Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262H611 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 100 Ft Arrangement:Electrical)
- ML20262H622 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits and Trays El 84 Ft Arrangement:Electrical)
- ML20262H608 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 64 Ft Arrangement:Electrical)
- ML20262H632 + (Unit 2 Aux Bldg Control Area Conduits & Trays El 64 Ft Arrangement:Electrical)
- ML20262H619 + (Unit 2 Aux Bldg Control Area Plan Elev 64 Ft 4KV Swgr Fire Barriers Arrangement:Electrical)
- ML20262H630 + (Unit 2 Aux Bldg Mech Penetr Area Conduit & Trays El 78 Ft Arrangement:Electrical)
- ML20261F226 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 1 of 4)
- ML20261F230 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 2 of 4)
- ML20261F234 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 3 of 4)
- ML20261F239 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 4 of 4)
- ML20261F207 + (Unit 2 Aux Bldg:Conc Blk Wall 25 & 26 El 139 Ft. Sheet 2 of 5)
- ML20261F199 + (Unit 2 Aux Bldg:Conc Blk Wall 25 El 135 Ft. Sheet 1 of 5)
- ML20261F215 + (Unit 2 Aux Bldg:Conc Blk Wall 25 Elev 139 Ft. Sheet 4 of 5)
- ML20261F250 + (Unit 2 Aux Bldg:Conc Block Wall 41 El 83 Ft. Sheet 3 of 3)
- ML20261F243 + (Unit 2 Aux Bldg:Concrete Blk Wall 1 & 41 El 83 Ft. Sheet 1 of 3)
- ML20261F246 + (Unit 2 Aux Bldg:Concrete Blk Wall 1 El 83 Ft. Sheet 2 of 3)
- ML20261F220 + (Unit 2 Aux Bldg:Concrete Block Wall 25 & 26 El 139 Ft. Sheet 5 of 5)
- ML20261F212 + (Unit 2 Aux Bldg:Concrete Block Wall 25 El 139 Ft. Sheet 3 of 5)
- ENS 41789 + (Unit 2 Aux Feedwater Train Separation Not Maintained During Operation)
- ENS 54401 + (Unit 2 Auxiliary Feed Pumps Inoperable)
- ML20260D074 + (Unit 2 Auxiliary One Line Diagram 480-Volt System MCC 2CA, 2CB,2PA,2PB & 2SA)
- 05000266/FIN-2010003-05 + (Unit 2 Battery Inverter Transfers to Nonsafety-Related Power During Unit 1 Testing)
- 05000316/FIN-2017002-02 + (Unit 2 CEQ Fan Failed Surveillance)
- ML19256A836 + (Unit 2 Circulating Water Pump House Excavation Is Scheduled for 790125-26 Completion.Util Will Notify NRC If Any Delay Occurs)
- ML16153A243 + (Unit 2 Combined, Correction to 2015 Annual Radioactive Effluent Release Report)
- ENS 47600 + (Unit 2 Commenced a Tech Spec Required Shutdown After Declaring Station Battery "B" Inoperable)
- ML20024B138 + (Unit 2 Computer Printout Fcc)
- ENS 55275 + (Unit 2 Containment Local Leak Rate and As-Found Integrated Overall Leakage Rate Exceeded Acceptance Criteria)
- 05000237/FIN-2012002-06 + (Unit 2 Control Rod Drive Flow Control Valve Failed Closed Due to Inadequate Work Order Instructions)
- 05000424/FIN-2007002-03 + (Unit 2 Cooling Water Systems Mitigating System Performance Index (MSPI))
- ML11129A031 + (Unit 2 Core Operating Limits Report (Colr), Revision 17)
- NOC-AE-03001470, Unit 2 Cycle 10 Startup Testing Summary Report + (Unit 2 Cycle 10 Startup Testing Summary Report)
- ML030700584 + (Unit 2 Cycle 10 Startup Testing Summary Report)
- ML022330595 + (Unit 2 Cycle 11 (U2C11) 90-Day Inservice Inspection (ISI) Summary Report)
- ML021290436 + (Unit 2 Cycle 12 Core Operating Limits Report (COLR))
- ML060740605 + (Unit 2 Cycle 13 (U2C13) - 12-Month Steam Generator (SG) Inspection Report)
- ML052340503 + (Unit 2 Cycle 13 (U2C13) 90-Day Steam Generator (S/G) Report for Voltage-Based Alternate Repair Criteria and W* Alternate Repair Criteria)
- ML073450555 + (Unit 2 Cycle 14 (U2C14) - 12-Month Steam Generator (SG) Inspection Report)
- ML051440813 + (Unit 2 Cycle 14 Core Operating Limits Report (COLR))
- NL-10-0662, Unit 2 Cycle 15 Version 2 Core Operating Limits Report + (Unit 2 Cycle 15 Version 2 Core Operating Limits Report)
- ML081580301 + (Unit 2 Cycle 16 Core Operating Limits Report (COLR))
- ML050910206 + (Unit 2 Cycle 17 Core Operating Limits Report, Supplemental Reload Licensing Report, and Loss-of-Coolant Accident Analysis Report)
- RA22-041, Unit 2 Cycle 19 Core Operating Limits Report Revision + (Unit 2 Cycle 19 Core Operating Limits Report Revision)
- RA21-019, Unit 2 Cycle 19 Core Operating Limits Reports + (Unit 2 Cycle 19 Core Operating Limits Reports)
- ML19126A274 + (Unit 2 Cycle 22-180-Day Steam Generator Tube Inspection Report)
- ML22038A094 + (Unit 2 Cycle 24 Refueling Outage - 90-Day Inservice Inspection Summary Report)
- RA-21-0098, Unit 2 Cycle 25 Core Operating Limits Report (COLR) and Reload Safety Analysis Report (RSAR) + (Unit 2 Cycle 25 Core Operating Limits Report (COLR) and Reload Safety Analysis Report (RSAR))
- ML23192A097 + (Unit 2 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report)
- RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR) + (Unit 2 Cycle 26 Core Operating Limits Report (COLR))
- NL-20-0242, Unit 2 Cycle 26 Core Operating Limits Report Version 2.0 + (Unit 2 Cycle 26 Core Operating Limits Report Version 2.0)