Unit 2 - Technical Specifications Change 03-06 - Change Inspection Scope for Steam Generator Tubes
ML043490647
Person / Time
Site: Sequoyah 
Issue date: 12/02/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TVA-SQN-TS-03-06
Download: ML043490647 (99)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 December 2, 2004 TVA-SQN-TS-03-06 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop:

OFWN P1-35 Washington, D. C. 20555-0001 Gentlemen:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2 -

TECHNICAL SPECIFICATIONS (TS) CHANGE 03 CHANGE INSPECTION SCOPE FOR STEAM GENERATOR (SG)

TUBES

Reference:

TVA letter to NRC dated May 8, 2002 "'Sequoyah Nuclear Plant (SQN) -

Unit 2 -

Supplemental Information to Support Emergency Technical Specification (TS) Change No. 02-05, Steam Generator (SG) Inspection Scope -

TAC No. MB4994" Pursuant to 10 CFR 50.90, TVA is submitting a request for TS change (TS-03-06) to license DPR-79 for Unit 2. The proposed TS change revises TS 3/4.4.5 including associated Bases 3/4.4.5 to change the inspection scope of SG tubing in the Westinghouse Electric Company explosive tube expansion (WEXTEX) region below the top of the tubesheet.

Additionally, the proposed TS change removes the axial primary water stress corrosion cracking at dented tube support plate alternate repair criteria and the associated note for the exclusion made for Unit 2 Cycle 12 operation only and changes the current definition of plugging limit to exclude possible indications below the W* distance.

f'nCA Pnned on Icyde pat

U.S. Nuclear Regulatory Commission Page 2 December 2, 2004 The proposed amendment is conservative with respect to Revision 2 of Westinghouse WCAP-14797, "Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region WEXTEX Expansions." WCAP-14797 Revision 1, (proprietary) and WCAP-14798 Revision 1, (non-proprietary) were submitted to NRC by Pacific Gas and Electric Company (PG&E) letter dated March 10, 1997, "License Amendment Request 97-04, Steam Generator Tube Alternate Repair Criteria for Indications in the Westinghouse Explosive Tube Expansion (WEXTEX) Region." Corrections were submitted to NRC by PG&E letter dated May 20, 1997, "Transmittal of Errata Sheets for WCAP-14797 and WCAP-14798." The use of WCAP-14797 including the Errata pages was approved by NRC letter to Diablo Canyon dated February 19, 1999, "Issuance of Amendments for Diablo Canyon Nuclear Power Plant, Unit No. 1 (TAC No. M98283) and Unit No. 2 (TAC No. M98284)."

Beaver Valley submitted Revision 2 to WCAP-14797 to the NRC on June 28, 2004 (Revision 2 corrected typographical errors).

NRC approved a similar amendment request for Beaver Valley on October 15, 2004.

TVA is submitting this TS change request in response to Generic Letter 2004-001 "Requirements for Steam Generator Tube Inspections." TVA previously submitted the SQN Unit 2 site-specific W* WCAP to NRC by the reference letter.

TVA is using the generic W* WCAP for this change.

The generic methodology uses bounding values for secondary side pressure and primary temperature.

These values are conservative compared to the SQN Unit 2 values in the site-specific WCAP.

Therefore, use of the generic W* WCAP is conservative. provides the application for withholding and affidavits (CAW-04-1908) signed by Westinghouse, the owners of the information, as well as the proprietary information notice and copyright notices.

The applications for withholding and the affidavits set forth the basis on which the information may be withheld from public disclosure by NRC and address the considerations listed in 10 CFR 2.390 (b)(4).

Accordingly, it is respectfully requested that the information that is proprietary to Westinghouse, (Enclosure 5) be withheld from public disclosure in accordance with 10 CFR 2.390.

U.S. Nuclear Regulatory Commission Page 3 December 2, 2004 Correspondence, with respect to the copyright or proprietary aspects of the subject report or the supporting Westinghouse affidavit, should reference CAW-04-1908 and should be addressed to:

J. A. Gresham Manager, Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC, P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 TVA has determined that there are no significant hazards considerations associated with the proposed change and that the TS change qualifies for categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c) (9).

Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and enclosures to the Tennessee State Department of Public Health.

TVA requests approval of this TS change by March 1, 2004, to support the next Unit 2 refueling outage scheduled to start in April 2004 and the implementation of the revised TS is requested to be within 45 days of NRC approval.

There are no commitments contained in this submittal.

If you have any questions about this change, please contact me at (423) 843-7170 or Jim Smith at (423) 843-6672.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on this 2nd day of December 2004.

Sincerel Paul Pace Manager, Site Licensing and Industry Affairs

U.S. Nuclear Regulatory Commission Page 4 December 2, 2004

Enclosures:

1. TVA Evaluation of the Proposed Changes
2. Proposed Technical Specifications Changes (mark-up)
3. Changes to Technical Specifications Bases Pages
4. Application for withholding and Affidavit
5. Westinghouse Proprietary Class 2 Application of W* to Sequoyah Unit 2 Steam Generator Tubes
6. Westinghouse Non-Proprietary Class 3 Application of W* to Sequoyah Unit 2 Steam Generator Tubes Enclosures cc (Enclosures):

Framatome ANP, Inc.

P. 0. Box 10935 Lynchburg, Virginia 24506-0935 ATTN:

Mr. Frank Masseth Mr. Lawrence E. Nanney, Director Division of Radiological Health Third Floor L&C Annex 401 Church Street Nashville, Tennessee 37243-1532 Mr. Douglas V. Pickett, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-7A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2

1.0 DESCRIPTION

This letter is a request to amend Operating License DPR-79 for Sequoyah Unit 2. The proposed changes revise Unit 2 Technical Specification (TS) 3/4.4.5, "Steam Generators," to change the scope of the steam generator (SG) tube sheet inspections required in the SG tubesheet region using the W*

methodology (W* is defined in WCAP-14797, Revision 2).

Specifically, the proposed change will revise the Unit 2 TS definition for SG tube inspection included in SQN TS Surveillance Requirement (SR) 4.4.5.4.a.8 to revise the definition to exclude the portion of the tube within the tubesheet below the W* distance.

The proposed change will revise SR 4.4.5.4.a.6 on SG tube repair criteria, add SR 4.4.5.2.e to require a 100 percent sample rotating probe inspection of the hot-leg tubesheet W* distance, add new W*

terminology definitions in SR 4.4.5.4.a.11, and add new reporting criteria for W* inspection information in SRs 4.4.5.5.d.1 and 4.4.5.5.e.

The SQN Unit 2 proposed change requires that any tube identified with service induced degradation in the W* distance below the top-of-tube sheet (TTS), will be plugged.

The change requires an account for postulated indications below the W* distance and their contribution to leakage.

SQN proposes to plug any service induced degradation within the W* distance.

This proposal is a conservative limited scope application of the complete W*

methodology as described in WCAP-14797, Revision 2.

We are also removing the previously approved primary water stress corrosion cracking (PWSCC) alternate repair criteria (ARC) as it expired at the end of Cycle 12 operation and further justification for its extension will not be pursued.

The PWSCC ARC was not utilized on Unit 2.

TVA is submitting this TS change request in response to Generic Letter 2004-001 "Requirements for Steam Generator Tube Inspections."

El-l

2.0 PROPOSED CHANGE

The following changes are proposed to SQN Unit 2 TSs:

1. Add TS 4.4.5.2.e to provide a new requirement for a 100 percent inspection of the hot-leg tubesheet W* length using rotating coil techniques, and to remove the axial PWSCC at dented tube support plate ARC.
2. Revise TS 4.4.5.4.a.6 to change the current definition of "Plugging Limit" to account for plugging all service induced degradation in the W* distance, and delete the axial PWSCC at dented tube support plate (TSP) ARC.
3. Revise TS 4.4.5.4.a.8, "Tube Inspection" definition to remove the revision made for Cycle 12 operation only, and to change the wording to exclude the portion the tube below the W* distance.
4. Replace TS 4.4.5.4.a.11 "PWSCC Tube Support Plate Plugging Limit" definition with definitions associated with W*.
5. Revise TS 4.4.5.5.d.1 to include reporting requirements for W* postulated leakage.
6. Replace TS 4.4.5.5.e by removing the reporting requirements for axial PWSCC at dented TSP and replacing with new reporting requirements for W*.
7. Revise Bases 3/4.4.5 to add information that explains the basis for the W* criteria and removes information related to ARC for axial PWSCC at dented TSP.

In summary, this change removes the ARC for axial PWSCC at dented TSP and replaces it with requirements associated with the W* methodology for tubesheet inspections.

3.0 BACKGROUND

Existing plant TS tube repair/plugging criteria apply throughout the tube length and do not take into account the reinforcing effect of the tubesheet on the external surface of an expanded tube.

The presence of the tubesheet constrains the tube and complements tube integrity in that region by essentially precluding tube deformation beyond the expanded outside diameter.

The resistance to both tube rupture and tube collapse is significantly enhanced by the tubesheet.

In addition, the proximity of the tubesheet in the expanded region significantly reduces the leakage of through wall tube cracks.

Based on these considerations, the establishment of W* methodology criteria to the portion of tubing expanded by Westinghouse explosive tube expansion is supported by testing and analysis results included in WCAP-14797, Revision 2.

E1-2

The W* methodology provides the basis for tubes with any form of degradation below the W* length to remain in service.

In addition, any primary to secondary leakage from tube degradation below the W* length is determined to be acceptably low as discussed in Enclosure 5.

As discussed in more detail in Enclosure 5, the generic W*

methodology contained in WCAP-14797, Revision 2 is applicable to the SQN Unit 2 SGs and it defines the hot-leg W* length for pullout resistance as 7.0 inches below the bottom of the WEXTEX transition.

SQN has chosen to use the 7.0 inches length in this request since it is the more conservative of the two listed lengths (5.2 inches for Zone A and 7.0 inches for Zone B) specified in WCAP-14797.

Since SQN proposes to repair any service induced degradation within the W* distance, this proposal is a conservative limited scope application of the complete W* methodology as described in WCAP-14797, Revision 2.

SQN Unit 2 does not use WCAP-14797, Revision 2 to leave tubes degraded within the W* distance in service via the W*

methodology.

SQN's proposed change requires that any service induced degradation identified in the W* distance be plugged.

The WCAP is only used to define the length of tubing that will be inspected with an RPC probe to remove degraded tubes from service by plugging.

This proposal implements the following W* repair criteria and acceptance criteria:

1. All service-induced indications within the W* distance below the TTS, will be plugged.
2. Any type or combination of tube degradation below the W*

distance is acceptable.

SQN proposes to postulate additional leakage below the W*

distance to be included in the total SQN Unit 2 steam line break (SLB) leak rate during postulated SLB conditions as described in Enclosure 5.

For the first inspection utilizing the criteria, SQN will base the projections on site-specific data detailed in. Twenty-five percent of the total historical indication count and End of Cycle (EOC)-13 projected indication count will be assumed to reside between 8 and 12 inches below TTS.

To date, 138 total indications have been reported, only 25 of which were circumferentially oriented.

A regression analysis using the data suggests that approximately 23 indications are expected for the EOC-13 outage.

Using only the last four outages' data, 25 indications are anticipated.

E1-3

Therefore, the cumulative SQN Unit 2 total number of indications including the EOC-13 projection is a maximum of 163 (138 + 25).

An additional 41 indications (25 percent of combined historical indications plus EOC-13 new indications) might be observed if the inspection distance were increased from 8 to 12 inches below TTS.

Note that this analysis is provided to estimate the number of indications between 8 and 12 inches below TTS using existing data.

TVA will continue to evaluate subsequent outage inspection data to assess the postulated number of indications between 8 and 12 inches below TTS.

Because of recent NRC questions, the following topics are included in Enclosure 5:

  • Basis supporting the validity of the original conclusion presented by WCAP-14797, Revision 2 that postulated circumferential degradation below the W* distance would not produce leakage at SLB conditions
  • SLB conditions leakage potential from axial PWSCC within W* distance
  • SQN Unit 2 inspection history and industry experience
  • The impact of locked tubes on W*
  • The impact of tubesheet bow on pullout and leak-rate testing
  • Tubesheet finite element modeling
  • Ligament tearing
  • No contact length for normal/postulated accident conditions
  • Tube radial contraction effects
  • The leakage model included in WCAP-14797, Revision 2
  • Secondary to primary leakage following a postulated loss-of-coolant accident (LOCA)
  • Consistency of different industry leak-rate results
  • How leak model addresses 360 degree circumferential cracks
  • Leak-rate loss coefficient

4.0 TECHNICAL ANALYSIS

SQN is proposing to modify the Unit 2 TSs to revise SRs 4.4.5.4.a.6, 4.4.5.4.a.8, and 4.4.5.5.d.1, add SR 4.4.5.2.e, and replace SRs 4.4.5.4.a.11 and 4.4.5.5.e.

SR 4.4.5.4.a.8 defines SG tube inspection scope.

SQN's proposed change alters the tube inspection scope to exclude the portion of the tube within the tubesheet below the W*

distance.

SR 4.4.5.4.a.6 provides SG tube repair criteria.

E1-4

SQN's proposed change requires repair of any service induced degradation identified in the W* distance below the TTS.

The amendment is based on the Westinghouse WCAP-14797, Revision 2. Since SQN proposes to repair any service induced degradation within the W* distance, this proposal is a conservative limited scope application of the complete W*

methodology as described in WCAP-14797, Revision 2. The WCAP was developed for Westinghouse fabricated SGs that utilized the WEXTEX tube expansion process for application of W*

methodology.

The W* methodology accounts for the reinforcing effect that the tubesheet has on the external surface of the SG tube within the tubesheet region.

The W* methodology shows that tube integrity and leakage below the W* distance remain within the existing design limits.

The W* criteria were developed for the tubesheet region of 51 Series SGs considering the most stringent loads associated with plant operation, including transients and postulated accident conditions.

The W* criteria were selected to prevent tube burst and axial separation due to axial pullout forces acting on the tube, and to ensure that the SLB leakage limits are not exceeded.

Constraint provided by the tubesheet precludes tube burst for cracks within the tubesheet.

Thus, the NRC Draft Regulatory Guide (RG) 1.121 criteria are satisfied by the tubesheet constraint.

Therefore, within the tubesheet, crack lengths do not need to be limited by burst considerations, and operating leakage limits are not required since, without the potential for tube burst, there is no need for the leak-before-burst leakage limit.

Conceivably, a 360 degree through-wall circumferential crack or a significant number of axially oriented cracks could permit severing of the tube and tube pullout from the tubesheet when the tube is subjected to axial forces from primary-to-secondary pressure differentials.

The W* criteria were developed to allow certain tubes with indications in the tubesheet region of the tubesheet to remain in service, while precluding tube pullout from the tubesheet under axial loading conditions.

A non-degraded W* length is required such that the tube-to-tubesheet contact pressures integrated over the W* length are sufficient to compensate for the axial forces on the tube, thus preventing tube pullout.

Loading analyses were conducted per the requirements of RG 1.121 for both the 3 times the difference between main steam pressure and reactor coolant pressure (3AP) at normal operating load and the limiting faulted condition load (with the applicable safety factor applied).

To prevent pullout, these loads must be reacted by the axial restraint afforded E1-5

by the contact pressure between the tube and tubesheet times the friction coefficient of the tube-to-tubesheet interface acting over some interface length.

Contact pressure between the tube and tubesheet is a function of the WEXTEX expansion pressure, and primary-to-secondary pressure and temperature differentials.

The W* length is defined to be the length of tube that provides assurance that tube pullout criteria are met with an appropriate safety factor for the most limiting loading scenario.

The WCAP-14797, Revision 2 bounding generic methodology parameters used in the calculation of the W* length are conservative for Sequoyah Unit 2.

The generic W* methodology detailed in WCAP-14797, Revision 2 is applicable to the SQN SGs and defines the maximum hot-leg W* lengths for pullout resistance as 7.0 inches below the bottom of the WEXTEX transition.

These distances are increased by an allowance for Non-Destructive Examination (NDE) uncertainties in measuring the W* length.

The NDE uncertainty on the W* length in WCAP-14797, Revision 2 is 0.12 inch.

The W* methodology provides the basis for tubes with any form of degradation below the W* length to remain in service.

This includes a tube with a 360 degree circumferential through-wall crack located just below the W*

distance, which would still not be pulled out by the worst-case main SLB axial loads on the tube.

The presence of the surrounding tubesheet prevents tube rupture and provides resistance against axial pullout loads during normal and accident conditions.

In addition, any primary-to-secondary leakage from tube degradation below the W* distance contributes less than 5 percent of the total leakage assumed for a postulated SLB accident and may be considered negligible.

Consequently, any tube degradation that may go undetected in this area would not affect structural or leakage margins.

To reduce the probability and consequences of SG tube rupture or tube failure, SQN performs rotating pancake coil (RPC) probe examinations in critical regions for crack like indications that would not be identified with the bobbin coil probe.

These critical regions are based on a degradation assessment where potential and active degradation is expected in SG tubes that could challenge structural and/or leakage integrity if the tubes are not taken out of service by repair.

The critical region of the tubes in the tube-to-tubesheet expansion in Westinghouse Model 51 SGs with WEXTEX explosive expansions is defined as the W* length.

The W* length is defined for SQN Unit 2 in WCAP-14797, Revision 2, considering E1-6

the most stringent loads associated with plant operation, including transients, and accident conditions.

The W*

distance is the required RPC probe inspected length as measured downward from the TTS including the distance to the Bottom of WEXTEX Transition (BWT) and includes the NDE uncertainty.

SQN Unit 2 does not use WCAP-14797, Revision 2 to leave tubes degraded within the W* distance in service via the W*

methodology.

SQN's proposed change requires that any service induced degradation identified in the W* distance be plugged.

The WCAP is only used to define the length of tubing that will be inspected with an RPC probe to remove degraded tubes from service by plugging.

Operating experience has demonstrated negligible normal operating leakage from PWSCC even under free span conditions in roll transitions.

PWSCC in WEXTEX expansion in the tubesheet region would be even further leakage limited by the tight tube-to-tubesheet crevice and the limited crack opening permitted by the tubesheet constraint.

The SLB conditions provide the most stringent radiological hazards for postulated accidents involving loss of pressure or fluid in the secondary system.

WCAP-14797, Revision 2 describes the methodology for calculating leakage for all cracks left in service and the justification to neglect the total SLB leak rate contributed by cracks below the W* distance.

Therefore, RPC probe inspection in the area below the W* distance is not necessary to preclude normal operating or accident induced leakage.

The above discussion states that there will be negligible leakage from any type of degradation below the W* distance, even under SLB conditions.

SQN proposes to postulate additional leakage below the W* distance to be included in the total SQN Unit 2 SLB leak rate during postulated SLB conditions.

5.0 REGULATORY SAFETY ANALYSIS The proposed technical specification (TS) changes the inspections for steam generator (SG) tubes in the hot-leg portion of the tube within the tubesheet.

The proposed change removes the axial primary water stress corrosion cracking (PWSCC) at dented tube support plate alternate repair criteria (ARC) and removes the associated exclusion made for Unit 2 Cycle 12 operation only.

E1-7

5.1 No Significant Hazards Consideration TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response

No.

Of the various accidents previously evaluated, the proposed changes only affect the steam generator tube rupture (SGTR) event evaluation and the postulated steam line break (SLB) accident evaluation.

Loss-of-coolant accident (LOCA) conditions cause a compressive axial load to act on the tube.

Therefore, since the LOCA tends to force the tube into the tubesheet rather than pull it out, it is not a factor in this amendment request.

Another faulted load consideration is a safe shutdown earthquake (SSE); however, the seismic analysis of Westinghouse 51 Series SGs has shown that axial loading of the tubes is negligible during an SSE.

TVA's amendment request takes credit for how the tubesheet enhances the tube integrity in the Westinghouse Electric Company explosive tube expansion (WEXTEX) region by precluding tube deformation beyond its initial expanded outside diameter.

For the SGTR and SLB events, the required structural margins of the SG tubes will be maintained due to the presence of the tubesheet.

Tube rupture is precluded for axial cracks in the WEXTEX region due to the constraint provided by the tubesheet.

Therefore, the normal operating 3AP margin and the postulated accident 1.43AP margin against burst are maintained.

The W* length supplies the necessary resistive force to preclude pullout loads under both normal operating and accident conditions.

The contact pressure results from the WEXTEX expansion process, thermal expansion mismatch between the tube and E1-8

tubesheet, and from the differential pressure between the primary and secondary side.

Therefore, the proposed change results in no significant increase in the probability or the occurrence of an SGTR or SLB accident.

The proposed changes do not affect other systems, structures, components or operational features.

Therefore, based on the above evaluation, the proposed changes do not involve a significant increase in the probability of an accident previously evaluated.

The consequences of an SGTR event are primarily affected by the primary-to-secondary flow rate and the time duration of the primary-to-secondary flow during the event.

Primary-to-secondary flow rate through a postulated ruptured tube (i.e., complete severance of a single SG tube) is not affected by the proposed change since the flow rate is based on the inside diameter of a SG tube and the pressure differential.

TVA's amendment request does not change either of these.

The duration of primary-to-secondary leakage is based on the time required for an operator to determine that a SGTR has occurred, the time to identify and isolate the faulty SG, and ensure termination of radioactive release to the atmosphere from the faulty SG.

TVA's amendment request does not affect the duration of the primary-to-secondary leakage because it does not change the control room indicators with which an operator would determine that an SGTR has occurred.

The consequences of an SGTR are secondarily affected by primary-to-secondary leakage, which could occur due to axial cracks remaining in service in the WEXTEX region in a non-faulted SG.

During a SGTR, the primary-to-secondary differential pressure is less than or equal to the normal operating differential pressure; therefore, the primary-to-secondary leakage due to axial cracks in the WEXTEX region of a non-faulted SG during a SGTR would be less than or equal to the primary-to-secondary leakage experienced during normal operation.

Primary-to-secondary leakage, is considered in the calculation determining the consequences of a SGTR and the value is bounding.

The postulated SLB has the greatest primary-to-secondary pressure differential, and therefore could experience the greatest primary-to-secondary leakage.

TVA's amendment request requires the E1-9

aggregate leakage, (i.e., the combined leakage for the tubes with service induced degradation inside the tubesheet) plus the combined leakage developed by other ARCs, to remain below the maximum allowable SLB primary-to-secondary leakage rate limit such that the doses are maintained to less than a fraction of the 10 CFR 100 limits and also less than the general design criteria (GDC)-19 limits.

TVA's proposed change also removes the existing axial PWSCC at dented tube support plate ARC and removes the exclusion made for Unit 2 Cycle 12 operation only from the TS.

This ARC was not used on Unit 2 and was only intended through the Unit 2 Cycle 12 operation.

Therefore, this change is inherently more conservative.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response

No.

TVA's amendment request does not introduce any physical changes to the Sequoyah Unit 2 SGs.

TVA's amendment request takes credit for how the tubesheet enhances the SG tube integrity in the WEXTEX region by precluding tube deformation beyond its initial expanded outside.

Removal of the existing PWSCC axial at dented tube support plate ARC incorporates the more conservative TS limit for SG tube plugging.

A failure to meet SG tube integrity results in an SGTR.

Because degradation detected within the WEXTEX region are required to be plugged, it is highly unlikely that a W* tube would fail as a result of a circumferential defect.

Therefore a tube severance, which would strike neighboring tubes and create a multiple tube rupture, is not credible.

The proposed change does not introduce any new equipment or any change to existing equipment.

No new effects on existing equipment are created.

El-10

Based on the above evaluation, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response

No.

The amendment request maintains the structural margins of the SG tubes for both normal and accident conditions that are required by Regulatory Guide 1.121.

For cracking located within the tubesheet, tube burst is precluded due to the presence of the tubesheet.

WCAP-14797 defines a length, W*, of degradation free expanded tubing that provides the necessary resistance to tube pullout due to the pressure induced forces (with applicable safety factor applied).

Application of the W* methodology will preclude unacceptable primary-to-secondary leakage during all plant conditions.

The methodology for determining leakage provides for large margins between calculated and actual leakage values in the W* criteria.

TVA's proposed change to remove PWSCC ARC from the TS does not compromise structural integrity or leakage integrity of SG tubes.

Based on the above, it is concluded that the proposed changes do not result in a significant reduction of margin with respect to plant safety as defined in the safety analysis report SAR or TSs.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Based on the above, TVA concludes that the proposed amendment present no significant hazards consideration under the standards set forth in 10 CFR 50.92 ( c), and accordingly, a finding of "no significant hazards consideration" is justified.

El-1l

5.2 Applicable Regulatory Requirements/Criteria The regulatory requirements associated with SG tube inspections include the following:

10 CFR 50 Appendix A Criterion 14 -

Reactor Coolant Pressure Boundary -

The reactor coolant pressure boundary shall be designed, fabricated, erected, and tested so as to have an extremely low probability of abnormal leakage, of rapidly propagating failure, and gross rupture.

10 CFR 50 Appendix A Criterion 15 - Reactor Coolant System Design -

The reactor coolant system and associated auxiliary, control, and protection systems shall be designed with sufficient margin to assure that the design conditions of the reactor coolant pressure boundary are not exceeded during any condition of normal operation, including anticipated operational occurrences.

10 CFR 50 Appendix A Criterion 30 -

Quality of Reactor Coolant System Pressure Boundary -

Components which are part of the reactor coolant pressure boundary shall be designed, fabricated, erected, and tested to the highest quality standards practical.

Means shall be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage.

10 CFR 50 Appendix A Criterion 31 - Fracture Prevention of Reactor Coolant Pressure Boundary -

The reactor coolant pressure boundary shall be designed with sufficient margin to assure that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the boundary behaves in a nonbrittle manner, and (2) the probability of rapidly propagating fracture is minimized.

The design shall reflect consideration of service temperatures and other conditions of the boundary material under operating, maintenance, testing, and postulated accident conditions and the uncertainties in determining (1) material properties, (2) the effects of irradiation on material properties, (3) residual steady state and transient stresses, and (4) size of flaws.

10 CFR 50 Appendix A Criterion 32 -

Inspection of Reactor Coolant Pressure Boundary -

Components that are part of the reactor coolant pressure boundary shall be designed to permit periodic inspection and testing of important areas and features to assess their structural E1-12

and leak tight integrity, and an appropriate material surveillance program for the reactor pressure vessel.

Regulatory Guide 1.83, Revision 1 -

Inservice Inspection of Pressurized Water Reactor Steam Generator Tubes.

Regulatory Guide 1.121, Revision 0 - Bases for Plugging Degraded Pressurized Water Reactor (PWR) Steam Generator Tubes.

There have been no changes to the plant design such that any of the regulatory requirements would come into question.

TVA's amendment application revises SQN's TS 3.4.5 to clearly delineate the scope of the SG inspection required in the tubesheet region.

SQN will continue to comply with applicable regulatory requirements.

In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

6.0 ENVIRONMENTAL CONSIDERATION

A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.

However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Therefore, pursuant to 10 CFR 50.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

E1-13

ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2 Proposed Technical Specification Changes (mark-up)

I.

AFFECTED PAGE LIST Unit 2 3/4.4-11 3/4.4-13 3/4.4-14a 3/4.4-14b 3/4.4-14c II.

MARKED PAGES See attached.

E2-1

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

1.

All nonplugged tubes that previously had detectable wall penetrations (greater than 20%).

2.

Tubes in those areas where experience has indicated potential problems.

3.

A tube inspection (pursuant to Specification 4.4.5.4.a.8) shall be performed on each selected tube. If any selected tube does not permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.

4.

Indications left in service as a result of application of the tube support plate voltage-based repair criteria shall be inspected by bobbin coil probe during all future refueling outages.

c.

The tubes selected as the second and third samples (if required by Table 4.4-2) during each inservice inspection may be subjected to a partial tube inspection provided:

1.

The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfections were previously found.

2.

The inspections include those portions of the tubes where imperfections were previously found.

Note:

Tube degradation identified in the portion of the tube that is not a reactor coolant pressure boundary (tube end up to the start of the tube-to-tubesheet weld) is excluded from the Result and Action Required in Table 4.4-2.

d Implementation of the steam generator tube/tube support plate repair criteria requires a 100 percent bobbin coil inspection for hot-leg and cold-leg tube support plate intersections down to the lowest cold-leg tube support plate with known outside diameter stress corrosion cracking (ODSCC) indications.

The determination of the lowest cold-leg tube support plate intersections having ODSCC indications shall be based on the performance of at least a 20 percent random sampling of tubes inspected over their full length.

e lnspoction of dented tubo support plato intersections will be performed in accordance with WCAP 15128, Rovision 2, dated Fobruary 2000 as Supplementod by TVhA'E letter to NRC dated March 2, 2000. This alternate repair criteria is applicable to Cycle 11 and 12 operation.

Th results of each sample inspection shall be classified into one of the following three categories:

Category Inspection Results C-1 Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.

Implementation of the steam generator WEXTEX expanded region inspection methodology (W*)

requires a 100 percent rotating coil probe inspection of the hot leg tubeshect W* distance.

March 8, 2000 SEQUOYAH - Unit 2 3/4 4-11 Amendment No. 181, 211, 213, 243 E2-1

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.4.5.4 Acceptance Criteria

a.

As used in this Specification:

1.

Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections.

2.

Degradation means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube.

3.

Degraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation.

4.

% Degradation means the percentage of the tube wall thickness affected or removed by degradation.

5.

Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.

6.

Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness.

Plugging limit does not apply to that portion of the tube that is not within the pressure boundary of the reactor coolant system (tube end up to the start of the tube-to-tubesheet weld). This definition does not apply to tube support plate intersections if the voltage-based repair criteria are being applied. Refer to 4.4.5.4.a.10 for the repair limit applicable to these intersections. ', _Cyclo 11and 42operatioR, thisrdefinition doesnoArnt apply foraxial PW~SCC indc t

theroof,WNvhihare loated within the thiclnsr,£ of d-enPte-d tube support plates~~

I hilnaIMUM IO t groator than or equal to 40 peFGGnt oftoiiia uwnthcn'Fr Insert 1 4 4 5 4.a411 for the Fepair limsits applicable to these inoscin.[Delete]I

7.

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 4.4.5.3.c, above.

8.

Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg excluding the portion of the tube within the tubesheet belo iRches (as measured from tho top of the tuboehoot).* [Delete]

er

9.

Preservice Inspection means an inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inspection shall be performed prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservice inspections.

Thick ovct uion ir, for Unit 2 CYlo 1 2 oporation only. [Delete]

May 10, 2002 SEQUOYAH - UNIT 2 3/4 4-13 Amendment No. 181, 211, 213, 243, 266 E2-2

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) where:

VURL

=

upper voltage repair limit VLRL

=

lower voltage repair limit VMURL

=

mid-cycle upper voltage repair limit based on time into cycle VMLRL

=

mid-cycle lower voltage repair limit based on VMURL and time into cycle At

=

length of time since last scheduled inspection during which VURL and VLRL were implemented CL

=

cycle length (the time between two scheduled steam generator inspections)

VSL

=

structural limit voltage Gr

=

average growth rate per cycle length NDE

=

95-percent cumulative probability allowance for nondestructive examination uncertainty (i.e., a value of 20-percent has been approved by NRC)

Implementation of these mid-cycle repair limits should follow the same approach as in TS 4.4.5.4.a.10.a, 4.4.5.4.a.10.b, and 4.4.5.4.a.10.c.

Note 1:

The lower voltage repair limit is 1.0 volt for 3/4-inch diameter tubing or 2.0 volts for 7/8-inch diameter tubing.

Note 2:

The upper voltage repair limit is calculated according to the methodology in GL 90-05 as supplemented. VURL may differ at the TSPs and flow distribution baffle.

11.

Do F-ctmrA Strom-rioR GraDkie Q (ParSpc)

TwUbi Support Plat 3

' ;;t impas frthe dirposition of an Alley 600 steam generator tube ocntud s6rvice

.hatxpiGciR9 predom~inantly axially oriGnted PWA.SGG at dented tube supotPlato4 n in

t>Q Qionns ;;,dtsr~ibed in WGAF 152,Rvsion 2, dated February 2000 asWplmnoTArlttr to WJRG date March 2, 2000. This Alternate reai riteria is applicableo Cycle 11 ;and-12 operation.
b.

The steam generator shall be deter elete and replace with Insert 3 corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 4.4-2.

March 8, 2000 SEQUOYAH - UNIT 2 3/4 4-14a Amendment No. 28, 211, 213, 243 E2 -3

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.4.5.5 Reports

a.

Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission within 15 days.

b.

The complete results of the steam generator tube inservice inspection shall be submitted to the Commission in a Special Report pursuant to Specification 6.9.2 within 12 months following the completion of the inspection. This Special Report shall include:

1.

Number and extent of tubes inspected.

2.

Location and percent of wall-thickness penetration for each indication of an imperfection.

3.

Identification of tubes plugged.

c.

Results of steam generator tube inspections which fall into Category C-3 shall be reported as a degraded condition pursuant to 10 CFR 50.73 prior to resumption of plant operation.

The written followup of this report shall provide a description of investigations conducted to determine cause of the tube degradation and corrective measures taken to prevent recurrence.

d.

For implementation of the voltage-based repair criteria to tube support plate intersections, notify the staff prior to returning the steam generators to service should any of the following conditions arise:

1.

If estimated leakage based on the projected end-of-cycle (or if not practical using the actual measured end-of-cycle) voltage distribution exceeds the leak limit (determined from the licensing basis dose calculation for the Dostulated main steam line break) for the next operating cycle.

Insert 4

2.

If circumferential crack-like indications are detected at the tube support plate intersections.

3.

If indications are identified that extend beyond the confines of the tube support plate.

4.

If indications are identified at the tube support plate elevations that are attributable to primary water stress corrosion cracking.

5.

If the calculated conditional burst probability based on the projected end-of-cycle (or if not practical, using the actual measured end-of-cycle) voltage distribution exceeds 1 X 10-2, notify the NRC and provide an assessment of the safety significance of the occurrence.

May 24, 2002 SEQUOYAH - UNIT 2 3/4 4-14b Amendment No. 28, 211, 213, 267 E2-4

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

e.

oriplomonGtation of the depth basod ropair criteria for axial FWNS-CC at dontod TFSP£,

eh out f tho-connd-ition mon.A9itrin and opo-ratio-nal a*olmotsgill bo roportod WIo Gth NRwithin 1 0 daye following complotion of the iRspGctiGR. The roport YAill includo-l tbultins f idia-ion6 foun'd-in tho iRsp8GtiGR, tabulatiens of tubor, ropairo-d and-loft in-l

1oricRudor tho APG, snd growth rt irbUtiGRG for indica;tignr fon 'd in tho linpoction aE woll as tho growth distributions urod to ostablish tho tubo ropair limits. Any corroctivo actions found nocossary in tho ovont that condition monitoring roquiromonts aro not mot v.il1 bo idontifiod in tho roport.

InerL March 8, 2000 Amendment No. 243 SEQUOYAH - UNIT 2 3/4 4-14c E2-5

Insert I This definition does not apply to service induced degradation identified in the W* distance.

Service induced degradation identified in the W* distance below the top-of-tube sheet (TTS),

shall be plugged on detection.

Insert 2 the W* distance, the tube to tubesheet weld and the tube end extension.

Insert 3

11.

a) Bottom of WEXTEX Transition (BWT) is the highest point of contact between the tube and tubesheet at, or below the top-of-tubesheet, as determined by eddy current testing.

b) W* Distance is the non-degraded distance from the top of the tubesheet to the bottom of the W* length including the distance from the top of the tubesheet to the bottom of the WEXTEX transition (BWT) and Non-Destructive Examination (NDE) measurement uncertainties (i.e., W* distance = W* length + distance to BWT + NDE uncertainties).

c) W* Length is the length of tubing below the bottom of the WEXTEX transition (BWT), which must be demonstrated to be non-degraded in order for the tube to maintain structural and leakage integrity. For the hot leg, the W* length is 7.0 inches which represents the most conservative hot-leg length defined in WCAP-14797, Revision 2.

Insert 4 The postulated leakage resulting from the implementation of the voltage-based repair criteria to tube support plate intersections shall be combined with the postulated leakage resulting from the implementation of the W* criteria to tubesheet inspection depth.

Insert 5

e. The aggregate calculated steam line break leakage from the application of tube support plate alternate repair criteria and W* inspection methodology shall be submitted in a Special Report in accordance with 10 CFR 50.4 within 90 days following return of the steam generators to service (MODE 4). In addition, the total number of indications that are identified from rotating probe inspections that are performed as part of the W* inspections will be included in this report.

E2-6

ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2 Changes to Technical Specifications Bases Pages I.

AFFECTED PAGE LIST Unit 2 B 3/4.4-3a B 3/4.4-3b II.

MARKED PAGES See attached.

E3-1

REACTOR COOLANT SYSTEM BASES where VGR represents the allowance for flaw growth between inspections and VNDE represents the allowance for potential sources of error in the measurement of the bobbin coil voltage. Further discussion of the assumptions necessary to determine the voltage repair limit are discussed in GL 95-05.

The mid-cycle equation of SR 4.4.5.4.a.10.e should only be used during unplanned inspection in which eddy current data is acquired for indications at the tube support plates.

SR 4.4.5.5 implements several reporting requirements recommended by GL 95-05 for situations which NRC wants to be notified prior to returning the S/Gs to service. For SR 4.4.5.5.d., Items 3 and 4, indications are applicable only where alternate plugging criteria is being applied. For the purposes of this reporting requirement, leakage and conditional burst probability can be calculated based on the as-found voltage distribution rather than the projected end-of-cycle voltage distribution (refer to GL 95-05 for more information) when it is not practical to complete these calculations using the projected EOC voltage distributions prior to returning the S/Gs to service. Note that if leakage and conditional burst probability were calculated using the measured EOC voltage distribution for the purposes of addressing GL Sections 6.a.1 and 6.a.3 reporting criteria, then the results of the projected EOC voltage distribution should be provided per GL Section 6.b(c) criteria.

Wastage-type defects are unlikely with proper chemistry treatment of the secondary coolant.

However, even if a defect should develop in service, it will be found during scheduled inservice steam generator tube examinations. Plugging will be required for all tubes with imperfections exceeding the repair limit defined in Surveillance Requirement 4.4.5.4.a. The portion of the tube that the plugging limit does not apply to is the portion of the tube that is not within the RCS pressure boundary (tube end up to the start of the tube-to-tubesheet weld). The tube end to tube-to-tubesheet weld portion of the tube does not affect structural integrity of the steam generator tubes and therefore indications found in this portion of the tube will be excluded from the Result and Action Required for tube inspections. It is expected that any indications that extend from this region will be detected during the scheduled tube inspections.

Steam generator tube inspections of operating plants have demonstrated the capability to reliably detect degradation that has penetrated 20% of the original tube wall thickness.

Tubes experiencing outside diameter stress corrosion cracking within the thickness of the tube support plate are plugged or repaired by the criteria of 4.4.5.4.a.10.

-rk-

'teaFR 9GR9FatGF tUbe FepaiF IiFR46 for pFimaFy wateF rtrtw;r, narresioR GFaGkiR9 (RWSGG) of

ePF969RtG a steam OeReratpw tube alternate FepaiF GF;teFia fGF OFGateF thaR or equal to 40 F-G-1 ---

PIURCC iRdinnfinnr, whinh wt; lng;;W within the thirSkRess., of 6

e UppeFt plater, The nr PAN SGG ;;Fe RE)t appliGab!8 to ethep typers Of lGGalized tube wall deqFadatieR lenated at intake

-:be r.UpiggFt p!RtR intRrrt;nti Th

--""4-- GGFRPleVGR Of

_a6Ge66FReRt tQ_ C-19-tR-FrAiRts the eRd -ef -

An GyGle (EGG)

Rt i6 GOMPletA-d-t9_ dMA63FFAIRA tht; Apai f

4he _

_1 _-1, Reed fGF tL1139 F Py_;;rd_-f4t ba;61r, ThAe ARCO "F;A Of rr;;rk depth profiles e-h-t-aine-di

'_R'UF6t PFeGGIAFeG.... 1.

frnrn Phm P int aRahxrt;

Rd 1w;k rate raa!Gulated fFeFR depth PFGfileG by seaFGhiR9 0,- fnf-l nr-,L'-' 1-fk,



.. d;.i I...th th.f

'IT o *--- -t 1 -

I i-1 Dye l.

.i -

' dai i-a

-1

-iJ

.. ai D

SEQUOYAH - UNIT2 Insert A B 3/4 4-3a March 8, 2000 Amendment No. 181, 211, 213, 243

REACTOR COOLANT SYSTEM BASES Delete r utinhloWest burst pressure and the longest longth that would tear through wall at steam line broak conditions. Tho repair bases for PWSCC at dented TSP intersections is obtained by projecting tho crack profile to tho end of the next operating cycle and determining if the projected profile mee~ts the requirements of WCAP 15128, Revision 2, dated February 2000 as supplemented by T'A's letter to NSRC dated March 2, 2000. The following provides the limits and bases for repair established in the WCAP analy6se:

Freespan Indication Repair Limits The tube wvill be repaired if tho crack length outside the dented TSP is '10% maximum depth.

Crack ILength imit for >Ž40.10 Maximum Depth The crack lenrth limit forn Ž0% maximum depth inRdiationRS i definRed as 0.3.75 incrh from the rcenterline of the TSP. Thir limit defiRes the edges of the TSP thic knesOs of 0.75 inch fnr Maodel 51 SIGs.

It is acceptable for the rackr-to extend to both edgeS of the TSP _r longr as the maximum depth of the crackn outrideR the TSP ir,-%

meFaxinmumRdepth and the reqiremrentrs fer rOC onditions are acGeptable.

Operational Assessment Repair Bases If the indication rstisfies the abe maimum depth and length requirements, the repair barse isr then obtainred by projeting the crack profile to the nAd of the next operating cycle and determining the burst pressure and leakage for the projected profile. The burst pressure and leakage is compared to the requirements in WCAP 15128, Revision 2, dated February _000 as supplemented by TVA'r letter to NRC dated March 2, 2^00.

Separate aRalyses are required for the total rrack length and the lenRth utrside the TSP duie to differAnc-es' in requiremRents. If the projected ErC rreui rements are satisfied, the tube will be lft in rAvice.

The results of the condition monitoring and operational assessments will be reporetd to the NJRC

.ithin 120 days folowing completion of the iRnpectiOR.

May 24, 2002 Amendment No. 213, 243, 267 SEQUOYAH - UNIT 2 B 3/4 4-3b

Insert A The W* criteria incorporate the guidance provided in WCAP-14797, Revision 2, 'Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region WEXTEX Expansions.! W* length is the length of tubing into the tubesheet below the bottom of the WEXTEX transition (BWT) that precludes tube pullout in the event of a complete circumferential separation of the tube below the W* length. W*

distance is the distance from the top of the tubesheet to the bottom of the W* length including the distance from the top of the tubesheet to the BWT and measurement uncertainties.

Indications detected within the W* distance below the top-of-tube sheet (TTS), will be plugged upon detection. Tubes to which WCAP-14797 is applied can experience through-wall degradation up to the limits defined in Revision 2 without increasing the probability of a tube rupture or large leakage event.

Tube degradation of any type or extent below W* distance, including a complete circumferential separation of the tube, is acceptable. As applied at Sequoyah Nuclear Plant Unit 2, the W* methodology is used to define the required tube inspection depth into the hot-leg tubesheet, and is not used to permit degradation in the W* distance to remain in service. Thus while primary to secondary leakage in the W*

distance need not be postulated, primary to secondary leakage from potential degradation below the W*

distance will be assumed for every inservice tube in the bounding steam generator.

The postulated leakage during a steam line break shall be equal to the following equation:

Postulated SLB Leakage = ARC GL95-05 + Assumed Leakage 0'8-'TTs+ Assumed Leakage 8-12 <'TS +

Assumed Leakage <TTS Where: ARC GL 95-05 is the normal SLB leakage derived from alternate repair criteria methods and the steam generator tube inspections.

Assumed Leakage 0-4-8TTs is the postulated leakage for undetected indications in steam generator tubes left in service between 0 inches and 8 inches below the top of the tubesheet.

Assumed Leakage *8 <TrS is the conservatively assumed leakage from the total of identified and postulated unidentified indications in steam generator tubes left in service between 8 and 12 inches below the top of the tubesheet. This is 0.0045 gpm multiplied by the number of indications. Postulated unidentified indications will be conservatively assumed to be in one steam generator. The highest number of identified indications left in service between 8 and 12 inches below TTS in any one steam generator will be included in this term.

Assumed Leakage >12- <TTS is the conservatively assumed leakage for the bounding steam generator tubes left in service below 12 inches below the top of the tubesheet. This is 0.00009 gpm multiplied by the number of tubes left in service in the least plugged steam generator.

The aggregate calculated SLB leakage from the application of all alternate repair criteria and the above assumed leakage shall be reported to the NRC in accordance with applicable Technical Specifications.

The combined calculated leak rate from all alternate repair criteria must be less than the maximum allowable steam line break leak rate limit in any one steam generator in order to maintain doses within 10 CFR 100 guideline values and within GDC-19 values during a postulated steam line break event.

ENCLOSURE 6 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2 Westinghouse Non-Proprietary Class 3 Application of W* to Sequoyah Unit 2 Steam Generator Tubes

Westinghouse Non-Proprietary Class 3 Westinghouse To: D. Gregg cc: E. Morgan J. Mermigos Date:

10/27/2004 From:

Ext:

Fax:

Chemistry Diagnostics and Materials Engineering 724-722-5314 724-722-5889 Your ref:

Our ref: LTR-CDME-04-148

Subject:

Application of W* to Sequoyah Unit 2 Steam Generator Tubes Please transmit the attached engineering information to the Tennessee Valley Authority (TVA),

Ms. Helen Cothron, in support of the implementation of a subset of the alternate repair criteria, W* criteria for the Sequoyah Unit 2 Nuclear plant (SQN2). TVA plans on implementing a limited application of W* per WCAP-14797, Rev. 2, at the next inspection.

This document is divided into five sections and contains information on the following topics:

1.0 2.0 3.0 4.0 5.0 Introduction W* Background Applicability of WCAP-14797, Rev. 2, to SQN2 Projected Steam Line Break Primary to Secondary Leakage SQN2 Response to Previous NRC W* RAls If you have any questions regarding the content of this letter, please contact me at the above telephone number.

Verified by:

W. K. Cullen CD&ME R. F. Keating Major Component Replacements and Engineering Official record electronically approved in EDMS 2000 5175.doc:49 A BNFL Group company

Page 2 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Application of W* to the Sequoyah Unit 2 Steam Generator Tubes

1.0 INTRODUCTION

TVA is proposing to modify the Sequoyah Unit 2 Technical Specifications 3/4.4.5, "Steam Generators," to change the scope of the steam generator (SG) tube sheet inspections required in the SG tubesheet region using the W* methodology. (W* is defined in WCAP-14797, Revision 2). Specifically, the proposed change will revise the Unit 2 Technical Specification definition for steam generator tube inspection included in Sequoyah Technical Specification (TS)Surveillance Requirement (SR) 4.4.5.4.a.8 to revise the definition to exclude the portion of the tube within the tubesheet below the W* distance. The proposed change will also revise SR 4.4.5.4.a.6 on steam generator tube repair criteria, add SR 4.4.5.2.e to require a 100 percent sample rotating probe inspection of the hot leg tubeshect W* distance, add new W* terminology definitions in 4.4.5.4.a. I1, and add new reporting criteria for W* inspection information in 4.4.5.5.d.1 and 4.4.5.5.e. The Sequoyah Unit 2 proposed change requires that any tube identified with service induced degradation in the W* distance or less than eight inches below the top-of-tube sheet (TTS), which ever is greater, must be repaired. Since Sequoyah proposes to repair any service induced degradation within the W* distance, this proposal is a conservative limited scope application of the complete W* methodology as described in WCAP-14797, Revision 2.

As a consequence of implementation, any degradation occurring below the W* distance may remain in service regardless of its axial or cirumferential extent. The amendment will be based on portions of WCAP-14797-P, Rev. 2, entitled "Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region WEXTEX Expansions," Reference 2.1, and the following information developed herein. The W* analysis accounts for the reinforcing effect that the tubesheet has on an external surface of the steam generator tubes within the tubesheet region.

This amendment is requested to address NRC GL 2004-01 with respect to defined tube inspection depth below the top oftubesheet using the Zetec Plus Point"', a.k.a. +Pt, coil for the Cycle 13 inspection. An additional amendment request will be required at a later date to address long term implementation of the W* program that removes some ofthe extreme conservatisms applied in this amendment request and fully implements the W* alternate repair criteria with respect to indications permitted to remain in service within the W* distance.

2.0 W* BACKGROUND Existing plant Technical Specification tube repair/plugging criteria apply throughout the tube length and do not take into account the reinforcing effect of the tubesheet on the external surface of an expanded tube. The presence of the tubesheet constrains the tube and complements tube integrity in that region by essentially precluding tube deformation beyond the expanded outside diameter. The resistance to both tube rupture and tube collapse is significantly enhanced by the tubesheet. In addition, the proximity of the tubesheet in the expanded region significantly reduces the leakage ofthroughwall tube cracks. Based on these considerations, the establishment TVA WSTAR.doc 03/12/2004 10:49 AM 51 75.doc:49

Page 3 of 61 Our ref: LTR-CDME-04-148 10/27/2004 of alternate repair criteria to the portion of tubing expanded by Westinghouse explosive tube expansion (WEXTEX) is supported by testing and analysis results included in Reference 2.1.

For Westinghouse Model 51 Series steam generators with WEXTEX expansions at Sequoyah Unit 2, the full depth tube-to-tubesheet expansion can be defined as follows. From the lower tube end and extending upward for a length of approximately 2.75 inches is a region expanded by a tube rolling expansion process. From the top of the rolled expansion region to the vicinity of the top of the tubesheet (TTS), the expansion joint was produced by the WEXTEX process.

The resulting full depth tube-to-tubesheet expansion can be considered as four distinct areas.

These are described in Reference 2.1 as:

1. The Roll Region - The region of tube which has been expanded by the tube rolling process. This region extends from the bottom of the tube to approximately 2.75 inches above the bottom of the tube.
2. The Roll Transition - The portion of the tube which extends from the roll expanded region of the tube to the initially unexpanded region, and which is subsequently expanded by the WEXTEX process.
3. The WEXTEX Region - The portion of the tube expanded by the explosive expansion process to be in contact with the tubesheet. This region starts at the roll transition and extends to the WEXTEX transition in the vicinity of the top of the tubesheet.
4. The WEXTEX Transition - The portion of the tube which acts as a juncture between the WEXTEX region and the unexpanded region of the tube. The region starts at the top of the explosively expanded region and extends for approximately 0.25 inches.

The alternate SG tube repair criteria referred to as W* were developed by Westinghouse (and has been licensed to varying extents at another plants) to permit tubes with predominantly axially oriented primary water stress corrosion cracking in the WEXTEX and hardroll regions to remain in service. The W* analysis determined the W* length as measured from the bottom of the tube explosive expansion transition that would permit flaws below that length to remain in service and based on the assurance that adequate strength is available to resist the axial pullout loads experienced within the tubesheet during all plant conditions.

The following definitions apply with regard to describing the W* criteria:

BWT - The bottom of the WEXTEX Transition as defined in WCAP-14797, Rev. 2, as approximately 0.25 inches from the top of the tubesheet.

W* length - The maximum length of tubing below the bottom of the WEXTEX transition (BWT) which must be demonstrated to be non-degraded and is defined in WCAP-14797, Rev. 2, Section 4.0 as 7.0 inches below the bottom of the WEXTEX transition on the hot leg side.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 4 of 61 Our ref: LTR-CDME-04-148 10/27/2004 W* distance - The distance from the top of the tubesheet to the bottom of the W* length including the distance from the top of the tubesheet to the BWT and measurement uncertainties.

The W* analysis provides the basis for tubes with any form of degradation below the W* length to remain in service. The presence of the surrounding tubesheet prevents tube rupture and provides resistance against axial pullout loads during normal and accident conditions as discussed in Reference 2.1. In addition, any primary to secondary leakage from tube degradation below the W* length is determined to be acceptably low as discussed in Section 4.0 of this report. Both steam generator tube structural and leakage integrity will be shown to meet the required performance criteria of Reference 2.2 and, thus, the necessary regulatory criteria as defined below.

General design criteria (GDC) 1, 2, 4, 14, 30,31, and 32 of 10 CFR 50, Appendix A, define requirements for the reactor coolant pressure boundary (RCPB) with respect to structural and leakage integrity.

General design criterion (GDC) 19 of 10 CFR 50, Appendix A, defines requirements for the control room and for the radiation protection of the operators working within it. Accidents involving the leakage or burst of SG tubing comprise a challenge to the habitability of the control room.

10 CFR 50, Appendix B, establishes quality assurance requirements for the design, construction and operation of safety related components. The pertinent requirements of this appendix apply to all activities affecting the safety related functions of these components; these include, in part, inspecting, testing, operating and maintaining Criteria IX, XI and XVI of Appendix B as applied to the SG tube integrity program defined by NEI 97-06, Rev. 1 "Steam Generator Program Guidelines", Reference 2.2.

10 CFR 100, Reactor Site Criteria, established reactor-siting criteria, with respect to the risk of public exposure to the release of radioactive fission products. Accidents involving leakage or burst of SG tubing may compromise a challenge to containment and therefore involve an increased risk of radioactive release. Sequoyah Unit 2 is licensed for the use of an alternate source term in accordance with 10 CFR 50.67 for some design basis accidents.

Under 10 CFR 50.65, the Maintenance Rule, licensees classify steam generators as risk significant components because they are relied upon to remain functional during and after design basis events. SGs are to be monitored under 10 CFR 50.65 (a) (2) against industry established performance criteria. Meeting the performance criteria of NEI 97-06, Rev. 1, provides reasonable assurance that the SG tubing remains capable of fulfilling its specific safety function of maintaining the reactor coolant pressure boundary.

The SG performance criteria as defined in NEI 97-06, Rev. I (Reference 2.2) identify the standards against which performance is to be measured. The performance criteria for steam generators shall be based on tube structural integrity, accident induced leakage and operational TVA WSTAR-doc 03/12/2004_10:49 AM 5175.doc:49

Page 5 of 61 Our ref: LTR-CDME-04-148 10/27/2004 leakage as defined below. Meeting the following three performance criteria provides reasonable assurance that the SG tubing remains capable of fulfilling its specific safety function of maintaining the reactor coolant pressure boundary.

1. The steam generator tubing shall meet the structural integrity performance criteria over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cooldown and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of three against burst under normal steady state full power operation and a safety factor of 1.4 against burst under the limiting design basis accident. Any additional loading combinations shall be included as required by existing design and licensing basis. It is noted that there have been subsequent changes to the wording of this paragraph with regard to the application of safety factors to be applied to loads associated with bending; tentative agreement on the wording was reached between representatives from the industry and the NRC staff in May of 2004. Those changes do not change the analyses associated with the application of the W* criteria.
2. The primary to secondary accident induced leakage rate for the limiting design basis accident, other than a steam generator tube rupture, shall not exceed the leakage rate assumed in the accident analyses in terms of total leakage rate for all steam generators and the leakage rate for an individual steam generator. Leakage is not to exceed 0.1 gpm per steam generator at a specific weight corresponding to a temperature of 600'F, except for specific types of degradation as specific locations where the NRC has approved greater accident induced leakage as part of a plant's licensing basis.
3. The RCS operational primary-to-secondary leakage through any one steam generator shall be limited to 150 gallons per day at a specific weight corresponding to a temperature of 600'F.

As discussed in more detail in Section 3.0 of this report, the generic W* analysis contained in WCAP-14797, Rev. 2, is applicable to the Sequoyah Unit 2 SGs and defines the maximum hot leg W* length for pullout resistance as 7.0 inches below the bottom of the WEXTEX transition.

Seven (7.0 inches) is for Zone B. Note that although Zone A is 5.2 inches, 7.0 inches is applied throughout. The maximum NDE uncertainty on the W* distance in Reference 2.1 is 0.12 inch.

Therefore, the required Technical Specification inspection distance below the top of the tubesheet, or bottom of the WEXTEX transition, whichever is lower, is 7.12 inches REFERENCES 2.1 WCAP-14797, Rev. 2, "Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region WEXTEX Expansions," Westinghouse Electric Company, Madison, PA, March 2003.

2.2 NEI 97-06, Rev. 1, "Steam Generator Program Guidelines," Nuclear Energy Institute, Washington, DC, January 2001.

TVA WSTAR-doc 03/12/2004_10:49 AM 5175.doc:49

Page 6 of 61 Our ref: LTR-CDME-04-148 10/27/2004 3.0 APPLICABILITY OF WCAP-14797, REV. 2, TO SEQUOYAH UNIT 2

3.1 BACKGROUND

INFORMATION As noted above, the W* length is the length of sound engagement of the tube within the tubesheet such that the force resisting expulsion from the tubesheet balances the force applied to the end of a presumed severed tube. The value of W* is determined using applicable performance criteria relative to tube burst, expulsion from the tubesheet in this case, and relative to allowable leakage, relative to that established for alternate repair criteria (ARC). The structural performance criteria are that tube burst will not occur with a margin of 3 during normal operation and 1.4 during the most severe faulted event, a postulated steam line break (SLB) for Sequoyah Unit 2.

Applied Load The applied force comes from the internal pressure in the tube. At the U-bend there is a component of the primary-to-secondary differential pressure acting in the axial direction. For the development of the criteria it is also assumed that the tube is severed in the tubesheet so that the differential pressure acts on the entire cross section area of the tube as calculated using the expanded outside diameter (OD) of the tube. The applied force, FA, is determined from the applied pressure, AP, area, A, and the outside diameter, Do, as FA = APA Wiere, A = 7r D" (1) 4 Here, AP is the difference between the primary, Pp, and secondary pressure, Ps, at the top of the tubesheet, i.e., Pp-Ps.

Reaction Load The reaction load in developing the W* length arises from friction between the tube and the tubesheet within the tubesheet hole. The friction force is the product of the normal force between the tube and the tubesheet and coefficient of friction between the tube and the tubesheet. The normal force arises or is affected by four sources:

1. The residual preload from the expansion process,
2. Differential thermal expansion between the tube and the tubesheet,
3. Resultant pressure in the tube within the tubesheet, and
4. Dilation of the tubesheet holes from bowing of the tubesheet.

The first three items result in a compressive normal force between the OD of the tube and the ID of the tubesheet hole. The last item results in a reduction of the normal force near the top of the tubesheet and an increase in the normal force below the tubesheet neutral axis. It is noted that a lateral load applied to the center of the tube span above the TTS would tend to result in a slight TVA WSTAR.doc 03/1212004_10:49 AM 5175.doc:49

Page 7 of 61 Our ref: LTR-CDME-04-148 10/27/2004 lateral contraction in the axial direction. An analysis of the geometry of deflection shows that the axial contraction is a small fraction of the lateral deflection and the bending load that would be developed at the top of the tubesheet would act to bind the tube tighter in the tubesheet hole. On this basis, the action of lateral flow loads can be neglected from further consideration.

Determination of W*

The calculation performed is to find the length, W*, that makes the following equality true between the resisting force on the left and the applied force on the right, p (Nx + NT + NP + ND )= AP A (2) where Nx = The residual normal force from the expansion process, NT = The normal force from the differential thermal expansion, Np = The normal force due to the resultant pressure in the tube, ND = The normal force resulting from dilation of the tubesheet hole, p = The coefficient of friction between the tube and the tubesheet.

The resisting forces are due to the interface pressure between the tube and the tubesheet. The actual force is the product of the interface pressure times the effective area of contact, the circumference of the tube times the length of contact. Conservative uncertainty adjustments are then made to the length of contact to determine W*. The diameter of the tube is constant, so an expression for the force per unit length is used and solved for the length, L. This means that each force term must be replaced by force per unit length term.

The solution for W* is then, APA(3) p (Fx + FT + Fp + FD) where W stands for the W* length and the letter F stands for the force per unit length of engagement. Each force per unit length term is then replaced by a corresponding pressure times circumference term, i.e.,

W

(

AP+

)

(4) 9 (PX + PT + PP + PD ) TD.

where Do is the outside diameter ofthe expanded tube. Substituting for the cross section area

yields, TVA WSTAR-doc 03/12/2004 10:49 AM 5175.doc:49

Page 8 of 61 Our ref: LTR-CDME-04-148 10/27/2004 JVAPD 0,

(5) 4p(P,. +PT +Pp +PD) for the determination of W, sans adjustments for uncertainties in measurement and end effects Where the assumption of a severed tube has been made. The following points are to be noted:

1. The applied load term, the numerator is affected by changes in the operation of the plant.

The value used for the generic document is the same as that for the plant specific application at Sequoyah Unit 2, hence the W* length would be expected to be the same as that for the generic application.

2. The residual expansion pressure, Px, is not affected by changes in the operation of the plant.
3. The thermal expansion term, PT, is affected by changes in the hot leg temperature, Thoo.

The hot leg temperature at Sequoyah Unit 2 is greater than the value used for the generic determination, hence the value of W* for use at Sequoyah Unit 2 should be less than the generic value.

4. The differential pressure term, Pp, is affected by changes in the primary or secondary pressure. The differential pressure term used for the Sequoyah Unit 2 analysis is less than the generic analysis; therefore, the value of W* for use at Sequoyah Unit 2 should be less than the generic value.
5. The dilation term, PD, is also affected by changes in the primary or secondary pressure.

The differential pressure acting across the tube sheet is the same as in the generic report.

It is noted that different differential pressure conditions were used for the determination of the different contributing load terms for the analysis of the generic report. This is an acceptable approach since the structure remains elastic when the terms are superimposed and is discussed in the following section.

3.2 APPLICATION OF WNFCAP-14797-P, REV. 2, TO SEQUOYAH UNIT 2 The determination of the non-degraded tube length considers the residual preload capability of the tube expansion process, the thermal tightening effects due to thermal expansion coefficient differences between the tube and the tubesheet material, pressure tightening effects, and loss of preload due to tubesheet bow effects. The residual preload inherent in the expansion in the expansion process is independent of differences between analysis and plant conditions. The generic analysis uses a hot leg temperature of 590'F, whereas the limiting Sequoyah Unit 2 hot leg operating temperature is approximately 609.50F (Reference 3.2). Therefore, the generic analysis includes less thermal tightening contribution than the actual condition within the steam generators. The generic analysis uses a secondary side steam pressure of 900 psia for evaluation of pressure tightening effects whereas the current secondary side steam pressure is 847.5 psig (1387 psi normal primary to secondary pressure differential). This steam pressure results in a smaller primary to secondary pressure differential for the generic analysis condition compared to TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 9 of 61 Our ref: LTR-CDME-04-148 10/27/2004 the Sequoyah Unit 2 condition. Therefore, the generic analysis considers about 3.3% less pressure tightening contribution than the actual condition within the Sequoyah Unit 2 steam generators. The generic analyses also uses a steam pressure of 760 psia (1490 psi differential pressure across the tubesheet) for evaluation oftubesheet bow effects whereas the current Sequoyah Unit 2 differential pressure across the tubesheet is 1387 psi, thus the generic analysis is about 6.6% more conservative than the current Sequoyah Unit 2 conditions. Assumed normal operating steam pressure also influences the analysis with regard to defining the applied end cap load that acts to push the postulated separated tube out of the tubesheet hole. The generic analysis uses a steam pressure of 760 psia for a differential pressure of 1490 psi which also is conservative compared to the current Sequoyah Unit 2 condition. Moreover, the internal steam pressure losses due to moisture separation will result in a slightly higher steam pressure within the steam generator. Therefore, the generic analysis includes greater end cap loading compared to the actual conditions within the Sequoyah Unit 2 steam generators. This end cap load must be reacted by the net residual contact load. As the end cap load is reduced, the non-degraded tube length is also reduced compared to the generic analysis.

Based on the above, it is expected that the Sequoyah Unit 2 specific W* should be less than the generic value because of the net effect of the changes. The independent considerations lead to the results similar to those presented in the WCAP-14797, Rev. 2. Table 3.1 summaries the comparison of Sequoyah Unit 2 operating parameters to those considered in the generic report.

3.3 SEQUOYAH UNIT 2 CONCLUSIONS The Reference 3.1 determination of the W* length of 5.2 inches Zone A and 7.0 inches for Zone B for the application to the Sequoyah Unit 2 SGs is considered to be valid. The differences in length required for the two zones are based on a variance in the tubesheet bow between peripheral and center regions of the tubesheet. The differences between the Sequoyah Unit 2 specific and the generic calculation values is the result of the conservative assumptions associated with performing a generic calculation, e.g., extremely low secondary side pressure (which increases the applied load and the dilation of the tubesheet holes), additional pressure considered in the crevice, and the use of a lower bound residual expansion pressure.

Nevertheless, the application of W* to the Sequoyah Unit 2 Nuclear plant (SQN2) SG tubes per the Reference 3.1 guidance is considered to be justified.

3.4 REFERENCES

3.1 WCAP-14797 (Proprietary) & WCAP-14798 (Non-Proprietary), Revision 2. Generic W*

Tube Plugging Criteriafor 51 Series Steam Generator Tubeshleet Region WEXTEX Expansions. Westinghouse Electric Company, Madison, PA. February, 1997.

3.2 L29 041025 801, letter from M. H. Cothron (TVA) to W. K. Cullen (Westinghouse),

10/25/04.

TVA WSTAR.doc 03/12/2004_10:49 AM 5 175.doc:49

Page 10 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Table 3.1 Comparison of W* for SQN2 SG Tubes Relative to Generic Information Item Analysis Term Sequoyah Unit 2 Generic Application of the Result

& _Description I

AP, Applied Pressure Ps= 847.5 psig PG = 760 psia SQN2 W* < Generic W*

(End cap)

(861.5 psia) l 2

PT, Thermal That = 609.50F Thot = 590'F SQN2 W* < Generic W*

Tightening 3

Pp, Pressure Ps= 847.5 psig PGr 900 psia SQN2 W* < Generic W*

Tightening (861.5 psia) 4 PD, Dilation AP = 1389 psi AP = 1490 psi SQN2 W* < Generic W*

Loosening 5

F, Three times Fs = 2589 lbf FG = 2781 lbf SQN2 W* < Generic W*

normal end cap load 4.0 STEAM LINE BREAK PRIMARY TO SECONDARY LEAKAGE DETERMINATION This evaluation documents the primary water stress corrosion cracking (PWSCC) history of Sequoyah Unit 2 to establish that the most likely point of initiation is at the top of tubesheet, and that the PWSCC initiation potential below the top of tubesheet is significantly less than the top of tubesheet region. Evaluation of the SQN2 specific data indicates that the likelihood that a circumferentially separated tube exists below the current +Pt coil inspection distance of 8 inches below the top of tubesheet is exceptionally small.

This evaluation also establishes a conservative leakage allowance to be applied to the number of postulated circumferentially separated tubes in order to estimate steam line break condition leakage. The leakage allowance is established by evaluation of existing drilled hole leakage data of Reference 2.1 for varying crevice length conditions between the top of the sample (analogous to top of tubesheet) and hole locations, and then relating the contact pressure between the tube and stimulant collar to contact pressures within the actual SG tubes.

4.1 Estimate of the Number of Indications In Service Below the Current Tubesheet Region Inspection Distance of 8 Inches PWSCC was first reported at Sequoyah Unit 2 at the EOC-4 (1990) inspection, four (4) axial PWSCC indications were reported. Circumferential PWSCC was first reported at the EOC-5 (1992) inspection in which two indications were reported along with 17 axial PWSCC indications at this outage. Circumferential PWSCC was not reported again until the EOC-8 TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 11 of 61 Our ref: LTR-CDME-04-148 10/27/2004 (1997) inspection when 3 indications were reported. Axial PWSCC indications were reported at the EOC-6, EOC-7 and EOC-8 inspections. The 1996 inspection was the first application of +Pt inspection technology for the tubesheet region.

Through the EOC-l0 (2000) outage the +Pt examination depth below the top oftubesheet (TTS) was 2 inches, i.e., the tube length between 2 and 8 inches below TTS was not previously inspected using a +Pt coil. Through the EOC-10 inspection with the inspection depth limited to 2 inches below the TTS, a total of 82 axial PWSCC indications (80 tubes) and 15 circumferential PWSCC indications (15 tubes) were reported. If the indication initiation distribution was uniform over the entire tube-in-tubesheet distance, then at least ninety-seven (97) indications would have been expected to be reported at the EOC-II inspection in the distance between 2 and 5.5 inches below TTS since 97 indications were reported for all previous inspections. However, only 14 indications (9 axial, 5 circumferential) in 14 affected tubes were reported in this elevation range (2 to 5.5 inches below TTS) strongly implying that the distribution of indications is not uniform within the tubesheet and that the density of indications is skewed with the highest density near the top of tubesheet. Twelve (12) indications (I1 axial, 1 circumferential) in nine (9) tubes were reported within 2 inches of TTS, for a total of 26 indications at the EOC-lI (2002) inspection. The remaining indications were between 2 and 7 inches below the TTS.

These data strongly imply that the distribution of indications, and the potential for new indications, is not uniform within the tubesheet and is skewed with the highest number near the TTS.

For the EOC-1 2 inspection, 15 PWSCC indications were reported; 7 were reported in the previously inspected range from TTS to 5.5 inches below and 8 were reported at > 5.5 inches below TTS. These 8 indications located greater than 5.5 inches below TTS had never been previously inspected using a +Pt coil.

Figure 4.1 presents a cumulative distribution plot of elevations of all PWSCC indications reported at SQN2. Since elevation information is not available for the EOC-7 and earlier outages, the total number of indications reported from these outages were assigned to elevation bins based on the elevation distribution for the EOC-8 and later outages. This plot clearly shows that the PWSCC initiation potential is significantly greater for the top of tubesheet region than at deeper elevations. Recall that for the EOC-10 and all early outages, the +Pt inspection distance below TTS was 2 inches while for the EOC-II and EOC-12 outages the +Pt inspection distances below TTS were 5.5 and 8 inches respectively. Figure 4.1 shows no increased initiation potential for indications at deeper elevations below TTS.

Figure 4.1 also presents cumulative distribution data of PWSCC as a function of elevation for the EOC-I I and EOC-12 outages only. For these outages, the inspection information for tube lengths never inspected can be used to formulate a judgment regarding indication potential at greater than 8 inches below TTS. At EOC-1 1, 26 total indications were reported with 14 located at greater than 2 inches below TTS, which was the bottom of the test extent for the EOC-1 0 outage. At EOC-12, 15 total indications were reported with 7 reported within 2 inches of TTS, zero reported between 2 and 5.5 inches below TTS (the bottom oftext extent for the EOC-1I outage), and 8 reported at greater than 5.5 inches below TTS. The lack of new initiates in the 2 TVA WSTAR-doc 03/12/2004_10:49 AM 5175.doc:49

Page 12 of61 Our ref: LTR-CDME-04-148 10/27/2004 to 5.5 inch below TTS range for the EOC-12 outage suggests a limited initiation potential for indications below the expansion transition. For both of these inspections, the inspection transient effect, which applies to the indication totals for areas never before inspected, shows that the total number of indications is approximately split between new initiates and indications never before inspected. Therefore, the historical indication counts can be used to estimate the number of indications below the EOC-13 inspection distance.

The elevation distributions for all data and the EOC-I I/EOC-12 data are quite similar, further supporting the argument that PWSCC initiation potential below the transition region is far less than for the transition region. Note that for these plots, indication elevations between 0.00 and 0.99 inch below the top of tubesheet are found in the 0 inch bin. The SQN2 cumulative elevation distribution was compared against that of other plants with Model 51 SGs. The distributions for all plants are quite similar. Figure 4.1 also includes the Diablo Canyon Power Plant and Beaver Valley Power Station distributions which are similar to SQN2.

For the EOC-1 and EOC-12 outages with a +Pt inspection distance of 5.5 and 8 inches below TTS respectively, 41 PWSCC indications were reported; 19 were reported within a previously inspected distance. For the EOC-4 through EOC-12 outages, 138 indications were reported with 124, or 90%, within 4 inches of the top oftubesheet and 10% reported greater than 4 inches below TTS. Thus, the number of indications between 8 and 12 inches below TTS would not be expected to be greater than the number reported between 4 and 8 inches below TTS. For conservatism in assessing the potential for leakage from indications below the inspection distance, 25% of the total historical plus EOC-13 projected indication count will be assumed to reside between 8 and 12 inches below TTS while only 10% of the historical total reside within a 4 inch length from 4 to 8 inches below TTS.

To date, 138 total indications have been reported, only 25, or 18%, of which were circumferentially oriented. Figure 4.2 illustrates the individual indication totals by outage. A regression analysis using all of the data suggests that approximately 23 indications are expected for the EOC-13 outage. Using only data from the last four outages, 25 indications are anticipated using a regression specific to that dataset. Therefore, the cumulative SQN2 total number of indications including the EOC-13 projection is a maximum of 163 (138 plus 25). An additional 41 indications (25% of combined historical indications plus EOC-13 new indications) might be observed if the inspection distance were increased from 8 to 12 inches below TTS. A very small number of these 41 postulated indications between 8 and 12 inches below TTS would be expected to have all of the following characteristics;

1. be circumferentially oriented
2. represent a 100% throughwall (TW) condition, and
3. extend for 360° (circumferential cracks).

At the EOC-12 inspection in 2003, which was the first inspection to 8 inches below TTS, four circumferential indications were reported; three were located at the WEXTEX expansion transition and one was located at 9.8 inches below TTS. As the length of tubing from 5.5 to 8 inches below TTS had never been inspected using a +Pt coil, it would be expected that a modest TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 13 of 61 Our ref: LTR-CDME-04-148 10/27/2004 number of large voltage indications would be observed in this range. None of these four were representative of a 100% TW condition based on the +Pt amplitude and the longest circumferential flaw arc length, i.e., 460. Eleven axial PWSCC indications were reported, of which seven were located at > 5.5 inches below TTS and were not previously inspected. Only one of the EOC-12 axial indications represented a 100% TW degradation potential based on flaw amplitude. Therefore, for the 41 postulated indications between 8 and 12 inches below TTS, seven (18% of 41) would be expected to be circumferentially oriented, and the number of indications with 1 00%TW penetration over 360° is zero. The 25 circumferential indications reported to date were located between the expansion transition and 9.8 inches below TTS; only two were located at > 4 inches below TTS. The longest circumferential PWSCC arc length reported for all outages was 970 at the EOC-11 outage.

Figure 4.3 presents a tubesheet map plot of all Unit 2 PWSCC indications reported at EOC-8 and later. A total of 22 of the 82 indications in this population are reported to be in the outboard region, defined as Zone A, which is the zone with the lesser amount of tubesheet deflection during operating or faulted conditions.

The above data were developed using the nominal inspection distance below TTS of 2, 5.5, or 8 inches, based on the outage chronology. In actuality, the inspection distance applied to each tube exceeds the specified value. This is purposely done during the data collection process to ensure that the appropriate distance is examined. This is shown by the deepest reported indications which reside at about 9.5 inches below TTS. Figure 4.4 presents a plot of the binned PWSCC elevation data for all historical indications with and without the expansion transition indications.

Excluding the expansion transition indications would be expected to provide the best dataset for estimating indications at deeper depths. A best fit regression of the data with the expansion transition excluded is included in this plot. This plot shows that the predicted number of indications in each bin is only 1 for 1 inch increment bins greater than 1 1 inches below TTS.

Figure 4-4 also includes an upper 90% probability prediction bound for this data. The 95%

prediction correlation suggests approximately 27 indications would be expected at > 8 but < 12 inches below the TTS. For conservatism, the previously established value of 41 will be applied.

Note that this analysis is provided to estimate the number of indications between 8 and 12 inches below TTS using existing data. The EOC-13 outage inspection data will be evaluated in the same manner to more accurately assess the postulated number of indications between 8 and 12 inches below TTS.

Previous evaluation of the residual stress distribution in hydraulically expanded tube-in-tubesheet joints indicates that the residual stresses below the expansion transition are likely compressive in nature. Therefore, PWSCC initiation is likely associated with a localized geometry discontinuity resultant from the tube drilling process. As all tubesheet holes were drilled from the primary face, the frequency of tube hole abnormalities would be expected to be increased as the secondary side face of the tubesheet is approached. The data of Figure 4.1 supports this argument. Furthermore the circumferential extent of these abnormalities would be expected to TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 14 of 61 Ourref: LTR-CDME-04-148 10127/2004 be limited. The inspection data that shows the largest circumferential arc extent is 380 for indications below TTS also supports this assumption.

4.2 Leakage Potential Evaluation of Postulated Circumferential Degradation Below W*

The NRC Staff has recently questioned the validity of the original assumption presented by WCAP-14797, Rev. 2, that postulated circumferential degradation below W* would not produce leakage at SLB conditions. This section establishes a basis supporting the argument that meaningful leakage would not result from degradation below the W* elevation. The accuracy of this statement can also be qualitatively verified by examining operating plant history. SG leakage events have been attributed to ODSCC in the freespan and at TSP intersections, PWSCC at U-bends, at tack roll transitions of non-expanded tubes, and due to loose parts/foreign objects.

Therefore, as no operating experience has been associated with postulated circumferential degradation below W*, it is reasonable to assume that the potential for such indications is unlikely, or that the inherent leakage resistance of at least 7 inches of sound WEXTEX expansion (based on a nominal 8 inch below TTS inspection distance when the expansion transition distance is ignored) at TTS is sufficient to preclude reportable leakage (i.e., < 2 gpd or < 1.4-1 04 gpm).

Two sets of leakage data support the W* criteria. The first set of data was prepared by tack rolling a 7/8 inches OD by 0.050 inch wall thickness Alloy 600 tube into a carbon steel collar.

The tube was then seal welded to the collar and then WEXTEX expanded. Ten (10) 0.125 inch diameter holes were drilled through the collar and tube at elevations referenced from the top of the test collar. The second set of leakage data examined the impact of contact pressure upon crack opening potential for axial flaws. This data may not be directly applicable to postulated circumferential degradation but it does show that at about 2500 psi contact pressure, that leak rates are essentially zero, i.e., < 1.33-10-5 gpm. These tests located the upper crack tip immediately below a channel machined in the tubesheet collar to eliminate any potential for flow restriction. The prevention of leakage at this contact pressure is expected to be independent of flaw orientation as contact pressure exceeds the primary to secondary pressure differential.

For the first set of leakage data, if it is assumed that the entire circumference of the drilled holes contributes to the leakage flow, the effective leakage flow length was 3.93 inches, which is greater than the leakage flow length of a postulated circumferentially separated tube of 2.79 inches based on a tubesheet hole ID of 0.890 inch. The first set of holes was located at 3 inches from the top of the test collar thus resulting in a tube to collar contact length of < 3 inch due to the transition geometry. The through holes in the carbon steel collar were drilled to a diameter slightly larger than 0.125 inch to permit staking of the tube holes. This staking operation inwardly deformed the tube at the tube/collar interface, in effect pulling the tube from the collar at the hole to ensure that the drilling operation did not affect the leak path. For this set of tests, the leak rate at 600'F was essentially 0 at SLB pressure differential. For these samples tested at 600'F and a pressure differential of 1620 psi, leak rates were essentially identical to the 2650 SLB tests suggesting that the increased driving pressure was balanced by the increased contact pressure due to pressure expansion. The observation of leakage at normal operating conditions in the leakage samples is not consistent with operating plant experience, either the samples yield conservative leakage estimates or such degradation is not present in operating units. A choked TVA WSTAR-doc 03/12/2004_10:49 AM 5175.doc:49

Page 15 of 61 Ourref: LTR-CDME-04-148 10/27/2004 flow condition may have also been present which implies that increased expansion distance between the indications and top oftubesheet would further reduce leak rate by adding additional resistance to flow. After completion of the 3 inch tests, a new set of holes was drilled at 2 inches from the top of the test collar. Leak rates were elevated above the 3 inch test levels. This process was repeated again locating the holes at 1.25 inches below the top of the collar and leak rates were again elevated above the previous test levels. The tube holes were not plugged after completion of testing at the 3 inches and 2 inches nominal crevice tests. Thus, the 1.25 inches and 2 inches nominal tests included leakage effects of the holes below these elevations.' In effect, the 1.25, 2, and 3 inches nominal crevice tests simulated tubes with circumferential separations at 7.7, 9.5, and 10.3 inches below TTS respectively (based on the contact pressures presented in Figure 4.7). All of these tests were conducted at a temperature of 600'F.

Prior to elevated temperature testing, room temperature testing was conducted at 1620 psid for each of the crevice depth conditions. For the room temperature, 3 inch tests at 1620 psid, the average leak rate -was -1 00 times the 600'F average leak rate. Figure 4.5 presents the 600'F drilled hole leak rate test data as a function of crevice depth for 2650 psid. Figure 4.6 presents the 600'F drilled hole leak rate test data as a function of crevice depth for the 2650 psid and 1620 psid test conditions. For the 3 inch nominal crevice tests at 2650 psid, the actual crevice depths were 2.37 inches, 2.29 inches, 2.37 inches, and 2.1 inches, for an average crevice depth of 2.28 inches. For the 2 inch nominal crevice tests, the average crevice length was 1.28 inches, and for the 1.25 inches nominal crevice tests, the average crevice length was 0.61 inches.

For the 3 inch tests at 600'F, 2 of the 4 samples had no leakage at 1620 or 2650 psid. The leak rates of the other two 2650 psid samples were 1.33 106 gpm and 1.33-10-5 gpm. For these tests, radial contact pressure due to thermal expansion, pressure expansion, and WEXTEX expansion are inherent. There was no allowance for tubesheet hole dilation. Thus, these tests can be seen as a representation of the point where tubesheet hole dilation effects are neutral, i.e., at the neutral axis, or between 11 and 12 inches below the TTS.

The above developed upper 90% prediction leak rates of 4.5 10-3 gpm per tube for indications between 8 and 12 inches below TTS and 8.7-10-5 gpm per tube for indications >12 inches below TTS are developed using data for those specimens that leaked. Note that 2 specimens with 3 inch nominal crevice lengths did not leak. If a leak rate of 7 l0- gpm, which is the average leak rate of the 3 inch nominal specimens that leaked is applied to the zero leakage specimens the upper 90% prediction is reduced by a factor of 1.3 (see Figure 4.5). If a leak rate of 1.33 104 gpm, which is the lowest leak rate of the 3 inch nominal crevice specimens is applied to the zero leakage specimens the upper 90% prediction is reduced by a factor of 2.7 (see Figure 4.5).

Figure 4.5 also shows the dependence of the leak rate on crevice depth, e.g., any postulated leakage from a separated tube at 18 inches below TTS (which would include increasingly greater contact pressure with increasing depth below TTS) would be much lower than the applied value which is based on a depth of 12 inches below TTS.

Figure 4.7 presents a plot of contact pressure as a function of distance below TTS for 4200 seconds into the SLB event. At this point the primary and secondary side temperatures are This would be expected to be small because of the lack of a pressure drop between the holes.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

6t:P-SL I S IV 67:01 tOOZ I/O 1OPhdVSAk VAJ.

-papnloui aq 1llhA omUVmol oI2V9ol OATIUAJOSUOO V 'J.AAhAOH 'UOII!pUOO 033pVl OU v UT BUilfnSI 'UO! 1t101 sqi OAoqBc Isixo plnom sqiluzl arnAoi3 pu oinssoid 1ouluom lVpurisqns 'SjL Akopq soq:U ZI < j oqnl pol}ndis AJlVlluolqiunomo po1lVlnsod v Jlo wud3 01 9 b si Sj molaq soqonu ZI puu 0-8 uoAX1Ioq oqnl paVIuVdi s Ajll luaajiunanz V °1 poi ddu opw iVl oAIlVafasuom uoi1!pu03 Si aql 'snqj S b aIBlo as 'punoq uojoipald %06.iddn qlt uud3 EOl pu iqldap 03IA013 junfl1ujo uoi13unj v si ojuV IVol zqljo uoOssaoIaz (ofmAu oaplautlpuV) uauoL oql Eumsn ud2 EO 61 S6 S1 o Pu oli pa13!paid oql '(qoui 19-0 JO qldzp 031A.Ja3 ul1nio qt!m suaLunods o~uVil o0 lUOJVA!Tba) qidop 03!A0U3 SIf IV *sz1VI)J Vol popipaid aip asn ol oq p1lno S.LL mAolq soqou!

Sio a3uUISIp uolpaZdsu *Ak oqj oloq oqnl pa1VJudos All V!uauJtumnaao p1VunlSsod Vi OlJm

¶Vol ImualodjoDJo u

UHISO QALA1aSUo3 V 'popnl3u!i ou Sum uoplVp oloq ol onp uoijonpax ainssoid 1pVlu oaqj OOUs 'JaA3aMOH awnssaid 13uV1u QA!sod IM iqltp3ua O3!AO.Ia3IOvoqS pUU S1LL mopq o nuilsip ouourlJu VSVsainssoid eluO iu!n ouVqo pdui waotuiq ol o1anp S1W molaq S011i31u VOl 0 ILLJoau oq U! qnl lumm ql ol paoidmoa DA!1eUAJOSU3 ST U1Vp ulw!wds aoTq pajjupp ql 1qtl pan23Ju q plno3 1! 'snqtj uo!1VJedos pa1lnlsod V oAoqu sopw g- -.TOj oinssaid pujuo3 luljlnsai OAI!sod ql!Ak Saq3u! C£9-J3OW!AOfl 1V OAq plnomx qnlj uipuodsauoa aqiL PP!Aold Sum ainssoid prVu03 oAplsod Tj!Akqoui! 90-joql-puala !Aala 1VlPnr u

'OSUO lSa1 03!AaJe3u1Wuou qtU!i gZ I o1.1g oqnIl junior oql iOJ Urq1 SU3ow!iodS oloq pollup aq ioj p!dtJ w1OmU Si SjIL Atopq oourls!pJo uojoaunJ St ainssaod paluo3oJ ouu3jo q oaJa oql SLL Amoloq soqau oi Alleu1uxo.ddu lu oqnl a ouoz oqlq yA luols!suovminssaid 1puou0 V AlOAU!

SISOl 03!AJ3 1eU]TUIoU II= E otj puV Sj AXoloq SOT!u L-L AlaVuI!xoidde 1V oqnl g auoZ oq ql!AuIMUlUS!Suo3 ainssaoid 3Vluo VOAlOAUISISOal 3!AaJ:IU!Uuousoqtuig &Z71q4 Uo0!puo0 tqldop DOIAa owuIVs tqh 1V eqnl V.qJ oinssaid 13ulu03j0 bold lUV1InlSwJ 0ql 01 po0idtUO3 palsOl SM1'Uol OO!A3 !unfl1 oqt Jjioj 'q3!q4 oI soinssaid 1aeluO s) 11loq pal0pp 041 IVIql sMkoqs Lt'-17 Wa 1UAo S-IS 0q4 ojUt spuooas OOzt, 1V osuodsw juild 0q11uo paseq 3e v1UP L' b nm3! oqj isd oogZ s! omnssod IluOO luipVw 1url5sol oql Sjl moloq spul 1i6 kAlUwixoiddu Ir 'la3qsoqnl amu0 041 o0 po!ilddu AaA!1IeAJaSUo3 SI VVP El aOUOz OqlJ1 SU0!2; a pue V ouoZ 0ql JjO lozqSfqnlJo dol moloq qldopj0 uO!mpunj V se amssoid 13olu3 lui!pJ luVIInsoi Jo bold V sluosold L-T am'3! 1jzoqsfqnlJo dol oln moloq qldopjo uoolOunj V sr onssold IDeluoo lutpej 1uelunsai dolOAOp 01 popnltu! Si m0oq b0sos0n1 01 onp arnssaid Joluoo UII uO!mlnpo1 q0l uoisuudxo XgjLXaM pue 'uO!Sudxo mnssoid 'uoisuvdxat) lmtuq0 01 oanp llqsoqnpJo dol molaq qldapjo uo!1ounj V Se QinssZjd 13V13u03 lIePJ ZA!1!sod IVIol 0q4 SolulnoIV3 'Z *AO) 'L6Ltl-dVDA isd blSI se MO! se oq plno3 suotu!oods luu!tuou qaui £ E oqlj sainssoid ljoluO QqO 01 !AfAWl 1 ol!u!A samssaid op!s faupuo3s pauunsse MqI!X suxumocds o~~a' oaql ioj amssaid lDouJUO soluunlso AI0ATVAjzsuoo q3IqM 'o3A0lo Oqr U!i!qM! oinssold ou soUunssV suotumods a~mroal oqi.oj uOInulmqVO oinssoid I3V1UOD Uo!tzLmssoJd 01 onp oinssojd lotluoo oql soonpi Lqa!qm 'isd oo8jo onssoid oo!AOD V sauinsse soinssaid poIluom zqnljo uoijulnolV 10old siql U! papnloU!

lou oir suotuwoods o2au3ol pue oqnl ql.oj soinsso.id pVuluoo uomSufdX0 XgjXM L

SX 2 L

olaq soqoU! £ 01 L-L Inoqu jo sqldop o1j oqnl 0q1 U! sainssald 1oeVu0 popipold 0q1 01 ojvpuns ojI suottnoods 0loq pal0pp 0q4 u! soinssaid 1ou1uoo aqj, *paztu!xcuu o1V sloogJ moq looqsoqni puu 'JuuIsuom oq 01 pauunsse bOOZ/LZIO1 8VI-tO-9Iao-Iafl PI mo 19Jog91 ed

Page 17 of 61 Our ref: LTR-CDME-04-148 10/27/2004 It is noted that the leak rate data are independent of the test pressure for the lengths tested since fitting separate regression lines yields similar slopes and intercepts. Statistical comparisons were made of the results of such analyses and it was found that there were no statistically meaningful differences. Thus, the attendant increase in contact pressure compensated for the increase in pressure difference by reducing the area available for the leakage flow, or the flow in the test specimen crevices was at choke conditions. Regardless, the conclusion is that all of the leak rate data, i.e., those for 1620, 2000 and 2650 psid, could have been included on the same plot.

Performance of this analysis results in a similar regression line that predicts slightly lower median flow rates. The other consequence of including all of the data is a reduction in the standard error of the regression and a reduction in the 9Oth percentile prediction bound, about a factor of two or slightly greater over the range of interest. Thus, the above calculation is based on a conservative segregation of the data. In addition, finally, additional calculations were performed to obtain linear regression coefficients for the logarithm of the leak rate as a function of the crevice length and the calculated contact pressure. The regression results were then used to estimate the 90'" percentile prediction bound relative to the predictions based on the regression on crevice length alone. The results indicated that neglecting the contact pressure leads to over predictions on the order of 4 to 20 relative to that from using the combined data set. In conclusion, the bounding calculation results reported could be about an order of magnitude greater than would be obtained from a refinement of the analysis.

As no 100% TW, 3600 circumferentially separated tubes are anticipated to be present between 8 and 12 inches below TTS, application of the W* alternate repair criteria could be such as to not involve leakage from postulated indications below W*. No leakage would be expected due to the substantial contact pressure at greater than 12 inches below the top of tubesheet. However, for practical purposes an estimate can be made and is discussed in developing a conservative estimate of the potential leakage as follows:

1)

If it is assumed that all 41 postulated indications between 8 and 12 inches below the TTS are circumferentially oriented and the tubes are severed, the leakage associated with these indications is 0.18 gpm using the 90gh percentile leak rate corresponding to a test specimen crevice length of 0.61 inch which has a contact pressure similar to that in the SG at a depth of-8 inches, and would be dispersed over 4 SGs.

2)

A conservative estimate of leakage for indications at greater than 12 inches below TTS can be accomplished by applying the upper 90gh percentile prediction leak rate at 2650 psid for the 3 inch nominal crevice data of 8.7 1 5 gpm. The contact pressure for the 3 inch nominal crevice samples is approximately equal to a Zone B at 10 inches below the TTS. At 12 inches below the top of tubesheet, the expected Zone B contact pressure at 4200 seconds into the SLB event is approximately 2900 psi, about 600 psi greater than for the average of 2273 psi for the 3 inch nominal crevice length leakage specimens.

If all remaining active tubes in the least plugged SG are assumed to contain a circumferential separation at 12 inches below TTS, the SLB leakage contribution would be approximately 0.26 gpm (3000 tubes times 8.7-10-5 gpm per tube). Note TVA WSTAR-doc 03/12/2004_10:49 AM 5175.doc:49

Page 18 of 61 Our ref: LTR-CDME-04-148 10/27/2004 that 2 of the 4 samples had no leakage at 2650 psid and the constrained crack leak test data suggest that no leakage could be expected, regardless of the indication orientation at a contact pressure of greater than 2500 psi.

Zone A contact pressures as a function of depth below the top of the tubesheet are higher than for Zone B, but not significantly. Zone A tubes retain positive resultant contact pressure for almost the entire crevice length. The added length with positive contact pressure is expected to provide a substantially increased resistance to leakage during a postulated event. It should also be noted that the assumption that all tubes contain a circumferential separation at > 12 inches below TTS is an extreme conservatism.

Combining the upper 90% prediction leak rate with the assumption that all tubes are separated is even more conservative, and may be so conservative that the predicted value is unrealistic. For a large number of samples, i.e., assuming all tubes are separated, any postulated SLB condition leakage would be expected to migrate to the mean leak rate. The mean, i.e., arithmetic average, leak rate regression for the 3 inch nominal crevice length specimens is on the order of 1.610-5 gpm per tube, and for the conservative assumption of all tubes separated, the expected leak rate would then be about 20% of the value of 0.26 gpm calculated above.

Summarizing, for an EOC-13 nominal inspection distance of 8 inches below TTS, total SLB leakage from indications below the inspection distance could be 0.44 gpm, with 0.18 gpm attributed to indications between 8 and 12 inches below TTS and 0.26 gpm attributed to indications at greater than 12 inches below TTS.

Predicted leak rate as a function of contact pressure was also considered, however it was determined that the leak rate prediction is best accomplished using the specimen crevice depth.

This determination was based on a comparison of the statistical goodness-of-fit between the two sets of data. At equal probability levels, the estimation of leakage using crevice depth provides for a conservative total leakage prediction compared to estimation of leakage using contact pressure.

Additional conservatism is present in the above described leakage prediction since all indications below the EOC-13 planned inspection depth of 8 inches below TTS are assumed to be circumferentially separated. As stated above, only 10% of the total historical indication count are circumferentially oriented. Leakage estimation from axial PWSCC is substantially less than the model used for circumferentially oriented PWSCC.

4.3 Confirmatory Leak Rate Evaluation In order to partially quantify the conservatism associated with the first order linear regression analysis approach involving only the crevice length, a subsequent analysis was performed which included the contact pressure as a second variable. The analysis also considered all of the data in establishing the regression line. The results of the analysis are presented on Figure 4.8. The 90oh percentile leak rate for a crevice depth of 0.61 inch is 5.2 4 1 0 4, corresponding to the value of 4.4l10-3 from the single variable analysis, a difference of a factor of 8. Likewise, the bounding TVA WSTARdoc 03/1212004_10:49 AM 5175.doc:49

Page 19 of 61 Our ref: LTR-CDME-04-148 10/27/2004 leak rate for a crevice length of 2.28 inches was calculated to be 1.33-10-5, a factor of 6.5 less than the corresponding value from the single variable analysis.

Application of these results to the previous analyses leads to the expectation that the 0.18 gpm total leak rate from indications in the range of 8 to 12 inches below the TTS would be reduced to 0.015 gpm by increasing the complexity of the analysis. Similarly, the 0.26 gpm leak rate for 3,000 postulated separated tubes at a depth of 12 inches would be reduced to 0.04 gpm, with the total expected leak rate being about 0.055 gpm instead of the considered 0.44 gpm. The calculated median leak rate per tube used with the assumption that all of the tubes in the SG are severed is reduced from 5 106 to 6.11 08 gpm per tube.

4.4 Conclusions Regarding Leakage Testing The WEXTEX drilled hole leakage testing indicates the following characteristics for a WEXTEX expanded tube with a postulated circumferential separation below the W* inspection distance.

I. Comparison of the room temperature and elevated temperature tests indicates that elevated temperature leak rates were approximately 100 times less than room temperature leak rates.

2. Comparison of the elevated temperature test data for 1620 and 2650 psi pressure differential shows the leak rates are essential constant for both pressure differential conditions suggesting that pressure expansion has a limited effect on leak rates.
3. Based on the observations of items I and 2, contact pressure is seen as the most significant factor for restricting leak rate.
4. For the 1.25" nominal crevice test case, the contact pressure is approximately equal to the contact pressure of an expanded tube at 7.7" below TTS while for the 3" nominal crevice test case, the contact pressure is approximately equal to the contact pressure of an expanded tubes at 10.3 inches below TTS. The contact pressure reduction in the test samples was more rapid (per unit length) than in the actual tube. Contact pressures in the leakage specimens did not account for pressure within the tube to tubesheet crevice, and results in a conservative estimate of contact pressure. Contact pressures for the SG tube (Figure 4.7) includes a crevice pressure of 800 psi for a leakage condition.
5. The accumulation of the leakage effects of the holes at 2 and 3 inch below TTS can be seen as a representation of the postulated case where the tube is separated at 7.7, 9.5, and 10.3 inch below TTS. The leak rate determined for the 1.25 inches nominal crevice tests is a conservative estimate of leakage for a tube with a postulated circumferential separation below the W* inspection distance.
6. Evaluation of the reported flaw elevations for SQN2 shows that indications were reported as deep as 9.8 inches below TTS. Therefore, a number of tubes were inspected to depths exceeding the nominal inspection depth for EOC-12 of 8 inches below TTS. Therefore, the likelihood of any postulated circumferentially separated tube at or below 8 inches below TTS is exceptionally small.

TVA WSTARdoc 03/12/2004_10:49 ANI 5175.doc:49

Page 20 of 61 Ourref: LTR-CDME-04-148 10/27/2004

7. Zone B tubes were used for estimation of SLB condition leak rates. The Zone A tubes retain positive resultant contact pressure over the entire crevice length, and this increased length is expected to represent a significant increase in SLB condition leak rates compared to Zone B.

TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 21 of 61 Our rcf: LTR-CDME-04-148 10/27/2004 Figure 4.1 80 70 60

>, 50 C,

=

40 4Or a,

L..

UL 30 20 10 0

Model 51 SG Tubesheet Region PWSCC Distribution 1996 -2003 Frequency SQOW Al Data 3-SQN2 EOC1 1 and 12 Only C cumulative % All SON2 Data

- BVPS 1 AD Data itDCPP 4r_

015 1

0.9 0.8 0.7 0.6 a) 0.5 X 0.4 =

0.3 0.2 0.1 0

-11

-10

-9

-8

-7

-6

-5

-4

-3 Elevation Below TTS Bin (inch)

-2

-1 0

More TVAWSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 22 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 4.2 SQN2 PWSCC Trending I

  • All SQN2 Data

-- EOC-13 0 EOC8 to EOC12 Expon. (EOC8 to EOC12)

Expon. (All SQN2 Data) I 30 25 20 U)

.0 Ez 15 10 5

0 3

4 5

6 7

8 9

10 11 12 13 14 15 Outage TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 23 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 4.3 SQN2 Tubesheet Region PWSCC Mapping I

Base Tubes WEXTEX Zone Boundary 0

PWSCC All SGs I 50 45 40 35 30 325 20 15 10 5

0

~~~~~~~.

1

-- ~~~~.

~.......

[

I...................

G3.............

v

............3----

r l

      • E I**

,'**E*.....

..3..

3..........

g..................

.2.

.......VV--.--.

.2.E n

................... 1- -n-*-leea--------a-----0l,

.2.........

....... 1 -----an-- -

.2..........,,,,--3----

Go.

2..................

2.......

.2.2......

c---on1--..............o.......

2.....,,,,,,,..... *** l ''3

.2.2.

0 10 20 30 40 50 60 70 80 90 100 Column TVAWSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 24 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 4.4 PWSCC Prediction: Exp Tansition Excluded I

Data excluding transition

-Upper 90% Prediction 0 All Data

-Expon. (Data excluding transition) 80 -

70-60-50-40-M.0 E

z 30-20 10-_

y ey 18.929e03 1 -

-1 3

-1 2

-1 1

-1 0

-9

-8

-7

-6

-5

-4 3

-2

-1 0

Elevation Below TTS (Inch)

TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 25 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 4.5 ace TVAWSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 26 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 4.6 a,c,e TVAWSTAR.doc 03/1212004_10:49 AM 5175.doc:49

Page 27 of 61 Ourref: LTR-CDME-04-148 10/27/2004 Figure 4.7 ace TVAWSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Pagc 28 of 61 Our rcf: LTR-CDME-04-148 10/27/2004 Figure 4.8 a,c,e TVAWSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 29 of 61 Our ref: LTR-CDME-04-148 10/27/2004 5.0 SEQUOYAH UNIT 2 RESPONSE TO NRC RAIS The NRC staff has previously transmitted further requests for additional information (RAls) to utilities planning to implement the W* plugging criterion. The SQN2 responses to the previous RAIs that are applicable to a plugging criterion that utilizes a non-degraded W* length (i.e., no service induced degradation is present) are provided below. The responses have been grouped into three categories: inspection results summary, structural analysis related and steam line break leakage considerations.

5.1 INSPECTION RESULTS

SUMMARY

5.1.1 Discussion of Inspection History at Sequoyah Unit 2 (Callaway RAI # 18 and # 23, St. Lucie Unit 2 RAI #26)

Table 5-1 presents a summary of the axial and circumferential PWSCC for the last five outages at SQN2.

Table 5-1 SG1 SG2 SG3 SG4 Inspection Axial Circ Axial Circ Axial Circ Axial Circ U2C8 (1997) 0 0

3 0

3 0

1 1

U2C9 (1998) 2 0

5 1

5 4

1 0

U2C10 (1999) 0 1

6 1

3 3

1 0

U2Cl l(2001) 5 0

5 1

4 0

6 5

U2C12 (2002) 1 0

6 1

3 3

1 0

Total 8

1 25 4

18 10 10 6

Table 5-2 presents a summary of all historical PWSCC indications from the SQN2 EOC-8 through EOC-12 outages that includes elevation below TTS, flaw length, and flaw amplitude.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 30 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Table 5-2 NDE Indicated Unit Cycle SIG Row Cal Location Elevation AxICirc Length Max Volts Inches Deg 2

12 1

15 33 HIS

.8.67 AXIAL 0.69 2.94 2

12 2

11 60 FITS

.6.74 AXIAL 0.47 0.59 2

12 2

19 72 HTS 9

AXIAL 0.17 0.35 2

12 2

20 60 HTS 05 AXIAL 0.15 0.43 2

12 2

35 40 HIS

-6.75 AXIAL 0.10 0.33 2

12 2

35 40 HIS

.7.25 AXIAL 0.77 2.39 2

12 2

35 40 WTS

.7.96 AXIAL 0.09 0.49 2

12 3

21 30 HIS

.9.48 AXIAL 0.21 0.72 2

12 3

31 62 HTS

.0.5 AXIAL 0.12 0.33 2

12 3

35 31 HTS

.9.42 AXIAL 0.31 1.91 2

12 4

6 46 HITS

.0.68 AXIAL 0.10 0.51 2

11 1

2 9

HIS

.1.32 AXIAL 0.15 0.36 2

11 1

2 9

HIrS

-0.5 AXIAL 0.15 0.41 2

11 I

2 9

HIS o.0.8 AXIAL 0.15 0.38 2

11 1

2 34 HIS

.0.85 AXIAL 0.24 0.28 2

11 1

19 39 HIS

.2.51 AXIAL 0.55 2.03 2

11 2

6 56 HIS

-0.6 AXIAL 0.16 0.4 2

11 2

7 24 HIS

.0.18 AXIAL 0.116 0.29 2

11 2

18 17 HIS

.3.17 AXIAL 0.12 0.52 2

11 2

22 60 HIS

.0.77 AXIAL 0.43 8.03 2

ii 2

37 6.4 HIS

.6.22 AXIAL 0.21 0.56 2

II 3

1 54 HIS

.0.51 AXIAL 0.32 0.49 2

11 3

5 16 HIS 1

.5.26 AXIAL 0.17 0.33 2

II 3

12 2

HIrS

.0.27 AXIAL 0.14 0.28 2

11 3

19 65 HITS

-2.98 AXIAL 0.28 1.94 2

I1 4

2 37 HIS

-1.55 AXIAL 0.17 0.22 2

11 4

2 40 HIS

-1.03 AXIAL 0.11 0.62 2

11 4

11 26 HIS

.5.58 AXIAL 0.41 0.36 2

11 4

13 60 HIS

.4A49 AXIAL 0.11 0.46 2

11 4

15 8

HIS

.2.74 AXIAL 0.15 0.72 2

II 4

15 70 HIS

.4.19 AXIAL 0.23 2.44 2

10 2

2 59 HIS

.1.75 AXIAL 0.09 0.75 2

10 2

3 93 HIS

.0.855 AXIAL 0.23 0.60 2

10 2

7 63 HIS

.1.5 AXIAL 0.14 0.46 2

10 2

1 7

86 HIS

.0.43 AXIAL 0.16 0.53 2

10 2

13 72 HIS

-0.2 AXIAL 0.12 0.31 2

10 2

21 60 HIS

-0.18 AXIAL 0.15 0.63 2

10 3

7 7

HITS

.2.07 AXIAL 0.10 0.29 2

10 3

10 27 HIS

.0.84 AXIAL 0.21 0.39 2

10 3

19 46 HIS

.3.78 AXIAL 0.338 2.73 2

10 4

38 61 HIS

-2.62 AXIAL 0.14 0.50 2

9 1

1 36 33 HITS

.0.32 AXIAL 0.13 0.61 2

9 1

1 76 HITS

.0.31 AXIAL 0.14 0.41 2

9 2

2 20 HIS

.0.44 AXIAL 0.08 0.7 2

9 2

4 55 HIS

.0.66 AXIAL 0.10 0.91 2

9 2

8 55 HIS

.0.21 AXIAL 0.12 1.22 2

9 2

12 71 HIS

.0.1 AXIAL 0.08 0.64 2

9 2

22 75 HIS

.1.02 AXIAL 0.06 0.56 2

9 3

23 23 HIS

.0.14 AXIAL 0.23 0.82 2

9 3

31 33 HIS

.2.6.4 AXIAL 0.27 1.09 2

1 9

3 31 33 HIS

-2.35 AXIAL 0.29 0.51 2

9 3

31 33 HITS

.1.04 AXIAL 0.22 0.69 2

9 3

22 36 HIS

-0.21 AXIAL 0.12 0.7 2

9 4

12 64 HIS

-1.9 AXIAL 0.13 0.77 2

8 2

2 53 HIS

-0.55 AXIAL 0.16 A8 2

a 2

10 54 HIS

.3.88 AXIAL 0.32 4.08 2

8 2

27 49 HIS

-1.34 AXIAL 0.11 0.91 2

1 8

3 22 12 HIS

.0.12 AXIAL 0.14 1.8 2

6 8 3

23 7

HIS

-0.43 AXIAL 0.18 1.59 2

8 3

214 67 HISr

.2.38 AXIAL 0.21 0.67 2

8 4

7 17 HI

-0.15 AXIAL 0.32 3.55 TVA WSTARdoc 03112/2004_10:49 AM 5175.doc:49

Page 31 of 61 Our ref. LTR-CDME-04-148 10/27/2004 Table 5-2 (cont'd)

NDE Indicated Unit Cycle SIG Row Col Location Elevation Ax/Circ Length Max Volts Inches Deg 2

12 2

6 20 FITS

-0.02 CIRC 46 0.31 2

12 3

8 23 HTS

-0.03 CIRC 27 0.6 2

12 3

24 31 HTS

-0.22 CIRC 41 0.71 2

12 3

34 31 IITS

-9.8 CIRC 45 1.35 2

11 2

37 64 FIS

-6.41 CIRC 32 0.67 2

11 4

12 60 HTS

-0.36 CIRC 97 0.98 2

11 4

15 60 HTS

-3.59 CIRC 69 0.32 2

11 4

18 60 HTS

-3.55 CIRC 92 3.75 2

11 4

20 45 HTS

-3.64 CIRC 48 1.46 2

11 4

24 9

HTS

-2.67 CIRC 74 1.95 2

10 1

25 39 HITS

-1.52 Clrc 31 0.8 2

10 2

19 82 HTS

-0.63 Circ 27 0.8 2

10 3

12 30 FTS

-0.17 Circ

_30 0.35 2

10 3

12 36 HTS

-0.14 Circ 77 0.75 2

10 3

12 73 HTS

-0.01 Circ 30 0.2 2

9 2

8 77 HITS

-0.08 Circ 25 0.61 2

9 3

13 31 HIS

-0.09 Circ 32 0.2 2

9 3

12 40 HTS

-0.11 Circ 28 0.9 2

9 3

13 41 HIS

-0.2 Circ D

39 0.85 2

9 3

19 25 HTS

-0.1 Circir

_25 0.52 2

8 4

8 63 HTS

-1.84 Circ 67 2.09 TVA WSTARdoc 03/12/2004_10:49 AM 51 75.doc:49

Page 32 of 6l Our ref: LTR-CDME-04-148 10/27/2004 5.1.2 Discussion of Industry Experience (Callaway RAI # 23 and # 65)

As noted above, a distribution of indications has been conservatively defined for the WEXTEX Region of the SQN2 steam generators. The potential occurrence of indications for Model 51 steam generators ;vill be projected uniformly over the entire length of the joint in the SLB Leakage Model. This is based on the indications being potentially caused by tubesheet hole drilling anomalies during manufacture and the propensity for tube indications at tube hole surface anomalies in a previous Westinghouse laboratory program involving hydraulically expended joints. It is assumed that potential corrosion of the WEXTEX tube joints would be similar because the anomalies would be sites of locally elevated residual stress. It is also based on the lack of indications in smooth bore, anomaly-free tube holes in hydraulically expanded joints (Alloy 600 tubes) in a laboratory program performed by Westinghouse for EPRI. This is conservative because based on observations at three hydraulic expansion (HE) joint plants of the Plant A tube size, most of the irregularities occurred in the upper reaches of the tubesheet. A more detailed set of data was received from one plant. Most of the signals recorded in the profilometry file were characterized as bulges. For the most part, the profilometry supports a declining trend of indications from the top of the tubesheet (see Section 4.0).

5.2 STRUCTURAL ANALYSIS 5.2.1 Determine Impact of Locked Tubes on W* (Diablo Canyon RAI # 1)

Locked tube residual axial loads occur because of packing and/or denting of the tube-to-tube support plate crevice while the plant is operating, i.e., when the tube is strained in the axial direction by primary-to-secondary pressure end cap load. Hence, the residual load in the tube is equal to the normal operating load. When the plant cools, a portion of the residual strain, and the attendant residual load remains. When the plant returns to power, the load at operating conditions is restored to the same level that was present when the locking occurred, i.e., at normal operating conditions. Since the TSP is restored to the elevation it occupied at the time of locking, it imparts no additional load on the tube. In other words, as the pressure load increases strain in the tube, the residual downward load of the tube on the TSP decreases. The W* criteria were developed to provide a margin of safety ofthree relative to the loads corresponding to normal operating conditions.

The second effect of the locked tube loading is the Poisson contraction of the tube in the hoop and thickness direction. Again, the axial stress conditions in the tube during operation are unaffected by locking of the tube at the TSP. The tensile test results used to demonstrate that the value used for the coefficient of friction were from conservative test programs. The equations used to calculate the coefficient of friction also did not account for the axial load, hence, the calculated values for the tests are lower than the actual values. Moreover, the configuration of the tensile tests also results in a Poisson contraction of the tube over the full range of the test load. This is conservative relative to demonstrating the factors of safety relatives to the requirements of RG 1. 121, e.g., testing to 3 times the required axial force results in a Poisson contraction three times that of the nominal condition.

TVA WSTARdoc 03112/2004_10:49 AM 5175.doc:49

Page 33 of 61 Our ref: LTR-CDME-04-148 10/27/2004 In summary, implicitly ignoring the potential effects of the tube being locked at the TSPs is conservative to determining the W* value. Even if a loss of engagement is postulated to be possible, and the effect of the locked condition is evaluated, the locked condition has no effect on the required W* length. Therefore, the implicit assumption that the tubes are not locked at the TSP is either conservative or not significant to the determination of W* (Reference 5.1).

5.2.2 Impact of Tubesheet Bow on Pullout and Leak Rate Testing (St. Lucie 2 RAI # 8, Callaway RAI # 8 and #55)

Tubesheet bow is the flexing of the tubesheet in response to the primary-to-secondary side pressure difference results in a dilation of the holes above the mid-plane of the tubesheet during normal operation and postulated faulted conditions. The contact pressure decreases above and increases below the approximate mid-plane2 of the tubesheet. The dilation does not have to be simulated since it can be treated analytically using the Theory of Elasticity.

In situ leak rate tests are conducted at ambient conditions and there is no differential pressure across the tubesheet. Thus, there are two conditions that are atypical of normal operating and postulated accident conditions. In summary, the increase in temperature tends to make the joint tighter, and the increase in differential pressure across the tubcsheet will tend to make the joint looser. In addition, for structural integrity testing, the increase in pressure internal to the tube will act to tighten the joint and increase the strength of the joint. Thus, the act of testing may bias the results in a non-conservative manner at the elevation of the degradation being tested. It is noted that there is no hole dilation at the location of the neutral plane of the tubesheet, slightly below mid-plane, and such testing which results in no leakage is indicative of operating and accident condition results to be expected at lower elevations within the tubesheet.

In situ structural testing is not likely to be meaningful in demonstrating compliance with performance criteria, i.e., demonstrating a resistance to pullout of greater than three times the normal operating pressure differential. Morever, the difference in contact pressure during in situ testing means that the leak rate data cannot be used directly to quantify potential leak rates. This does not mean that an analytical procedure could not be developed to deal with such quantification, that is the basis for correlating the leak rate to the inverse of the loss coefficient and further correlating the loss coefficient to the tube-to-tubesheet contact pressure.

The effect oftubesheet bow can result in an average decrease in the contact pressure during postulated accident condition for the Model 51 tubes. For the tubes tested to date, in situ testing resulted in no measurable leakage. However, the contact pressure during the performance of the in situ test was significantly less than the contact pressure present when the laboratory tests where performed, almost all ofwhich leaked. Thus the leak rate tests performed in situ are relevant to demonstrating whether or not an indication leaks. Although the leak rate from a leaking indication may not lend itself to a precise quantified prediction of the leak rate during operation, it can be used to estimate whether or not the leak rate would be significant during 2

The location of the neutral plane of the tubesheet is slightly below the mid-plane because of the membrane stress caused by the distributed pressure load.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 34 of 61 Our ref: LTR-CDME-04-148 10127/2004 operation or postulated accident conditions. A deformation balance can be performed to determine if lower pressure test should be performed (results from an analysis of Model F SGs were that higher pressure led to higher leakage).

During the Fall 2003 inspection at a plant with CE steam generators, a 1.9 V (by + Point), 1400 arc length, 99% through wall (by phase angle) circumferential crack (PWSCC) at the top of the tubesheet was in situ tested with no leakage being reported at the postulated SLB pressure difference.

5.2.3 Tube Pull Out Testing Description (Callaway RAI # 25)

The pullout testing program and results are described in the "Pullout Test Specimen Descriptions" section of WVCAP-14797, Rev. 2, Section 4.2.2, and is summarized below.

The W* pullout test samples were selected from a number of specimens prepared in the W*

program to provide a lower bounding case condition with regard to pullout resistance. The W*

pullout samples consisted of carbon steel collars approximately [

]b -Ce. The nominal unexpanded outside diameter of the tube was 0.875 inches.

Since the NVEXTEX expansion is a high energy process which causes the tube OD to impact and to be deformed into even small variations in the tubesheet hole bore surface, the feature which is of most significance is the surface finish of the tubesheet hole. The Series 51 SG tubesheet hole requirement was [

1a c microinch rms maximum. The samples in the test program were procured to a [

Ia,c rmns requirement. For the W* pullout tests, two tubesheet collar specimens were selected, one specimen which appeared to have a bore surface roughness at the upper end of the bare finish requirements, and one with a smooth. Both oftubesheet collar specimens had uniform diameter profiles.

a,c The WEXTEX samples fabricated for pull force testing were of a double ended configuration.

After WEXTEX expansion, the samples were qualitatively checked for joint leak tightness.

About 70% of the specimens exhibited a slight degree of looseness in the hoop direction in that it was possible to rotate the tube by a estimated 1 or 2 degrees (1°=7 mils on the tube OD).

The samples were also noted to have [

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 35 of 61 Our ref: LTR-CDME-04-148 10/27/2004 bce 5.2.4 Tubesheet Finite Element Model Discussion (Callaway RAI # 27 and # 43)

Loads are imposed on the tube as a result of tubesheet bowing under various pressure and temperature conditions. The finite element analysis of the tubesheet, channelhead, and lower shell were performed to determine the unit displacements throughout the tubesheet for two pressure unit loads (primary and secondary side) and three thermal unit loads (tubesheet, shell, and channel head). The analysis yielded the unit displacements throughout the tubesheet for these five unit loads. The normal operating and faulted conditions (pressure and temperature) were then applied to these unit displacements for calculating the tube-to-tubesheet contact pressure distribution from the top to the bottom of the tubesheet.

The pressure and temperature parameters for the feedline break, steam line break, and loss of coolant accident (LOCA) events were from a generic accident analysis. It is shown in Section 3.0 of this report that the generic temperature and pressure parameters used in the structural analysis bound the values used in the accident analysis of the SQN2 steam generators.

5.2.5 Ligament Tearing Discussion (Callaway RAI # 30)

One of the concerns that must be addressed in dealing with cracks in SG tubes is the potential for cracked tube radial ligament tearing to occur during a postulated accident when the differential pressure is significantly greater than during normal operation. While this is accounted for in the strength evaluations that demonstrate a resistance to pullout in excess of 3-AP for normal operation and 1.4-AP for postulated accident conditions, the potential for ligament tearing to significantly affect the SLB leak rate predictions needs to be accounted for.

Ligament tearing considerations for circumferential tube cracks that are located below the W*

depths within the tubesheet are significantly different from those for potential cracks at other locations. The reason for this is that W* has been determined using a factor of safety of three relative to the normal operating pressure differential and 1.4 relative to the most severe accident condition pressure differential. Therefore, the internal pressure end cap loads which normally lead to an axial stress in the tube are not transmitted below about 1/3 ofthe W* depth. This means that the only source of stress acting to extend the crack is the primary pressure acting on the flanks of the crack. Since the tube is captured within the tubesheet, there are additional forces acting to resist opening of the crack. The contact pressure between the tube and tubesheet results in a friction induced shear stress acting opposite to the direction of crack opening, and the pressure on the flanks is compressive on the material adjacent to the plane of the crack, hence a Poisson's ratio radial expansion of the tube material in the immediate vicinity of the crack plane is induced which also acts to restrain the opening of the crack by increasing the contact pressure between the tube and the tubesheet. In addition, the differential thermal expansion of the tube is TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 36 of 61 Our ref: LTR-CDME-04-148 10/27/2004 greater than that of the carbon steel tubesheet, thereby inducing a compressive stress in the tube below the W* length.

A scoping evaluation of the above effects was performed by ignoring the forces that resist the crack opening, and simply looking at the effect of the pressure acting to open the crack. If a 3600 throughwall crack is considered, the stress from the pressure on the flanks is 0.206 or 20.64% of the stress that would result from an end cap pressure load for the same pressure. The primary pressure during normal operation and during a postulated accident is 2250 and 2665 psia respectively. The actual pressure difference between accident and normal operating conditions is 415 psi or 18% and the relative effect is equivalent to a change in pressure of 100 psi or 4% if the source of the stress were the end cap pressure differential.

The magnitude of the effect can also be used to conservatively estimate the ligament thickness of tube material affected. Using the ASME Code specified minimum yield stress of 35.2 ksi at 650'F, the applied forces can be calculated as if the pressures were applied to the entire cross-sectional area of the tube material, thus representing the maximum force'that can be applied to the tube as the result of a pressure on the crack flanks. These calculated maximum forces are 290.9 and 349.6 lbs at internal pressures of 2250 and 2665 psia respectively. So as not to exceed the yield stress, less than 9% of the cross-sectional area of the tube is required to resist the maximum force of 344.6 during a postulated accident. This equates to a circumferential crack that extends 360° and is 92% through-wall, i.e., the remaining material is less than 3.5 mils thick.

The corresponding value for the normal operating condition is a little more than 3.0 mils. Thus, the difference in required wall thickness between the normal operation and accident condition pressures is on the order of 0.5 mil. If the resisting forces discussed above were to be included in this evaluation, the difference would be significantly less.

In summary, considering the worst-case scenario, the likelihood of ligament tearing from radial circumferential cracks resulting from an accident pressure increase is small since at most, only 8% of the cross-sectional area is needed to maintain tube integrity. Also, since the crack face area will be less than the total cross-sectional area used above, the difference in the force applied as a result of normal operating and accident condition pressures will be less than the 53.7 lbs calculated for the Model 51 steam generators. Therefore, the potential for ligament tearing is considered to be a secondary effect of essentially negligible probability and should not affect the results and conclusions reported for the W* evaluation. The leak rate model does not include provisions for predicting ligament tearing and subsequent leakage, and increasing the complexity of the model to attempt to account for ligament tearing has been demonstrated to be not necessary (Reference 5.2).

5.2.6 Discuss No Contact Length for Normal/Postulated Accident Conditions The no contact length for each of the SG zones for both normal and postulated accident conditions is the axial length over which dilation of the tubesheet causes the mechanical interference fit contact pressure between the tube OD and the tubesheet hole surface to reduce to zero. The no contact length during normal operating conditions is less than 1.0 inch in Zones A and B. The no contact length during a postulated SLB is less than 3 inches in Zones A and B.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 37 of 61 Our ref: LTR-CDME-04-148 10/27/2004 All WEXTEX expansions are assumed to have a small gap over the upper 0.7 inches of distance below the BWT for both pullout force and leakage analyses.

5.3 STEAM LINE BREAK LEAKAGE CONSIDERATIONS (CALLAWAY RAI # 59)

The leak rate model included in Reference 2.1 is based on data from crevice tests and from cracked tube tests. The computer code CRACKFLO is based on the theory of two phase flow and crack opening area. Crevice flow uses a theory model with empirical data for validation at various levels of contact. An empirical effective axial crack length is used. The individual elements of which have been validated against test data. The DENTFLO model is based on a crack in series with the crevice. The model balances flow through the crack and through the crevice such that the continuity is maintained. The pressure at the exit of the crack must match the pressure at the entrance to the crevice. A deterministic corrosion calculation algorithm has been demonstrated to be conservative to a Monte Carlo simulation of uncertainties.

5.3.1 Validation of W* Leak Rate Model Through In Situ Testing (Callaway RAI # 63, St.

Lucie 2 RAI # 19)

The following discussion is included for information only. The use of a bounding leak rate model based on test data for the SQN2 SG indications obviates the need to apply the standard W* leak rate model.

W* Leakage Model and In Situ Testing Validation Program The W* leakage model was developed based upon first principles of leakage from a crack in a tight crevice. Leakage from a tight crevice is a series path through the crack with the crack opening constrained by the tubesheet, and followed by leakage through the tight crevice. In the leakage model, the total steam line break (SLB) pressure drop occurs from the tube inside diameter (ID) to near the top of the tubesheet (TTS) at the bottom of the WEXTEX transition (BWT). The crack inside the tubesheet, with very small clearances, cannot open significantly due to the constraint of the tubesheet hole ID. Leakage tests were performed to directly model this effect by measuring the leakage at the upper tip of the crack with small tube to tubesheet clearances. The leak rates for the constrained crack are correlated with contact pressure using an equivalent CRACKFLO crack length to represent leakage. Since the equivalent crack length is the length that gives the measured leak rate, the plot of Figure 6.4-1 of WCAP-14797, Revision 2, is essentially the leak rate through the crack at the crack tip versus contact pressure. The principal purpose in introducing the CRACKFLO equivalent length, rather than measured leakage, is to permit adjustments of the measured leak rates for the pressure drop across the crack in series with the crevice pressure drop for the leakage model.

The test data for leakage through the crevice is modeled using the crevice loss coefficient correlated with contact pressure. The loss coefficient is fit to each measured leak rate for the correlation with contact pressure, such that the correlation is essentially the leak rate through the crevice versus contact pressure. The use of a loss coefficient correlation, rather than leak rate, TVA WSTARdoc 03/12/2004_10:49 AM 5 175.doc:49

Page 38 of 61 Our ref: LTR-CDME-04-148 10/27/2004 permits adjustments of the leak rate for the pressure drop across the crevice in series with the crack pressure drop.

Both the effective crack length and loss coefficient correlations are obtained as regression fits from the leak rate measurements. These values, therefore, are not analytical results. The analytical model is only used to perform the series leakage analysis, and consists primarily of adjustments to obtain equal leakage through the crack and crevice for the total tube ID to crevice exit pressure drop. This is a first principles fluid flow calculation based on prototypic, experimentally developed, effective lengths and loss coefficients. Combined crack and crevice leak tests by in situ testing were been performed in 2R9 and 2R1 0 as described below.

To date, 14 W* indications have been in situ leak tested in the industry: 7 at Diablo Canyon Unit 2 (DCPP 2) at refueling outages 2R9 (1999) and 2R10 (2001), 1 at Sequoyah Unit 2 (SQN 2),

and 6 at Beaver Valley Unit 1 (BVPS 1). The indications are listed in Table 5-3. No leakage was observed in any test. Most of the indications were located near the bottom of WEXTEX transition (BWT), such that the tubesheet provided minimal crevice restriction. The DCPP 2 indications are located in tubes that had been deplugged, were tested to normal operating pressure differential, and were returned to service. Non-deplugged W* indications at DCPP have not grown deep enough to satisfy the requirements for leak testing.

It is the TVA intent to only in situ test indications that meet the requirements of the EPRI In Situ Guidelines.

TVA WSTARdoc 03/1212004_10:49 AM 5175.doc:49

Page 39 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Table 5-3 Industry In Situ Test Results for Axial PWSCC in WEXTEX Region Plant Year SG Tube Deplug Crack distance Peak Crack Max Approx Test Leak tube below BWT, Volt Length Depth Length >

Pressure Rate (below mTS inch 80%, inch for SQN and BVPS). inch DCPP 2 1999 1

R3C59 Yes 0.51 5.6 0.27 100%

0.23 NOP 0

DCPP 2 1999 1

R7C62 Yes 0.59 4.2 0.35 80%

None NOP 0

DCPP 2 1999 2

R31C25 Yes 0.98 4.0 0.24 70%

None NOP 0

DCPP 2 2001 3

R7C52 Yes 0.56 3.4 0.43 94%

0.37 NOP 0

DCPP 2 2001 4

R3C5 Yes 0.55 1.5 0.83 100%

0.63 NOP 0

DCPP 2 2001 4

R2C29 Yes 3.52 4.5 0.91 100%

0.84 NOP 0

DCPP 2 2001 4

R2C29 Yes 1.83 0.9 0.34 100%

0.1 NOP 0

SQN 2 1997 4

R7C17 No 0.15 3.6 0.32 100%/O 0.02 3dpNO 0

BVPS 1 1997 A

RIOC51 No 0.24 0.7 0.30 77%

None 3dpNO 0

BVPS 1 1997 A

R27C28 No 3.20 1.2 0.22 35%

None 3dpNO 0

BVPS 1 1997 B

R5C83 No 0.35 1.5 0.21 30%

None 3dpNO 0

BVPS 1 1997 C

R27C31 No 0.60 0.9 0.18 44%

None 3dNO

()

BVPS 1 2001 A

R7 C59 No 1.86 1.98 33%

N/ASLBAP 0

BVPS I 2001 B

R35C22 No 1.51 1.3 50%

N/A SLBAP 0

(l) In situ pressure testing tooling system leakage. No leakage judged to be due to a flaw.

W* in situ leak tests are conducted at the normal operation differential pressure. If the indication leaks, the test will be continued up to the SLB differential pressure, and the tube will be repaired.

If leakage is not detected at the normal operation pressure difference, the test would be terminated without extending the pressure differential to SLB conditions. All tubes that are tested in siit are removed from service regardless of the test results.

Also, it is noted that in situ leak testing of likely throughwall indications near the top of the tubesheet does provide meaningful information relative to the potential for throughwall indications located deeper in the tubesheet to leak. The in situ testing experience has been such that indications do not leak. Because the hole dilation diminishes with distance into the tubesheet, there is a location with a post accident condition radial contact load that corresponds to that achieved during the in situ testing. Thus, testing of through wall indications near the top of the tubesheet supports the evaluations that conclude that leakage from tube indications deeper in the tubesheet would be negligible.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 40 of 61 Our ref: LTR-CDME-04-148 10/27/2004 5.3.2 Discussion of Tube Radial Contraction Effect (Diablo Canyon RAI # 2)

Equations 4.4-4 and 4.4-7 of WCAP-14797-P, Rev. 2, do not include a term to account for a contraction of the tube by the Poisson effect due to tube end loading. Had this been accounted for, the term P1 2a 2b1 E, [b -a 2 (Current 4.4-4 Term) in both equations 4.4-4 and 4.4-7 would have been written as Corrected Equation E

[(b 2

)

]2 (Modified 4.4-4 Term)

The net result of including the Poisson effect in the expression for the outward movement of the tube OD due to internal pressurization, i.e., accounting for the end cap load on the tube, would be a maximum 15% reduction in the calculated value for the outward movement of the tube OD due to internal pressure. This is based on a value of Poisson's ratio, v, of 0.3 so 2-v or 1.7 should have been used instead of 2 as the constant in the numerator. Calculations have been performed to determine the net result of including the aforementioned Poisson effect in the expression for the tube-to-tubesheet contact pressure, with equation 4.4-7 written as:

E [ b-a:b +b(atbe -arr)(T-70)

E 2 ba2+

2 b [C2 + b2 +1+

b Fb 2 +a2_

Ers~c c2-2 J E, Lb 2 -a2 j(Modified 4.4-7)

For the range of contact pressures associated with the data in Figure 6.4-2 of WCAP-14797, Rev.

2, including the Poisson effect due to the tube end cap load produces net reductions in the contact pressure ranging from 50-350 psi, depending on the magnitude of the contact pressure plotted (which is a function of the internal pressure in the leak test specimen. A slight reduction of 50-100 psi occurs in the contact pressure for data points on the lower end of Figure 6.4-2, when accounting for the Poisson effect, thus shifting the data points slightly to the left. For the highest data points of Figure 6.4-2, a contact pressure reduction on the order of 250-350 psi would be calculated to occur, shifting these data points farther to the left. Hence, overestimation of the contact pressure through not accounting for the contraction of the tube due to the end cap load causes the scale on the crevice resistance correlation of Figure 6.4-2 and the effective crack length correlation of Figure 6.3-8 of WCAP-14797, Rev. 2 to shift outward. Modifications to account for the Poisson effect will cause both curves to become steeper, resulting in higher crevice resistance and a smaller effective crack length for a given calculated contact pressure.

Hence, neglecting the Poisson effect in calculating the contact pressure for the test specimens TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 41 of 61 Our ref: LTR-CDME-04-148 10/27/2004 produced conservative values of effective crack length and loss coefficient for the given contact pressures. This effect, however, is neutralized in the application of these correlations because lower contact pressures will be applicable for applying the correlations to calculate leak rates as described in Section 6.4 of WCAP-14797, Rev. 2. That is, the same contact pressure formula used to develop the leak rate correlations is also used to apply the correlations for calculating leak rates in Section 6.4. Hence, calculated leak rates using contact pressures which account for the Poisson effect would be expected to be negligibly different (estimated as less than a few percent) from those calculated neglecting the contraction of the tube due to the end cap load.

The conclusions from the leak rate analysis would not be affected by the absence or presence of the Poisson's term in the calculation of the contact pressure.

In retrospect, it would have been more appropriate to include the Poisson contraction effect in the analyses. However, the expected negligible impact does not justify performing a complete reanalysis of the data with the Poisson effect included (Reference 5.3). Moreover, it is noted that because the load transmitted along the tube diminishes with depth into the tubesheet, the original equation is correct below what would be a W* distance without the application of a safety factor to the end cap load. This would further diminish any effect below that distance and further support the conclusion that a correction, really a modification, to the analysis is not necessary.

5.3.3 Discussion of Secondary to Primary Leakage Following Postulated LOCA (Diablo Canyon RAI # 3)

During normal operation, the tube-to-tubesheet contact pressure in the region above the tubesheet neutral bending axis is reduced by upward bending of the tubesheet due to the primary-to-secondary AP. This reduction in contact pressure is a function of elevation and radial location from the center of the tubesheet, and is accounted for in the determination of the W* lengths.

During a postulated LOCA event, the primary side pressure drops to atmospheric conditions while the secondary side remains at 1005 psia. The component of the tube-to-tubesheet contact pressure resulting from primary pressure inside the tube is lost, and the external pressure on the tube acts to further reduce the tube-to-tubesheet contact pressure. However, the reversal of the AP across the tubesheet causes the tubesheet to bow downward, providing an increase in that component of the tube-to-tubesheet contact pressure above the neutral axis of the tubesheet. In the top four inches of the W* region near the top of the tubesheet, the increase in contact pressure due to downward tubesheet bending more than offsets the reduction in contact pressure due to the reversed AP across the tube wall. For instance, at a distance of 2" below the TTS, the tube-to-tubesheet contact pressure resulting from the primary-to-secondary AP is 790 psi during normal operation, while the maximum loss of contact pressure due to tubesheet bending is 1549.5 psi; the net minimum contact pressure (including an additional 509.8 psi contact pressure due to thermal expansion and 693 psi due to the residual WEXTEX contact pressure) is 443.3 psi. For postulated LOCA conditions, the loss of primary side pressure in conjunction with a secondary side pressure of 1005 psi results in a calculated contact pressure due to the secondary-to-primary AP of -1225.6 psi. However, tubesheet bow in the opposite direction adds 970.6 psi in addition to the 509.8 psi contact pressure due to thermal expansion and 693 psi from the WEXTEX expansion residual preload; the net minimum contact pressure is 947.8 psi, which is TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 42 of 61 Our ref: LTR-CDME-04-148 10/27/2004 504.5 psi greater than the contact pressure during normal operating conditions. The net effect is a tighter joint at the top of the tubesheet during a postulated LOCA event than exists during normal operating conditions. Past analyses performed by Westinghouse have shown that secondary-to-primary in-leakage through free span cracks occurs at a slower rate than primary-to-secondary leakage at the same AP. Based on this experience, along with the lower magnitude of the LOCA AP relative to that during normal operation, and with the increase of tube-to-tubesheet contact pressure at the TTS caused by the reverse tubesheet bow, in-leakage to the primary side during a LOCA event would be expected to occur at a slower rate than primary-to-secondary leakage during normal operation, which is limited to 150 gpd (0.1 gpm). In-leakage to the primary side through W* tubes during a LOCA event is therefore assured of occurring at a slower rate than 0.1 gpm and would therefore not affect the plant LOCA analyses (Reference 5.3).

5.3.4 Discussion of Consistency of Leak Rate Results - C* Test Data Applicability 5.3.4.1 Introduction Reference 5.4 describes the development of criteria, designated W* (W-star), developed for utilities to use to disposition steam generator (SG) tube degradation when such degradation is found in the tube length that is within the tubesheet for tubes explosively expanded into the tubesheet, i.e., Westinghouse SGs with WEXTEX tube-to-tubesheet joints. A presentation was given to the NRC staff in 1996, Reference 5.5, and again in September 2003, Reference 5.6, further explaining the basis for the establishment of the criteria and its implementation.

Following the development of the W* criteria, two additional criteria were developed, designated H* for dealing with indications in tubes hydraulically expanded into the tubesheet in Westinghouse SGs and C* for dealing with indications in tubes explosively expanded, explanded, into the tubesheet in Combustion Engineering (CE) fabricated SGs. The information developed from these programs has been used to technically justify limiting the length of eddy current test (ECT) rotating pancake coil (RPC) inspection of the tubes within the tubesheet, notwithstanding the full length inspection using bobbin coil technology. The rationale is that the regulatory criteria relative to margin against burst during normal operation and postulated steam line break (SLB) events is precluded by the presence of the tubesheet and that the total leak rate from all indications within the tubesheet would be less than the UFSAR accident analysis assumption for primary-to-secondary leakage in the faulted loop during a postulated SLB, typically less than 1.0 gpm. The only possible mode of burst for tubes with degradation within the tubesheet is expulsion from the tubesheet of a severed tube end. It has been found that the length of engagement required to preclude burst relative to the length required to meet leakage requirements is a function of the joint fabrication process. The length required to meet leak rate requirements is usually longer than the length required to prevent burst for explosively and hydraulically expanded joints. The number of circumferential indications in WEXTEX tube-to-tubesheet joints is very small, and the testing program demonstrated that axial indications would be expected to exhibit no or miniscule leak below the W* distance, hence the conclusion was expressed that degradation of any extent could be tolerated below W*.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 43 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Recent leak rate results obtained from a second series of tests of explanded joints were preliminarily found to be potentially significantly greater than those obtained from the first series oftests. This prompted one utility with CE designed SGs to conservatively increase the length of the RPC inspection within the tubesheet because the final analysis of the test data was, and still is, incomplete, hence the final results of the analysis for CE explansion joints were and are unknown. However, a thorough review has since confirmed the validity of the original testing (Reference 5.7). Several of the steps taken by the test operators effectively deoxygenated the deionized water that was used in the W* leak tests. Nitrogen sparging, dissolved oxygen measurements or frequent venting during heatup was adequate to remove oxygen from the test water. Cooldown procedures and between test machining steps were conducted in a manner such that the sample was not exposed to air while at an elevated temperature. Therefore, it is highly unlikely that oxides formed within the tight annulus between the tube and the tubesheet stimulant that would have affected the leak rate results.

5.3.4.2 Testing Information There have been several series of tests performed on specimens expanded into tubesheet simulating collars using installation techniques typical of those used to fabricate the original SGs.

The results of these tests have led to the establishment of plugging or inspection criteria designated as W* for WEXTEX, H* for hydraulic, and C* for Combustion Engineering tube-to-tubesheet joints. The predecessor criteria were F* for force and L* for leak rate from hard rolled tube-to-tubesheet joints. The F* criterion involved no leakage from the tubesheet crevice and is of no interest in this discussion except to note that F* was the length of engagement necessary to resist pullout of the tube from the tubesheet under all operating condition loads. The L* criteria, the length of engagement to prevent leakage, was similar to the W* criteria and the philosophy of development was the same. Because the length of engagement to prevent leakage, L*, in hard rolled joints was so short, shorter than the F* length, there was no consideration of allowing cracks to remain in service within the L* length.

5.3.4.2.1 W* Testing The leakage from cracks inside the tubesheet is comprised of two leak paths. One path is the tube to tubesheet crevice above the top of the crack. The second leak path is related to the ability of a crack to open inside the tubesheet where the tubesheet constrains opening of the crack flanks in the radial and hoop directions. The W* leak tests included two series of tests to separately measure leakage from the two leakage paths. The two tasks supported a W* leak rate calculation model incorporating the two leakage paths in series and satisfying conservation of mass and momentum relations.

The leakage path for the tube-to-tubesheet crevice leakage was achieved by drilling holes through the collar simulating the tubesheet and tube. The area of the drilled holes in the tube was sufficient for the tests to approximate leakage from a tube severed at the area of the holes. In particular, some of the tubes were staked, i.e., deformed inward, at the holes to assure separation of the tube from the collar, effectively opening the leak path at the interface. The measured TVA WSTARdoc 03112/2004_10:49 AM 5175.doc:49

Page 44 of 61 Our ref: LTR-CDME-04-148 10/27/2004 leakage from these tests represents crevice restriction as a function of tube to tubesheet contact pressure as the only limitation on leakage.

The second series of tests were performed as constrained axial crack leak tests. These tests were performed to reflect the limited ability of the crack to open inside the tubesheet as a reduction in leakage compared to a freespan crack or a severed tube. Tube sections were prepared with fatigue cracks, which conservatively model primary water stress corrosion cracks (PWSCC) since the fatigue cracks are uniformly throughwall with no ligaments and have a smoother crack face surface (less tortuosity) than corrosion cracks. The tubesheet collars were drilled with tight tolerances and the test tubes were ground on the OD in order to obtain small, well defined initial gaps to improve the accuracy of the contact pressure analyses. The collars were machined with a 360° groove with axial grooves to the top of the collar providing a large leakage path from the circumferential groove to the top of the collar. For the leak tests, the upper tip of the fatigue crack was located at the bottom of the circumferential groove in the collar to provide a leak path from the crack tip to the top of the collar with a negligibly small resistance. These tests measure only the constraining effect of the tubesheet on crack opening and leakage to the tip of the crack.

Tests were performed in two collars with initial ambient condition diametral tube-to-collar gaps of 0.4 and 0.9 mils to obtain variability in the contact pressures. The elevated temperature tests were performed with borated and lithiated water to simulate primary water conditions. These tests thus measured leakage from a constrained crack to the tip of the crack as a function of contact pressure. These test results in combination with the crevice leakage test results provide test data for the entire leakage path in support of the leakage model for tubesheet crack leakage.

The results from the crevice tests were used to develop a flow loss coefficient or resistance as a function of contact pressure between the tube and the tubesheet. This was necessary because the tubesheet bows upward during operation resulting in a varying contact pressure that is a minimum at the top of the tubesheet and a maximum at the bottom. The leak rate equation is, Q IdP()

pK dx where Q is the leak rate, p is the effective viscosity of the fluid (water or steam or a combination), K is the loss coefficient, and dP/dx is the axial primary-to-secondary pressure drop driving the fluid through the crevice. The test programs are conducted to solve the rearranged

equation, 1 dP pQ dx' (2) and results in the determination of the logarithm of K as a linear function of the contact pressure, P,, between the tube and the tubesheet, see Figure 5.1. Three-dimensional finite element analysis was performed to map the tube-to-tubesheet contact pressure as a function of depth into the tubesheet at various radii from the center of the SG. This later step was taken to account for the dilation of the TS holes because the TS bows upward due to the primary-to-secondary pressure difference. In summary, a prediction of the potential leak rate from any and all indications within TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 45 of 61 Our ref: LTR-CDME-04-148 10/27/2004 the tubesheet could be made based on a knowledge of the flaw distance below the top of the tubesheet, the temperature within the tubesheet, the radial location of the tube hole in the tubesheet (by row and column) and the primary-to-secondary operating conditions. The second series of tests was performed to measure the effect of the tubesheet on the leak rate from axial cracks in the SG tubes. The results of the analysis of the test data demonstrated that the loss coefficient would be extremely large for indications located below about 6 inches into the tubesheet.

The crevice testing was conducted at ambient and elevated temperature conditions using deionized (Dl) water, and, based on Reference 5.7, also deoxygenated water. A review of the test data the test equipment and test conduct indicates no apparent anomalies and no reason to question the efficacy of the obtained data. A total of four specimens were tested at a variety of internal pressure and temperature conditions. The results of the tests exhibited similar trends with no single specimen dominating the results. Moreover, the room temperature test results were consistent with the elevated temperature results according to the model, i.e., the major contributor to the leak rate behavior should be the viscosity for the same contact pressure conditions. Finally, a review of the testing program information from the time, including a meeting with the test engineer (now retired), indicates that the level of oxygen in the test water was minimized, a heated reservoir was used and the reservoir was vented periodically to control the pressure and remove oxygen.

5.3.4.2.2 H* Testing Programs The initial H* tests were conducted in the late 1990's using Westinghouse Model F tube specimens hydraulically expanded into carbon steel collars to simulate the tube-to-tubesheet joint. The justification of the H* length also made use of test results documented in a 1988 Westinghouse report relative to demonstrating the efficacy of the hydraulically expanded joints in Model F SGs. Tests were conducted for two different lengths of engagement and a variety of induced contact pressures between the tube and the tubesheet. The contact pressure can be controlled by the internal pressure in the tube and the temperature at which the test is performed.

The Model F SG tests were conducted using DI water at ambient and elevated temperatures and at various primary-to-secondary differential pressures simulating normal operation and postulated accident conditions. The analysis approach was the same as that for W* in that a loss coefficient as a function of contact pressure was calculated and used to predict the leak rate of potentially throughwall tube indications within the tubesheet. A review conducted in 2001 of the earlier test data indicated that the leak rate resistance could be a function of the time-at-temperature of the specimen, i.e., the leak rate may decrease with operating time.

It was postulated at the time by Westinghouse that the interaction of the hot deionized, but not deoxygenated, water could have resulted in oxidation of the tubesheet in the crevice leading to the decrease in the leak rate as a function of time. It was also postulated that a similar corrosive reaction would take place in primary water as the carbon steel would interact with boron carried through the crack. Replenishment of the boron would not take place once the flow was stopped and further corrosion would not take place. Thus, the test results would be expected to be in concert with field data wherein an operating plant with Model F SGs with hydraulically TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 46 of 61 Ourref: LTR-CDME-04-148 10/27/2004 expanded tubes was concluded to have a tube that was severed or nearly severed several inches into the tubesheet without attendant leakage during operation or during in situ testing. A second laboratory testing program was undertaken using tube specimens representative of Westinghouse Model D5 SGs to extend the H* results to another class (different tube size) of Westinghouse SGs with hydraulically expanded tubes. Deoxygenated primary water was used as the testing medium for the second series of tests. The results from the tests indicated a slight, but not statistically significant, decrease in the leak rate as a function ofjoint length and/or contact pressure. In other words, the resistance to leaking primary water increased relative to the use of DI water. This information provided direct confirmation relative to the adequacy of the use of DI water for the H* crevice leak rate testing and probably the W* test program, both of which were conducted at the Westinghouse laboratory in Churchill, Pennsylvania. Subsequent information, Reference 5.7, indicates that the deionized test water would have been depleted of oxygen also.

5.3.4.2.3 C* Testing Programs The approach taken to demonstrating compliance was to determine the depth within the tubesheet that degradation of any extent could be postulated for all ofthe tubes in the SG and the leak rate requirement of the UFSAR accident analyses leak rate assumption in the faulted loop during a postulated SLB event would not be exceeded. The required length of engagement was determined from a series of tests performed for the Combustion Engineering Owners Group (CEOG). A length of engagement on the order of 7 inches, including measurement error, was calculated to be sufficient to meet a typical leak rate requirement of 0.1 gpm, apportioned to the tube circumferential indications within the tubesheet, during a postulated SLB event if all of the tubes were considered to have 360° by 100% deep circumferential cracks at that elevation. The tests were conducted using typical tube sizes for CE designed plants, test blocks and collars representative of the tubesheet fabrication process, and also included a tubed section of tubesheet from a plant that was cancelled during fabrication of the components. The explansion installation process for the tubes into the tubesheet holes was either duplicated or the tube-to-tubesheet joints already existed. Tubesheet holes in CE designed units are classified as being either rough bore or smooth bored depending on the plant. The rough bore drilling process results in holes more like, but not necessarily identical to, those in Westinghouse designed SGs, also a drilling process, than the smooth bore trepanning process used for a few plants' SGs.

Most of the initial test program was conducted using specimens at ambient conditions, i.e., 70'F, with a few specimens tested at elevated temperature. All of the first series of tests used deionized water as the testing medium. A significant fraction of the specimens exhibited no leakage at pressures approximating normal operation and SLB conditions. The results of the tests were analyzed using the W* methodology for the Reference 5.6 presentation in response to an NRC query regarding whether the results obtained by Westinghouse were similar to those obtained by CE (now a part of Westinghouse). It was found that the loss coefficients from the C* tests were not inconsistent with those from the W* tests. This is an expected result since the explosive expansion process would be expected to be somewhat consistent, but not identical, from one SG fabricator to another. As noted above, it is possible that the finish results from the drilling process would also be different and the differences could affect the leak rate test results.

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 47 of 61 Our ref: LTR-CDME-04-148 10/27/2004 A second series of tests was initiated at the same time as the Model D5 testing program to increase the amount of data available at elevated temperature and to obtain results using primary water as the testing medium. A total of nine (9) specimens remaining from the initial test program were tested to obtain additional leak rate data points. The preliminary results from the analysis of the test data indicated an average decrease in the crevice resistance, i.e., loss coefficient, of about a factor of eight relative to the prior C* test data. Since the final results from the analysis of the data were not expected to be available for several weeks, one utility, with a plant in a SG inspection outage, decided to significantly increase the length within the tubesheet that would be inspected by RPC. Those results have not been finalized as of the time of this writing, however, there are no expected findings that would raise any concerns relative to the W* test program or its results.

5.3.4.3 Discussion There have been several series of tests run to measure the resistance of the tube-to-tubesheet crevice for a variety ofjoints fabricated by both Westinghouse and Combustion Engineering.

Most of the tests employed deionized water as the test medium but some of the recent tests employed a primary water simulant, borated and lithiated. Two sets of test results from the recent tests provided a direct comparison of results using DI water with those using borated and lithiated water. One set of those tests led to results indicating the later medium leads to reduced leakage relative to DI water while the other led to somewhat contradictory results. The first set was performed using test specimens simulating the hydraulic expansion of tubes into the tubesheet while the second simulated the CE explosive expansion process, a.k.a. explansion.

Hydraulically expanded joints are looser than explosively expanded joints and offer less resistance to flow. In addition, models of the joint behavior would indicate that the W* joint loss coefficient should exhibit a higher dependency, i.e., correlation slope, that that of H* joints. The W* results are totally consistent with these technically based expectations. In addition, the conduct of the W* tests was such as to minimize any of dissolved oxygen in the testing medium.

There were some inconsistencies noted from the results of the second series of C* tests. The leak rates were of similar magnitude to those obtained from tests of hydraulically expanded, i.e., H*,

joints. This is contradictory to physical expectation since explosively expanded joints have been verified to lead to a higher pullout resistance. This higher residual contact pressure results in a smaller leak path through the crevice and should result in a smaller leak rate for the same thermal and differential pressure conditions. In addition, the leak rates from the second series of C* tests did not result in significant differences between smooth and rough bore tubesheet specimens.

The first series of tests demonstrated a higher crevice leakage resistance for rough bore tubesheet samples. This is consistent with some models of the tube-to-tubesheet interface and how it is changed during the expansion process.

5.3.4.4 Conclusions There is no direct evidence to suggest that any changes should be made to the W* inspection length. Indeed, final analyzed test data, the H* results, indicate that there should be no difference TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 48 of 61 Our ref: LTR-CDME-04-148 10/27/2004 between results obtained with deionized or primary water. There are enough consistencies between the results obtained from the original W* tests relative to the later H* tests to conclude that the data were valid and formed an appropriate basis for establishing the W* criteria values.

There are inconsistencies noted with the C* test results to conclude that they should not be used as a basis for modifying the W* criteria. Information gathered regarding the conduct of the tests supports this conclusion. Thus, the direct evidence that is available confirms the validity of the W* test results.

Finally, there are so few circumferential indications in the SQN2 SG tubes within the tubesheet that the margin relative to the allowable leak rate is very significant. The conclusion from these considerations is that the W* criteria should not be modified for the SQN2 tube inspections (Reference 5.8).

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 49 of61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 5.1 WEXTEX Loss Coefficient as a Function of Added Contact Pressure a,c,e TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 50 of 61 Our ref: LTR-CDME-04-148 10/27/2004 5.3.5 Address How Leak Model Addresses 3600 Circumferential Crack (Callaway RAI # 17, 26, 31 and 37)

The bounding leak rate model is directly based on the test data from effectively severed tubes and thus obviates the concern that led to the original RAIs. The prediction of leak rates is discussed in Section 4.0 of this report. The leak rate from a 3600 crack between at the W*

distance and 12 inches below the top of the tubesheet at the worst case radial location within the tubesheet is calculated to be 0.0045 gpm at 90% prediction interval. At greater than 12 inches below the top of the tubesheet, the bounding per tube leakage allowance is approximately 910 15 gpm. Modeling of future leak rates is a function of the number of circumferentially oriented cracks that are in the SGs at elevations below the W* distance.

5.3.6 Leak Rate Loss Coefficient RAI Discussion (Diablo Canyon RAI # 4 and 5)

The bounding leak rate model is directly based on the test data from effectively severed tubes and thus obviates the concern that led to the original RAIs. The response that was provided to support the application of W* at Diablo Canyon is provided for information.

5.3.6.1 Background Mr. Phillip Rush, then of the NRC staff, transmitted a facsimile to Mr. Thomas Pitterle of Westinghouse on September 29, 1998, with the following discussion:

"Attached are copies of some Excel graphs I made to investigate the possibility of specimen dependence on the unusual scatter evident in Figure 6.4-2 of the W* topical report. I first separated the data into four groups by specimen ID, i.e., W4-001, W4-004, NV4-008, and W4-018. Then I broke down the data in some of the groups into three subgroups (short, medium and long). Short medium and long specimens are those with crevice lengths on the order of 0.5 inches, I inch, and 2 inch respectively. As you can see from the attached figures, tests of W4-004 specimens and W4-018 clearly demonstrate that something unusual has cropped up in the test results. Please look at this and get back to me with your conclusions.

Feel free to call me to discuss this observation."

The facsimile from Mr. Rush looks at the data base used to establish crevice loss coefficients for WEXTEX tube-to-tubesheet crevices. This data base was developed from leak tests run on simulated WEXTEX crevices and appears as Figure 6.4.2 of Reference 5.4. The data set is listed in Table 6.2-3 of Reference 5.4.

The information plots transmitted by Mr. Rush depicted data from Reference 5.9, which was prepared in response to earlier RAIs and updated Table 6.2-3 of the WCAP to include calculated loss coefficients (flow resistance) for the test specimens. The essence of Mr. Rush's concern is summarized as "... tests of W4-004 specimens and W4-018 clearly demonstrate that something unusual has cropped up in the test results."

TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 51 of 61 Our ref: LTR-CDME-04-148 10/27/2004 The "something unusual" to which Mr. Rush refers is apparently that the loss coefficient appears to be dependent on crevice length. Physically, the loss coefficient should be independent of the length of the crevice.

5.3.6.2.

Purpose A review the NVEXTEX leak rate data set and resulting calculated loss coefficients was conducted to determine if an unwarranted crevice length effect on loss coefficient is evident in the test data (Reference 5.9).

5.3.6.3 Loss Coefficient vs. Contact Pressure (Diablo Canyon RAI #4 and # 5)

Mr. Rush re-plots the data set of loss coefficient vs. contact pressure (Figure 6.4-2 of Reference WCAP-14797-P, Rev 2). The loss coefficient test data used by Mr. Rush were provided via Reference 5.9. A review of the data set in this letter shows that most of the loss coefficients are an order of magnitude higher than those plotted on Figure 6.4-2. The corrected data set is attached as Table 5-3 to this letter and supercedes the data set previously provided via Reference 5.9. It is noted that Table 5-3 represents the data analyzed in support of the conclusions of Reference 2.1.

Mr. Rush's plots of the data, separated by sample number and crevice length, were re-plotted using the correct data set. These plots appear as Figures 5.2 through 5.5. Except for a few of the points, the plots have the same appearance as Mr. Rush's with the loss coefficient scale an order of magnitude lower. The data scatter on Figures 5.2 through 5.5 is consistent with the scatter on Figure 6.4-2 of Reference 5.4. Recall that the data appear to have constant variance about the regression line of Reference 5.4 and do not contradict the assumption of normality for the distribution of the residuals from the regression analysis.

On the surface, Figure 5.3 (for Sample W4-004) and to a lesser degree, Figure 5.5 (for Sample W4-018) seem to indicate that loss coefficient is increasing with decreasing crevice length.

Samples W4-001 and 008 do not show this pattern. Figures 5.6 through 5.9 re-plot the same loss coefficient data sets versus crevice length with operating conditions as a parameter. When viewed in this manner, the data shows no consistent trend of loss coefficient variation with length. Sample WP4-001 shows a general increase of loss coefficient with length although one set of operating conditions shows the reverse trend. The medium lengths for Sample WP4-004 have lower loss coefficients than the short lengths, but the trend is reversed for the single set operating conditions tested at the long length. Sample WP4-008 shows a general increase of loss coefficient with length. Sample WP4-018 shows a decrease of loss coefficient with length for the medium and long lengths, but the reverse trend for the single case of short and medium length tested.

5.3.7.4 Conclusions The above review of the loss coefficient data for WEXTEX crevices shows no consistent length effect. The absence of a length effect is expected based on physical grounds.

TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 52 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Overall, it is noted that the leak rate data include considerable scatter, but do not show unacceptable bias toward the variables influencing crevice leakage. While scatter is common for leak rate data, the W* tests may include more than typical data scatter. The leak rates are small and minor variations in the crevice can influence the observed leak rates. Regardless, the spread in the loss coefficient data and associated uncertainties on the leak rates are included in the W*

analyses, for both the loss coefficient and effective crack length.

5.3.7 Evaluation of Axial PWSCC within W* Distance (St. Lucie RAI # 17 and Callaway RAI # 72)

SLB Conditions Leakage Potential from Axial PWSCC within W*

At the BVPS 1 Rl 5 outage, 18 axial PWSCC indications on 18 tubes were reported. These indications ranged in elevation from 0.18 inch below TTS to 9.79 inch below TTS. The breakdown of indications per SG was; SGA, 3, SGB, 5, SGC, 10. Ten (10) of these 18 indications were noted within 1 inch of the TTS, and are assumed to be located within the expansion transition. The largest amplitude signal of 1.89 volts by +Pt was noted on tube R20 C36, SGA. Based on a +Pt amplitude versus depth correlation developed by Westinghouse, the maximum depth of this indication is estimated at 71%TW. The phase based depth analysis indicated a maximum depth of 97%TW. This flaw was located at 0.43 inch below TTS, which locates it within the expansion transition, and this elevation report is also consistent with the measured BWT. As this indication was located so close to the TTS, if it truly contained I 00%TW penetration, leakage would be expected. The flaw length from profiling was 0.31 inch.

This indication was in situ pressure tested to 2841 psi with no leakage and no burst reported at 4900 psi. FENOC has conservatively performed in situ pressure testing at previous outages of other axial PWSCC indications located within the W* distance. At the IR14 outage (2001), a 1.98 volt axial PWSCC indication located at 1.86 inch below TTS was in situ pressure tested with no leakage or burst reported. At Diablo Canyon, axial PWSCC indications with amplitudes up to 5.6 volts by +Pt have been in situ pressure tested with no leakage or burst reported. At 5.6 volts, this indication is judged to have contained a I00%TW penetration. No less than 5 of the in situ pressure tested indications at Diablo Canyon are judged to have contained a I00%TW penetration based on +Pt amplitude. None leaked during in situ pressure test.

Other industry in situ pressure test data supports the application of the voltage based sizing technique. During the Fall 2003 inspection at a plant with C-E SGs, a 1.9 volt by +Pt, 1060 arc length circumferential PWSCC indication was reported at the top oftubesheet. The phase based depth assessment indicated that the maximum depth of 99%TW extended for nearly the entire flawed length. This indication was in situ pressure tested for leakage only. No leakage was reported at 2900 psi. It should be noted that the depth estimate using the amplitude correlation is approximately 73%. In conclusion, in situ pressure testing of PWSCC indications at or below TTS has shown no leakage potential for indications up to 5.6 volts by +Pt.

TVA WSTARdoc 03/1212004_10:49 AM 5 175.doc:49

Page 53 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Growth of Non-Detected or New Initiates During Operation A history review of each of the BVPS IR15 indications was performed using the IR14 +Pt inspection data. Thirteen (13) of the 18, IR15 flaws had a precursor signal in the 1R14 data. Of the five 1R15 indications with no precursor signal in IR14, only one had an amplitude >IV.

This indication was found at 0.49 inch below TTS, placing it within the expansion transition.

The only indication with a modest amplitude growth was R20 C36, which had an amplitude growth of 1.38 volts. As this indication was located within the expansion transition, the higher residual stresses of the transition would be expected to exacerbate growth. R20 C36 also had the largest length growth of 0.14 inch, and also had the only substantial depth growth (by phase) of 59%. Cycle 15 growth data is provided in Table 1. The Cycle 14 growth statistics are essentially equal to the Cycle 15 growth statistics. The only appreciable difference between the growth data for Cycles 15 and 14 is maximum depth growth. The expansion transition flaws appear to have a slightly higher maximum depth growth. The average +Pt voltage growth of 0.31 volts is modest for PWSCC as PWSCC amplitudes are greater than ODSCC for equal depths. The average length growth of 0.01" suggests that the residual stress fields that initiate the PWSCC are limited in length and do not represent a potential for indications with significant lengths.

The average +Pt voltage of the 1 R14 precursor signals was 0.52 volts, suggesting that the detection threshold for axial PWSCC is slightly above this value. With a maximum +Pt voltage growth for Cycle 15 of 1.38, the maximum EOC16 PWSCC amplitude expected is approximately 2 V. Based on the correlation of+Pt voltage to maximum depth, this postulated indication would be expected to have a maximum depth of about 74%TW. Therefore, axial PWSCC within the W* distance that either is initiated during the cycle or remains in service based on probability of detection is judged to result in an indication that is well <1 00%TW at the end of the next operating cycle, and will not contribute to primary to secondary leakage during a postulated SLB event. If IR16 observed axial degradation within the W* distance is judged to contain 100%TW penetration, the end-of-cycle 17 evaluation of postulated SLB condition leakage will account for these indications in the calculation of SLB leakage in the operational assessment.

Indication Distribution Approximately half ofthe total reported indications occurwithin 1 inch of the top oftubesheet.

A regression of all indication elevations and number of indications within a 1 inch elevation bin produces a best fit curve that predicts approximately 2 indications in the 8 to 9 inch below TTS bin, and approximately 1 indication per bin at 12 inches below TTS and lower. A regression was fit using all data with the exception of the data in the TTS to 1 inch below bin to determine if the initiation trend follows a similar pattern as for all data. The regression for this subset of data is essentially equal to the regression for all data. Thus, the judgment that the flaw initiation potential decreases with increasing depth below TTS remains valid for this data. Figure 4.4 presents the plot of all data and below expansion transition data as a function of depth below TTS. Note that the 90% probability prediction interval for all data bounds the data, particularly at the deeper elevations (Figure 4.4).

TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 54 of 61 Our ref: LTR-CDME-04-148 10/27/2004 5.3.8 Contact Pressure Throughout the SLB Event (Callaway RAI # 61)

Information provided to the NRC during the June 8, 2004 meeting plots contact pressure as a function of depth below TTS for the SLB event at 4200 seconds. WCAP-14797 presents a summary of contact pressures for various conditions. Using the WCAP-14797 information for normal operating conditions, the Zone B contact pressure at 8" below TTS is approximately 1406 psi, with WEXTEX contact pressure included. However, this calculation assumes a hot leg temperature of 590'F and also assumes that the secondary side pressure (assumed 900 psi) acts on the tube OD over the entire tube in tubesheet length. For the SQN2 condition, additional contact pressure will be provided due to the actual hot leg temperature of 609.50F. The drilled hole leakage test data suggests that the pressure drop through the actual crevice length of 2.25 inch is about 2500 psi based on the observation that 2 of the 4 samples had no leakage during the leak test with a 2650 psi pressure differential. Thus, the assumption that the secondary pressure acts on the tube OD in the crevice without losses is quite conservative. If secondary side pressure does not act on the tube OD in the crevice at deep depths, which is a reasonable assumption, and the actual hot leg operating temperature and pressure differential for SQN2 is applied, the normal operating contact pressure at the tubesheet neutral axis is approximately 2403 psi, which bounds the contact pressure of the 3 inch nominal samples. The SLB reference case for contact pressure evaluation used a hot leg temperature of 460'F and pressure differential of 2560 psi. The neutral axis contact pressure for the SLB case at 4200 seconds is approximately 2903 psi, which also bounds the contact pressure of the 3 inch nominal samples.

Contact pressures at the neutral axis were also evaluated for the Case (3) condition of Table 3.2-1 of WCAP-14797. This case considers plant conditions at 600 seconds into the SLB event. For this case the hot leg temperature is 433°F, the secondary side temperature is 212'F, and primary to secondary pressure differential is 2344 psi. The contact pressure at the neutral axis is 2683 psi, which still bounds the contact pressure of the 3 inch nominal leakage samples by approximately 600 psi. These calculations were performed using the same model used to develop the contact pressures contained in WCAP-14797, only the input values were changed to account for the different temperatures and pressures. These calculations were performed for a depth below TTS of 10.5 inch. The bounding leakage methodology presented to the NRC on June 8, 2004 compares contact pressures at 12 inch below TTS against the 3 inch nominal leakage samples. The actual tube contact pressures at 12 inch below TTS will be several hundred psi greater than the values listed above. Therefore, the bounding leakage methodology is judged to be conservative for the SLB event. While the leakage tests were conducted at 6000F and the 4200 second SLB hot leg temperature is predicted to be 460'F, the results of the leakage test are still considered applicable as flashing of the primary water in the crevice is expected to occur at both 6000F and 460'F, thereby resulting in a choked flow condition. Note that the measured, condensed mass flows are essentially equal for the range of pressure differentials, suggesting a potential for a choked condition. The contact pressure model calculates contact pressures at the neutral axis (10.5" below TTS), 6, 4, and 2" below TTS as well as at TTS. For the 6 inch below TTS elevation for hot leg temperature of 4330 F, secondary side temperature of 212 0F, and 2344 psi differential pressure, the contact pressure is 1803 psi. The bounding leakage model considers a separate leakage allowance for postulated separated tubes at 8 to 12" below TTS as well as >12" below TTS. Therefore, at 8" below TTS, the contact pressure is expected to TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 55 of 61 Ourref: LTR-CDME-04-148 10/27/2004 be approximately 2194 psi (interpolation using 6 inch and 10.5 inch below TTS contact pressures), which is well above the contact pressure of the 1.25 inch nominal leakage samples of approximately 1352 psi. Therefore, the bounding leakage methodology is judged to be conservative for the SLB event for both the 8 to 12 inch below TTS elevation and the >12 inch below TTS elevation.

TVA WSTARFdoc 03/12/2004_10:49 AM 5175.doc:49

Page 56 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Table 5-3 WEXTEX Loss Coefficient Reanalysis Arranged by Sample #/Crevice Length ac,e TVA WSTARdoc 03/1212004_10:49 AM 5175.doc:49

Page 57 of 61 Ourref: LTR-CDME-04-148 10/27/2004 Figure 5.2 Loss Coefficient vs. Crevice Length - Sample W'4-001 a,c,e Figure 5.3 Loss Coefficient vs Contact Pressure - Sample WN14-004 a,c,e TVA WSTARdoc 03/12/2004_10:49 AM 5175.doc:49

Page 58 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 5.4 Loss Coefficient vs. Crevice Length Sample W4-008 a,c,e Figure 5.5 Loss Coefficient vs. Contact Pressure -Sample W4-018 a,c,e TVA WSTARFdoc 03/12/2004_10:49 AM 5175.doc:49

Page 59 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 5.6 Loss Coefficient vs. Crevice Length Sample WP4-001 ace Figure 5.7 Loss Coefficient vs. Crevice Length Sample WP4-004 ac,e TVA WSTAR.doc 03/12/2004_10:49 AM 5175.doc:49

Page 60 of 61 Our ref: LTR-CDME-04-148 10/27/2004 Figure 5.8 Loss Coefficient vs. Crevice Length a,c,e Figure 5.9 Loss Coefficient vs. Crevice Length TVA WSTAR.doc 03/1212004_10:49 AM 5175.doc:49 a,c,e

Page 61 of 61 Our ref: LTR-CDME-04-148 10/27/2004

5.4 REFERENCES

5.1 NSD-E-SGDA-98-017, "RAI for Application of W* Tube Repair Criteria at Diablo Canyon," 1/26/98 5.2 CN-SGDA-04-52, "W* Ligament Tearing for Model 51 Steam Generators at Beaver Valley Unit I," 5/19/04 5.3 NSD-E-SGDA-98-260, Rev. 1, "Response to NRC RAls on Diablo Canyon W*", 8/20/98 5.4 WCAP-14797 (Proprietary), Revision 2, Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region WVEXTEXExpansions, Westinghouse Electric Company, Madison, PA (March 2003) 5.5 WCAP-14795 (Proprietary), NRC/Utility Meeting on Model 51 Steam Generator Tube IntegrityARCMethodology, Westinghouse Electric Company, Madison, PA (December 1996).

5.6 Presentation Material, "The Application of W* Criterion to TVA SGs at Sequoyah Nuclear Station," Tennessee Valley Authority Meeting with the NRC Staff, Rockville, MD (September 10, 2003).

5.7 LTR-SGDA-04-104, "Clarification of W* Leak Rate Testing," Westinghouse Electric Company, Nuclear Services Division, Madison, PA, April 29, 2004.

5.8 PGE-04-24, "Pacific Gas and Electric Company Diablo Canyon Units 1 and 2, W*

Implementation Recommendation," 3/12/04 5.9 NSD-E-SGDA-99-006, "NRC RAI on Diablo Canyon W* Loss Coefficient,"

Westinghouse Electric Company, Nuclear Services Division, Madison, PA, January 11, 1999.

TVA WSTARdoc 03112/2004_10:49 AM 5175.doc:49

ENCLOSURE 4 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 2 WESTINGHOUSE ELECTRIC COMPANY APPLICATION FOR WITHHOLDING AND AFFIDAVIT (CAW-04-1908)

Westinghouse Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Direct tel:

Direct fax:

e-mail:

(412) 3744643 (412) 3744011 greshajaewestinghouse.com Our ref: CAW-04-1908 October 28, 2004 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

LTR-CDME-04-147, "Application of W* to the Sequoyah Unit 2 Steam Generator Tubes" (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-04-1908 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.

Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-04-1908, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

Very t you 7/ J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Enclosures cc:

W. Macon, NRC E. Peyton, NRC A BNFL Group company

CAW-04-1908 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

Ss COUNTY OF ALLEGHENY:

Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

. A. Gres am, Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed, before me this 0d' day of A

2004 Notary Public Notaria Seal Sharon L Rod, Notary Pubric Monmeville Boro, Allegheny County My Cormoison Expres January 29,2007 Member. Pennssyivania Association orNotares

2 CAW 1908 (1)

I am Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2)

I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse "Application for Withholding" accompanying this Affidavit.

(3) 1 have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4)

Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i)

The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii)

The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a)

The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

3 CAW-04-1908 (b)

It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c)

Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d)

It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e)

It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f)

It contains patentable ideas, for which patent protection may be desirable.

There are sound policy reasons behind the Westinghouse system which include the following:

(a)

The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b)

It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c)

Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

(d)

Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component

4 CAW-04-1908 may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e)

Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(f)

The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iii)

The information is being transmitted to the Commission in confidence and, under the provisions of 10 CER Section 2.390, it is to be received in confidence by the Commission.

(iv)

The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-CDMR-04-147, "Application of W* to the Sequoyah Unit 2 Steam Generator Tubes" (Proprietary), dated October 2004. The information is provided in support of a submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted for use by Westinghouse for Sequoyah Unit 2 is expected to be applicable to other licensee submittals in support of implementing the W* inspection methodology addressing service induced degradation in the tube joint region of steam generators.

This information is part of that which will enable Westinghouse to:

(a) Provide documentation of the analyses, methods, and testing for the implementation of the W* tube inspection methodology.

(b) Provide evaluation of the required W* engagement lengths for Sequoyah Unit 2.

5 CAW-04-1908 (c) Provide a bounding W* potential steam line break leakage evaluation for Sequoyah Unit 2.

(d) Assist the customer to respond to NRC requests for information.

Further this information has substantial commercial value as follows:

(a)

Westinghouse plans to sell the use of similar information to its customers for purposes of meeting NRC requirements for licensing documentation.

(b)

Westinghouse can sell support and defense of this information to its customers in the licensing process.

(c)

The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.

Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar licensing support documentation and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.