Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050260675 + (Updated Response to a Request for Additional Information Reconciliation of Regulatory Requirements)
- ML20076M068 + (Updated Responses to First Set of Interrogatories.Related Correspondence)
- ML20003C352 + (Updated Responses to Friends of the Earth 780419 & 780807 Interrogatories.Nrc Updated Responses Are Complete. Certificate of Svc Encl)
- ML20052C033 + (Updated Responses to NRC 760629,1112 & 1118 Second,Third & Fourth Sets of Interrogatories & 760413 Request for Admissions.Certificate of Svc Encl)
- RS-14-091, Updated Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, License Renewal Application + (Updated Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, License Renewal Application)
- RS-14-183, Updated Responses to NRC Set 14 Requests for Additional Information, Related License Renewal Application + (Updated Responses to NRC Set 14 Requests for Additional Information, Related License Renewal Application)
- BVY 17-019, Updated Responses to Orders Applicable to the Proposed Independent Spent Fuel Storage Installation Physical Security Plan + (Updated Responses to Orders Applicable to the Proposed Independent Spent Fuel Storage Installation Physical Security Plan)
- W3F1-2014-0025, Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) + (Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR))
- ML042530221 + (Updated Responses to Requests for Additional Information (Rais) on the Proposed Perry Nuclear Power Plant Physical Security Plan)
- ML25232A205 + (Updated Restart Inspection Activity Plan for Palisades Nuclear Plant)
- ML18037A056 + (Updated Results of Geologic Monitoring Through Jul 1984. SER Open Item 16 Info Included)
- ML20086S035 + (Updated Rev 1 to Inservice Testing Program)
- ML20125D275 + (Updated Rev 1 to Nuclear Plant Engineering Preservice Insp/Pump & Valve Testing Plan)
- ML18151A546 + (Updated Rev 5 to Operational QA Program)
- ML12045A255 + (Updated Revision to Nine Mile Point, Units 1 & 2 - Emergency Action Levels, Attachments 4 and 5)
- GNRO-2003/00002, Updated Risk Metrics for Extending the Emergency Diesel Generator Allowed Outage Time + (Updated Risk Metrics for Extending the Emergency Diesel Generator Allowed Outage Time)
- ML20058J334 + (Updated Ro:Liquid Radwaste Treatment Sys Inoperable for More than 31 Days After 820308.New Limiting Condition of Operation Procedure Issued on 820720.Minor Adjustments Made & Sys Rendered Operable on 820726)
- ML20090D635 + (Updated Ro:On 711231,unit Tripped Offline as Result of Surveillance Testing.Sensor Support Accidentally Bumped Causing High Level Trip Sensor to Operate Resulting in Turbine Trip.Operator Given Review of Sys Response)
- ML20076D702 + (Updated SAR Change Pages for RAIs NP-7-2 and NP-A-2)
- ML20045H021 + (Updated SAR for 1993 for Fort Calhoun Station)
- ML20107K687 + (Updated SAR for Univ of Lowell Research Reactor)
- ML20092M289 + (Updated SAR in Support of License R-123 Renewal)
- PNP 2012-009, Updated SDP Assessment of DC Panel D11-2 Fault + (Updated SDP Assessment of DC Panel D11-2 Fault)
- ML16279A517 + (Updated SER Containment Leak Rate to ACRS)
- ML19319C524 + (Updated SER Input from Accident Analysis Branch Re Turbine & Tornado Missiles protection.Safety-related Sys Protected by Adequate Structural Barriers.Addl Info Required Re Facility Inherent Protection Against Tornado Missiles)
- ML19329B483 + (Updated SER Re Operations Phase QA Program.Program Adequate)
- ML20248B898 + (Updated SG Run Time Analysis Cycle 9)
- ML18155A467 + (Updated Safety Analysis Report (UFSAR) Revision 35, Appendix L, Requirements of Renewed Operating Licenses)
- ML18155A450 + (Updated Safety Analysis Report (USAR) Revision 35, Section 6, Engineered Safety Features)
- ML18166A209 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix G, Containment System Evaluation)
- ML18155A465 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix J, Pre-Operational and Startup Tests)
- ML18155A466 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix K, Containment Pressure Response to LOCA)
- ML18155A445 + (Updated Safety Analysis Report (USAR) Revision 35, Section 1, Introduction and Summary Description)
- ML18155A446 + (Updated Safety Analysis Report (USAR) Revision 35, Section 2, Site and Environs)
- ML18155A455 + (Updated Safety Analysis Report (USAR) Revision 35, Section 11, Plant Power Conversion System)
- ML18155A457 + (Updated Safety Analysis Report (USAR) Revision 35, Section 13, Plant Operations)
- ML18155A449 + (Updated Safety Analysis Report (USAR) Revision 35, Section 5, Containment System)
- ML18155A454 + (Updated Safety Analysis Report (USAR) Revision 35, Section 10, Plant Auxiliary Systems)
- ML18166A204 + (Updated Safety Analysis Report (USAR) Revision 35, Section 14, Safety Analysis)
- ML18155A453 + (Updated Safety Analysis Report (USAR) Revision 35, Section 9, Plant Radioactive Waste Control Systems)
- ML18155A456 + (Updated Safety Analysis Report (USAR) Revision 35, Section 12, Plant Structures and Shielding - Redacted)
- ML18155A451 + (Updated Safety Analysis Report (USAR) Revision 35, Section 7, Plant Instrumentation and Control Systems)
- ML18155A448 + (Updated Safety Analysis Report (USAR) Revision 35, Section 4, Reactor Coolant System)
- ML18166A208 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix F, Probable Maximum Flood Study)
- ML18166A205 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix D, Radioactive Source Bases)
- LIC-12-0076, Updated Safety Analysis Report (USAR) Revision for Fort Calhoun Station, Unit 1 - USAR-9.6, Auxiliary Systems - Spent Fuel Pool Cooling System + (Updated Safety Analysis Report (USAR) Revision for Fort Calhoun Station, Unit 1 - USAR-9.6, Auxiliary Systems - Spent Fuel Pool Cooling System)
- L-PI-18-018, Updated Safety Analysis Report (USAR) Revision 35, Appendix I, Postulated Pipe Failure Analysis Outside of Containment + (Updated Safety Analysis Report (USAR) Revision 35, Appendix I, Postulated Pipe Failure Analysis Outside of Containment)
- ML18166A206 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix E, Report of Environmental Studies Geology, Hydrology and Seismology)
- L-PI-14-058, Updated Safety Analysis Report (USAR) Revision 33, Technical Specification Bases Revisions, Commitment Change Summary and Report Consistent with 10 CFR 54.37(b) + (Updated Safety Analysis Report (USAR) Revision 33, Technical Specification Bases Revisions, Commitment Change Summary and Report Consistent with 10 CFR 54.37(b))
- ML18155A452 + (Updated Safety Analysis Report (USAR) Revision 35, Section 8, Plant Electrical Systems)
- ML18166A210 + (Updated Safety Analysis Report (USAR) Revision 35, Appendix H, Annual Report, the Meteorological Program)