLOSED 2 SPRAY PUMP B NB0203 STMT SPRAY PUMP B OPEN/ 3 SUPPLY BKR RACKED DOWN NG01AEF2 BN HV-03 SUPPLY BKR Verified OFF 3 NG02BBR1 EN HV-12 SUPPLY BKR Verified OFF 3 NG02BFR1 EN HV-07 SUPPLY BKR Verified OFF 3 BN HV-03 RWST to CTMT SPRAY CLOSED 4 PUMP B HANDWHEEL EN HV-12 CTMT SPRAY PUMP B CLOSED 4 DISCHARGE HANDWHEEL EN V-100 EDUCTOR TO SPRAY PUMP CLOSED 4 B

EN V-024 RWST TEST LINE CLOSED 4 ISOLATION EN V-068 CTMT SPRAY PUMP B OPEN 5 DRAIN EN V-115 CTMT SPRAY PUMP B VENT OPEN 5 Page 5 of 5

Administrative SRO A.3 JOB PERFORMANCE MEASURE JPM NO: SRO-A3 K/A NO: 2.3.1 COMPLETION TIME: 10 Minutes K/A RATING: 3.0 JOB TITLE: SRO REVISION: 0 TASK TITLE: Given a Radiological Survey Map and Knowledge of 10 CFR: 20 and related Radiation Work Permit determine the facility radiation control requirements Radiological conditions and controls required.

DUTY: Radiation Control The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 6 of 5

SRO A3 Staging: Begin this JPM in the hall outside Access Control at the RWP desk.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. You are a spare licensed operator on shift.

Initiating Cues: The Control Room Supervisor states they have received a sump alarm on the B RHR Pump room sump and asks you to investigate. Given the survey map, determine the RWP that you would use. Evaluate the radiological conditions in the area and provide the requested information to the following questions.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide survey map.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have correctly answered the three questions.

START TIME:

STOP TIME:

Page 1 of 3

SRO A3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U RWP 06-005 should be

10. *Reviews survey map selected Comments:

and determines RWP.

S U High Radiation Area.

11. *Identify the Comments:

classification for the Based on the 2 at the room the sump is doorway to the RHR located in. pump room.

S U Immediately.

12. *Determine time till Comments:

dosimeter will alarm in RWP rate setting is 125 300 mr/hour field. mr/hour.

S U Based on Special

13. *Identify the areas on Instruction 3# on the Comments:

the Survey Map that RWP.

require any special HP controls prior to 1. The room itself accessing. due to High Radiation Area.

2. The RHR pump seal housing due to Highly Contaminated Area.

THE JPM IS 3. The RHR pump COMPLETE room sump due to Highly RECORD STOP TIME Contaminated ON PAGE 1 Area.

Identify at least two of the three areas.

  • Indicates Critical Task Page 2 of 3

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. You are a spare licensed operator on shift.

Initiating Cues: The Control Room Supervisor states they have received a sump alarm on the B RHR Pump room sump and asks you to investigate. Given the survey map, determine the RWP that you would use. Evaluate the radiological conditions in the area and provide the requested information to the following questions.

NOTE: Circle the correct answers or write them down for the following questions and provide the evaluator with your completed paperwork.

1. The area where the sump is located is a:

A) Potential Hot Particle Area B) Contaminated Area C) High Radiation Area D) Radiation Area

2. If you had to access the pump discharge piping immediately in front of the RHR Pump, how long before your dosimeter would alarm.

A) Immediately B) 4 minutes C) 15minutes D) 25 minutes

3. Identify the areas on the Survey Map that require HP notification prior to accessing.

Page 3 of 5

Administrative (Simulator Scenario #1) SRO A.4.1 WOLF CREEK JOB PERFORMANCE MEASURE JPM NO: SRO A.4 K/A NO: 2.4.41 COMPLETION TIME: 15 Minutes K/A RATING: 4.1 JOB TITLE: SRO REVISION: 0 TASK TITLE: After observing an event on the simulator, make Knowledge of the emergency action level the E-plan Classification and Protective Action thresholds and classifications.

Recommendation.

DUTY: Emergency Plan The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

AP 06-002, Radiological Emergency Response Plan EPP 06-001, Control Room Operations EPP 06-005, Emergency Classification EPP 06-006, Protective Action Recommendations APF 06-002-01, Emergency Action Levels EPF 06-007-01, WCGS Emergency Notification TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 4 of 5

SRO A-4.1 Scenario #1 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the acting Shift Manager.

Initiating Cues: Analyze the events you have just experienced on the simulator, complete an EPF 06-007-01, WCGS Emergency Notification form. Use current plant status.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: After the Candidate indicates they would obtain the Emergency Notification form from the Shift Managers desk drawer, present the blank form attached to this JPM.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. . (PIR 2003-2930)

Task Standard: Upon completion of this JPM, the Candidate will have made the correct classification and the correct protective action recommendation per the performance page for the scenarion just completed.

START TIME:

STOP TIME:

PAGE 1 of 3

SRO A-4.1 Scenario #1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U EAL

1. *This classification is Comments:

for Scenario #1 3-LRCB1 - Yes 3-LRCB2 - Yes 3-LRCB3 - No 3-LRCB5 - Yes 3-LRCB6 - No 3-LRCB7 - No Alert

2. *Perform Attachment A PAR of EPP 06-006 Perform Attachment A of EPP 06-006 Complete EMERGENCY ACTION NOTIFICATION as indicated on attached Key.
  • Sections 3, 4, 5, 7, and 8 are critical THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1
  • CRITICAL STEP PAGE 2 of 3

SRO A-4.1 Scenario #1 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the acting Shift Manager.

Initiating Cues: Analyze the events you have just experienced on the simulator, complete an EPF 06-007-01, WCGS Emergency Notification form. Use current plant status.

PAGE 3 of 3

Administrative (Simulator Scenario #2) SRO A.4.2 WOLF CREEK JOB PERFORMANCE MEASURE JPM NO: SRO A.4 K/A NO: 2.4.41 COMPLETION TIME: 15 Minutes K/A RATING: 4.1 JOB TITLE: SRO REVISION: 0 TASK TITLE: After observing an event on the simulator, make Knowledge of the emergency action level the E-plan Classification and Protective Action thresholds and classifications.

Recommendation.

DUTY: Emergency Plan The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

AP 06-002, Radiological Emergency Response Plan EPP 06-001, Control Room Operations EPP 06-005, Emergency Classification EPP 06-006, Protective Action Recommendations APF 06-002-01, Emergency Action Levels EPF 06-007-01, WCGS Emergency Notification TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 PAGE 3 of 3

SRO A-4 Scenario #2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the acting Shift Manager.

Initiating Cues: Analyze the events you have just experienced on the simulator, complete an EPF 06-007-01, WCGS Emergency Notification form. Use current plant status.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: After the Candidate indicates they would obtain the Emergency Notification form from the Shift Managers desk drawer, present the blank form attached to this JPM.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. . (PIR 2003-2930)

Task Standard: Upon completion of this JPM, the Candidate will have made the correct classification and the correct protective action recommendation per the performance page for the scenarion just completed.

START TIME:

STOP TIME:

PAGE 1 of 3

SRO A-4 Scenario #2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U EAL

2. *This classification is Comments:

for Scenario #2 2-SGTF1 - Yes 2-SGTF2 - No 2-SGTF9 - Yes 2-SGTF10 - No 2-SGTF12 - No ALERT PAR

2. *Perform Attachment A Perform Attachment A of of EPP 06-006 EPP 06-006 Complete EMERGENCY ACTION NOTIFICATION as indicated on attached Key.
  • Sections 4, 5, 7, and 8 are critical THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1
  • CRITICAL STEP PAGE 2 of 3

SRO A-4 Scenario #2 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the acting Shift Manager.

Initiating Cues: Analyze the events you have just experienced on the simulator, complete an EPF 06-007-01, WCGS Emergency Notification form. Use current plant status.

PAGE 3 of 3

RO A1.a Simulator Set Up: IC 30 Use the Fuse/Breaker Remote function and remove power from B BATP (PBG02B)

Use the Fuse/Breaker Remote function and remove power from Excess Letdown Valve BG HV8154A.

Hang DNO Tags on BG HIS-8154A and B BATP Handswitch.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. Boric Acid Transfer Pump B is tagged for out for seal replacement.

The pump breaker is off and its inlet and outlet isolations are tagged closed. Excess Letdown Valve BG HV-8154A has its breaker tagged open due to electrical faults.

Initiating Cues: The Control Room Supervisor directs you to perform STS BG-001, BORON INJECTION FLOW PATH VERIFICATION.

Except for manual valves listed above, ALL other manual valves are in their normal CKL or Locked Component Log positions.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide STS BG-001 with Cover Sheet completed for Authorization to begin.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have identified the Boration and Letdown Flowpaths for the STS.

START TIME:

STOP TIME:

Page 2 of 19

RO A1.a TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. Review Procedure. Initial Conditions State Mode 1.
  • Determine Section 8.1 Comments:

must be performed for current Mode.

S U If candidate asks for Completes Figure 1.

2. *Perform Step 8.1.1.1 local verification of valve Comments:

and 8.1.1.2 to verify positions can restate On Panel RL001/2.

RWST to RCS Initial Conditions or flowpath. provide the following Notes that the Blue positions as required. Placard is on the A Train CCP and should OPEN valves use the B CCP for the line up.

BG 8471A BG 8471B Circles PBG05B in Step 8.1.1.2 BG 8485A BG 8485B See key.

BG 8483A BG 8483C BG 8483B BG 8402A BG 8402B EM V-107 EM V-108 EM V-109 EM V-110 S U Completes Figure 4.

3.
  • Perform Step 8.1.1.3 Comments:

to verify PORVs At Panel RL021/22 available.

Verifies that both PORV and Block valves are available See key.

  • Indicates Critical Task Page 3 of 19

RO A1.a TASK NUMBER - ELEMENT CUE STANDARD SCORE S U Completes Figure 4.

4. *Perform Step 8.1.1.4 Comments:

to verify Excess On Panel RL001/2 Letdown Flow Path Recognize BG HV-8154A is Tagged out.

See Key If candidate asks for Completes Figure 2.

5.
  • Perform Step 8.1.2 to local verification of valve verify BAST to RCS positions, restate Initial Must use A CCP flowpath. Conditions or provide the (PBG05A) to complete following positions: flow path.

CLOSED Valves: Recognizes B Transfer BG V-8465A Pump is not available BG V-8465B Recognize same Excess BG V-8475 Flow Path can be used.

BG V-166 See Key BG V-173 BG V-172 OPEN Valves:

BG V-8461A BG V-8463 BG V-148 BG V-149 BG V-152 BG V-8471A BG V-8485A BG V-8471B BG V-8485B S U

6. Complete Procedure N/A remaining steps in Procedure. Comments THE JPM IS Complete Sign Cover Sheet and Record Stop Time. return to the SRO.
  • Indicates Critical Task Page 4 of 19

RO A1.a Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. Boric Acid Transfer Pump B is tagged for out for seal replacement.

The pump breaker is off and its inlet and outlet isolations are tagged closed. Excess Letdown Valve BG HV-8154A has its breaker tagged open due to electrical faults.

Initiating Cues: The Control Room Supervisor directs you to perform STS BG-001, BORON INJECTION FLOW PATH VERIFICATION.

Except for manual valves listed above, ALL other manual valves are in their normal CKL or Locked Component Log positions.

Page 5 of 19

Administrative RO A.1.b JOB PERFORMANCE MEASURE JPM NO: RO-A1B K/A NO: 2.1.25 COMPLETION TIME: 20 Minutes K/A RATING: 2.8 JOB TITLE: RO REVISION: 0 TASK TITLE: Determine Time to Boil and Core Uncovery Ability to obtain and interpret station based on a loss of Shutdown Cooling. reference materials such as graphs, monographs, and tables which contain performance data.

DUTY: Conduct of Operations The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN EJ-015 TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 6 of 19

RO A.1.b Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Today is March 17th. You are a spare licensed operator in the Control Room for Outage Support. The plant is in Mode 5 with water level in the reactor vessel at 3.5 feet below the vessel flange. Train A Residual Heat Removal (RHR) is in operation cooling the reactor core. Train B RHR System is in Standby. Reactor Coolant System temperature is 180°F. The reactor was shutdown on March 8th after operating at 100% power for the last 100 days.

Initiating Cues: Train A Residual Heat Removal pump tripped. Attempts to start B RHR pump are unsuccessful. The Control Room staff has entered procedures to mitigate the event. The Control Room Supervisor directs you to determine the following using the appropriate procedure:

1. the time to boiling
2. the time to start of core uncovery.
3. the time to complete core uncovery.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes:

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have determined from OFN EJ-015, LOSS OF SHUTDOWN COOLING, the answers for the above questions.

START TIME:

STOP TIME:

Page 1 of 3

RO A.1.b TASK NUMBER - ELEMENT CUE STANDARD SCORE

7. Locate Copy of OFN Must determine that the crew would EJ-015, and step 30. be in OFN EJ-015 and step 30 refers to the graphs.

Recognize the initiating cues stated

8. Check plant - IN the water level in the reactor vessel REDUCED is 3.5 feet below the vessel flange.

INVENTORY Answer: YES CONDITION.

Locate Figure 5 of OFN EJ-015.

9. *Estimate time to Recognize it has been 9 days since boiling using FIGURE 5 shutdown and that the vessel is not pressurized. Answer: 14 minutes +/- 1.

Locate Figure 6 of OFN EJ-015.

10. *Estimate time to onset Recognize it has been 9 days since of core uncovery using shutdown. Utilize the ONSET OF FIGURE 6. CORE UNCOVERY graph line.

Answer: 127 minutes +/- 5.

S U Locate Figure 6 of OFN EJ-015.

11. *Estimate time to Recognize it has been 9 days since Comments:

complete core uncovery shutdown. Utilize the COMPLETE using FIGURE 6. CORE UNCOVERY graph line.

Answer: 268 minutes +/- 5.

THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates Critical Task Page 2 of 3

RO A.1.b Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: Today is March 17th. You are a spare licensed operator in the Control Room for Outage Support. The plant is in Mode 5 with water level in the reactor vessel at 3.5 feet below the vessel flange. Train A Residual Heat Removal (RHR) is in operation cooling the reactor core. Train B RHR System is in Standby. Reactor Coolant System temperature is 180°F. The reactor was shutdown on March 8th after operating at 100% power for the last 100 days.

Initiating Cues: Train A Residual Heat Removal pump tripped. Attempts to start B RHR pump are unsuccessful. The Control Room staff has entered procedures to mitigate the event. The Control Room Supervisor directs you to determine the following using the appropriate procedure:

1. the time to boiling
2. the time to start of core uncovery.
3. the time to complete core uncovery.

Page 3 of 3

Administrative RO A.2 JOB PERFORMANCE MEASURE JPM NO: RO-A2 K/A NO: 2.2.13 COMPLETION TIME: 20 Minutes K/A RATING: 3.6 JOB TITLE: RO REVISION: 0 TASK TITLE: Prepare a Clearance Order to remove a Knowledge of tagging and clearance leaking pump from service. procedures.

DUTY: Equipment Control The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

Drawings: M-12EN01, M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04 Procedure: AP 21E-001 CLEARANCE ORDERS TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 4 of 3

RO A2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is Mode 1. Containment Spray Pump B has a developed a serious leak on its discharge flow element EN FE-011.

Initiating Cues: The Control Room Supervisor directs you to identify the isolation boundaries that will be required to remove Containment Spray Pump B from service and isolate EN FE-011. List the components on the clearance order sheet provided in the proper sequence.

Component Names are NOT required.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Have copies of the following drawings to replace any marked up by the examinee.

M-12EN01, M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have designated the correct isolation boundaries.

START TIME:

STOP TIME:

Page 1 of 5

RO A2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

12. Locates the proper May locate in any drawings. sequence. Comments:

M-12EN01 M-12BN01, E-13EN01, E-13EN02, E-13EN03, E-13BN04

13. Identifies the Main See key for proper Control Board position.

Handswitches May list in any sequence.

EN HIS-09, BN HIS-03, EN HIS-12, EN HIS-07 S U See key for proper

14. *Identifies electrical position and breaker Comments:

power supplies. number.

Ctmt Spray Pump B BN HV-03 EN HV-12 EN HV-07 S U See key for proper

15. *Identifies isolation position. Comments:

valves.

BN HV-03 EN HV-07 is an EN HV-12 encapsulated valve and may or may not be EN V-100 listed.

EN V-025

  • Indicates Critical Task Page 2 of 5

RO A2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U See key for proper

16. *Identifies vent and position. Comments:

drain valves.

At least one of the valves from each group must be selected.

Drains:

1. EN V-032
2. EN V-068
3. EN V-107 Vents:
  • EN V-089
  • EN V-115
  • EV V-095 S U Two critical tasks are
17.
  • Identifies preferred associated with the Comments:

sequence. sequence:

1. Spay pump handswitch must be placed in Pull to Lock or the Pump breaker racked out prior to closing suction valves.
2. Vents and drains THE JPM IS must be last.

COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates Critical Task Page 3 of 5

RO A2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is Mode 1. Containment Spray Pump B has a developed a serious leak on its discharge flow element EN FE-011.

Initiating Cues: The Control Room Supervisor directs you to identify the isolation boundaries that will be required to remove Containment Spray Pump B from service and isolate EN FE-011. List the components on the clearance order sheet provided in the proper sequence.

Component Names are NOT required.

Page 4 of 5

KEY FORM APF 21E-001-02 REV 01 CLEARANCE ORDER CONTINUATION SHEET Components Required to Clear Equipment Placement Section Restoration Component Tagged Component Description Position Seq. Tagged Verified Position Seq. Removed Verified By By By By EN HIS-09 CTMT SPRAY PUMP B PULL TO LOCK 1 BN HIS-03 RWST to CTMT SPRAY PUMP B CLOSED 2 EN HIS-12 CTMT SPRAY PUMP B CLOSED 2 DISCHARGE EN HIS-07 CTMT SUMP TO CTMT SPRAY CLOSED 2 PUMP B NB0203 STMT SPRAY PUMP B SUPPLY OPEN/ 3 BKR RACKED DOWN NG02ABF1 BN HV-03 SUPPLY BKR Verified OFF 3 NG02BBR1 EN HV-12 SUPPLY BKR Verified OFF 3 NG02BEF3 EN HV-07 SUPPLY BKR Verified OFF 3 BN HV-03 RWST to CTMT SPRAY PUMP B CLOSED 4 HANDWHEEL EN HV-12 CTMT SPRAY PUMP B CLOSED 4 DISCHARGE HANDWHEEL EN V-100 EDUCTOR TO SPRAY PUMP B CLOSED 4 EN V-025 RWST TEST LINE ISOLATION CLOSED 4 EN V-032 PP & TEST CONNECTION OPEN 5 EN V-068 CTMT SPRAY PUMP B DRAIN OPEN 5 EN V-095 CTMT SPRAY PUMP B SUCTION OPEN HEADER VENT EN V-115 CTMT SPRAY PUMP B VENT OPEN 5 EN V-107 TEST CONNECTION OPEN 5 EN V-089 TEST CONNECTION OPEN 5 Page 5 of 5

Administrative RO A.3 JOB PERFORMANCE MEASURE JPM NO: RO-A3 K/A NO: 2.3.1 COMPLETION TIME: 10 Minutes K/A RATING: 2.6 JOB TITLE: RO REVISION: 0 TASK TITLE: Given a Radiological Survey Map and Knowledge of 10 CFR: 20 and related Radiation Work Permit determine the facility radiation control requirements Radiological conditions and controls required.

DUTY: Radiation Control The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT CLASSROOM X METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

TOOLS/EQUIPMENT: NONE PREPARER: DATE:

01/03/2006 Page 6 of 5

RO A3 Staging: Begin this JPM in the hall outside Access Control at the RWP desk.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. You are a spare licensed operator on shift.

Initiating Cues: The Control Room Supervisor states they have received a sump alarm on the B RHR Pump room sump and asks you to investigate. Given the survey map, determine the RWP that you would use. Evaluate the radiological conditions in the area and provide the requested information to the following questions.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide survey map.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have correctly answered the three questions.

START TIME:

STOP TIME:

Page 1 of 3

RO A3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U RWP 06-005 should be

18. *Reviews survey map selected Comments:

and determines RWP.

S U High Radiation Area.

19. *Identify the Comments:

classification for the Based on the 2 at the room the sump is doorway to the RHR located in. pump room.

S U Immediately.

20. *Determine time till Comments:

dosimeter will alarm in RWP rate setting is 125 300 mr/hour field. mr/hour.

S U Based on Special

21. *Identify the areas on Instruction 3# on the Comments:

the Survey Map that RWP.

require any special HP controls prior to 1. The room itself accessing. due to High Radiation Area.

2. The RHR pump seal housing due to Highly Contaminated Area.

THE JPM IS 3. The RHR pump COMPLETE room sump due to Highly RECORD STOP TIME Contaminated ON PAGE 1 Area.

Identify at least two of the three areas.

  • Indicates Critical Task Page 2 of 3

RO A3 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. You are on a tour in the Auxiliary Building.

Initiating Cues: The Control Room Supervisor states they have received a sump alarm on the B RHR Pump room sump and asks you to investigate. Given the survey map, determine the RWP that you would use. Evaluate the radiological conditions in the area and provide the requested information to the following questions.

NOTE: Circle the correct answers or write them down for the following questions and provide the evaluator with your completed paperwork.

1. The area where the sump is located is a:

A) Potential Hot Particle Area B) Contaminated Area C) High Radiation Area D) Radiation Area

2. If you had to access the pump discharge piping immediately in front of the RHR Pump, how long before your dosimeter would alarm.

A) Immediately B) 4 minutes C) 15minutes D) 25 minutes

3. Identify the areas on the Survey Map that require HP notification prior to accessing.

Page 3 of 3

Simulator S-1 JOB PERFORMANCE MEASURE JPM NO: S -1 K/A NO: 4.5E06EA2.2 COMPLETION TIME: 20 Minutes K/A RATING: 3.5/4.1 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Align Alternate High Head Injection. Ability to determine and interpret the following as they apply to the (Degraded Core Cooling):

Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments.

DUTY: Operate the Emergency Core Cooling System.

The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

EMG FR-C2 TOOLS/EQUIPMENT: NONE PREPARER: DATE:

12/13/05

JPM No. S -1 Init IC 174 IC 174 was developed with power removed from B CCP and BG HV8105.

JPM S-2, NB02 de-energized, will be in progress and may affect power indications for some of the B Train components. Only one train is required to satisfy this JPM.

DNO tag the B CCP and put the handswitch in pull-to-lock.

Ensure Blue placard is on B CCP handswitch.

RUN when the evaluators are ready.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

For the evolution required for you to perform, your area of the main control boards will reflect the proper plant conditions. Recognize due to other evaluations in progress, some main control board indications may differ from what you expect.

Initial Conditions: The Plant has experienced a LOCA. The crew is currently performing EMG FR-C2. CCP A has tripped and locked out. CCP B is DNO tagged.

Initiating Cues: The Control Room Supervisor directs you to perform Attachment A of EMG FR-C2.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide a current copy of EMG FR-C2, Attachment A.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930)

Task Standard: Upon completion of this JPM, the Candidate will have established alternate high head injection per Attachment A of EMG FR-C2.

START TIME:

STOP TIME:

Page 1 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. Verify charging pump suction: Comments:
  • At least one charging Locate BN HIS-112D on pump suction from MCB panel RL001/2.

RWST valve is open. Realize that the switch indicates RED.

Or

  • Both VCT outlet valves Locate BG HIS-112B on are open. MCB panel RL001/2.

Note the GREEN light is illuminated.

Step A1 S U

2. Check any CCPs Locate BG HIS-1A and running. 2A on MCB panel Comments:

RL001/2. Realize that A CCP has tripped by the AMBER light lit.

Note that the B CCP is DNO tagged.

Go to the RNO.

STEP A2 S U

3. Perform the following:

Comments:

  • Manually start the The Operator may ask Realize neither CCP can CCPs. permission to reset the be started.

handswitch and attempt to start A CCP.

  • Start the Normal Locate BG HIS-3 on MCB panel RL001/2.

Charging Pump (NCP) CUE: May perform one on recirculation, if Rotate the handswitch to attempt to re-start A neither CCP can be the right. Note the RED CCP.

started. light is illuminated.

STEP A2 RNO

  • Indicates Critical Task Page 2 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

4. Reset safety injection. Operator may recognize this step has already Comments:

been performed.

Locate and depress SB HS-42A and SB HS-43A on MCB panel RL001/2.

Operator may use the NPIS screen NORM to STEP A3 check if SI is reset.

S U

5. Reset CISA and CISB. Locate and depress on MCB panel RL017/18: Comments:
  • SB HS-52 STEP A4
  • Indicates Critical Task Page 3 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

6. Establish instrument air Operator may recognize to Containment: this step has already Comments:

been performed and only

  • Ensure ESW to Air verify actions.

Compressor Valves are open.

Locate EF HIS-43 and 44 on MCB panel

  • Reset and close air RL019/20. Note that EF compressor breaker HIS-43 indicates RED.

reset switches.

Locate KA HIS-2C and 3C on MCB panel RL023/24. Note both handswitches are reset.

Locate KA PI-40 on MCB

  • Check that instrument panel RL023/24. Note air pressure is greater pressure is greater than than 105 psig. 105 psig.

Locate BB PK-455A on MCB panel RL001/002.

  • Check that the Ensure output signal is Pressurizer master less than 50%.

controller is reading less than a 50% output signal. Locate KA HIS-29 on MCB panel RL023/24

  • Open the Instrument Air and note the RED light is Supply Containment illuminated.

Isolation Valve.

STEP A5

  • Indicates Critical Task Page 4 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

7. Establish the normal charging header flow Comments:

path:

  • Open the Charging Locate BG HC-182 on Header Back Pressure MCB panel RL001/2 and Control Valve. rotate the potentiometer to the full open position.

Note the meter reads The candidate may 100%.

dispatch the Auxiliary

  • Open the Charging Building watch to Locate BG HIS-8105 and Pumps To Regenerative manually open BG HV- 8106 on MCB panel HX Containment 8105.If this occurs then - RL001/2. Depress the Isolation Valves. Cue as Auxiliary OPEN pushbutton for Building watch that HP BG HIS-8106 and note is not available and RED light is illuminated.

your dosimeter is No power is available to alarming on rate. BG HIS-8105.

Go to the RNO.

STEP A6 S U

8. Go to Step A11, if flow Proceed to Step A11.

path through normal Comments:

charging header cannot be established.

STEP A6 RNO

  • Indicates Critical Task Page 5 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

9. Open the Bit inlet If candidate dispatches Locate EM HIS-8803A valves. the Auxiliary Building and B on MCB panel Comments:

watch to check open EM RL017/18. Note the HV-8803B - Cue: HP is RED light is illuminated not available and your for EM HIS-8803A.

dosimeter is alarming Examinee may use the on rate. NPIS computer to verify EM HV-8803B is open, if power is not available.

STEP A11 S U

10. Open the BIT outlet If candidate dispatches Locate EM HIS-8801A valves. the Auxiliary Building and B on MCB panel Comments:

watch to check open EM RL017/18. Note the HV-8801B - Cue: HP is RED light is lit on 8801A not available and your handswitch. Examinee dosimeter is alarming may use the NPIS on rate. computer to verify EM HV-8801B is open, if power is not available.

STEP A12 S U

11. Check if CCP flow Locate BG HIS-1A and B through the BIT has on MCB panel RL001/2. Comments:

been established by Note BG HIS-1A checking any CCPs indicates tripped and BG running. HIS-1B is DNO tagged.

Go to the RNO.

Proceed to Step A15.

STEP A13

  • Indicates Critical Task Page 6 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

12. Check that the NCP is Locate BG HIS-3 on running. MCB panel RL001/2. Comments:

Note the RED light is illuminated.

STEP A15 S U

13. Establish NCP flow If candidate dispatches path to the BIT: the Auxiliary Building Comments:

watch to check valve

  • Ensure one train of status - Cue: BG V- Recognize the blue valves from the 8483A is open and placard is on BG HIS-2A, charging header to 8483C is closed. which means BG-the BIT is open. V8483A is open. Locate EM HIS-8803A on MCB panel RL018. Note the RED light is lit.

Locate BG FK-462 on

  • Open the NCP MCB panel RL001.

Annunciators for Charging Line Flow discharge flow Press the MAN control valve. Hi/Low will alarm as pushbutton and then the upper OUTPUT 462 and 121 are opened.

pushbutton to increase until the meter reads >

0%.

  • Open the CCP Locate BG FK-121 on MCB panel RL001.

discharge flow control valve. Press the MAN pushbutton and then the upper OUTPUT pushbutton to increase until the meter reads >

0%.

STEP A16

  • Indicates Critical Task Page 7 of 9

JPM No. S -1 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U Locate EM FI-917A and

14. *Check that flow is B on MCB panel Comments:

indicated on the CCPs RL017/18. Realize flow to BIT flow meters. is indicated on EM FI-917A.

If little or no flow is indicated the candidate should return to previous step and further increase the controller outputs on BG FK-121 and BG FK-462.

STEP A17 S U

15. Return to Procedure Report task complete.

and Step In Effect. Comments:

Acknowledge report.

THE JPM IS COMPLETE.

RECORD STOP TIME ON PAGE 1.

STEP A18

  • Indicates Critical Task Page 8 of 9

Simulator S-2 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

For the evolution required for you to perform, your area of the main control boards will reflect the proper plant conditions. Recognize due to other evaluations in progress, some main control board indications may differ from what you expect.

Initial Conditions: The Plant has experienced a LOCA. The crew is currently performing EMG FR-C2. CCP A has tripped and locked out. CCP B is DNO tagged.

Initiating Cues: The Control Room Supervisor directs you to perform Attachment A of EMG FR-C2.

  • Indicates Critical Task Page 9 of 9

Simulator S-2 JOB PERFORMANCE MEASURE JPM NO: S-2 K/A NO: 4.1.055 EA1.07 COMPLETION TIME: 15 Minutes K/A RATING: 4.3/4.5 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Re-energize the affected NB bus from the Ability to operate and monitor the following as normal offsite power supply IAW OFN NB-030. they apply to a Station Blackout: Restoration of power from offsite DUTY: Station Blackout The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN NB-030 TOOLS/EQUIPMENT: NONE PREPARER: DATE: 12/13/05

  • Indicates Critical Task Page 10 of 9

JPM No. S-2 Init IC 174 IC 174 was developed with power removed from NB02 JPM S-1, Alternate High Head Injection, will be in progress.

Hang DNO tags on KJ HS-108A, B EDG start button, and NE HIS-26, D/G output breaker and put handswitch NE HIS-26 in pull-to-lock.

RUN when the evaluators are ready.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

For the evolution required for you to perform, your area of the main control boards will reflect the proper plant conditions. Recognize due to other evaluations in progress, some main control board indications may differ from what you expect.

Initial Conditions: The Plant has experienced a lockout of bus NB02 and control room personnel are performing steps in OFN NB-030, Loss of AC Emergency Bus NB01 (NB02). Electrical Maintenance has repaired the bus lockout and has reset the bus lockout. B EDG was locally secured and DNO tagged during maintenance activities.

Initiating Cues: The Control Room Supervisor directs you to continue in OFN NB-030, Attachment B, Step B12, RNO b.3, to perform steps required to energize bus NB02 from its normal source of power.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of Attachment B of OFN NB-030, with place keeping marked, to the examinee.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930)

When Evaluators are ready, go to RUN Task Standard: Upon completion of this JPM, the Operator will have performed the steps of the procedure necessary to energize NB02 thru XNB02 from its normal offsite source.

START TIME:

STOP TIME:

PAGE 1 of 5

JPM No. S-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. When the NB02 bus Realize the initiating lockout has been reset, condition stated the bus Comments:

continue with Step B13. lockout has been reset.

Proceed to Step B13.

Operator may observe annunciator 21A is not illuminated.

STEP B12, RNO b.3)

S U

2. Check if the B Realize the initial emergency diesel conditions stated the B Comments:

generator is running. EDG was secured.

Proceed to the RNO.

STEP B13 S U

3. Go to Step B16 for Realize the CRS normal offsite power, if directed to energize bus Comments:

the CRS directs that NB02 from its normal NB02 be energized from source of power.

a source other than the emergency diesel Proceed to Step B16.

generator.

STEP B13, RNO

  • Indicates Critical Task PAGE 2 of 5

JPM No. S-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

4. Verify the normal offsite power supply is Comments:

available:

Locate NB HIS-1 on

  • ESF transformer MCB panel RL015/16.

XNB02 Note that the GREEN light is lit for open breaker.

Proceed to RNO b.

STEP B16 S U

5. Perform the following:

Comments:

  • Close 13.8 kV Locate NB HIS-1 on XMR01 to XNB02 MCB panel RL015/16.

breaker PA0201, if Rotate the handle to the the PA02 lockout right to close.

relay is reset.

  • Go to Step B17, if ESF transformer Note ESF transformer XNB02 can be XNB02 is energized.

energized. Proceed to Step B17.

STEP B16, RNO b.

  • Indicates Critical Task PAGE 3 of 5

JPM No. S-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

6. Re-energize bus NB02 from its normal offsite Comments:

power supply:

Locate NB HS-8 on MCB

  • Place NB02 normal panel RL015/16. Rotate supply sync. Transfer the handle to the right to switch to the ON the ON position.

position.

  • Close NB02 normal Locate NB HIS-4 on supply breaker. MCB panel RL015/16.

Rotate the handle to the right to close the breaker.

  • Place NB02 normal Locate NB HS-8 on MCB supply sync. Transfer panel RL015/16. Rotate switch to OFF. the handle to the left to the OFF position.
  • Check that bus NB02 is Locate NB EI-2 on MCB energized. panel RL015/16. Note voltage is displayed on the meter or that NB ZL-6 white light is illuminated for NB02.

Report that NB02 is Acknowledge report.

energized.

THE JPM IS COMPLETE.

RECORD STOP TIME ON PAGE 1.

STEP B17

  • Indicates Critical Task PAGE 4 of 5

Simulator S-3 SRO Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

For the evolution required for you to perform, your area of the main control boards will reflect the proper plant conditions. Recognize due to other evaluations in progress, some main control board indications may differ from what you expect.

Initial Conditions: The Plant has experienced a lockout of bus NB02 and control room personnel are performing steps in OFN NB-030, Loss of AC Emergency Bus NB01 (NB02). Electrical Maintenance has repaired the bus lockout and has reset the bus lockout. B EDG was locally secured and DNO tagged during maintenance activities.

Initiating Cues: The Control Room Supervisor directs you to continue in OFN NB-030, Attachment B, Step B12, RNO b.3, to perform steps required to energize bus NB02 from its normal source of power.

  • Indicates Critical Task PAGE 5 of 5

Simulator S-3 SRO JOB PERFORMANCE MEASURE JPM No. S-3 (SRO) K/A NO: 4.2068 AK3.09 COMPLETION TIME: 15 Minutes K/A RATING: 3.7/4.4 and 3.9/4.4 JOB TITLE: SRO REVISION: 0 TASK TITLE: Establish Plant Control From The ASP Knowledge of the reasons for the following responses as they apply to the Control Room Evacuation: Transfer of the following to local control: charging pumps, charging header flow control valve, PZR heaters, and boric acid transfer pumps DUTY: Control Room Evacuation The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN RP-013, Control Room Not Habitable TOOLS/EQUIPMENT: None PREPARER: DATE:

12/2/2005

  • Indicates Critical Task PAGE 6 of 5

JPM NO: S-3 (SRO)

INIT IC 175 Read to Performer:

Initial Conditions: You are the Control Room Supervisor. The Control Room has been evacuated due to toxic fumes in accordance with OFN RP-013. You have completed step 6 and are arriving at the Auxiliary Shutdown Panel.

Initiating Cues: In accordance with OFN RP-013, step 7, take control of the Plant and supervise Plant shutdown. The NCP is in service.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide the Candidate with an information only copy of OFN RP-013, Control Room Not Habitable.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

When evaluators are ready:

Task Standard: Upon completion of this JPM, the Candidate will have taken control of the Plant from the Auxiliary Shutdown Panel, established AFW control, taken action to control the Plant cooldown, and taken action to restore pressurizer level.

START TIME:

STOP TIME:

Page 1 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U On RP118A, locate and

16. *At the ASP, Transfer select to local: Comments:

Controls For Aux Feedwater System And

  • AL HS-9 Atmospheric Reliefs To Local
  • AL HS-11 On RP118B, locate and select to local:
  • FC HS-313 STEP 7
  • Indicates critical task Page 2 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

17. Operate Available Monitor Plant Equipment From the parameters. Comments:

ASP, As Necessary, To establish Stable Plant Conditions STEP 8 S U

18. On Shift Personnel CUE:

Establish Comments:

Communications With All On Shift Personnel ASP From Designated Have Established Areas Communications STEP 9 S U

19. Check Neutron Flux - On RP118A, locate SE DECREASING NI-61X and Y. Note flux Comments:

decreasing

  • SE NI-61Y STEP 10
  • Indicates critical task Page 3 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

20. Turbine Building When called, CUE: Contact the Turbine Operator, Check Site Building Operator at Comments:

Power - AVAILABLE Breakers PA0110 and PA01/PA02 PA0202 are closed.

PA01 and PA02 Voltage Is Normal.

STEP 11 S U On RP118A, locate

21.
  • Check RCS Cold Leg Comments:

Temperatures -

  • BB TI-433X
  • STABLE AT 561°F
  • BB TI-443X OR
  • BB TI-423X
  • TRENDING TO 561°F On RP118B, locate NOTE: It is not
  • BB TI-413X necessary to check all indicators Note temperature is less than 561°F and trending lower. Perform the RNO.

STEP 12

  • Indicates critical task Page 4 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

22. IF temperature less than 561°F AND Comments:

decreasing, THEN

  • Stop dumping steam Locate AB ZL-1B and 3B on RP118A and AB ZL-2B and 4B on RP118B.

Note green lights only illuminated.

Candidate may use

  • *IF cooldown continues, TDAFW or MDAFW THEN control total feed valves.

flow to limit RCS cooldown. Maintain On RP118A, locate AL greater than 270,000 HK-6B, 8B, 9B, 11B and lbm/hr until NR level on RP118B, locate AL greater than 6% on at HK-10B, 5B, 7B, and least one SG 12B. Take each out of lock detent open and actuate to the left while monitoring total AFW flow on AL FI-1B, 2B, 3B, and 4B for a total of STEP 12 RNO between 270K and 300K LBM/HR.

S U

23. Check SG Levels:

Comments:

  • Narrow range level in at least one SG -

GREATER THAN Locate AE LI-528X and 6% AE LI-548X on RP118A, and AE LI-517X and AE LI537X on RP118B.

STEP 13

  • Indicates critical task Page 5 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

24. Check PZR level If SRO contacts building control watch to determine Comments:

which charging pump is

  • Dispatch an operator to running, CUE: The NCP control charging flow is running. Contact spare operator locally. and dispatch to BG FCV-462.

When directed, CUE: On RP118A, locate BB

  • Check PZR level >17% LI-459B. On RP 118B, I am standing by at BG locate BB LI-460B. Note FCV-462 level is <17% on both meters. Perform the STEP 14 RNO.

S U

25. Perform the following:
  • On RP118A, locate BB Comments:

HIS-8149CB and BB

  • Check letdown HIS-8149BB. Note red isolation. IF letdown is light only on HIS-NOT isolated, THEN 8149BB. Depress the isolate letdown. close PB and note green light only illuminated.

On RP118B, locate BB HIS-8149AB. Note green light only illuminated.

  • On RP118A, locate BB HIS-52A. Note red light
  • *Check PZR Heaters and white light Are -OFF illuminated and actuate switch to the OFF position. Note green light only illuminated.
  • On RP118B, locate BB HIS-52B. Note red light and white light illuminated and actuate STEP 14.b. RNO switch to the OFF position. Note green light only illuminated.
  • Indicates critical task Page 6 of 8

JPM NO: S-3 (SRO)

TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

26. Control Charging To When contacted to Contact Operator at Restore PZR Level increase charging Charging Flow Control Comments:

locally, CUE: Opening Valve to increase BG FK-462. charging.

STEP 14.b. RNO (cont)

S U

27. Check PZR Level Candidate will continue Control and PZR through remaining steps Comments:

Pressure to ensure plant is stable.

The JPM may be terminated at any time.

Steps 15 and 16 THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates critical task Page 7 of 8

Simulator S3 Initial Conditions: You are the Control Room Supervisor. The Control Room has been evacuated due to toxic fumes in accordance with OFN RP-013. You have completed step 6 and are arriving at the Auxiliary Shutdown Panel.

Initiating Cues: In accordance with OFN RP-013, take control of the Plant and supervise Plant shutdown. The NCP is in service.

  • Indicates critical task Page 8 of 8

Simulator S3 WOLF CREEK JOB PERFORMANCE MEASURE JPM NO: 302-S K/A NO: 3.3 006 A1.13 COMPLETION TIME: 25 Minutes K/A RATING: 3.5/3.7 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Fill an SI Accumulator - Mode 3 Ability to predict and/or monitor changes in parameters: Accumulator pressure (level, boron concentration)

DUTY: Emergency Core Cooling System (ECCS)

The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

TOOLS/EQUIPMENT: NONE PREPARER: DATE:

02/06/2006

  • Indicates critical task Page 9 of 8

JPM N0. S-3 IC 175 Set asisal(3)=51100 Set asisag(3)=1000 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator with the plant stable in Mode 3. Accumulator "C" level is approximately 40% and annunciator 45C is lit. There is no known leakage past the Accumulator check valves. RWST was sampled yesterday and boron concentration is 2423 ppm. No evolutions have occurred that would have diluted the RWST since the sample.

Initiating Cues: The Control Room Supervisor directs you to raise SI Accumulator "C" level to between 55% - 58% using B SI Pump. RHR Header depressurization is desired during pump run. Safety Injection Pump discharge relief valves are expected to lift upon pump start.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of SYS EP-200 to the Candidate.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930)

Task Standard: At the completion of this JPM, the Examinee will have increased SI Accumulator "C" level to 55% - 58% using B Safety Injection Pump.

START TIME:

STOP TIME:

PAGE 1 of 6

JPM N0. S-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. Perform Prerequisites.

Comments:

5.1 - 5.3 Steps 5.1 - 5.3 should be N/A 5.4 Ensure cooling to desired SI pump. Verifies B CCW Train has a running pump.

5.5 Check both SI Train Initial step.

A and B are operable Cue from CRS: BOTH Trains are operable. Initial step.

S U

2. Procedure Locate EP PI-964 and EP PI-965 on RL017/18. Comments:

6.1.1 Check accumulator Determine pressure is pressure less than 619 psig. N/A the step.

Locate RCS or PRZR 6.1.2 Record RCS Pressure pressure indication on RL001/2. Record the pressure.

6.1.3 Depressurize RHR header if desired.

Locate EJ HIS 8890A or

  • Open EJ HIS-8890A or B and open one valve.

8890B N/A the other valve.

  • Ensure EM HIS-8964 Check open.

Open Check open.

  • Ensure EM HIS-8871 open. Recognize the Initiating Cue stated B SIP is to be used. N/A the step.

6.1.4 Using SI Pump A

  • CRITICAL STEP PAGE 2 of 6

JPM N0. S-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

3. Procedure Comments:

6.1.5 Using SI Pump B

1. Ensure EM HIS 8814B - Ensures Red Lite lit on OPEN EM HIS-8814B.
2. Ensure BN HIS 8813 - Ensures Red Lite lit on OPEN BNIS-8813 Recognizes initial cue
3. Close EM HIS-8821B was that reliefs are expected to lift. The critical step is to inform the CRS that T.S. 3.5.2 must be entered prior to closing the valve. Press close button and observe Green Lite lit and Red Lite out.
  • Rotate EM HIS-5 to
4. Start SI Pump B Start; observe Red Lite lit and Green Lite out.

While not critical Mgmt expectations are to make a plant announcement prior to start and to have a NPIS screen displaying pump parameters for the B SI pump.

  • Presses open on EM
5. Open EM HIS 8821B HIS 8821B. Observe Red Lite lit and Green Lite out. Informs CRS that T.S. 3.5.2 can be exited.
  • CRITICAL STEP PAGE 3 of 6

JPM N0. S-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

4. Fill Accumulator Comments:
  • 6.1.6 Open EM HIS-8888 *Presses open on EM HIS 8888. Observe Red Lite lit and Green Lite out.

Steps 6.1.7 and 6.1.8 6.1.7 for Accumulator A and were marked N/A by the 6.1.8 for Accumulator B. CRS prior to starting.

6.1.9 Fill Accumulator C Locate EP LI-954 or EP LI-955 on RL017/18.

1. Record highest level Record level.
2. *Open EP HIS- *Presses open on EM 8878C HIS 8888. Observe Red Lite lit and Green Lite out.

Monitor level and close

3. *Fill to 55 - 58% EP HIS-8878C when and close EP HIS- between 55 - 58%.

8878C.

4. Record level Record level change for change. accumulator "C". Final -

initial. Should be from 15 to 18%.

  • CRITICAL STEP PAGE 4 of 6

JPM N0. S-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

5. Continue Procedure Press close button on Comments:

6.1.11 Close EM HIS-8888 EM HIS-8888 and observe Green Lite lit and Red Lite out.

6.1.12 Run SI pump for 5-10 If asked cue: Leakage is Initial Conditions stated minutes. not present. leakage was not present.

  • 6.1.13 Stop SI Pump B.
  • Rotate EM HIS-5 to Stop; observe Red Lite out and Green Lite lit.

While not critical, Mgmt expectations are to make a plant announcement when securing B SI pump.

6.1.14 Ensure valves Press Close on valve closed. opened in step 6.1.3.

EJ HIS-8890A Ensures Green Lite lit EJ HIS-8890B As CRS cue: and Red Lite out.

SYS EJ-323 is in effect.

6.1.15 Ensure valves open. Ensures Red Lite lit and Leave valves open.

EM HIS-8964 Green Lite out.

EM HIS-8871 N/A the step.

6.1.16 Check for Chemistry Acknowledge request.

need to sample. Contacts Turbine Respond as Turbine Building Operator to stop Watch: B SI Pump 6.1.17 Secure Pump Room fan at breaker for B Room Cooler is Cooler. room. (NG02ACF3) secured.

Initial and Date step.

THE JPM IS COMPLETE RECORD STOP TIME 6.1.18 Section 6.1 ON PAGE 1 complete.

  • CRITICAL STEP PAGE 5 of 6

SIMULATOR S-4 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator with the plant stable in Mode 3. Accumulator "C" level is approximately 40% and annunciator 45C is lit. There is no known leakage past the Accumulator check valves. RWST was sampled yesterday and boron concentration is 2423 ppm. No evolutions have occurred that would have diluted the RWST since the sample.

Initiating Cues: The Control Room Supervisor directs you to raise SI Accumulator "C" level to between 55% - 58% using B SI Pump. RHR Header depressurization is desired during pump run.. Safety Injection Pump discharge relief valves are expected to lift upon pump start.

  • CRITICAL STEP PAGE 6 of 6

SIMULATOR S-4 JOB PERFORMANCE MEASURE JPM NO: S-4 K/A NO: 4.2.060AA1.02 COMPLETION TIME: 20 Minutes K/A RATING: 2.9/3.1 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Manually Actuate CRVIS and FBIS. Ability to operate and / or monitor the following as they apply to the Accidental Gaseous Radwaste:

Ventilation system DUTY: Monitor the ESFAS System.

The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN SP-010, Accidental Radioactive Release TOOLS/EQUIPMENT: NONE PREPARER: DATE:

12/12/05

  • CRITICAL STEP PAGE 7 of 6

JPM No. S-4 Init IC 175 Key 1 to actuate Rad Monitors RUN Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. Annunciator 61A and 61B are in alarm. Fuel Handling is not in progress.

Initiating Cues: The Control Room Supervisor directs you to perform OFN SP-010, Accidental Radioactive Release.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide a current copy of OFN SP-010.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Operator will have manually actuated CRVIS and FBIS and manually aligned two FBIS components that failed to automatically align.

START TIME:

STOP TIME:

Page 1 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

28. Check Listed Gaseous Monitors - ANY HI-HI Comments:

ALARM ACTUATED.

  • GG RE-27(3) Go to the RM11 Panel.

(SP056A) Note GG RE-

  • GG RE-28(3) 27 and GG RE-28 are indicating HI-HI (Red).

STEP 1 S U

29. Check If Control Room Ventilation Isolation is Comments:

required:

a. HI-HI alarm on any of the following monitors

- ACTUATED.

  • GG RE-27 Note that GG RE-27 and
  • GG RE-28 GG RE-28 are both in HI-HI (Red).

STEP 2

  • Indicates Critical Step Page 2 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

30. *Verify Control Room Comments:

Ventilation Isolation:

a. Check ESFAS status Go to SA066X and Y panel CRVIS section panels on RL017/18.

- ALL WHITE Note no status lights for LIGHTS LIT. CRVIS are lit and go to RNO.

  • Red Train
  • Yellow Train STEP 3.a S U
31. Perform the following:
  • Critical step is to Comments:

actuate at least one

  • If CRVIS has not train. Per procedure the actuated, then manually candidate should actuate actuate CRVIS. both trains.
  • If any CRVIS component Locate and depress SA is not properly aligned, HS-9 and SA HS-13 on then manually align the MCB panel RL017/18.

component.

  • If neither train of CRVIS Locate SA066X and is in service, then SA066Y on RL017/18.

establish one in service. Note upper status lights for CRVIS - All WHITE

  • If only one train of CRVIS can be placed in Note that both trains are service, then within 90 in service.

minutes isolate out of service train.

If only one train is actuated then the candidate needs to state that the other train has to be isolated within 90 minutes.

STEP 3.a. RNO

  • Indicates Critical Step Page 3 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

32. Ensure the Control Check outer door.

Room outer door is Comments:

closed. When Candidate moves to check outer door, CUE:

Outer door is closed.

STEP 3.b S U

33. Check if Containment Purge should be Comments:

isolated:

a. HI-HI alarm on any of Go to the RM11 panel the following (SP056A) and note that monitors - none of the designated ACTUATED monitors is in alarm and go to Step 5.
  • GT RE-22
  • GT-RE-31
  • GT RE-33 STEP 4
  • Indicates Critical Step Page 4 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

34. *Check if Fuel Building Comments:

should be isolated:

a. HI-HI alarm on any of the following monitors has Realize that GG RE-27 ACTUATED. and GG RE-28 are both in HI-HI (Red).
b. Check ESFAS status Locate SA066X and panel FBIS section -

SA066Y on MCB panel ALL WHITE LIGHTS RL017/18. Note no LIT.

white lights lit for FBIS section and perform the RNO.

STEP 5 S U

8. Perform the following:
  • Critical step is to Comments:

actuate at least one

  • *If FBIS has not train. Per procedure the actuated, then manually candidate should actuate actuate FBIS. both trains.

Locate and depress SA HS-10 and SA HS-14 on MCB panel RL017/18.

  • If any FBIS component is not properly aligned, then manually align Locate SA066X and component. Refer to SA066Y on MCB panel ATTACHMENT B. RL017 and note all white lights not actuated on SA066X and Y for FBIS.

Go to ATTACHMENT B.

STEP 5.b. RNO

  • Indicates Critical Step Page 5 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U Critical step is to ensure at least one train is Comments:

completely aligned. Must start the non-running fan

9. *Ensure Emergency OR open the closed Exhaust Fans are valve. Per procedure the running. candidate should actuate both trains.
  • CGG02A Locate GG HIS-15A and
  • CGG02B 21A on MCB panel RL020.
  • Note that GG HIS-21A indicates red light lit.

Note that GG HIS-15A indicates green light only. Actuate GG HIS-15A to the run position and note red light only illuminated.

10. Ensure the Fuel Building To Emergency
  • Locate GG HIS-40 and Filter Units dampers are 43 on MCB panel open. RL020. Note green light only illuminated for GG
  • GG HZ-40 dampers HZ-43. Depress the GG-D025 OPEN pushbutton for GG HZ-43 and note red

GG-D018 Candidate may stop May note the upper level when they note that white lights lit on panel upper tier white lights are SA066X and Y for FBIS.

lit for FBIS on SA066X and Y. If so, the rest of Step B1 and Step B2. the steps may be marked N/A THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1.

  • Indicates Critical Step Page 6 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

11. Ensure the Fuel Building Locate GG HIS-38A and Air Supply Fans are 39A on MCB panel Comments:

stopped. RL020 and note green lights only illuminated.

  • SGG01A
  • SGG01B STEP B3.

S U

12. Ensure the Fuel Building Damper indication is Air Supply Fan integral to the fan Comments:

Discharge Dampers are handswitch.

closed.

Locate GG HIS-38A and

  • GG HZ-38 dampers 39A and note the GG-D5 damper green lights only illuminated.

S U

13. Ensure the Fuel Building Locate GG HIS-36A and Air Inlet Dampers are 37A on MCB panel Comments:

closed. RL020 and note green lights only illuminated.

  • Indicates Critical Step Page 7 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

14. Ensure the Spent Fuel Locate GG HIS-42 on Pool Discharge to MCB panel RL020 and Comments:

Auxiliary Building note green light only damper is closed. illuminated.

S U

15. Ensure the Fuel Building Locate GL HIS-62 on Exhaust to Auxiliary MCB panel RL020 and Comments:

Building Ventilation note green light only damper is closed. illuminated.

  • GL HZ-62 damper GL-D58 STEP B7.
  • Indicates Critical Step Page 8 of 10

JPM No. S-4 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

16. Align other ventilation systems discharging to Comments:

the Unit Vent:

  • Ensure the Access Locate GK HIS-47 and Control Exhaust Fans 49 on panel RP068.

are stopped. Note green lights only illuminated.

  • GK HIS-47 for CGK02A
  • GK HIS-49 for CGK02B
  • Ensure the Main Steam Locate GF HIS-17 and Enclosure Exhaust Fans 18 on panel RP068.

are stopped. Note red light illuminated on GF HIS-17. Rotate

  • GF HIS-17 for the switch to the stop CGF03a position and note green light only illuminated.
  • GF HIS-18 for Operator should note CGF03B that this causes an AUTO start of GF HIS-18 and rotate that switch to the stop position and note green light only illuminated.
  • Ensure Aux/Fuel Normal Locate GL HIS-30 and Exhaust Fans are in 31 on MCB panel slow speed. RL020. Note both indicate fast speed.
  • GL HIS-30 for Select slow on each CGL03A handswitch and note slow red light illuminated
  • GL HIS-31 for on each.

CGL03B THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1.

STEP B8.

  • Indicates Critical Step Page 9 of 10

SIMULATOR S-5 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant is in Mode 1. Annunciator 61A and 61B are in alarm. Fuel Handling is not in progress.

Initiating Cues: The Control Room Supervisor directs you to perform OFN SP-010, Accidental Radioactive Release.

  • Indicates Critical Step Page 10 of 10

SIMULATOR S-5 JOB PERFORMANCE MEASURE JPM NO: S-5 K/A NO: 3.8 029 A1.03 COMPLETION TIME: 10 Minutes K/A RATING: 3.0/3.3 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Start Up the Containment Mini Purge. Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment Purge System controls including: Containment pressure, temperature, and humidity DUTY: Operate Plant Service Systems The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

SYS GT-120, CONTAINMENT MINI PURGE SYSTEM OPERATIONS TOOLS/EQUIPMENT: NONE PREPARER: DATE:

12/12/05

  • Indicates Critical Step Page 11 of 10

JPM No. S-5 INIT IC 176 RUN Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator, the plant is stable in Mode 2. Outside temperature is 70°F. A gaseous release permit has been issued and is complete to the point of starting the release.

Initiating Cues: The Control Room Supervisor directs you to place the Containment Mini Purge Exhaust System in operation using section 6.1 of SYS GT-120. The prerequisites of SYS GT-120 have been verified and signed off.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of SYS GT-120.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Operator will have started up the Containment Mini Purge Exhaust System.

START TIME:

STOP TIME:

PAGE 1 of 4

JPM No. S-5 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

1. Record the time and Examiner provides a Enter the time and date date the purge must be time that is two hours provided in the Comments:

initiated from the permit. after the start of the procedure.

JPM and todays date.

STEP 6.1.1 S U

2. Align the Containment Purge dampers: Comments:

Locate GT HIS-29 on RL019/20, depress the

  • *Open CTMT PURGE OPEN pushbutton, and EXH DAMPER. note red light only illuminated.
  • GT HIS-29 Locate GT HIS-28 on
  • *Open CTMT PURGE RL019/20, depress the EXH DAMPER. OPEN pushbutton, and note red light only
  • GT HIS-28 illuminated.

Locate GT HIS-12 on

  • Open CTMT MINI RL019/20, depress the OPEN pushbutton, and PURGE EXH OUTER note red light only CTMT ISO.

illuminated.

  • GT HIS-12 Record time and date.
  • Record time and date dampers are opened.

STEP 6.1.2

  • Indicates Critical Step PAGE 2 of 4

JPM No. S-5 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

3. *Start the Containment Comments:

Mini Purge Exhaust fan and verify its discharge damper opens. Locate GT HIS-20 and GT HZ-20 on MCB

  • GT HIS-20 panel RL019/20. Rotate handswitch to the AND right. Note the RED light lit for the fan and
  • GT HZ-20 the RED light lit for the damper.

STEP 6.1.3 S U

4. Open the Containment Mini Purge Exhaust Comments:

Inner Containment Iso and record the time and date opened.

Locate GT HIS-11 on

  • *GT HIS-11 MCB panel RL019/20.

Depress the OPEN pushbutton. Note the RED light is illuminated.

  • Time and date THE JPM IS Record time and date COMPLETE opened.

RECORD STOP TIME ON PAGE 1 STEP 6.1.4

  • Indicates Critical Step PAGE 3 of 4

Simulator S-6 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator, the plant is stable in Mode 2. Outside temperature is 70°F. A gaseous release permit has been issued and is complete to the point of starting the release.

Initiating Cues: The Control Room Supervisor directs you to place the Containment Mini Purge Exhaust System in operation using section 6.1 of SYS GT-120. The prerequisites of SYS GT-120 have been verified and signed off.

  • Indicates Critical Step PAGE 4 of 4

Simulator S-6 JOB PERFORMANCE MEASURE JPM NO: S-6 K/A NO: 4.2.005 AA1.01 COMPLETION TIME: 30 Minutes K/A RATING: 3.6/3.4 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Perform OFN SF-011 to realign a Ability to operate and / or monitor the following as misaligned rod they apply to the Inoperable / Stuck Control Rod:

CRDS DUTY: Monitor Reactivity The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

OFN SF-011, Realignment Of Dropped, Misaligned Rod(s), And Control Group Malfunctions TOOLS/EQUIPMENT: NONE PREPARER: DATE:

12/13/05

  • Indicates Critical Step PAGE 5 of 4

JPM No. S-6 IC 176 Set rods per RBU, adjust rods two steps out then two steps in to ensure step counters are working.

Reset IC 176 From the Actions screen select Remote Function rCRF01. Use when candidate contacts INC.

Do not go to RUN until just before JPM begins so Tavg does not become an issue during the JPM.

Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator. Control rod M12 has been misaligned for twenty minutes. The reactor is stable at 80% power. The problem causing the misaligned rod has been corrected.

Initiating Cues: The Control Room Supervisor directs you to realign rod M12 per step 20 of OFN SF-011. All notifications have been made in compliance with the note prior to step

20. INC and the Aux Building Watch are standing by in the Rod Drive MG Set Room.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of OFN SF-011.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM the Operator will have placed rod M12 in proper alignment in accordance with OFN SF-011.

START TIME:

STOP TIME:

PAGE 1 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

5. Check If Rod Can Be On RL021/22, Monitor Moved At Normal Rate. DRPI and note the rod is Comments:

misaligned by more than

  • Misaligned less than 12 12 steps steps Note the initiating cue OR stated the rod has been misaligned for 20
  • Misaligned for less than minutes one hour Determine rod can be moved at normal rate.

STEP 20 S U

6. Prepare To Realign Rod Comments:
  • *Place rod bank AUTO/MANUAL selector On RL003/4, rotate SE switch to the bank with HS-9 to Bank D position misaligned rod CBD.

STEP 21.a S U

7. Prepare To Realign Rod Comments:
  • Direct INC to locally When contacted as INC, Contact INC and request verify rod bank selected CUE: they locally verify that by SE HS-9 is aligned light indication denotes properly by light Light indication is that control bank D is indications on rod bank D is selected. selected associated cabinets Step 21.b
  • Indicates Critical Step PAGE 2 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

8. Prepare To Realign Rod Comments:
  • *At RL003, record position of group step At RL003/4, locate step counter for group counter for control group containing misaligned D, note and record the rod position is 175 STEP 21.c S U
9. Prepare To Realign Rod Comments:

Determine from DRPI

  • *IF rod is misaligned indication that rod is high with respect to misaligned High.

other rod in group THEN insert rods in misaligned On RL003/4, locate SF bank until next set of HS-2 controller. Move DRPI LEDS - LIT controller to the IN position while monitoring STEP 21.d DRPI on RL022.

Release SF HS-2 when next set of LEDs lights.

S U

10. Prepare To Realign Rod Comments:
  • IF rods are misaligned low with respect to other rods in group, THEN Realize step is NA perform the following:

STEP 21.e

  • Indicates Critical Step PAGE 3 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

11. Prepare To Realign Rod Comments:
  • *At lift coil disconnect panel, place all lift coil Locate panel labeled disconnect switches for Control Rod Disconnect other rods in affected Switch Box, on north wall bank to ROD behind Control Boards.

DISCONNECTED Pull out on and move position. switch D4, D12, M4, and H8 to the ROD DISCONNECTED position (UP).

STEP 21.f S U

12. Prepare To Realign Rod Comments:
  • *At RL003, record position of group step At RL003/4, locate step counter for group counter for control group misaligned. D, note and record the position is 170 STEP 21.g S U
13. Adjust Turbine Load As Booth Operator will Necessary To Maintain control Turbine Load. Comments:

Tavg Within 3°F of Tref . As CRS, CUE:

The rest of the crew will control Tavg.

STEP 22

  • Indicates Critical Step PAGE 4 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

14. Realign Misaligned Rod To Associated Group Comments:

Position

  • Check misaligned rod - NOTE: Booth Operator Realize misaligned rod is IN SHUTDOWN action: in Control Group and GROUP perform the RNO.

rCRF01, Manual Contact INC personnel at the Pulse-to-Analog

  • At Pulse-to-Analog Converter Cabinet and Converter cabinet, hold instruct them to hold the AUTO-MANUAL switch switch in MANU AL in MANUAL STEP 23.a and RNO S U On RL003/4, locate SF
15. Realign misaligned rod HS-2 controller. Move to associated group Comments:

controller to the IN position position while monitoring DRPI and the rod demand step counter for Bank D. Release SF HS-2 when DRPI indicates all rods aligned.

STEP 23.b

  • Indicates Critical Step PAGE 5 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

16. Check misaligned rod - Realize the rod is in a IN SHUTDOWN Control Group and Comments:

GROUP perform RNO.

At Pulse-to-Analog NOTE: Booth Operator Contact INC personnel converter cabinet, release action: at cabinet and instruct AUTO-MANUAL switch them to release the rCRF01, AUTO switch STEP 23.c and RNO S U

17. Reset Misaligned Rod Comments:
  • *At lift coil disconnect panel, place all lift coil Locate panel on north disconnect switches for wall. Pull out on and affect bank to ROD move switch D4, D12, CONNECTED position M4, and H8 to the ROD CONNECTED position (DOWN).

STEP 24.a S U

18. Reset Misaligned Rod Comments:
  • *At RL003, open window and reset On RL003, open the affected group step window for CBDA and counter by hand to reset counter to 170 position recorded in Step 21.g STEP 24.b
  • Indicates Critical Step PAGE 6 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

19. Reset Misaligned Rod Comments:
  • *On RL003, reset rod control urgent failure On RL003/4, locate and alarm. depress SF HS-4.

Acknowledge urgent failure alarm and note the annunciator goes out.

STEP 24.c S U

20. Verify proper operation of affected rods by Comments:

moving affected rods 6 On RL003/4, locate SF steps in each direction. HS-2 controller. Move controller to the OUT position while monitoring DRPI and the rod demand step counter for Bank D. Release SF HS-2 when step counter indicates 6 steps out.

Verify proper response on DRPI.

On RL003/4, locate SF HS-2 controller. Move controller to the IN position while monitoring DRPI and the rod demand step counter for Bank D. Release SF HS-2 when step counter indicates 6 steps in.

Verify proper response on DRPI.

STEP 24.d

  • Indicates Critical Step PAGE 7 of 9

JPM No. S-6 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

21. Move affected group to On RL003, locate SF position recorded in HS-2 controller. Move Comments:

Step 21.c controller to the OUT position while monitoring DRPI and the rod demand step counter for Bank D. Release SF HS-2 when step counter indicates 175. Verify proper response on DRPI.

STEP 24.e S U On RL003/4, locate SE

22. Place ROD BANK HS-9. Rotate switch AUTO/MAN SEL switch Comments:

When INC is contacted from bank D position to in MAN position cue: Bank D is MAN position.

selected.

  • Determine group step counters are the same, After candidate selects have INC check master manual on rod control cycler on 4 or 5. Cue: Master Cycler binary counter is on 4.

When candidate reaches

  • Perform STN RJ-001 step to perform STN RJ-001 the JPM may be terminated.

THE JPM IS COMPLETE STEP 24.f RECORD STOP TIME ON PAGE 1

  • Indicates Critical Step PAGE 8 of 9

Simulator S-7 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator. Control rod M12 has been misaligned for twenty minutes. The reactor is stable at 80% power. The problem causing the misaligned rod has been corrected.

Initiating Cues: The Control Room Supervisor directs you to realign rod M12 per step 20 of OFN SF-011. All notifications have been made in compliance with the note prior to step 20.

INC and the Aux Building Watch are standing by in the Rod Drive MG Set Room.

  • Indicates Critical Step PAGE 9 of 9

Simulator S-7 JOB PERFORMANCE MEASURE JPM NO: S-7 K/A NO: 3.5.026 K4.01 COMPLETION TIME: 15 Minutes K/A RATING: 4.2/4.3 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Align Containment Spray System for Knowledge of CSS design feature(s) and/or recirculation IAW EMG ES-12. interlock(s) which provide for the following:

Source of water for CSS, including recirculation phase after LOCA DUTY: Monitor and Operate Containment Spray.

The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

EMG ES-12 TOOLS/EQUIPMENT: NONE PREPARER: DATE:

12/13/05

  • Indicates Critical Step PAGE 10 of 9

JPM No. S-7 INIT 177 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator. The Plant experienced a large break LOCA. The crew has progressed through EMG E-0, E-1, and have transitioned to EMG ES-12 where they are holding at step 12.

Initiating Cues: The Control Room Supervisor directs you to perform Step 12 and 13 of EMG ES-12, as necessary.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of EMG ES-12, Steps 12 and 13.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Operator will have aligned the Containment Spray System for recirculation.

START TIME:

STOP TIME:

Page 1 of 4

JPM No. S-7 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

23. Check if the Containment Spray Comments:

System should be aligned for recirculation: Locate EN HIS-3 and 9 on MCB panel

RUNNING.

Locate BN LI-930, 931, 932, and 933 on MCB

  • *RWST level - LESS panel RL017/18. Note THAN 12%. all indicators indicate less than 12%. Locate annunciator 47C and note it is illuminated.

STEP 12 S U

24. Align the Containment Spray System for Comments:

recirculation:

Locate EN HIS-1 and 7

  • *Open both on MCB panel Containment RL017/18. Depress the Recirculation Sump to OPEN pushbutton and Containment Spray note red light only is Pump valves. illuminated on EN HIS-1.

Note no indication on EN HIS-7.

Go to the RNO.

STEP 13

  • Indicates Critical Task Page 2 of 4

JPM No. S-7 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U Locate EN HIS-9 on

25. If either valve cannot MCB panel RL017/18.

be opened, then stop Comments:

Rotate the handswitch the associated left to the OFF position.

Containment Spray Note green light only pump. illuminated.

  • The critical step is to secure the B pump prior to cavitation. At 6%

RWST level the RWST Empty alarm is actuated and the fold out page requires securing all STEP 13.a. RNO pumps taking suction from the RWST.

Report Containment Spray pump B has been secured.

S U Locate EN HIS-3 and 4

26. Close both RWST to on MCB panel Containment Spray Comments:

RL017/18. Depress the pump valves. CLOSE pushbutton on both handswitches.

Note green light only illuminated.

Report Steps 12 and 13 are complete.

Acknowledge Report THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1 STEP 13.b.

  • Indicates Critical Task Page 3 of 4

Simulator S-8 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Reactor Operator. The Plant experienced a large break LOCA. The crew has progressed through EMG E-0, E-1, and have transitioned to EMG ES-12 where they are holding at step 12.

Initiating Cues: The Control Room Supervisor directs you to perform Step 12 and 13 of EMG ES-12, as necessary.

  • Indicates Critical Task Page 4 of 4

Simulator S-8 JOB PERFORMANCE MEASURE JPM NO: S-8 K/A NO: 4.5.005EK3.2 COMPLETION TIME: 15 Minutes K/A RATING: 3.7/4.1 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Establish Feed Flow to SG Knowledge of the reasons for the following responses as they apply to the (Loss of Secondary Heat Sink): Normal, abnormal and emergency operating procedures associated with (Loss of Secondary Heat Sink).

DUTY: Response To Loss Of Secondary Heat Sink The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB X PLANT CLASSROOM METHOD OF PERFORMANCE: SIMULATED PERFORMED X

REFERENCES:

EMG FR-H1, Response To Loss Of Secondary Heat Sink TOOLS/EQUIPMENT:

PREPARER: DATE:

12/6/2005

  • Indicates Critical Task Page 5 of 4

JPM No. S-8 INIT IC 177 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the Balance of Plant Operator. The Plant is experiencing a post trip loss of heat sink. Attempts to establish feed flow to the SGs with any Aux Feedwater pump per EMG FR-H1 have been unsuccessful. The crew has just completed step 10 to establish Feedwater Control.

Initiating Cues: The CRS assigns you to begin with step 11 of EMG FR-H1 and attempt to establish feed to Steam Generator B. The Turbine Building operator is standing by.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide the Candidate with an information only copy of EMG FR-H1.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

When evaluators are ready: Go to RUN Task Standard: Upon completion of this JPM, the Candidate will have commenced feeding B SG from a condensate pump.

START TIME:

STOP TIME:

Page 1 of 6

JPM No. S-8 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

35. Check Both Main Checks Red Light Feedwater Pumps - illuminated on both Comments:

Tripped handswitches or Both MCB Annunciators lit.

Locate Heater Iso valves

36. Ensure Low Pressure and Bypass Valve on Heater Condensate Iso RL023/24 and determine Valves - AT LEAST the heater Iso valves are ONE SET OPEN open by noting red lights on
1. AD ZL-55 Or
2. AD ZL-43
37. MSIVs - AT LEAST Or ONE OPEN
3. AD ZL-30 AB HIS-14 AB HIS-17 Recognize all four AB HIS-11 MSIVs are open on RL025/26.

AB HIS-20 STEPS 11, 12 and 13

  • Indicates Critical Task Page 2 of 6

JPM No. S-8 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

38. Start one Turbine Driven Main Feedwater Comments:

Pump.

  • Actuate both MFP FWIS At RP068, place FC HIS-Block Switches 510 and FC HIS-1510 in Block Position.

At RL005/6, Place FC

  • Place Both MFP Speed HIS-88 and FC HIS-188 Control in Manual. in Manual.

speed

  • Ensure SI Reset Ensure SI reset by verifying alarms 30A and 31 A not lit, or reset using SB HIS-42A and 43A on RL001/2.

Attempt to reset both MFPs. Recognize MFPs

  • *Reset BOTH MFP Trip will not reset and Circuits. perform RNO for step 14.

Go to Step 17 Step 14 and RNO

  • Indicates Critical Task Page 3 of 6

JPM No. S-8 TASK NUMBER - ELEMENT CUE STANDARD SCORE

4. Start Motor Driven Main Feed Pump.

Verifies power to pump

  • Ensure PB04 is by checking pump energized. indication or verifying PB04 power.

Press Open on push button AE HS-103.

  • Open Verifies suction and Suction/Discharge discharge valves indicate valves. open.

Acknowledge request Dispatch local operator.

  • Local vent using and CUE: Pump is AE-V344 and locally vented and BM-V185 is close BM-V185. closed.

Places AE HIS-104 to

  • *Start the MD the START position.

MFP. Verify red light lit and green light out. May see flow indicated.

  • Fill and vent seal Dispatch local operator.

Acknowledge request, cooler as resources CUE: Will fill and vent permit. seal cooler using SYS AE-122.

STEP 17

  • Indicates Critical Task Page 4 of 6

JPM No. S-8 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

39. Control Main Per the Caution flow Feedwater Flow To At should be established Comments:

Least One SG: slowly.

If the Candidate asks the

  • *Open main feedwater CRS which valves and reg bypass valve which SG to use, CUE: Locate AE LK-560 on RL005/6. Depress the OR Use the Bypass valve Manual PB and depress and feed SG B. the raise PB until dual

reg valve STEP 18 S U

40. Check SG Levels Comments:
  • Bleed and Feed - NOT Realize bleed and feed ESTABLISHED not in progress
  • Check narrow range level in at least one SG

- GREATER THAN 6% Locate level indicators on RL025/26 and check

  • Perform RNO level in SG B. Performs RNO.

Checks Core Exit TCs stable or decreasing.

Checks Wide Range When candidate checks Level in B SG level increasing and feed increasing.

flow established, CUE Maintains feed flow to THE JPM IS B SG STEP 19 and RNO COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates Critical Task Page 5 of 6

JPM No. S -1 Initial Conditions: You are the Balance of Plant Operator. The Plant is experiencing a post trip loss of heat sink. Attempts to establish feed flow to the SGs with any Aux Feedwater pump per EMG FR-H1 have been unsuccessful. The crew has just completed step 10 to establish Feedwater Control.

Initiating Cues: The Control Room Supervisor assigns you to begin with step 11 of EMG FR-H1 and attempt to establish feed to Steam Generator B. The Turbine Building operator is standing by.

Page 6 of 9

In Plant P-1 WOLF CREEK JOB PERFORMANCE MEASURE JPM NO: 202-P K/A NO: 002 A2.01 COMPLETION TIME: 20 Minutes K/A RATING: 4.3/4.4 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: EMG C-0, Loss of All AC, Isolate RCP Seal Ability to (a) predict the impacts of the following Leak Off malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of coolant inventory DUTY: Reactor Coolant System The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT X CLASSROOM METHOD OF PERFORMANCE: SIMULATED X PERFORMED

REFERENCES:

EMG C-0, Loss Of All AC Power TOOLS/EQUIPMENT: NONE PREPARER: DATE:

02/06/2006

JPM No. P-1 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant has experienced a total loss of AC power. EMG C-0 is being performed.

Initiating Cues: The Control Room Supervisor has directed you to perform step 15 of EMG C-0 to isolate the RCP seals.

DO NOT OPERATE ANY EQUIPMENT IN THE PLANT ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide the operator with a copy of EMG C-0, Step 15.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. . (PIR 2003-2930)

Task Standard: Upon completion of this JPM, the Candidate will have isolated the valves from the RCP seals.

START TIME:

STOP TIME:

PAGE 1 of 4

JPM No. P-1 TASK NUMBER - ELEMENT CUE STANDARD SCORE

1. Dispatch personnel to locally close valves to isolate RCP seals S U Go to BG HV-8100 at
  • *Seal Water Return As operator describes Aux Building, 2000 Comments:

Containment level, South Penetration opening valve cue:

Isolation Valve Room. Gently engage Clutch Lever is clutch lever while BG HV-8100 engaged turning the handwheel in Stem is insertting. a clockwise direction.

The declutch lever may Handwheel stops be released once it turning. engages. Continue turning the handwheel clockwise till the stem is fully inserted and the handwheel stops turning.

  • *Seal Water Valve is turning in the clockwise direction.

Go to BG V101 at Aux Building, 2000 level, S U Injection Filters Inlet Valve will not turn any RX Coolant Filter/Seal Isolations Comments:

more. Stem is totally Injection Filter A Valve BG-V101 inserted. Room. Rotate the valve operator in the clockwise direction and note the position of the stem.

Go to BG V105 at Aux Valve is turning in the Building, 2000 level, S U BG-V105 clockwise direction. RX Coolant Filter/Seal Valve will not turn any Injection Filter B Valve Comments:

more. Stem is totally Room. Rotate the valve inserted operator in the clockwise direction and note the position of the stem

  • CRITICAL STEP PAGE 2 of 4

JPM No. P-1 TASK NUMBER - ELEMENT CUE STANDARD SCORE

  • *CCW Return S U From RCS Isolation Go to the EG HV-61 at Valve As operator describes the Aux Building, 2000, Comments:

opening valve cue: North Penetration Room.

EG HV-61 Gently engage clutch Clutch Lever is lever while turning the engaged handwheel in a Stem is inserting. clockwise direction. The declutch lever may be Handwheel stops released once it engages.

turning. Continue turning the handwheel clockwise till the stem is fully inserted and the handwheel stops turning..

Contact Control Room and Report step complete Acknowledge report Call Control Room and report step 15 complete.

STEP 15 THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • CRITICAL STEP PAGE 3 of 4

JPM No. P-1 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The Plant has experienced a total loss of AC power. EMG C-0 is being performed.

Initiating Cues: The Control Room Supervisor has directed you to perform step 15 of EMG C-0 to isolate the RCP seals.

DO NOT OPERATE ANY EQUIPMENT IN THE PLANT PAGE 4 of 4

In Plant JPM P-2 JOB PERFORMANCE MEASURE JPM NO: P-2 K/A NO: 4.2 068 AA2.05 COMPLETION TIME: 15 Minutes K/A RATING: 4.2/4.3 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Turbine Building Operator OFN RP-017 Ability to determine and interpret the following as they apply to the Control Room Evacuation:

Availability of heat sink DUTY: Perform OFN RP-017, Control Room Evacuation The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT X CLASSROOM METHOD OF PERFORMANCE: SIMULATED X PERFORMED

REFERENCES:

OFN RP-017, Control Room Evacuation, Attachment B.

TOOLS/EQUIPMENT:

PREPARER: DATE:

11/30/2005 PAGE 4 of 4

JPM NO: P-2 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

NO EQUIPMENT WILL BE OPERATED IN THE PLANT - SIMULATE ONLY Staging:

Have the candidate go to the 2047 level of the Communications Corridor, outside the Control Room and then provide the initiating cue.

Read to Performer:

Initial Conditions: You are an extra licensed operator on shift. You are designated as the operator to perform the Turbine Building Actions for OFN RP-017, CONTROL ROOM EVACUATION.

Initiating Cues: You hear the following gaitronics announcement: Reactor Trip, Evacuating the Control Room due to fire, entering OFN RP-017.

This is a timed JPM.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide the Candidate with a training only copy of OFN RP-017, Attachment B during the completion of element 2.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM, the Candidate will have simulated tripping the RCPs from their PA01 and PA02 breakers and simulated tripping the turbine at either PG Load Centers PG11 and PG12 or at the EHC skid.

START TIME: Phase A Actions Complete Time:

Page 1 of 6

JPM NO: P-2 STOP TIME:

Page 2 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE

1. Obtain Arc Face Shield After the candidate Locate the Emergency and Lab Coat. locates the locker and Locker located on the simulates opening the 2033 level near columns locker, CUE: TE and T-3. Key to the locker is on Turbine Face Shield and Lab Bldg Operator Key Ring.

Coat are in hand.

Operations Expectations is to have a face shield and FR clothing (Lab Coat) prior to operating 13.8 Kv breakers.

S U As each handswitch is Locate Breaker PA0107,

2. *Locally Trip RCPs. rotated to the left, CUE; PA0108, PA0205, and Comments:

PA0204 cubicles in turn

  • PA0107 for RCP A - Noise of breaker and simulate rotating the TRIPPED opening trip handle to the left.

Note sound of breaker

  • PA0108 for RCP B - Green light only is opening and green light TRIPPED illuminated. only illuminated.
  • PA0205 for RCP C -

TRIPPED Phase A actions must be

  • PA0204 for RCP D - completed within 5 TRIPPED Record this time. minutes.

For the performance of the JPM the time limit is CUE : This is the end of 10 minutes.

the Phase A time critical portion of this JPM, continue with the procedure actions.

STEP B1

  • Indicates critical task Page 3 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

3. Obtain A Copy Of This Locate the Emergency Procedure. Locker located on the Comments:

2033 level near columns TE and T-3. Key to the After the candidate locker is on Turbine locates the locker and Bldg Operator Key Ring.

simulates opening the locker, CUE:

Procedure is in hand.

Provide the candidate with an information only copy of OFN RP-017, STEP B2 Attachment B.

S U

4. Perform the following Simulated removing equipment from locker: Comments:
  • Obtain radio and flashlight
  • Radio and flashlight
  • Obtain pocket ion
  • Pocket ion chambers chambers and TLDs
  • Simulated selecting
  • Select Channel 1 on the CUE: Equipment is in channel 1 on the radio hand and the radio is radio selected to channel 1 STEP B3 S U
5. Inform SRO that Phase Simulate calling Aux A actions are complete Shutdown Panel on Comments:

channel 1 and report Phase A actions are Acknowledge report complete STEP B4

  • Indicates critical task Page 4 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE

6. On PK41 OPEN Cue: Simulate Entry Candidate should state breaker for DC control that Security be power to PA01 contacted prior to entry of cage area.

Have Candidate discuss S U location of panels.

CUE: PK4103 is OFF Comments:

Go to the security cage surrounding PK1 & PK2 on level 2033 Turbine Bldg NW. Indicate entry STEP B5 is required using the high security key to open

7. On PK62 OPEN S U PK4103.

breaker for DC control power to PA02 Go to the security cage Comments:

CUE: PK6204 is OFF surrounding PK1 & PK2 on level 2033 Turbine Bldg NW. Indicate entry is required using the high STEP B6 security key to open PK6204.

  • Indicates critical task Page 5 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

8. Verify Turbine Trip When the candidate Go to the Main Stop indicates they are Valves on the 2033 Comments:

checking the position of level SE part of bldg just Main Turbine Stop outside the Main Lube Valves 1, 2, 3, or 4. If Oil Room and note the the turbine is operating valves are not closed by (stop valves open), CUE: noting the transducer rod is extended along the The valves are as you side of the valve stem.

actually see them now. (The valve stem is not extended down out of the If the turbine should valve body) happen to be actually out of operation (stop valves closed), CUE The transducer rod is extended upward Realize the turbine is not toward the valve body tripped and perform the STEP B7 RNO

  • Indicates critical task Page 6 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U Critical step is to trip

9. *Locally trip turbine both pumps OR open the Comments:

by either: bypass valve.

EITHER

  • Trip both EHC Pumps Locate PG1105 on 2016 level, south end of Turb CUE: Building. Depress trip PB and open the racking Noise is heard, breaker window for the breaker.

indicates open AND Locate PG1205 on 2016 Noise is heard, breaker level, south end of Turb OR indicates open Building. Depress trip PB and open the racking window for the breaker.

OR OR

  • Open Hyd Fluid Return Coolers Bypass Valve Locate CH FV-1 above Valve operator is head level on west side turning to the left. of EHC skid, 2000 level Threads are retracting. on SE side of Turb Valve will no longer Building. Simulated turn left. rotating the valve STEP B7 RNO operator to the left.
  • Indicates critical task Page 7 of 6

JPM NO: P-2 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

10. Ensure AL HV-36 CST Use radio to contact ASP to Turbine Driven AFP for the status of the Comments:

Suction Iso Valve is CUE: breaker OPEN Breaker NG03CEF4 is

  • Contact SRO to ensure NOT open yet breaker is off Perform the RNO and do not continue at this time When candidate states they cannot continue THE JPM IS terminate the JPM.

COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates critical task Page 8 of 6

JPM NO: P-2 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

NO EQUIPMENT WILL BE OPERATED IN THE PLANT - SIMULATE ONLY Read to Performer:

Initial Conditions: You are an extra licensed operator on shift. You are designated as the operator to perform the Turbine Building Actions for OFN RP-017, CONTROL ROOM EVACUATION.

Initiating Cues: You hear the following gaitronics announcement: Reactor Trip, Evacuating the Control Room due to fire, entering OFN RP-017.

This is a Time Critical JPM.

Page 9 of 6

In Plant JPM P-3 JOB PERFORMANCE MEASURE JPM No. P-3 K/A NO: 4.1E055EK3.02 COMPLETION TIME: 15 Minutes K/A RATING: 4.3/4.6 JOB TITLE: RO/SRO REVISION: 0 TASK TITLE: Align the Fire Protection System to the CST SAFETY FUNCTION: 4 DUTY: Operate Auxiliary Feedwater System The performance of this task was evaluated against the standards contained in this JPM and determined to be:

[ ] SATISFACTORY [ ] UNSATISFACTORY Reason, if UNSATISFACTORY:

EVALUATORS SIGNATURE: DATE:

TASK PERFORMER:

LOCATION OF PERFORMANCE:

CONTROL ROOM SIMULATOR/LAB PLANT X CLASSROOM METHOD OF PERFORMANCE: SIMULATED X PERFORMED

REFERENCES:

EMG C-0 TOOLS/EQUIPMENT:

PREPARER: DATE:

12/2/2005 Page 10 of 6

JPM NO: P-3 Read to Performer:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

NO EQUIPMENT WILL BE OPERATED IN THE PLANT - SIMULATE ONLY Initial Conditions: A loss of all AC power has occurred while in Mode 1. The Control Room Operators are at step 27 of C-0, Loss of All AC Power and CST to AFP suction pressure is low.

Initiating Cues: The Control Room Supervisor directs you to manually align the Fire Protection System to the CST per EMG C-0, Step 27 RNO.

ASK IF THE OPERATOR UNDERSTANDS THE INITIATING CUES.

Notes: Provide an information only copy of C-0, Step 27.

THE EVALUATOR OR EXAM GROUP SHALL VERIFY THAT THE PROCEDURE REVISION FOR THIS JPM IS CURRENT AND THAT ANY CHANGE AGAINST THE REFERENCED PROCEDURE DOES NOT INVALIDATE THIS JPM. (PIR 2003-2930).

Task Standard: Upon completion of this JPM the Operator will have installed a jumper hose between the Fire Protection System header and the condensate reject to CST header flush connection.

START TIME:

STOP TIME:

Page 11 of 23

JPM NO: P-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

11. *Locally close Comments:

Locate valve in the CST

  • AP-V006, Valve Room. Simulate Condensate Reject CUE: Chain is removing the lock and Iso removed. Stem is chain. Rotate the retracting. Valve will handwheel in the no longer turn in the clockwise direction.

clockwise direction. Monitor that the stem is retracted and the valve will not longer rotate in the clockwise direction.

Locate valve in the Stem is retracting. Turbine Building SE of

  • AD-V121, Valve will no longer Condensate Valve Condenser. Simulate turn in the clockwise rotating the handwheel in Outlet Iso. direction. the clockwise direction.

Monitor that the stem is retracted and the valve will no longer rotate in the clockwise direction.

Locate valve in the

  • BM-V153, SG Stem is retracting. Turbine Building SE of Blowdown to CST Valve will no longer Condenser. Simulate Inlet Isolation turn in the clockwise rotating the handwheel in direction. the clockwise direction.

Monitor that the stem is retracted and the valve will not longer rotate in the clockwise direction.

STEP 27 RNO a.

  • Indicates critical task Page 12 of 23

JPM NO: P-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

12. *Obtain flange from Comments:

AFW Emergency Provide photo of locker Locate Emergency Locker contents. Locker outside the Aux Boiler room main door.

Simulate removing the break away lock and removing the flange.

STEP 27 RNO b. CUE: The flange is in Have Candidate point out hand. the flange.

  • Indicates critical task Page 13 of 23

JPM NO: P-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

13. *Connect the fire hose Comments:

between: CUE: Hose is in hand. Simulate obtaining a 2 1/2 fire hose from a hose house or the Brigade Locker.

Locate the valve in the

  • KC-V278 CUE: The hose is SE stairwell of the threaded on the valve Turbine Bldg. Simulate and the coupling is placing the female end snug. on the FP valve and turning the coupling clockwise until tight.

CUE: The adapter is Locate the flush

  • Flush connection next to bolted to the flange.

AP-V006 connection next to AP-V006, remove the blank, and install the adapter.

CUE: The fire hose is Attach the fire hose to threaded to the the adapter.

adapter.

Candidate may state they STEP 27 RNO c. would contact Security for the propped open door.

  • Indicates critical task Page 14 of 23

JPM NO: P-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

14. Ensure diesel driven Simulate using a hand fire pump is running. held radio and contact Comments:

the Control Room and notify them to start the diesel driven fire pump.

CUE: Diesel driven fire STEP 27 RNO d. pump is running S U

15. *Pressurize the fire Comments:

hose. Actuate KC-V278 in the counter clockwise CUE: Valve will no direction.

longer turn.

May note hose distends because of system pressure.

If asked, CUE: The hose has become solid to the touch and shows indication of being charged.

STEP 27 RNO e.

  • Indicates critical task Page 15 of 23

JPM NO: P-3 TASK NUMBER - ELEMENT CUE STANDARD SCORE S U

16. *Locally add water to Comments:

CST. Open AP-V006 by actuating the handwheel in the counter clockwise direction. Check for

a. Open AP-V006 CUE: Handwheel is rising stem.

turning counter clockwise. Stem is rising. Handwheel will no longer turn.

Should contact Control Room for further If contacted, CUE: Go instructions.

on with other duties, we will monitor CST level.

STEP 27 RNO f.

THE JPM IS COMPLETE RECORD STOP TIME ON PAGE 1

  • Indicates critical task Page 16 of 23

JPM NO: P-3 I will explain the initial conditions, which steps to simulate or discuss, and provide initiating and subsequent cues. You may use any approved reference materials normally available to you. Make all written reports, oral reports, and log entries as if the evolution was actually being performed. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

NO EQUIPMENT WILL BE OPERATED IN THE PLANT - SIMULATE ONLY Initial Conditions: A loss of all AC power has occurred while in Mode 1. The Control Room Operators are at step 27 of C-0, Loss of All AC Power and CST to AFP suction pressure is low.

Initiating Cues: The Control Room Supervisor directs you to manually align the Fire Protection System to the CST per EMG C-0, Step 27 RNO.

Page 17 of 23