Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating + (Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating)
- AEP-NRC-2020-54, Unit 2 - Supplement to Temporary Request from Security Training Requalification Requirements of 10 CFR Part 73, Appendix B, Section VI + (Unit 2 - Supplement to Temporary Request from Security Training Requalification Requirements of 10 CFR Part 73, Appendix B, Section VI)
- EPID:L-2020-LLE-0104 + (Unit 2 - Supplement to Temporary Request from Security Training Requalification Requirements of 10 CFR Part 73, Appendix B, Section VI)
- AEP-NRC-2016-78, Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and + (Unit 2 - Supplement to the License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification and)
- ML021550437 + (Unit 2 - Supplemental Information to Support Emergency Technical Specification (TS) Change 02-05, Steam Generator (SG) Inspecton Scope - TAC MB4994)
- ML082750518 + (Unit 2 - Supplemental Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors)
- AEP-NRC-2016-81, Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed . + (Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed .)
- ML043070443 + (Unit 2 - Technical Requirements Manual)
- ML022000554 + (Unit 2 - Technical Specification (TS) Change No. 02-03, Essential Raw Cooling Water (ERCW) Operability During Movement of Heavy Loads - One Time TS Change in Support of Steam Generator Replacement Project)
- ML051190265 + (Unit 2 - Technical Specification (TS) Change 03-06 - Change Inspection Scope for Steam Generator (SG) Tubes - Revised Request)
- ML023220122 + (Unit 2 - Technical Specification (TS) Change No. 02-03, Revision 1, License Amendment Request (LAR) to Support Unit 1 Generator Replacement Project)
- ML023100233 + (Unit 2 - Technical Specifications Change 420 - Safety Limit Minimum Critical Power Ratio - Cycle 13 Operation)
- ML043490647 + (Unit 2 - Technical Specifications Change 03-06 - Change Inspection Scope for Steam Generator Tubes)
- AEP-NRC-2021-42, Unit 2 - Transmittal of Report of Changes to the Emergency Plan + (Unit 2 - Transmittal of Report of Changes to the Emergency Plan)
- AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan + (Unit 2 - Transmittal of Report of Changes to the Emergency Plan)
- AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan + (Unit 2 - Transmittal of Report of Changes to the Emergency Plan)
- IR 05000341/2017012 + (Unit 2 - Triennial Fire Protection Inspection Report 05000341/2017012 (DRS-A.Dahbur))
- ML12290A025 + (Unit 2 - Ufsar/Selected Licensee Commitment Changes)
- CNS-16-050, Unit 2 - Ufsar/Selected Licensee Commitment Changes + (Unit 2 - Ufsar/Selected Licensee Commitment Changes)
- RA20-044, Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report + (Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report)
- ML20072K150 + (Unit 2 - Unit 1 Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Reports)
- WBL-25-006, Unit 2 - Update to Fire Protection Report + (Unit 2 - Update to Fire Protection Report)
- ML061010420 + (Unit 2 - Withdrawal of Relief Request)
- WBL-21-046, Unit 2 -Emergency Plan Implementing Procedure Revision + (Unit 2 -Emergency Plan Implementing Procedure Revision)
- L-PI-10-099, Unit 2 180-Day Steam Generator Tube Inspection Report + (Unit 2 180-Day Steam Generator Tube Inspection Report)
- NL-05-2127, Unit 2 2B Charging Pump + (Unit 2 2B Charging Pump)
- 05000336/FIN-2009004-03 + (Unit 2 A Reactor Coolant Pump Seal Cooler Weld)
- ML072640494 + (Unit 2 Accident - Presentation Slides)
- 2CAN060012, Unit 2 Additional Information on Proposed Risk-Informed License Change Regarding Steam Generator Tubing + (Unit 2 Additional Information on Proposed Risk-Informed License Change Regarding Steam Generator Tubing)
- 05000412/FIN-2015007-03 + (Unit 2 Alternative Post-Fire Shutdown Procedures Deficiencies for Some Postulated Spurious Operations)
- 05000265/LER-2012-003 + (Unit 2 Automatic Reactor Scram Due to Digital Electro Hydraulic Control System Failure)
- ENS 49786 + (Unit 2 Automatic Reactor Trip)
- ENS 49184 + (Unit 2 Automatic Reactor Trip)
- 05000455/LER-2005-001, Unit 2 Automatic Reactor Trip Due to Low Steam Generator Level Resulting from a Software Fault on the Turbine Control Power Runback Feature + (Unit 2 Automatic Reactor Trip Due to Low Steam Generator Level Resulting from a Software Fault on the Turbine Control Power Runback Feature)
- 05000425/LER-2004-004, Unit 2 Automatic Reactor Trip Followed by Safety Injection + (Unit 2 Automatic Reactor Trip Followed by Safety Injection)
- 05000529/LER-2023-001-01, Unit 2 Automatic Reactor Trip on Low Steam Generator Water Level Due to Degraded Feedwater Flow + (Unit 2 Automatic Reactor Trip on Low Steam Generator Water Level Due to Degraded Feedwater Flow)
- ML20262H613 + (Unit 2 Aux Bldg Cols EE-GG,14-17.6 Conduits & Trays El 45 Ft & El 55 Ft Arrangement:Electrical)
- ML20262H616 + (Unit 2 Aux Bldg Cols F-F-MM,14-17.6 Conduits and Trays El 84 Ft Arrangement:Electrical)
- ML20262H605 + (Unit 2 Aux Bldg Cols FF-MM,14-17.6 Conduits & Trays El 100 Ft Arrangement:Electrical)
- ML20262H635 + (Unit 2 Aux Bldg Cols FF-MM,14-17.6 Conduits & Trays El 64 Ft Arrangement:Electrical)
- ML20262H611 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 100 Ft Arrangement:Electrical)
- ML20262H622 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits and Trays El 84 Ft Arrangement:Electrical)
- ML20262H608 + (Unit 2 Aux Bldg Cols MM-TT,14-17.6 Conduits & Trays El 64 Ft Arrangement:Electrical)
- ML20262H632 + (Unit 2 Aux Bldg Control Area Conduits & Trays El 64 Ft Arrangement:Electrical)
- ML20262H619 + (Unit 2 Aux Bldg Control Area Plan Elev 64 Ft 4KV Swgr Fire Barriers Arrangement:Electrical)
- ML20262H630 + (Unit 2 Aux Bldg Mech Penetr Area Conduit & Trays El 78 Ft Arrangement:Electrical)
- ML20261F226 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 1 of 4)
- ML20261F230 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 2 of 4)
- ML20261F234 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 3 of 4)
- ML20261F239 + (Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 4 of 4)
- ML20261F207 + (Unit 2 Aux Bldg:Conc Blk Wall 25 & 26 El 139 Ft. Sheet 2 of 5)