Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14015A135 + (Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figures 3.6-2 Through Figure 3.6-16)
- ML13016A312 + (Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.5-1 Through 2.5-299)
- ML13016A333 + (Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems)
- ML13016A339 + (Updated Safety Analysis Report, Revision 15, Chapter 10 - Steam and Power Conversions System)
- ML14015A105 + (Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics)
- ML101540176 + (Updated Safety Analysis Report, Revision 23, Section 9.1A, Fuel Storage Rack Analysis)
- ML14015A250 + (Updated Safety Analysis Report, Revision 16, Chapter 13 - Conduct of Operations)
- ML101540175 + (Updated Safety Analysis Report, Revision 23, Section 9.1, Auxiliary Systems)
- ML14015A286 + (Updated Safety Analysis Report, Revision 16, Appendix C - Computer Programs)
- ML14015A152 + (Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 63 of 111 Through Figure 3.6-1. Sheet 69 of 111)
- ML13016A350 + (Updated Safety Analysis Report, Revision 15, Appendix C - Computer Programs)
- ML14015A101 + (Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 1 of 111 Through Figure 3.6-1. Sheet 42 of 111)
- ML14015A291 + (Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis)
- ML14015A246 + (Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems)
- ML14015A107 + (Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics, Figure 2.4-19 Through Figure 2.4-53)
- ML14015A106 + (Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics, Figure 2.1-1 Through Figure 2.4-18)
- ML13016A311 + (Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.4-19 Through 2.4-53)
- ML14015A134 + (Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 101 of 111 Through Figure 3.6-1. Sheet 111 of 111)
- ML13016A342 + (Updated Safety Analysis Report, Revision 15, Chapter 13 - Conduct of Operations)
- ML14015A290 + (Updated Safety Analysis Report, Revision 16, Chapter 14 - Initial Test Program)
- ML13016A332 + (Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30)
- ML052010474 + (Updated Safety Analysis Report. USAR-02.03 Section 2 Site and Environs. Revision 19 Section 2.3 Meteorology)
- ML063630255 + (Updated Safety Evaluation Report Related to the License Renewal of Oyster Creek Generating Station)
- ML16252A350 + (Updated Safety Evaluation Report Related to the Grand Gulf Nuclear Station License Renewal Application)
- ML17340A520 + (Updated Safety Evaluation Supporting Proposed Steam Generator Repairs at Facilities)
- ML18087A821 + (Updated Salem Restart Status Rept)
- BSEP 04-0062, Updated Schedule for License Renewal Application + (Updated Schedule for License Renewal Application)
- CNRO-2007-00036, Updated Schedule for Submittal of Future License Renewal Applications for Entergy Plants + (Updated Schedule for Submittal of Future License Renewal Applications for Entergy Plants)
- ML092450109 + (Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants: Waterford 3, Grand Gulf, and River Bend, Unit 1)
- RBG-47703, Updated Schedule of Submittal of Future License Renewal Application + (Updated Schedule of Submittal of Future License Renewal Application)
- W3F1-2014-0012, Updated Schedule of Submittal of Future License Renewal Application + (Updated Schedule of Submittal of Future License Renewal Application)
- CNRO-2012-00006, Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants + (Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants)
- RBG-47436, Updated Schedule of Submittal of Future License Renewal Application River Bend Station - Unit 1 + (Updated Schedule of Submittal of Future License Renewal Application River Bend Station - Unit 1)
- CNRO-2006-00033, Updated Schedule of Submittal of License Renewal Applications for Entergy Plants + (Updated Schedule of Submittal of License Renewal Applications for Entergy Plants)
- CNRO-2005-00025, Updated Schedule of Submittal of License Renewal Applications for Entergy Plants + (Updated Schedule of Submittal of License Renewal Applications for Entergy Plants)
- L-PI-04-118, Updated Security Plan + (Updated Security Plan)
- NG-04-0656, Updated Security Plan + (Updated Security Plan)
- ML042950027 + (Updated Security Plan)
- ML042730164 + (Updated Security Plan)
- NRC 2004-0093, Updated Security Plan + (Updated Security Plan)
- ML043020284 + (Updated Security Plan - Page Changes)
- ML042860182 + (Updated Security Plan, Training and Qualification (T&Q) Plan, and Safeguards Contingency Plans)
- ML17306A869 + (Updated Seismic Hazard Evaluation for PVNGS Wintersburg,Az Final Rept)
- ML13252A150 + (Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi Accident)
- NL-13-1236, Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC, Including SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 of 14 + (Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC, Including SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 of 14)
- ML14071A060 + (Updated Seismic Recommendation 2.3 Walkdown Report)
- ML14051A734 + (Updated Seismic Recommendation 2.3 Walkdown Report)
- 1CAN091301, Updated Seismic Walkdown Report + (Updated Seismic Walkdown Report)
- 2CAN091302, Updated Seismic Walkdown Report + (Updated Seismic Walkdown Report)
- ML13200A159 + (Updated Seismic Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident)
- RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 + (Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138)