2CAN060012, Unit 2 Additional Information on Proposed Risk-Informed License Change Regarding Steam Generator Tubing

From kanterella
Jump to navigation Jump to search

Unit 2 Additional Information on Proposed Risk-Informed License Change Regarding Steam Generator Tubing
ML003728901
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/23/2000
From: Vandergrift J
Entergy Operations
To:
NRC/OCIO/IMD/RMB
References
-RFPFR, 2CAN060012, TAC MA8418
Download: ML003728901 (71)


Text

Entergy Operations, Inc.

Russellville, AR 72802 Tel 501 858 5000 June 23, 2000 2CAN060012 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OP 1-17 Washington, DC 20555

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Additional Information on Proposed Risk-informed License Change Regarding Steam Generator Tubing (TAC NO. MA8418)

Gentlemen:

On March 9, 2000 (2CAN030003), Entergy Operations submitted a proposed license change to allow risk-informed operation for the remainder of the 14e operational cycle for Arkansas Nuclear One, Unit 2 (ANO-2). Supplemental information in support of the proposed change was submitted on April 11, 2000 (2CAN040005) April 28, 2000 (2CAN040006),

May30,2000 (2CAN050011), June 20, 2000 (2CAN060015), and June 22, 2000 (2CAN060017). The proposed license change was also discussed with the Staff during a meeting on June 8, 2000. By letter dated June 12, 2000 (2CNA060001), the Staff requested additional information necessary to continue the review of Entergy Operations' request. The requested information is attached.

Should you have questions concerning the information provided, please contact me.

Very truly yours, D. Vandergrf1 Dior, Nuclear Safety Assurance JDV/jjd attachments Ac /

U. S. NRC June 23, 2000 2CAN060012 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. Thomas W. Alexion NRR Project Manager Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 04-D-03 One White Flint North 11555 Rockville Pike Rockville, MD 20852

Attachment to 2CAN060012 Page 1 of 19 Additional Information in Support of Risk-informed License Change

1. Provide a description of the plant changes required to support the new depressurization procedure.

The Emergency Core Cooling System (ECCS) vent valves are used to depressurize the Reactor Coolant System (RCS) in the event that the RCS heat sink is lost.

This would occur during a loss of all feedwater to the steam generators. Under these conditions, the RCS would continue to heat up and increase pressure until the pressurizer safeties lifted. The RCS pressure would be greater than the shutoff head for the Safety Injection System pumps and no makeup would be available to replenish the water going out the safeties. Eventually the core would boil dry.

The ECCS vent valves are used to reduce the RCS pressure below the shutoff head of the Safety Injection pumps. With the RCS depressurized, water from the Safety Injection Pumps can then enter the RCS to provide core cooling. The water heated by the core will exit out the ECCS vent valve providing once through cooling for the core.

2S4741- . . gS *mtr 2F2]'-42 The ECCS vent valves consist of 2CV-4740-2 and 2CV-4698-1. Both valves are controlled from 2C-09 and are powered from opposite train 125 volt vital DC, making them available during a Station Blackout. The cabinets with breakers for these valves are both located in the 21B53 room (room 2091).

Attachment to 2CAN060012 Page 2 of 19 When actuated, the ECCS vent path provides a 2.624 inch diameter vent path to the quench tank.

During accident scenarios with a loss of one emergency train (both AC and DC),

the RCS cannot be depressurized using either ECCS vent or LTOP valves. The modification provides for the installation of equipment to facilitate temporary power to the ECCS vent valves.

The modification provides a simple means for both ECCS vent valves to be energized from the opposite DC bus using a temporary connection to permanently mounted twist-lock plugs. The permanently mounted twist lock plugs will be connected to the load sides of 2D26 breaker 2D26-A2 and 2D27 breaker 2D27-A2.

')2DG2-21 )2D01 -21 2D26 2D27

)2D26-A2 )D7A 2CV4740-2 2CV-4698-1 When loss of a DC bus occurs, the procedures direct the control room to dispatch the Emergency DC Crossconnect Watch to the 2B53 room to STANDBY for further instruction. When the need to depressurize the RCS is identified, procedure guide the control room operator to open the ECCS vent valve on the still energized bus. The Crossconnect Watch then opens the DC bus supply breaker to the de-energized MCC as directed by the control room operator (2D26 or 2D27). Next, the Crossconnect Watch will open the upstream feeder breakers to both ECCS vent valves. The Crossconnect Watch will then connect the extension cable. Once the cable connectors are locked in place, the feeder breaker to the ECCS vent valve on the energized bus is closed sending DC power to the opposite train vent valve. The second ECCS vent valve is then opened from the control room commencing depressurization of the RCS.

Attachment to 2CAN060012 Page 3 of 19 Female Plug Female Plug Male Plug Male Plug RD 2 D26 A213 1KBK 13K N. 2D27A2 2D26A2 BK (_)

(-)

Connected in cabinet 2D26 Stored Outside Room 2091 RD -- 2D27A2

(+)

Connected in cabinet 2D27 Cable is 3/C #6 with White Conductor Spared The connection cable will be stored in a cabinet located outside the 2B53 room and labeled as follows:

"FOR EMERGENCY USE ONLY" "USE PER SAMG Developed Strategy (SDS-02)"

The cables connected to each breaker will be identified with the same label. These cables will be found in the raceway between the Row "A" and "B" breakers in each cabinet.

Additional information on the use of this modification is included in the response to Questions 3 through 6.

2. Based on a description of each of the dominant scenarios that contribute to the high/dry portion of your core damage frequency, provide a description of the timing, and in particular timing of cues relative to plant state. Similarly, provide a description of the cues and what instrumentation is needed to provide those cues.

The primary cues to the operator to identify when to depressurize the RCS are as follows:

"* Level in either SG is less than 70" Wide Range. Monitoring of this parameter is initiated by Annunciator Corrective Action 2K04 F(G)I "EFAS A(B) S/G ACT" in which EFAS actuates at 23% Narrow Range which is around 300" Wide Range.

"* No Main Feedwater (MFW) as alarmed on Annunciator Corrective Action Windows 2K03 A8/11 - "FEED PUMP TRIP"

"* Emergency Feedwater (EFW) as alarmed on Annunciator Corrective Action Windows 2K05-A9 "2P-7A TURB OVERSPEED TRIP" and 2K07-A9 '2P-7B FAILURE ON EFAS"

Attachment to 2CAN060012 Page 4 of 19

" No Auxiliary Feedwater (AFW) available as alarmed on Annunciator Corrective Action Window 2K03-J1O "2P75 TRIP"

" At least five (5) Core Exit Thermocouples (CETs) are reading above 800'F. Monitoring of this parameter is initiated by Annunciator Corrective Action 2K01 A10/11 "CONT CENTER 2D01(2)

UNDERVOLT" OR 2K06 D8 "CET TEMP HI" (driven from 2TI-4793)

All cues are alarmed in the Control Room directly or indirectly.

Estimates for the time of CET high temperature cue, the mean hot leg failure, and the mean SG tube failure after time of core uncovery were calculated by MAAP and PROBFAIL. These estimates are provided in the table, below.

Time After Core Uncovery (see)

Accident Scenario Hottest CETs Median Hot Mean SG

> 800OF Leg Failure Tube Failure High/Dry/Low: both SGs 263 3163 2902 depressurized (base)

High/Dry/High: both SGs 219 3227 3233 pressurized (pbase)

Medium/Dry/Low: both SGs 312 3622 3989 depressurized (midbase)

High/Dry/Medium: both 245 3170 3201 SGs at medium pressure (base3)

High/Dry/High: both SGs 243 5124 6034 pressurized with one RCP loop seal cleared (pclr)

High/Dry/High, Low: one 231 4825 5238 SG pressurized and other depressurized, RCP loop seal cleared in the pressurized SG loop (c/ru)

High/Dry/High, Low: one 236 4598 3290 SG pressurized and other depressurized, RCP loop seal cleared in the depressurized SG loop (cIr)

Attachment to 2CAN060012 Page 5 of 19 A list of the instrumentation associated with each of the RCS depressurization cues follows.

(a) SG level cue: 2LIS 1079 and 2LIS-1 179 (SG WR level),

(b) Main Feedwater (MFW), Emergency Feedwater (EFW), Auxiliary Feedwater (AFW) (alarms listed previously)

(c) CETs, Safety Parameter Display System (SPDS), Reactor Vessel Level Monitoring System (RVLMS), 2D01/02 undervoltage (u/v).

Entry conditions warranting RCS depressurization are:

(a) loss of all feedwater, (b) level on either SG < 70" WR, and (c) five or more CETs > 800'F Two scenarios and their respective response follow:

(a) If undervoltage (u/v) relays on either DC bus 2D01 or 2D02 indicate an undervoltage condition, annunciator 2K01 will activate and ACA 2203.012A (2K01 annunciator corrective action) will direct the dedicated cross-tie operator (DXO) to proceed to 2B53 room access to obtain SDS-02 and then proceed to corridor 340 to prepare to open the ECCS vent valves by either powering 2CV-4698-1 from vital bus 2D26 or 2CV-4740-2 from vital bus 2D27. In addition, operators are instructed to monitor steam generator feed to identify whether a sustained loss of all feedwater has occurred, to monitor steam generator level to determine if SG is less than 70" WR, and to monitor the CETs to determine if the five highest CET indications are above 800'F. If all of these conditions are satisfied, then the ECCS vent valves will be opened.

(b) If either of two core exit thermocouples (CETs) indicate a temperature greater than variable alarm setpoint (2TI-4793), i.e., greater than 700'F, annunciator 2K07 will activate Window D-8 and ACA 2203.012G (2K07 annunciator corrective action) will direct operator action. Specifically, operators are instructed to monitor steam generator feed to identify whether a sustained loss of all feedwater has occurred, to monitor steam generator level to determine if SG is less than 70" WR, and to monitor the CETs to determine if the five highest CET indications are above 800'F. If all of these conditions are satisfied, then the ECCS vent valves will be opened. An Alert Emergency Class is declared using Emergency Action Level 9.2 (which mans the Emergency Response Organization) and the operator is directed to implement Functional Recovery EOP.

Attachment to 2CAN060012 Page 6 of 19

3. Provide a copy of the procedures leading to and including the depressurization action, indicating the entry conditions.

The associated portions of draft procedures 2203.012A, 2203.012G and SDS-02 are attached. These draft procedures may be modified prior to implementation to reflect additional lessons learned.

4. Provide a discussion of the training on the new depressurization procedure.

Attached are drafts of the Emergency DC Crossconnect Watch Study Guide and qual card used to train personnel on performing SDS-02. These drafts may be modified prior to implementation to reflect additional lessons learned.

5. Provide a description of the actions necessary to perform the task, including an identification of who performs the actions, and where.

The associated portions of draft procedures SDS-02, 1015.001, 1015.016 and 2202.006 are attached. These draft procedures may be modified prior to implementation to reflect additional lessons learned.

6. Provide a rough estimate of the time required to perform the task.

The tasks discussed in SDS-02 can be performed in less than 15 minutes. An actual walk down of these actions was completed in less than 10 minutes. With both 2D01 and 2D02 available, the ECCS vent valves can be opened in two minutes.

7. Provide an estimate of the interval of time required after occurrence of the depressurization procedure initiation cues in order to achieve a probability of 0.25 or less that the human actions needed for depressurization are not yet completed.

The time interval available for successful initiation of RCS depressurization following the last cue calling for depressurization which results in a failure probability of 0.25 or less is estimated to be about 23 minutes. This estimate is based on the use of Human Reliability Analysis quantification methods documented in the ANO-2 Individual Plant Examination and in updates to this risk analysis. It assumes that the time interval between when the highest five CETs read NOOT and the mean time for a steam generator tube failure prior to hot leg failure is about 43 minutes. This time interval is based on PROBFAIL calculations.

Attachment to 2CAN060012 Page 7 of 19

8. Provide the correlation for the Larson-Miller creep damage parameter used for the stainless steel surge line in your thermal-hydraulic analyses with the Modular Accident Analysis Program (MAAP) computer code.

The majority of the ANO-2 surge line is composed of Stainless Steel SA-351 Gr.

CF8M. However, the surge line nozzle, which connects the surge line with the hot leg, is composed of carbon steel SA-105 Gr 2.

Entergy does not have a correlation for the Larson-Miller creep damage parameter for SA-351 Gr CF8M since the surge line was not modeled as a contributor to RCS failure in the ANO-2 PROBFAIL calculations. Rather, the ANO-2 Steam Generator Tube Rupture (SGTR) risk analysis conservatively assumed that the hot leg was the only RCS piping subject to creep failure as a means of reducing RCS pressure prior to SG tube creep.

Since the hottest region of the surge line is expected to be in the vicinity of its nozzle, since the nozzle base metal is SA-105 Gr. 2 (carbon steel), and since the nozzle wall thickness near its safe end is about the same as that as the rest of the surge line, the surge line nozzle is expected to be the point of its creep failure.

The Larson-Miller Parameter (LMP) for carbon steel was previously provided. If desired, the LMP for stainless steel 304 can also be provided.

Attachment to 2CAN060012 Page 8 of 19

9. Provide the fraction of tubes currently plugged in each steam generator. If sleeves are currently installed, include their effect on net flow rate as its equivalent in number of plugged tubes.

After completion of 2P99, the repairs to the ANO-2 SGs are as follows:

SGA SGB REPAIRED TO DATE PLUGS 1487 1460 REPAIRED TO DATE SLEEVES B&W 285 48 ABB-CE 376 146 TOTAL 661 194 EQUIVALENT PLUGGED

  • 1511.379 1465.985 EQUIVALENT PERCENT PLUGGED 17.97% 17.430%

AVERAGE 17.70%

10. Provide any other parameter changes from the conditions specified in your previously submitted document titled Calc No. 99-E-0019-02, "ANO-2 MAAP and PROBFAIL Calculations."

No changes to the subject calculation have been made. The revised SGTR risk analysis presented at ANO's June 8, 2000, meeting with the NRC Staff continues to use the results of the MAAP calculations as input. However, the revised SGTR risk analysis no longer uses the results of the PROBFAIL calculations in 99-E-0019-02. Instead, the PROBFAIL analysis has been revised to utilize defect m and mp distributions rather than SG "fragility distributions" and these new PROBFAIL calculations are documented in the revised SGTR risk calculation.

The m and mp distributions were calculated for and applied at the same burnup conditions as were the SG fragility distributions, i.e., at the Beginning of Period (BOP), just after 2P99, at Middle of Period on 6/15/00, assuming no SG inspection/repair (MOP-NR), and at End of Period on 9/15/00, assuming no SG inspection/repair (EOP-NR). Ninety-three (93) defects were assumed to be present in each SG after each inspection and repair.

Attachment to 2CAN060012 Page 9 of 19

11. Using the most recently provided estimates of flaw growth rates and the probability of detection as a function of flaw size during your most recent inspection (2P99), provide the probability distributions for the stress magnification factors for partial through-wall cracks (mrp) and through-wall cracks (m) for each of these 3 points in time during your current operating interval: 1) start-up the fall of 1999, 2) June 15, 2000 without inspection, and
3) September 15, 2000, without inspection.

The following four tables of data are the Mp and/or M values for the following predicted conditions:

"* (TABLE 1) Mp for beginning of period following 2P99 (Case 1')

"* (TABLE 2) Mp for conditions at the middle of period 2P00 (Case 2') which is June 15, 2000

"* (TABLE 3) Mp for conditions at the end of period 2R14 (Case 3') which is September 15, 2000

"* (TABLE 4) M for all three conditions. There is not a separate M table for each condition since M is based on lengths and the lengths are kept constant through out the intervals This data was generated using the most recent model that was submitted based on use of the following:

"* Bi-variant probability of detection (POD) using peak depth and bobbin volts

"* Five independent POD curves used probabilistically

"* Probabilistic growth based on ANO specific data

"* Sizing uncertainty of 12.7%

"* Depth based on profiled data Also attached are the probability distribution graphs for the data listed above.

Attachment to 2CAN060012 Page 10 of 19 TABLE 1 Mp Values for Case I' Beginning of Cycle Conditions MP CDF MP CDF MP CDF 1.1 0.06777 4.1 0.99920 7.1 0.99985 1.2 0.47099 4.2 0.99932 7.2 0.99985 1.3 0.71055 4.3 0.99935 7.3 0.99985 1.4 0.82756 4.4 0.99942 7.4 0.99985 1.5 0.89105 4.5 0.99948 7.5 0.99986 1.6 0.92681 4.6 0.99953 7.6 0.99986 1.7 0.94922 4.7 0.99954 7.7 0.99987 1.8 0.96363 4.8 0.99959 7.8 0.99988 1.9 0.97313 4.9 0.99961 7.9 0.99988 2.0 0.97940 5.0 0.99964 8.0 0.99988 2.1 0.98441 5.1 0.99968 8.1 0.99988 2.2 0.98805 5.2 0.99970 8.2 0.99988 2.3 0.99067 5.3 0.99973 8.3 0.99988 2.4 0.99240 5.4 0.99973 8.4 0.99988 2.5 0.99382 5.5 0.99973 8.5 0.99988 2.6 0.99489 5.6 0.99974 8.6 0.99988 2.7 0.99566 5.7 0.99975 8.7 0.99988 2.8 0.99634 5.8 0.99976 8.8 0.99988 2.9 0.99690 5.9 0.99976 8.9 0.99988 3.0 0.99727 6.0 0.99976 9.0 0.99988 3.1 0.99759 6.1 0.99977 9.1 0.99991 3.2 0.99791 6.2 0.99980 9.2 0.99991 3.3 0.99815 6.3 0.99980 9.3 0.99991 3.4 0.99835 6.4 0.99982 9.4 0.99991 3.5 0.99851 6.5 0.99983 9.5 0.99991 3.6 0.99866 6.6 0.99983 9.6 0.99991 3.7 0.99881 6.7 0.99983 9.7 0.99991 3.8 0.99889 6.8 0.99983 9.8 0.99991 3.9 0.99902 6.9 0.99984 9.9 0.99991 4.0 0.99914 7.0 0.99985 10.0 0.99991

Attachment to 2CAN060012 Page 11 of 19 TABLE 2 Mp Values for Case 2' Conditions at 2P00 MP CDF MP CDF MP CDF 1.1 0.03814 4.1 0.99820 7.1 0.99960 1.2 0.37440 4.2 0.99830 7.2 0.99960 1.3 0.64070 4.3 0.99840 7.3 0.99960 1.4 0.78230 4.4 0.99860 7.4 0.99960 1.5 0.86100 4.5 0.99860 7.5 0.99960 1.6 0.90720 4.6 0.99880 7.6 0.99960 1.7 0.93490 4.7 0.99880 7.7 0.99960 1.8 0.95270 4.8 0.99890 7.8 0.99960 1.9 0.96470 4.9 0.99900 7.9 0.99960 2.0 0.97260 5.0 0.99910 8.0 0.99970 2.1 0.97850 5.1 0.99910 8.1 0.99970 2.2 0.98270 5.2 0.99920 8.2 0.99970 2.3 0.98590 5.3 0.99920 8.3 0.99970 2.4 0.98840 5.4 0.99920 8.4 0.99970 2.5 0.99020 5.5 0.99930 8.5 0.99970 2.6 0.99180 5.6 0.99930 8.6 0.99970 2.7 0.99310 5.7 0.99930 8.7 0.99970 2.8 0.99390 5.8 0.99940 8.8 0.99970 2.9 0.99470 5.9 0.99940 8.9 0.99970 3.0 0.99510 6.0 0.99940 9.0 0.99970 3.1 0.99580 6.1 0.99940 9.1 0.99970 3.2 0.99620 6.2 0.99940 9.2 0.99980 3.3 0.99650 6.3 0.99950 9.3 0.99980 3.4 0.99680 6.4 0.99950 9.4 0.99980 3.5 0.99720 6.5 0.99950 9.5 0.99980 3.6 0.99750 6.6 0.99950 9.6 0.99980 3.7 0.99770 6.7 0.99950 9.7 0.99980 3.8 0.99780 6.8 0.99950 9.8 0.99980 3.9 0.99790 6.9 0.99950 9.9 0.99980 4.0 0.99810 7.0 0.99960 10.0 0.99980

Attachment to 2CAN060012 Page 12 of 19 TABLE 3 Mp Values for Case 3' Conditions at 2R14 MP CDF MP CDF MP CDF 1.1 0.03414 4.1 0.99754 7.1 0.99917 1.2 0.33176 4.2 0.99768 7.2 0.99917 1.3 0.60255 4.3 0.99783 7.3 0.99917 1.4 0.75443 4.4 0.99798 7.4 0.99920 1.5 0.83988 4.5 0.99808 7.5 0.99921 1.6 0.89146 4.6 0.99815 7.6 0.99921 1.7 0.92253 4.7 0.99820 7.7 0.99924 1.8 0.94238 4.8 0.99830 7.8 0.99925 1.9 0.95614 4.9 0.99838 7.9 0.99927 2.0 0.96561 5.0 0.99849 8.0 0.99927 2.1 0.97261 5.1 0.99850 8.1 0.99929 2.2 0.97792 5.2 0.99856 8.2 0.99930 2.3 0.98169 5.3 0.99861 8.3 0.99931 2.4 0.98432 5.4 0.99863 8.4 0.99931 2.5 0.98676 5.5 0.99868 8.5 0.99932 2.6 0.98882 5.6 0.99874 8.6 0.99933 2.7 0.99033 5.7 0.99875 8.7 0.99933 2.8 0.99148 5.8 0.99880 8.8 0.99935 2.9 0.99257 5.9 0.99882 8.9 0.99936 3.0 0.99351 6.0 0.99885 9.0 0.99936 3.1 0.99419 6.1 0.99888 9.1 0.99936 3.2 0.99470 6.2 0.99892 9.2 0.99937 3.3 0.99518 6.3 0.99895 9.3 0.99937 3.4 0.99566 6.4 0.99901 9.4 0.99938 3.5 0.99602 6.5 0.99904 9.5 0.99940 3.6 0.99643 6.6 0.99909 9.6 0.99940 3.7 0.99679 6.7 0.99911 9.7 0.99941 3.8 0.99699 6.8 0.99914 9.8 0.99941 3.9 0.99720 6.9 0.99916 9.9 0.99941 4.0 0.99743 7.0 0.99916 10.0 0.99941

Attachment to 2CAN060012 Page 13 of 19 TABLE 4 M Values for All Operating Intervals M CDF M CDF M CDF 1.0 0.00002 4.1 0.97530 7.2 1.00000 1.1 0.00002 4.2 0.97530 7.3 1.00000 1.2 0.00002 4.3 0.98160 7.4 1.00000 1.3 0.00486 4.4 0.98160 7.5 1.00000 1.4 0.01795 4.5 0.98568 7.6 1.00000 1.5 0.02815 4.6 0.98568 7.7 1.00000 1.6 0.07344 4.7 0.98568 7.8 1.00000 1.7 0.12220 4.8 0.98568 7.9 1.00000 1.8 0.16248 4.9 0.98568 8.0 1.00000 1.9 0.22495 5.0 0.98568 8.1 1.00000 2.0 0.29096 5.1 0.98568 8.2 1.00000 2.1 0.35963 5.2 0.98568 8.3 1.00000 2.2 0.43818 5.3 0.98568 8.4 1.00000 2.3 0.46410 5.4 0.99795 8.5 1.00000 2.4 0.48550 5.5 0.99795 8.6 1.00000 2.5 0.52196 5.6 0.99795 8.7 1.00000 2.6 0.56015 5.7 0.99795 8.8 1.00000 2.7 0.65145 5.8 0.99795 8.9 1.00000 2.8 0.68932 5.9 0.99979 9.0 1.00000 2.9 0.73285 6.0 1.00000 9.1 1.00000 3.0 0.74418 6.1 1.00000 9.2 1.00000 3.1 0.75898 6.2 1.00000 9.3 1.00000 3.2 0.80621 6.3 1.00000 9.4 1.00000 3.3 0.83554 6.4 1.00000 9.5 1.00000 3.4 0.87185 6.5 1.00000 9.6 1.00000 3.5 0.89144 6.6 1.00000 9.7 1.00000 3.6 0.89308 6.7 1.00000 9.8 1.00000 3.7 0.91485 6.8 1.00000 9.9 1.00000 3.8 0.93504 6.9 1.00000 10.0 1.00000 3.9 0.95144 7.0 1.00000 4.0 0.97302 7.1 1.00000_,

Attachment to 2CAN060012 Page 14 of 19 CDF of Mp Values at Beginning of Cycle Conditions for ANO2 (Case 1')

1.2 -T 1.0 0.8 C.)

C.

0.6 1 -,- CDFý I

U- 0.4 0.2 0.0 I FI I I I I I I FII I I II I I I I I II I I I II I I I I I I I I IIII I I II N P. CO) 0) U"0 N-. CO 0) LO CNC)C'O LI (I N'-

c6 06 05 Mp

Attachment to 2CAN060012 Page 15 of 19 CDF for Mp Values at 2P00 Conditions for ANO2 (Case 2')

1.2 ...................................................................................................................................................................................................................

1.0 - I t.. INS C., 0.8 i i 0

0*

0.6 [--a CDF 0

1..

U- 0.4 0.2 0.0 II I I I I I I II I F I I II I I II II I I 6II III II II III II III IIIIIIIIIIIIIII

- r 03O 0') III 'I 0) LO)

- ,-- t",4 C' I IIo6 06 6 Mp

Attachment to 2CAN060012 Page 16 of 19 CDF for Mp Values at 2R14 Conditions for ANO2 (Case 3')

1.2

............... r. .....

1.0 0.8 C.,

0.6 S--w-CDF]

CM U- 0.4 0.2 0.0 ~

I I II I II II I~I I l'I lI l~

I Il l lI I I I II I I [1 1I I I I"J H "'"I I I I 1'1 I I I II I I I I I I I Il l I I i l Ii N- C) C) - N- MO M) L.O N,- CO 0) I.'

- (N (N (6O ,,N.- c6 C)

Mp

Attachment to 2CAN060012 Page 17 of 19 CDF for M for All Operating Intervals 1.2 .................... .......................................

............................ I..............

1.0 O0.8 -am J*00"

.= 0.6 --- CDF uL. 0.4 0.2 nt kJ. S, IJI I I I I I'* I I I I I I I I I I I I I II I I 1I I I I1II I I] I I If II I I I I I I II II I I I I I I I I I I I I I i I I i Ii iI i ii ii i ii i j i 1 i I 'I o 0 0 0.0 O0 0 0 0o 010 .O 1 00 (C4 C~4CVi) Vi 41 4106( (6C 1,: P.: COC 06 0)0C M

Attachment to 2CAN060012 Page 18 of 19

12. During the meeting between Entergy and NRC on June 8, 2000, Entergy staff stated that an improved eddy current testing calibration standard had been used for inspections conducted during the 2P99 outage. They also indicated that they had performed a study in which the eddy current testing data taken with the new and improved calibration standard was compared to data taken with the previously used calibration standard for 30 some indications. Please provide the referenced eddy current data for review by the staff. Also, provide bobbin probe eddy current data for a random sample of 12 tubes covering the full length of the tubes and the rotating pancake coil eddy current data for a random sample of 12 tube/tube support plate intersections.

These latter data should be those taken with the calibration standard of record, i.e., the new and improved standard, for the examinations.

During the latter part of the most recent mid-cycle outage (2P99) it was noticed that most distorted support indications (DSI) were being called at a consistent higher voltage than in the previous outages. Many possibilities were discussed and one identified change in equipment setup from previous outages was the use of toolhead calibration standards that had been borrowed from another plant. These calibration standards were used to improve inspection efficiency due to changes in the robotic manipulators used during the mid-cycle outage.

To determine the impact of the calibration standards, a test was conducted. Due to the inspection/plugging schedule of the two steam generators it was determined that a complete acquisition station with an "outage" eddy current bobbin probe was still available on the "A Cold Leg" platform. A "clean" calibration standard from the lot that had been used the previous two outages was taken to the "A Cold Leg" platform and a number of calibration standard "pulls" were accomplished using bobbin probe S/N 296917. These calibration standard "pulls" were then setup according to the current Examination Technique Specification Sheet #1 (ETSS #1) and used to compare the voltages using the 2P99 calibration standard setup. Note: voltage normalization was set at 4.00 volts on the 4 - 20% holes on each calibration standard.

Eddy current data for twelve tubes was collected and compared using the two calibration setups from the "A" SG. Data for these twelve tubes was collected previously with the same bobbin probe, s/n 296917, as the ANO calibration standard. An increased reported voltage on all DSIs were found when using the 2P99 standard versus the ANO calibration standard setup.

Approximately thirty DSIs were analyzed using both calibration standard setups and again the reported voltage was consistently greater when using the 2P99 setup compared to the ANO calibration standard setup.

Attachment to 2CAN060012 Page 19 of 19 ANO personnel have compared an additional forty two DSIs from the "B" SG and all of the reported voltages are greater when using the 2P99 standards compared to the ANO standard.

The following data is being provided to the NRC on an optical disk:

Side A

  • The previous calibration standard from 2R13 along with 2R13 setups
  • 32 tubes of 2P99 confirmed bobbin DSIs from the "B" SG
  • ANO calibration standard from 2P99 along with 2P99 setups 0 12 random confirmed bobbin DSIs with corresponding RPC data from the "B" SG 0 12 random confirmed RPC SAIs with corresponding bobbin data from the "B" SG In addition, drawings of the calibration standards and ANO-2 ETSS#1 and ETSS#2 for both 2R13 and 2P99 have been provided to support the data on the optical disk.

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 11 ENTERGY SCN No.: 1 ANO-2 STEAM GENERATOR EDDY CURRENT Page: 55 EXAMINATION GUIDELINES 10.4.1 ATTACHMENT I - ETSS #1 Bobbin Examination Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE Page: 1 of 4 Site: Entergy Operation Inc. Arkansas Nuclear One Unit #2 Examination Scope Applicability: Standard ASME Code Examination. Use for detection of IGA/ODSCC at non-dented drilled and eggcrate support structures, in freespan tubing and within sludge pile region. This technique includes the detection and sizing of wear at diagonal and vertical straps using differential A*/1Il/amnl , dD m]v-Instrument Tubing Manufacturer/Model: Zetec MIZ-30A or Equiv. Material Type: Inconel 600 Data Recording Equipment OD/Wall (inch): 0.750" OD X 0.048" Wall Manuf./Media: HP HD 2.6 Gb Optical or Equiv. Calibration Standard Software Type: ASME with Fan Bar Wear and EDM Manufacturer: Zetec Analog Signal Path Version/Revision: EN 98, 1.30 Probe Extension Manuf.: Zetec Examination Procedure Extension Type & Length: Universal 945-1760,75 ft.

Number/Revision: HES-28 Rev. 11 Slip Ring Model Number: 508-2052 Scan Parameters Scan Direction: Pull Digitization Rate, Samples Per Inch (minimum): Axial Direction >30 Circ. Direction N/A Probe Speed Sample Rate RPM Set RPM Min RPM Max

  • 48 IPS 1777 N/A N/A N/A

<_24 IPS 1100 N/A N/A N/A Probe Manufacturer/Part Number Length Description (Model/Diameter/Coil Dimensions)

A-600-MIULC Zetec 700-1192-061 110 ft.

A-540-SF/RM / A-560 SF/RM / A-580-SF/RM Zetec 754-0402-001/D#2121-10-B/700-0402-051/D#2121-9-B 110 ft.

A-600-M/ULC (500 nose) Zetec D# 2120-5-G 110 ft.

600-M/ULC Replaceable Foot Bobbin Probe 760-2112-001 110 ft.

Data Acquisition Calibration Differential Channels Channel & Ch. 1 & 3 Ch. 5 & 7 Ch. 9 & 12 Ch. 15 & 17 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 100% TWH 100% TWH 100% TWH Tube Support Ring 40 degrees 40 degrees 40 degrees 90 Degrees Span Setting 100% TWH 100% TWH 100% TWH Tube Support Ring 6 divisions 6 divisions 6 divisions 5 divisions Calibration Absolute Channels Channel & Ch.2&4 Ch. 6 & 8 Ch. 10 & 13 Ch. 16 & 18 Ch. 11 & 14 Frequency 400 kHz 200 kHz 100 kHz 20 kHz 100 kHz Encoder Phase Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Tube Support Ring Encoder Pulse Rotation Flaws up first Flaws up first Flaws up first 90 Degrees @ 90 Degrees Span Setting 60% TWH 60% TWH 60% TWH Tube Support Ring Encoder Pulse 5 divisions 5 divisions 2 divisions 4 divisions @ 4 divisions

ARKANSAS NUCLEAR ONE SENGINEERING STANDARD No.: HES-28 ENTERGY Rev. No.: 11 1 ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.:

EXAMINATION GUIDELINES Page: 56 Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE Pa ge: 2of4 Configuration Board Settings tdg: off I down Configuration #: Name: Bobbin Isamples/sec:See Pg 1lof 4 rec. media =

board # 1 board # 2 board # 3 board # 4 board # 5 board # 6 board # 7 boa tester =

18 probe # 1 probe # 1 probe # 2 probe # 2 p 1 obe #1 pr#1 robe#1 Prot

  1. of channels=

DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE A D B C A D B C A D B C A D B C A D B C A D B C A D B C A Drive Polarity N N N N N Group Number12 Coil Number 11_1 5 18 1 5 8_

FREQ #1 Time Slot# 1 400kHz G:x2 12.V D A D A FREQ#2 Time Slot# 2 200kHz G:x2 112.OV D A D A FREQ #3 Time Slot # 3 100kHz G:x2 12.0V D A D D A D FREQ #4 Time Slot # 4 20kHz G:X4 12.OV D A D A FREQ #5 Time Slot # 5 I I FREQ #6 TieSlot # 6 FREQ #7 Time Slot # 7 1

FREQ #8 Time Slot # 8 END LOC OH: 1 1 DRIVE A: D = Al-A2, P = dr:A1 pu:A2,DP =dr: D1&D2 Pu : A1&A2 THRESHOLD: off off DRIVE B: D = B1-B2, A = A1-B2 (P) GAIN : x6 P = dr : BI pu:B2, DP = dr : CI&C2 pu : BI&B2 ACTIVE PROBES: 2 DRIVE C: D= C1-C2, A = D1-C2 DRIVE DS:D = D1-D2I Special Instructions

1. The A-600-M/ULC probe is the primary use probe for the bobbin examination. [he A-58USIIKVI ana A-36ou0riSORv are used to test low row tubes.
2. The A-580-SFRM probe can be used in tubes reported as RRT with the .600" probe as directed by the FTI Level III and Entergy approval. If needed, a 0.560 SF/RM probe, or a 0.540 SF/RM can be used as directed by the FTI Level III and Entergy approval.
3. Enter a message at the beginning of each calibration group indicating that the data is being acquired with either single or dual probes. If dual probes are being used state which calibration group is the primary probe and which is the secondary probe.
5. When acquiring data with a single probe Coil 1 (differential) channels will be Chl=400 kHz, Ch3=200 kHz, Ch5=100 kHz, Ch8=2OkHz and the Coil 5 (absolute) channels will be Ch2=400 kHz, Ch4=200 kHz, Ch6=100 kHz, Ch9=20 kHz.
6. Slower speeds (24 IPS) are recommended in the smaller radius U-bend tubes (row 5 and below) due to probe snapping through the U-bend.
7. Three recordings of the calibration standard should be performed at the beginning and end of each calibration group.
8. As a minimum, a position verification and a message will be entered once per calibration group.
9. Tubes, which have been mis-encoded, should be corrected by entering a message to void that entry and re-examining the tube with the proper encode. This is required to maintain an accurate DSR database.

ARKANSAS NUCLEAR ONE ENGINEERING STANDARD No.: HES-28 ENTERGYRev. No.: 11 ENTERGY ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1 EXAMINATION GUIDELINES Page: 57 Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE Page: 3 of 4 Data Analysis Calibration Differential Channels Channel & Ch I Ch 3 Ch5 Ch8 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 100% TWH 100% TWH 100% TWH Tube Support Ring

@40 degrees (d_ _@40 degrees @ 40 degrees @(90 Degrees Span Setting 100% TWH 100% TWH 100% TWH Tube Support Ring Minimum @(75% FSH ( 75% FSH (a)75% FSH @50% FSH Calibration Absolute Channels Channel & Ch 2 Ch4 Ch 6 Ch9 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 100% TWH 100% TWH 100% TWH Tube Support Ring

@ 32 Degrees A 32 Degrees @ 40 Degrees @ 270 degrees Span Setting 60% TWH 60% TWH 60% TWH Tube Support Ring Minimum ( 50% FSH @(50% FSHP @ 20% FSH( @ 40% FSH Calibration Process and Other Channels Channel & P1 (Ch 1/5) P2 (Ch 1/3/5 turbo) Ch 7 400/100 kHz Diff 400/200/100 kHz Diff 100 kHz Frequency Configure & Adjust Suppress Save 100, 60, 20 N/A Parameters Support Ring Suppress TSP & TSH Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Encoder Pulse @ 90 Flaws start down Flaws start down Degrees Span Setting 100% TWH 100% TWH Encoder Pulse @ 4 Minimum @ 75% FSH 6 50% FSH Divisions Voltage ormalization Calibration CH Curves Set Points CH Signal Set Normalize Type 4X20% FBH 4 Vp-p All Phase 1, 3, 5, P1 100, 60, 20 FBH 1

Data Screening Left Strip Chart Right Strip Chart Lissajous P1 Ch 6 Ch P1 Reporting Reduirements Condition/Region Report Ch. Comment Absolute Drift ADI 6 Vert-Max (Low Row U-bend)

Freespan DFI -P Use "Free Span Bobbin Coil Indication Flow Chart" Eggcrates DSI PI See Note 6 Tubesheet DTI P2 See Note 4 Dents DNT PI All Dent Indications > 3 volts located anywhere.

Indication Not Reportable INR Indications detected are not reportable by guidelines Indication Not Found INF Resolution is require to research and resolve per Iguidelines Possible Loose Part PLP 9 Any Indication of Secondary Side Foreign Parts, See Note 9 Sludge Pile NQI PI In the Sludge Pile

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 11 ENTERGY SCN No.: I ANO-2 STEAM GENERATOR EDDY CURRENT Page: 58 EXAMINATION GUIDELINES Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE Page: 4 of 4 Special Instructions

i. Refer to Appendix I additional instructions regarding the data screening and evaluation of Bobbin Probe data. (The required extent to be analyzed for all bobbin examination is to be TEH-07H

+1.0"; data acquired outside this extent does not require analysis.)

2. Zoom the strip chart to a maximum value of 8 to increase visibility of small amplitude indications.
3. All areas of the tubing should be examined with both P1 and Ch6 for indications and/ or drifts that may be indicative of cracking.
4. Review tubesheet data for indications of degradation, distortion and drifts indicative of axial or circumferential cracking. Indications may be confirmed by using Ch5, Ch6 or P2. Evaluation is typical in PI or Chl. Based upon experience at ANO-2, take care to examine the entire tubesheet entry signal at the setup span on Chi and Ch3 for distorted signals indicative of cracking. Also observe the response of P2. The requirement to screen the entire tubesheet entry signal is critically important in both the hot leg and cold leg. Distorted signals, which may be indicative of a flaw on the bobbin, shall be flagged for RPC examination by reporting as DTI in the % column.

If the indication is not in the expansion transition, the indication should be evaluated and reported from P1.

5. In the presence of deposits at the top of the tubesheet, if the signal has the characteristics of a flaw on P1, report these indications as an "NQI" code and test with an RPC examination.
6. Evaluate each support on the P1 process channel. Eggcrates typically have three signals representing the two edges and the center of the eggcrate. Indications can be confirmed with Chi, 3, or 5 when deposit influence is not present. Indications that are phased in the ID plane on P1 should confirm on Ch3 and/or Ch5. Indications may not always display an expected counter clockwise rotation.
7. When using Auto Calibration features, make sure that you are using the file that matches the Standard being used.
8. Monitor the configuration widget for proper data sampling. Set the warning dialog to trigger at 30 axial samples.
9. Observe the stripchart and Lissajous presentations for indications occurring anywhere along the tube but especially on top of the tubesheet and supports. Possible loose parts shall be screened and reported as a Possible Loose Part (PLP) on 20 kHz absolute. This will signify the need for further characterization with a rotating probe technique.

41 /

IfiE ADDED WIDIII(AtL-OIJI LOC. A0K LOCAriom A 0 C 0 E F 0 H IJ 1 I'tiYSIMALY MEAS DEPIII pl L21i0,1 - *2,01 3YA!~.AW T Qg.' &asbr .214s1 d'1I LJEPTII IN Sr- WALL A _AP71 510/~ W A VIA 0r- DEFECT *003 130~

t3*.C 250 1- -j 86--

750 B50

.650 g -m

- -003,07 lt -l W T01L -27 LIN I -2 ELECTR-ElCI -AIO E'3 a~ H J'M~flOVE ~ a0.975L~


WAL FV' A- SCAR AV.052 IIEAS WALL '-','" 4x 7 I% 30AR WE R CA IHOINAL WALL 71 1k. *ckul *a2V xUs%O. e7104 60% .500 10 ltIAr LTo Na ou .i A IC L42.

rEsi FIVL LISED- Ohm.. ~ SHO51W A W/EAR SCARL SETUIAL NU '+_- Im2z* i// /zf,.

P.0 N-k-91---.500 MAX.

ULLALITY TEL. NO, M&E filr a40Uzrfl ~~

0AII RE11 1iuci10 CL "Amlo'll 061241w4 ZETECII aA i~sp. )"NA FMII til oai3a/g4 DILEIUALGWIDE TU13E STD.

CLIrMMM n-CaviblN .811X.00.ois Wt MISC. DEFECTS IEWED BY. ,

An $114 full"________r ~

NWV.*A U bil ~3/g 2-415-1015

I/

I J K 0 ýI 0 E F A B C LOC A110 *_O ___ .._ o__ .02/1 S

.... .. i ,-" f-PI IY SIC A -LY I.IEAS. UlI'III -* "

. . . " - - I TllD 31/.-27 UNS-2A go7.' .3/4.

DEPT11 IIII96 0f WALL A17.

E1

-1250 00 .650 0 3.02U DIA OF D~AC 5 .............

-I0 C0 0, ....

ALIGN ELEC1RO-ETCl L-/ A-Et-ALGNEL; .3TC LO X (V AXI AL L .

LO 30% EI I a rv-, n I

MATERIAL j-A-*--L ( - cce I AVERAGE MEAS. WALL Tl IlL2.5-15 D crc .Iwxon O.

NOMIIAL WALL TI 1K. ,olv -.

HEAT LOT NO..---q-*-----

(

TEST FREO. USED ,-J SERIAL NO.

P'O. NO.

REL. NO. NOTE: ZETEC

,,ILE DUAL GUIDE TUBE STD.

OUALITY REL. NO. __ ---, IaLIF&&l(ES W/ MISC. DEFECTS DATE MFG. __ ..

0 A. INSP.

CUSTOMER .. Doo Ilo

~2-1snodW2 2-415-1015

~

RECORDED0 ______

PROBE USED __.

R! VIE WED By 7211

I I I II eC.ncflKiC I I I I II I FAVU O IVK L ~ .STtSLTR DATE ER1T ApVD ýCKDRý'

2 ~ 9I~rS E 1IAI1 ADE IDTH CALL-OUI LOC. A-B-E-F IHWxz

. S LOCATION a C D E F 0 H I I k A

___- _ _ okas0A0 -01' PHYSICALLY MEAS. DEPTH -.Dwl. .Om'cý ____~'

0?. AA 2--c7 DEPTH IN % OF WALL DIA OF DEFECT *.]03 ALIGN ELECTRO-ETCH AND GROOVES M4ATERIAL Cei -I LOC B AVERAGE MEAS. WALL TH:<.. o5001r;g7SLOX o_____0____ X'936UP NOMINAL WALL THK.

HEAT LOT NO. :1152.li3-0 TEST FREO. USEED 10 SERIAL NO- _______

P.O. NO.

OATE I W5I UK HO REL. NO. L2 JIIL. 0f-EWE FCFE QUALITY FiEL. NO. NOTE: litt ARE IN INCHES 1OLEPAtICES G3.MATELICHjs2EizZ DOAT CHECK I9JIC T CIM,, N UM-K amTE S.IEA~ X 1441O LssA WA%"I@E

-I CATE MFG. -I________

)ECIMAL FRACT. a 1116 a XN'ES 08/30/gA C.A. INSP.______________ý *XXXX 1.003 W/ MISC. DEFECTS CUSTOMER C-otRm-tmcL XXX &.015

.XX 1.650 DESON SNLAI Smun lowe 2-415-1015 RECORDED ___________ 4 4.003 AFYD. CA WU1ILAR sl* 1 2-415-O012 PROBE USEDl!ý 0. ATKINS -.lkcýNMS p&V7_llci 1 OF 2 08/31/9h4 ý)(14 SHT

_____________ .1__________________ -.

I j. K F a H C D E A a LOCAT ION t.2ý2 wo Oto *02-.'cJ PHIYSICALLY HEAS. DEPlII

,IL ~ 7. ~- --

DEPIII IN % OF WALL DIA or- DEFECT H4Al ERAL AR9"tca AVERAGE ME AS. WALL T1 I(..20I1. 0 CEE -'

LOCJ PK N4OMINAL WALL ii Ii1(. _________

SH OW A WE AR SCAR HEAT LOT N. j52f-- . I 1'30'1 TEST FRED.USD IAs

.500 14 AX. -

SERIAL NO. 13- -2 P.O. NO0. G!N

Ž t11LE DUAL GUIDE TUBE STD.

)UALITY IREL. NO.

)ATE MrFO._________ W/ MISC. DEFECTS

).A.IN . 51-i 1102 -4 15 -10 15 9 11 1 Of 2 W- S7 EU i-m o lECoRDE 0 ~t..-.-

-1110E USED Ll REVIE WEDýBMK-~

cjJ -- niOsn--3 3 W~t 3'w.2-,I 9) IP L -1 a1/ P TN '

.)j I t'll 011 II3 s-30']. A';nelfl i i l tIIt~~

ONI . .I rQ41v .m no j 1I04

-=

'T~ON W8t3S A.W2tz 3Ji

WS 11y
/A VNIMhki4u~~l NW16)LV4U

?I~r*- ~i)

,J Kbo it it1 oo YMSNVIF9d3 1I' v$M'01~oo i M Si34UY~ 1130VI f 01WAS - 0 11001ti 700 i%1 .0 IDS%OZ. 0IEVJ X7  : .~j uo 0 rJ1?46r) S3A()OdO OWP

>10Y)1 On ji Io X'sC mam A1rwY wI 13c

-cv 9-a- .

03 _ _

311 __

I -~~)T U

~ ~~~~~........................... . ....... ........... _

0133G. i 0 Lo. o 11t d3

'.%4I

-z____r MA WW 1W3-kA I

r1.

Il

-I--

I-.---- U N--n

.1S _____j 13 114 NIA)U

~ a4'D CK DR

~

EW ------

S P OTATE * - - - j 1 5 0 0N 2 AILgi I 1jI- - - - - - - - -LY-~ E OWIR Iiot Ff 'F V1 P ED -

2-1 -n) -R P ACE EF-NOTE -SEE

~xa 3AI3- LL

.Z - 2l 1APR~~i5 P HIYS ICALLY MEAS. DEPTH TM 3/I2 UN DEPTH IN % (f WALL -- TIO 27 USZ i-1 8r6J j j-o 1::100o-I-- 30 PASE ,*GLF HE.AS 1250 ?4---so E.T ..........

CIA CF DEFECT' ~003 130s...----..----=

125__ - K J A "I wE ALL~E IWSILO*O ALUIA C wET0CiVW'a Na K J------- .........

5 .wpg~ 11F 0.9 LOG 0a Lc M AT RIA I O 16 01

- v Wi AM.col~--- tycI LO L(X 03118 20%11W l ALOT45ND A tJ~S 41EO TE~~09

~_ _ ~R IW E(3.

_ iR Ti J WA - 7 - ) J 0I 6--

OGXJ 50L jER £5%lf N O I 7I't a:ILES4 U DE U F S 07/6 60%52J4_______ .300ii Jilt D A

-JM RA to WA f~ (

DATE~,5- MFO. 'V$

ESWL 1140fgxI LW I RK AVsttERAG N M WALL--I--2, tqAL

.i' - 1JW A SCARD 81 19 0 A KU S PRi43r USET NnU~

7 l E O .LE+D WVI

\

MoESE2-415i-0004 ('011 PLACEM.EN1 .SAL T 6A.E LE~RIE S!W IMY

ý I....~ Wit..O FORE SE.YE15 OF NY1AY4 SLEEVE L~i, jC, onitCIS 0H . K c1I o t bA IUN A BC0EF

.Q.~ tI Si~

19 .L~. 2 ~ UL- .iW PHIYSICAL.LY MCA& DjEPrV QH 1

~ G93 25a a3

,.. ~~

47 ~ ~ ~ ~ ~ -~j ~ ~ -L!2 AP- .. II tLEPrH INJ% Z I -ALLI E.T. F41ASE AINGLE MEAS. 835 - .5 1 t-7(12

.500O - 5 - -. U 3.50 12b 750 I)34-7 U S2 DIA Or DEFECT s,003

~.

.............................. .4 ~ ..

... .. ........... ... ...... ol ALI3N ELE.CTRO--TC ac A 3e CDAXLIML OG K AND GORWVES .0otUx11Dr 601 l LC i 30% WLAR SCAFI iiK r. ) I;AI1 (P ~~~2z 9.0f52 TliIJ) Y/ALL(.3~ ~4 6 20%

DCL L~~i1' J iNACERIAL 11 50% WEARi SCAR 0ICjC 0 x11F Iu Q~ 6 1 .0O~

i~~~IEAS~L H . f,&

v/L w 3 st d 1. 7/ 04 110 %

AVERAI3E ME S W L 4OL NOI-IlNAL WALL IN4K 1ES L 1$E. USED,! .Au1Q1m-V IL1 I. IUO LOG I AOAIWOL KOi 910W A WE~AR SCAR

-A SM&ht No.

p a Flo ZZL 1-SDOnmAx. -- FrT __I 3*

i71~RI~3~ri~

-FL. wviiiieP

=L. 140 XJ. II~NOTE:

Y E . . - - IIIi A nE PIIh'UIlS 0 E LCII UI4A 08)24/94 E E Cw l-U 13& tg LIl'0 1Ol 6011614a u

DU AL GU ID TUBE ST

.A. ~ -l~/ W Ij 5a1 It III$5 ~tlie s WipJ MISC. UEFECI vi $. DEC 23 oA1 ' uo .I .SaE-cUSlIMiER 2 -415-101~

' C MEO AJSE

~C0Da 00 a1 f/ 1 9 -

VIE.

1AWS OAIFRI IN IT T FOR SEE. I S NOTE: SEE 2 -115000L9 F ORPLACEME HI -F LOCATK9NU A a 35j LA tE - X35 :P i.4.--

PHYIC5KALLY HEAS, DEPTH

% CF WALL U4..~iI 2~a~..p 3/4,-27 IHtS-2A El. PIIASE ,IGLE MEA.IJUJ

.. ...... _ _ _ _~

137 01A 0.. ... -..- ...-. -....... ------ t~r4 JM-v

-____ -v A ZO MPV I too atL W110 3re- WIEAR SCAR 0tR ELECTRO-ETCII 10 I to J

ANDANnncflVES p

.mALgOwwOI X Lc j~EI ViALL )~ 3 ~ 2 3 13 lug061-al M~EI~.LOC J

I Ww xol. o tp.U L

AV1~RAC) I wVS ALI .TIIK 1fios~ z P.  %

- ý7! b1o 11  : JV I K T .LOT N A 1 1f M.INA A WEAR SOA))

9 D~ * -ISHMcr FFE.L 0 LC01 J.IU Al. NO.4 !L~~~~SIA

.0. MO. 1 Q i fE III IItI~ZETEC DUAL GUIDE TUBE STD, EL. ~~140TE PCIW 06~b130/9 ATE ,.-. -: ------- Al tRAEl Im 1.1iwil MISC._IDEFIECTS 1

UcIJCM.ER -w lI~As C~~rdIED1 AVDOAIIONS 11 031/9 ~~~~uC DIeE 2-1 5-jCýlt Z __.B PTA

Gf L9WI HA~ I 4 I,11IU OF NYLON SLEE Ce E FE~VO 4)r~

1,Hy<IcALLY 14A LAhYI% 2162k~~H~~a~0NL

-1~ .21 2MI. in~ - -JQ EIt, IN~% ()r WALL E-IVASE AI4GLC 14EAS 83730 02

-30 ... ... ~ ~

.~O . I 6 A1 I 0E4 DDC .0 LOG wII v LOI 'M tlw0 ALIGN ELECTRO-ETC 4 632/16 21A IV~i IIIVE I

,LO I' c I AR W& 1-1-4 AVERAGM 1AS- W LO LL.J(LA AO 9LOJ L0 O) 5j t IE AR9

  • N?

N D,A AL EAT:

WAL .2w LNO P.O.Eo. 1iEAS Al Ft C3 ZEE CO AVEILAO&

'IIL.NO, 111l6 Bat"L DUAL GUIDE TLIBI: i)

RL. N

.- ~~-

nu,&TY E(IIIAL tRAAE.

va misc. Dr- FF-CTS W

AEM i.4FO. OA. t-SP 08 3 / 4-dtL --------

-.0 0 A.lr~ p - -- - -

J0OE USE0ujas014

SEEEV 2-l-K EwTE oi EFNYONSL~v

,ES rrc PLACEI.1c141 M~F~ _TI a S~fs.GADDED 0AJ £175M ORIENTATICII FRo E~R SEC. VIEWS VIi.;uS lap~

K I

D1C F 0 I D^-AlOZAN A 11IYSICALLY AEA9, OEP11iI &a ffl - * . - 4 L&3 3jeLLX i~L l3AIM. ~ ~ Q

~)EP1HIHN¶CVMt OF1WAL

%A2 .A4012 2 ~ ~ 10'

%-.T.PH-ASE ANGOLE REAS. - .063 TO342 IS2 00~ O 30 0EA CF DEFECT 1.003 1.250,.5 -

130*- ........-- - -

5 M %144A..CFlPfE A C E 0 __

DOI A~a EE'RI-E ICH wIc A 1 arcO -11E W It I L Wl *DO .Oi2 W I dU s i s L OUi OR1IVES mmOR 0 LOI 3096 WEAR SCAR 0 .052111PRUJ WALL f l(fl ot G.0 ,

O0 0ITFA LOG J IAEFA FC LXC 1 50% WEARI SCAU N~~ERAGE MEAS. WAL.L TH v 3,1%C. IXCI UP.£001 0411&P~ WALL IHW. LO FEAT LOT N0--Ufa Qi1 Lro got I P.51 F~tO U~E() LA- A WE~~lSAR

. z__ Z WERAL. NO. _ _ _ _

(I ti 'til IEL. NO ~ J110TE' ZETDA E E AR0RIMS Jilli---- 1. IAATELICII 08124194 YJALITY REL. NO TUBE SIP.

AI1E I(~liaW fRACI. IM CgC - "'IfIDUAL GUiD

)AL INP. it 6 NI-0a135 W/ MISC. DEFECTS

- USTIER "U M- COM DPDOA 2-415- 1015 16 F¶EOU .j7~ft~f7~Z~ ____ U.ATKI45 08f3VD4 WOWT

131

~MUMS o VD CK DII SEE. VIEWS K HOTF gC. 2-W SL00IA VEUAI C - o- -rspp AIJSON EI A IOIFE OF HY O 1

I LOCA TIO N0C - Aý Mi!!2~ *

%mlob L5 O a

LIJ0f AP rtYSICALI.Y 14EAS VIT:PIII vm!Er~U~5 -~

C3

-,~Ž

.2-' loo . __I-'

A1a .A4A I

  • 1

-4 iFpjIt V-1% Cr WALI.

F.T. ("IASE ArNXE MdEAS.

8 3i. r- .750 1.

-- 6I-650 -.

- - -- -D

_ _ _ _ __(I-W 3f 3/L_27 0413-1 r.

OF DFE~ (~*iR a.03 120 -- '~O I,)

DE E OF- T 0 31 1t.97 -- ~

-- - 5........ * - * -

... - NL IItIS 4,) B~~.

KOC

.1 a

O 30 %w FA RSCAR AE N " 33 w

  • Ai t c . ter cc 111 _jL 2C 0.16 frA 2 0.0O R)LW AX M~~d HAIM& JACI loc r LOC H5"WAm 071n rA) .500 1.0 IFt1'

/,VEftACCE MEAS. WALL tNijM4AL WALL 11I...P'2K.-

~~ ~Lc 60 LIf wD.t0k01 L C(;

ici&

L I.

4F.AI ý 1 W A WE -A n S CM f CIis LO @ t w fl SERlIAL NO. -7 / ý.500MAX.-1 I

811¶1 IrII NORIE a41Lp

-l. PIN 0.1 I~.IlC _______________________

I3A as--i~IE!E1 I).AVmkAIEK~ MUM ILTE 1 600%(L V&3 0 OI OLIALITY IlEL. N O.- Ox______ ~~ 11 DUAL. GUIDE TUBE STt).

f~lii IW)((S AIlia --

A-t-MG -l-L *Aixtt - tA11 5 IJE~081319'* W/ MISC. DEFECTS OA C a A__bD.=V2--4 15-1015 MCUS ELP -- __

A1IRIIIS .0 ill 11 aSD-IL4W AL

- . e .

% E D,, A VIE~a 4L~I-A'

, UEEtS5I"~y

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 11 SCN No.: I ENTERGY Page: 59 ANO-2 STEAM GENERATOR EDDY CURRENT EXAMINATION GUIDELINES 1 _1 10.4.2 ATTACHMENT II- ETSS #2 RPC Examination (Pancake, Ax, and Circ)

Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. Directed coils) Page: 1 of 5 Site: Entergy Operation Inc. Arkansas Nuclear One Unit #2 Examination Scope Applicability: Tubesheet examinations. Diagnostic testing and/or to confirm bobbin indications. Detection of IGAIODSCC or PWSCC.

Instrument Tubing Manufacturer/Model: Zetec MIZ-30A/30-8 Material Type: Inconel 600 Data Recording Equipment OD/Wall (inch): 0.750* OD X 0.048" Wall Manuf./Media: HP HD 2.6GbOptical or Equiv. Calibration Standard Software Type: RPC EDM Notch Standard Manufacturer. Zetec Analog Signal Path Version/Revision: EN98 1.30 Probe Extension Manuf.: Zetec Examination Procedure Extension Type &Length: Universal 945-1760, 75 ft.

Number/Revision: HES-28 Rev. 11 Slip Ring Model Number: 508-2052 Scan Parameters Scan Direction: Push or Pull Digitization Rate, Samples Per Inch (minimum): Axial Direction L_,25 Circ. Direction :30 Probe Speed Sample Rate RPM Set RPM Min RPM Max 0.45 inlsec. 1280 900 810 1086 Probe/Motor Unit Description (Model/Diameter/Coil Dimensions) Len th Motor Units 810-4090-000 - .610 (.115) MRPC 3C-52PH 50' or 83' 700-4055-071 -. 610 9D-MRPC-52MU D# 2651-2-A - .580 (.115) MPRC 3C-52PH 50' or 83' 810-4050-001 - .560 9D-MRPC-52MU D#3414-13-A - .600 TTS extension shaft (+2"/-2") 48 Data Acquisition Calibration 0.115 Coil Channels (Dual Probes)

Channel& Ch. 1 &4 Ch. 7 &10 Ch. 13 & 17 Ch. 23 &24 Frequency 300 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 20% IDAX Notch 20% IDAX Notch 20% ID AX Notch Tube Support Ring Up ft,12 deqrees 01 12 degrees 0 12 degrees 0 90 degrees Span Setting 40% OD Axial Notch 40% OD Axial Notch 40% OD Axial Notch Tube Support Ring 0- 2 divisions 0 2 divisions 0, 2 divisions (M 3 Divisions Calibration Axial Sensitive Coil and Trio ger Channels (Dual Probes)

Channel& Ch. 2 &5 Ch. 8 &11 Ch. 15 &19 Ch. 14 & 18 Frequency 300 kHz 200 kHz 100 kHz 100 kHz Phase Rotation 20% IDAX Notch 20% IDAX Notch 20% IDAX Notch Large pulse up,

__ 12 degrees 0 12 degrees 0 12 degrees small pulse horizontal Span Setting 40% OD Axial Notch 40% OD Axial Notch 40% OD Axial Notch Large Pulse M_2 divisions 0 2 divisions f 2 divisions 0 4 divisions Calibration Circumferential Sensitive Coil (Dual Probes)

Channel& Ch. 3 &6 Ch. 9 &12 Ch. 16 &20 Ch. 21 &22 Frequency 300 kHz 200 kHz 100 kHz 100 kHz (optionol)

Phase Rotation 20% ID Circ. Notch 20% ID Ciro. Notch 20% ID Circ. Notch Pu 12 degrees 12 degrees 12 degrees Q 90 degms Span Setting 40% OD Circ. Notch 40% OD Circ. Notch 40% OD Circ. Notch Pulse-,

1 0 2 divisions 0 2 divisions ft 2 divisions Q 4 dMslonsF

ARKANSAS NUCLEAR ONE No.: HES-28 Rev. No.: 11 b ENTERGY ENGINEERING STANDARD ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: I Page: 60 EXAMINATION GUIDELINES Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) I - Page: 2 of 5 Configuration Board Settings trig: off I down Confiauration#: Name: 3-Coil Isamplesisec: 1280 roe. media - Hird tester - board# 1 board # 2 board # 3 board # 4 board # 5 board # 6 board#7 boa

  1. of channels 24 probe # I probe # 1 probe # 2 probe # 2 probe #1 pbe #1 robe#1 1b DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE A D B C A D B C A D B C A 0 8 C A D B C A D B C A D 9 C A Drive Polarity N I ITFT NE~T f[

NZIINIZIZIIIF IIN Group Number JJIJI] -1LI LLI 1112 22 LLI12 WL. W.1 CoillNumber___ LJ. 4LLL 5LLI 71LL 8W.111LL5LLL 7 L~J FREQ #1 Time Slot # 1 D D 0 0 D D 300kD- G:x2 12.0V 0 FREQ#2 Time Slot#32 D D D 0D D 0 200kWz k G:x2 12.OV FREQ #3 Time Siot3 0 D 0 D D 0 D D 100lzk G:x2 12.0V FREQ #4 Time Slot # 4 D 0 FREQ #5 Time lot# 5 0 0 20Id-z G:x4 112.OV I FREQ #6 Time Slot # 6 FREQ #7 Time SIot#7 FREQ # Time Slot # 8 ENDLOCCH: 1 1 DRIVE A: D - AI-A2, P -drAl puA2,DP "dr: D1&D2pu: A&A2 THRESHOLD: off off DRIVE B: D - B1-B2, A - A1-82 (P) GAIN: xG P - dr: BI pu:B2, DP n dr: Cl&C2 pu: B1&B2 ACTIVE PROBES: 2 DRIVE C: 0 = CI-C2, A a D1-C2 DRIVE D:D D,,D14-2 Special Instructions

1. EnW a message at the beginning of each calibration group indicating that the data is being acquired with eithe single or dual probes. If dual probes are being used state which calibration group is the primary probe and which in the secondry probe. The mesge shell Include whether the data is acquired on the push or pull.

Z When acquiring data with a single probe delete boards 3 & 4. The Coll (.115" Panc) channels wi then be Ch 1=300 kHz, Ch 4-200 kHz, Ch 7=100 kHz, Ch 12=20 kHz. The Coil 4 (Trigger) channel will be Ch8=100 kHz. The Coil 5 (Aidal) channels wil be Ch 2=-300 kHz, Ch 5=200 kHz, Ch 9=100 kHz. The Coil 7 (CIrc) channelswi* be Ch 3=300 kHz, Ch 6=200 kHz, Ch I=Ol 00 kHz. Coil #8 will be Ch Il 100 kHz.

3. Examine each location and record a run-out. Run-out record not required for tubesheet Intersection scans.
4. The TSH expansion transition shall be acquired by pushing the probe ttrough transition and shall be adequate to cover the target location. The scan shall normally be from 20" below the transition to VIP above the top of tho tubesheet. In the event that the probe stalls on the push, the data may be acquired by pulling the probe through the transition. This wi require the operator to meage the event prior to acquiring the data.
5. Other locations may be scanned on the PULL or PUSH and shall be adequate to covr the trgt location. For special interest Indications located within a structure, the data shall be acquired :. from the center of the structure. AN other locations aWl be acquired from structure to structure unless encoders ae used, In which cae the scan may include aonsbucture. In these In ces, care should be taken to Insur tat the piope location is scanned with adequate data past the target location (recommend 5 Inches) to account for any vans In probe speed or uda scaling.
6. One calibration standard may be recorded at the beginning and end of each cal group provided R isa successful san of the standards; complet length.
7. Tubes which have been mis-encoded should be corrected by entern a messag to void that entry and re-emmilng the tube with On prpm code.

This is required to maintain an accurate DSR database.

8. Axdal Encoder is to be used for all speial Interest examinations. When not used, activate tiresW as usual, and no setup is required.

ARKANSAS NUCLEAR ONE No.: HES-28 SENGINEERING STANDARD Rev. No.: 11 goG SCN No.: I ANO-2 STEAM GENERATOR EDDY CURRENT Page: 61 EXAMINATION GUIDELINES I _I Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) Page: 3 of 5 Data Analysis Pancake Channiels Channel& Frequency Ch i Ch 4 Ch 7 Ch 12 (Loci.to 300 kHz 200 kHz 100kHz 20 kHz Phase Rotation 20% ID A)t Notch 20% ID Ax. Notch 20% ID Ax. Notch Tube Support Ring Up 90 12 degrees 9b 12 dearees 0 12 dearees 9 9O0deruees Span Setting 40% OD Ax Notch 40% OD Ax. Notch 40% OD Ax. Notch Tube Support Ring Minimum I 2 divisions 1 2 diviMsons I C 2 divisions 1 3 Diviseons Axiel SensitiveCoil &iTricer Channels_

Channel & Frequency Ch2 Ch 5 Ch 9 Ch 8 (Trigger 300 kHz 200 kHz 100 kHz 100 kHz Phase Rotation 20% IDAx. Notch 20% ID Ax. Notch 20% ID Ax. Notch Large Pulse Up,

_ _12 degreesc__ 12rees f12dowees i 12 dearees Small Pulee Hort.

Span Setting 40% OD Axial Notch 40% O0 Axdal Notch 40% OD Axial Notch Large Pulse Minimum Q 2 divisions Q 2 divisions Q 2 divisions Q 4 divisions Circumferential Sensitive Channels & Encoder Channel Channel & Frequency Ch 3 Ch 6 Ch 10 Ch 11 300 kHz 200 kHz 100 kHz 100 kHz (encoder)

Phase Rotation 20% ID Circ. Notch 20% ID Circ. Notch 20% ID Circ. Notch Pulse S12 dearees 0 12 decrees 0 12 decrees 0 90 degrees Span Setting 40% OD Circ. Notch 40% OD Circ. Notch 40% OD Circ. Notch Pulse Minimum 2 divisions & 2 divisions Q 2 divisions Q 4 dMilons Process Channels Channel & Frequency Ch P1 Ch P2 Ch P3 NWA (See Note 5) 300/100 kHz Panc 300/100 kHz Axdal 300(100 kHz Clrc Phase Rotation 20% ID Ax. Notch 20% ID Ax. Notch 20% ID Circ. Notch 0- 12 degrees it 12 dearees Q 12 degrees Span Setting 40% OD Ax. Notch 40% OD Adal Notch 40% OD Circ. Notch Minimum 0 2 divisions 0 2 divisions & 2 dMslons Voltage Normalization Calibration Curves CH Signal (Note 13) Set Normalize Type CH Set Points I 100% Ax notch 20 Vp-p Ch. 4 7 &P1 (Reso) Phase Curve (Note 12) 1 40, 60, 100 Ax. OD notch 2 100% Ax notch 20 Vp-p Ch.5, 9 &P2 3 100% Circ. notch 20 Vp-p Ch. 6, 10 &P3 (Reso) Phase Curve (Note 12 1 40, 60,100 Cir OD notch Data Screening Left Strip Chart Right Strip Chart Ussajous P1 Ch 6 Ch P1 Reportng Rquirements Condition/Region Report Ch.(Note 16) Comment Single Axial Indication SAI 1 or P1 Any amplitude - Report on volts peak - peak (TBR in Util 2)

Multiple Axial Indication MAI 1 or P1 Any amplitude - Report on volts peak - peak (TBR in Util 2)

Single Circumferential Indication SCI I or P1 Any amplitude - Report on volts peak - peak (TBR irnUtil 2)

Multiple Circumferential Indication MCI 1 or P1 Any amplitude - Report on volts peak - peak (TBR in Util 2)

Single Volumetric Indication SVI 1 or P1 Any amplitude - Report on volts peak - peak (TBR in Util 2)

Mixed Mode Indication MMI 1 or P1 Any amplitude - Report on volts peak - peak (TBR in Util 2)

Possible Loose Part PLP 12 Any Indication of Secondary Side Foreign Parts Volumetric VOL 1 or P1 Any amplitude - Report on volts peak - peak Loose Part Indication LPI P1 Any Indication of tube degradation associated wi PLP (see Notel5) (TBR in Util 2)

Multiple Volumetric Ind. MVI 1 or P1 Any amplitude - Report on volts peak-peak (TBR in Util 2)

ARKANSAS NUCLEAR ONE No.: HES-28 Rev. No.: 11 b ENTERGY ENGINEERING STANDARD ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: I Page: 62 EXAMINATION GUIDELINES I _I Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) I I Page: 4 of 5 Special Instructions I

i. Refer to Appendix il additional instructions regarding the data screening and evaluation of RPC Probe data.

2., All phase rotation settings are set with indications going up

3. Rotate data using "Data Slew Menu' so coils 5 and 7 are aligned with coil 1.
4. Span, Phase, and Volts are to be set using the center of the notch.
5. Process Channel P1, P2 and P3 shall be created to aid in the evaluation of indications that may be masked by deposits. Suppress the tube support ring on the calibration standard using the signal response from one complete revolution of the support ring. After suppression check the standard to make sure all flaws are not distorted by the suppression process.
6. Evaluate the full length of the recorded data.
7. Plot tubesheet interfaces with Channels 1, 2 and 3 as a minimum.
8. Volumetric (MBM) calls at the top of the tubesheet may represent mixed mode cracking. Indications should be investigated to determine that cracking is not present prior to accepting a MBM call.
9. Monitor the configuration widget for proper data sampling. Set the warning dialog to trigger at 25 axial samples and 30 circumferential samples. When these requirements are not met in the area of Interest, reject the data and notify the Lead.
10. When the c-scan plot area is set to +/-1.0* there should be a minimum of 50 scan lines and 72 data points per scan line.
11. Label channels 1,4, 7 and P1 "Panco. Label channels 2, 5, 9 and P2 as *Axial'. Label channels 3, 6, 10 and P3 as'Circ". Label channel 8 as "Triggo. Label channel 11 as "AxEn'. Label channel 12 as 'Loc'.
12. Resolution as required will size, on best effort basis, each reported indication. Two phase angle calibration curves will be required. One for axial indications and one for circumferential indications. These calibration curves will be developed inside the RPC c-scan window.
13. When the 100% EDM notch saturates on specific channels, use the 60% ID notch and set to 7.0 volts for these channels.
14. This configuration can be used with a single pancake coil.
15. Any bobbin PLP call shall be rotated and compared to the previous outage inspection. If the PLP was called last outage, the bobbin signal shall be compared and any change >10 degrees phase angle on P1 shall be reported as an LPI and repaired.
16. Reporting from the directed coils (axial, ciro) is allowable when the pancake coil does not produce a good signal.

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 11 SCN No.: I ENTERGY ANO-2 STEAM GENERATOR EDDY CURRENT Page: 63 EXAMINATION GUIDELINES I ~ Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) Page: 5 of 5 Resolution Sizing Methodoloav of Indications for Enqineerinq Evaluation SG ROW COL VOLTS DEG PCT CHAN LOCATION FROM TO FXTFNT UITIL1 UITIL2 TO EXTENT UTILI UTIL2 Volumetric Indication (SVI, MVI, MMI, LPI)

)4H 0.5 0.56 05H004H I TBR 05H04H The Location shall be recorded as The voltage shall be the The Depth shall be the the distance from the center of the maximum voltage I deepest or most nearest structure to the first Hit of response of the Frepresentative estimate. the indications. All Line Entries indication. I shall have the same Locations.

1 Indications will be measured using the 300 kHz pancake coil. If other frequencies or coils give a better representation of the indication it may be used. Depth measurements will be estimated from the phase angle calibration curve using the deepest hit or the most representative estimate. The most representative estimate is that derived from multiple hits, which display close correlation, and only one hit is greatly different.

2 Linear (crack-like) indications require a length measurement. The measurement will be taken from the C-SCAN strip chart using the To/From measurement feature. Multiple scan lines shall be reviewed to insure a conservative measure.

3 Volumetric indications require length and width measurement. Set the threshold just above baseline and adjust the box to the size of the positive image. Set the OD (.750") for tube diameter in C-SCAN "users select".

4 In the Circ and Axial Liss windows of the C-SCAN "set volts units" to "use main eddy voltage".

5 Report SVI, MVI, VOL, SAI, MAI from Circ Liss. Report SCI, MCI from Axial Liss.

(Ii-L ANID UIP',; l-LAW*

L:IDI4 C,05 ,002 WIDE X 50)0 L.U) JO L. !JE EV.SII.- NO 5111.,I.1.lAHGES DRAFT. ERROR M N SHOWS 100%

A B C D E F 01K1 J K L ACNTRU 1CLE LOCAIIOlY, LOC N

___ý PHYSICALLY FMEAS UEI'III T-k\LO %a.

j~v,,:k- N DEPTIh III % OF WALL

%ocý?.-kcxnUN-ASP:

II J L N W, 0 F UNS-2A I1 0033 ORIENTATION OF ALL FLAWS SlIlOWS 60% ID SHOWS 60% 0O. SHOWS 40% ID. SHOWS FLAW40% O.D. SHOWS CIRC. FLAW 20% I.D SIHOWS 100% CIRC. FLAW AXIAL E 052 1003 IN STD - 75 DIA.

O .067,.003 IN SIO > .75 DIA.

AXIAL FLAW LOC B CIRC. FLAW LOC D AXIAL FLAW LOC F LOC.H LOCJ LOC L MATERIAL t*I L AVERAGE MEAS WALL THK. ,oS1 NOMINAL WALL THK * ,*in LOC.K LOC M

.EAT LOT NO_ "1*-VL LOCO LOCI LOG C LOC.E SHOWS 2096 1.0

-N..----- LOC A SHOWS 40% I.D. SHOWS 40% OD.

TEST FREO USED SHOWS 100% SI lOWS 100% SI-OWS 60% ID SHOWS 60% 00. CIRC. FLAW AXIAL FLAW CIRC FLAW CIRC FLAW AXIAL FLAW SERIAL NO !A51JI_ TI-IRU HOLE AXIAL FLAW P0 NO - "1114

-A_ )13 ARE III IINHES 5EL NO __ _

IOLERAIJES K ZEGKE 12/03/961

. CDIECK DUALITY REL NO . .(hIIAtL FRAAt 0116 12/10/gB 1 0 DELL DATE MFG. ,V5-9 1*xxx .. 00I xxx

  • 015 DESIGN BJ O A INSP XX* 050 GUST ONER G_. * *-.
'U *I 3, '

%JUA s0 ______

RECORDED 12110/96 0IROBE USED PEVIEWED B)Y

ALL AXIAL AND CIRC FLAWS X 500 LONG ARE EOM 005 ,GO2 WIDE I m N V SHOWSHOLE 7HRU 100%

0 11 1 J LOC.N 0

B c D E F A

LOCATIOtI PHIeSIC/1LLY MEAS DEPTII .T.X

\._.co CLL DEPT H IN % OF WALL L N i UNS-2A 003f ORIENTATION OF ALL FLA' SHOWS F20% .D SHOWS 60% D.0. CIRC FLAW

@ 0. 0. 0 SHOWS 100% SHOWS 60% ID. CIRC. FLAW AXIAL FLAW O052 003 1 IN SfD. -. .75 DIA. AXIAL FLAW LOCL I.0670.003 IN StD. > .75 DIA. AXIAL FLAW CIRC. FLAW LOC.H LOC.J LOC D LOC F LOCG MATERIAL .. _ tIL L,,

MEAS WALL I'HK ,251 AVERAGE NIAINAL WALL TilK.

LOCI LOCK LOC M HEAT LOT NO LOCA LOC LOC SHOWS.-20% ID SHOWS 60% 00 SHOWS 40%,ID SHOWS 40% OD.

TEST FPCEO USED t4ý SHOWS 100% SHOWS 10C% SHOWS 50% ID CIRC. FLAW AXIAL FLAW 01S CIRC. FLAW AXIAL FLAW SEPRAL NO CIRC. FLAW AXIAL FLAW THRU HOLE P 0 NO

_..E-- .

REL NO i 1ILERANIES OUALITY REL NO OAT I=F M 0 FG- '11

).A INS?

.I; GOIRDE 0 ._...._Jl,_-

FRC2E bSED REVIEWED '_

j

At- . A\XIAL AID CiRC FLAWS 2 `10 (IIAIIfiE 5 S II IDt RAFTI E R ~l ARIL EDM 005 1 CC?2 WI')E: X -1 (T ; . 5 0 _ _iA/IE7 EV. SI 111 .

500 L(X G 3 __? .___E_ -01/

1< ML THRU P~OLE LOCATIlON A nv"4oI D F II N Vmt~. 'pLOC tMEA:S DEP1lI SOS10 PIIt'SICALLY

'q7- QI .3Q *l - _32 o

$2

-~ ~ ~~~ L3i OCQ DEPTH IM' % Cf V/tLL H3 D F 11 J L W-)

111]

"Qa I_________________________________,7__

-- 0.7455.0033 ORIENT OF ALLATFLAWS ION Z12 WP K 05_

-1.420___

\ A8 800 .8 26. & 8.40


__ ___ __ __ 10 44 SHOWS 40%6 ID. 51-IOWS 40% 00D. SHOWS 20% I D SI-OWS 10056 Sh OWS 60%6 ID. SHOWS 6096 00. AXIAL FLAW CIRC0 FLAWY

@0 ,2, 003 IN STID ~.75 DIA. CIRC FLAW AXIAL FLAW CIRO. FLAW 75 DIA. AXIAL FLAY) LOC L 0@067 t003 IN 513. LOC F LOC.H LOCJ 1-0c13 LO 0

MATERIAL A~t A .-

MEAS WALL THK1 .051 AV/ERAGE

~-0 NC*413NAL WALL THK - 9ff-- LOCCM LOGO6 LOC I LOC.K LOC A LOC C LUCGE SHOWS 20% I D.

!EST FRED UJSED-N_111, SOWS 60% 00 S1HOWS 40% I D S1HOWS 40% 00D.

ShW 0%SOW 01 i0W D AXIAL F'AWN NO1 SERIALL o~~

FL AW AXIAL FA, CIRC. FLAW AXIAL FLAW CIRC

__ 911 TIIRU HIOLE C113C FLAWN DAT E postr ua#fs"U %CU 1.ac r0 N~O NOAW mREL~5~t1i IN KE 1ý 1/3~6L3R 4IhE INK REL NO NOTE KE

__________2/03/96__Z______EC 1

ILERAIK(ES C_____ ______

OUALITY NC ~ -~-1J______

PEL D~lE MFG E

_____MFG

E(IhIAL j 03x FRAUI .1/16 CIEC0 TO1 DELL L II/r 122110196 0.1. CALIBRATION STANDARD 0DA 114SP.M tX '--- DE sIGNt Da4010_-1-A P-34Y_

s 0hhk i

.w CUSOME BJ 12/10/96 SIMILARl NOO XX a 050 OAE 22-4515 GUST *003 _________

RECORDED ____________ __

':GULAR ,3 T 2-1-15 PROBE USED UIB 2 116~~

F~~I REVIEWED By

1.

S__-- ~FEVISICONS , '1

... .,Au. L D1.E D E R K ALL AXIAL AND CIPC FLAWS 3 2 $bEE I B 01,00,97 REV.SI,..2 . NO CHANGES SIT,. DRAFT. ERROR I---"-Z ARE EID,, c5 00OO2 wIDE X 500 LONG A B C D E F .13 1 1 K L 1 N SHOWS 100%

LOCATIOtl 2 l. J _L¶*"i L

  • THRJ HO LE

__ tV - - olQ _.o .O _ . 22_. . . L PHYSICALLY ,EAS DEPTH

. -- ' 3 * * -- *-I-%" @

DEPTH IN % OF WALL \Io?, ._ C

  • ID _ L t_ - *

-3.2ULS u D F r-3/4-27 UNS-2A ORIENTATION I I OF ALL FLAWS CI-OWS 10% ID. SHOWS FLAW 40% O.D. SHOWS CIRC 2u01 FLAW S0o52,oo3 IN SID s. .75 DIA

- 75 DIA, SIAOWS 10096 AXIAL FLAW SHOWS 60% ID CIRC FLAW SI-IOWS FLAW AXIAl.

60% OD.

RC FLAW LOC.H-1 AXIAL LOC J LOC L Iu I

0067,003 IN SI LOC D LOC F LOC G MATERIAL . .

AVERAGE MEAS WALL l14K ,051 NOMAINAL WALL TIII( 04 LOCM LOCI LOC.(

HEAT LOT NO _ HOWS 40% I.D. SHOW3 40% OD. SHOWS 20% I.D

.OC C LOC E .OC O AXIAL FLAW TEST FRED USED 1ý LOC A SIIOWS 6006 OGD SIXIAL FLAW CIRC. FLAW 51-lOWS 1009& 5-HOWS 100% SH-lOWS 60% ID A ZETEC

-& 59-0°1 CIRC FLAW AXIAL FLAW CIRC FLAW SERIAL N10 THRU HOLE P.0 NO _.E _ '-- DA

__.t, )III ARE III ItMC!E5 K ZE GKE E 101031951 10100UA111%410 1'1 REL. NO NOTE CHECK TITLLE TOLERAIICES QUALITY ,EL NO w t-6 G.T. CALIBRATION STANDARD

'E(IIIAL FRACI .1116 12/10/96 DATE MVFG _______ T 1) 0 DELL D,,tl0-I-A Pu3JL3 S0 DE O A INSP

,IES

'xxx 015 xx , 050 BJ 12/10/96 Sd"IA iowo NO 2-415-1059 1

  • 003 ,Pvo OA 0

CUSTOMER ' - I OF 3 LGULA , 3" GAP SC4LE S -

RECORDED ._ _.._ G.A 12110196 F.gII L f 000--o PROBE USED REVIEV/ED BY

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 ENTERGY IPage: 1 ANO-2 STEAM GENERATOR EDDY CURRENT EXAMINATION GUIDELINES 10.2 ATTACHMENTS 10.4.1 ATTACHMENT I - ETSS #1 Bobbin Examination Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE T Page: 1 of 4 Site: Entergy Operation Inc. Arkansas Nuclear One Unit #2 Examination Scope Applicability: Standard ASME Code Examination. Use for detection of IGA/ODSCC at non-dented drilled and eggcrate support structures, in freespan tubing and within sludge pile region. This technique includes the detection and sizina of wear diaaonal and vertical straos usina differential 400/1 00-amplitude mix.

Instrument Tubing Manufacturer/Model: Zetec MIZ-30A or Equiv. Material Type: Inconel 600 Data Recording Equipment OD/Wall (inch): 0.750" OD X 0.048" Wall Manuf./Media: HP HD 1.3Gb Optical or Equiv. Calibration Standard Software Type: ASME with Fan Bar Wear and EDM Manufacturer: Zetec Analog Signal Path Version/Revision: EN 98, Latest Approved Version Probe Extension Manuf.: Zetec Examination Procedure Extension Type & Length: Universal 945-1760, 75 ft.

Number/Revision: HES-28 Rev. 9 Slip Ring Model Number: 508-2052 Scan Parameters Scan Direction: Pull Digitization Rate, Samples Per Inch (minimum): Axial Direction >_33 Circ. Direction N/A Probe Speed Sample Rate RPM Set RPM Min RPM Max

_<48 IPS 1777 N/A N/A N/A

_<24 IPS 1100 N/A N/A N/A Probe Description (Model/Diameter/Coil Dimensions) Manufacturer/Part Number Length A-600-M/ULC Zetec 700-1192-061 110 ft.

A-540-SF/RM /A-560 SF/RM /A-580-SF/RM Zetec 754-0402-001/D#2121-10-B/700- 110 ft.

0402-051 A-600-M/ULC (500 nose) Zetec D# 2120-5-G 110 ft.

Data Acquisition Calibration Differential Channels Channel& Ch. 1 &3 Ch. 5 & 7 Ch. 9 & 11 Ch. 13 & 15 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 100% TWH 100% TWH 100% TWH Tube Support Ring 40 degrees 40 degrees 40 degrees 90 Degrees Span Setting 100% TWH 100% TWH 100% TWH Tube Support Ring 6 divisions 6 divisions 6 divisions 5 divisions Calibration Absolute Channels Channel& Ch. 2 &4 Ch. 6 & 8 Ch. 10 & 12 Ch. 14 & 16 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Tube Support Ring Flaws up first Flaws up first Flaws up first 90 Degrees Span Setting 60% TWH 60% TWH 60% TWH Tube Support Ring 5 divisions 5 divisions 2 divisions 4 divisions

ARKANSAS NUCLEAR ONE ENGINEERING STANDARD No.: HES-28 R Rev. No.: 9 ANO-2 STEAM GENERATOR EDDY CURRENT Page: 2 EXAMINATION GUIDELINES SCN No.: I Examination Technique Specification Sheet ETSS # 1- BOBBIN PROBE I ]Page: 2of4 Configuration Board Settings trig: off I dow Configuration #0 Name: _samples/ sec: rec. media=

tester= board# 1 board #2 board#3 board # 4 board#5 board # 6 board # 7 board#8

  1. of channels= 16 probe# 1 probe # 1 probe # 2 Wrobe # 2 probe #1 robe # 1 Probe # 1 probe # 1 DRIVE DRIVE DRIVE DRIVE DRIVE jA DRIVE D B C A DRIVE D B C A DRIVE D B C A D B C A D B C A D B C A D B C A Q B C!

Drive PolarityN NN N Group Number Coil Number________

FREQ #1 Time Slot # 1 400okd G:x2T12.0V D A D A FREQ #2 Time Slot # 2 200-kHe G:x2ý12.0V D A D A FREQ #3 Time Slot # 3 100ki-z G:x2 12.oV D A D A FREQ #4 Time Slot # 4 20kl-k G:x4 12.0V D A D A FREQ #5 Time Slot # 5 FREQ #6 Time Slot # 6 FREQ #7 Time Slot # 7 FREQ #8 Time Slot # 8 END LOCCH: 1 1 DRIVE A: D = A-A2, P = drAl pu:A2,DP dr: D1 &02pu:A1&A2 THRESHOLD: off off DRIVE B: D = B1-B2, A = A1-B2 (P)GAIN: x6 P = dr:B1 pu:B2, DP= dr: CI&C2 pu: B1&B2 ACTIVE PROBES: 2 DRIVE C: D = Cl-C2, A= D1-C2 DRIVE D:aDn=rt-o2 SCN Special Instructions

1. The A-600-M/ULC probe is the primary use probe for the bobbin examination. The A-580SF/RM and A-560SF/RM are used to test low row tubes.
2. The A-580-SFRM probe can be used in tubes reported as RRT with the .600" probe as directed by the FTI Level III and Entergy approval. If needed, a 0.560 SF/RM probe, or a 0.540 SF/RM can be used as directed by the FTI Level III and Entergy approval.
3. Examine each tube full length or to the extent possible.
4. Enter a message at the beginning of each calibration group indicating that the data is being acquired with either single or dual probes. If dual probes are being used state which calibration group is the primary probe and which is the secondary probe.
5. When acquiring data with a single probe Coil 1 (differential) channels will be Ch1=400 kHz, Ch3=200 kHz, Ch5=100 kHz, Ch7=20kHz and the Coil 5 (absolute) channels will be Ch2=400 kHz, Ch4=200 kHz, Ch6=100 kHz, Ch8=20 kHz.
6. Slower speeds (24 IPS) are recommended in the smaller radius U-bend tubes (row 5 and below) due to probe snapping through the U-bend.

'CN- 7. Three recordings of the calibration standard should be performed at the beginning and end of each calibration group.

8. As a minimum, a position verification and a message will be entered once per calibration group.
9. Tubes, which have been mis-encoded, should be corrected by entering a message to void that entry and re-examining the tube with the proper encode. This is required to maintain an accurate DSR database.

ARKANSAS NUCLEAR ONE SENGINEERING a- ANO-2 STEAM GENERATOR EDDY CURRENT STANDARD No.: HES-28 Rev. No.: 9 Page: 3 EXAMINATION GUIDELINES SCN No.: I Examination Technique Specification Sheet ETSS # 1 - BOBBIN PROBE Page: 3 of 4 Data Analysis Calibration Differential Channels Channel& Ch 1 Ch 3 Ch 5 Ch 7 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation 100% TWH 100% TWH 100% TWH Tube Support Ring

@ 40 degrees @ 40 degrees @ 40 degrees @ 90 Degrees Span Setting 100% TWH 100% TWH 100% TWH Tube Support Ring Minimum @ 75% FSH @ 75% FSH @ 75% FSH @ 50% FSH Calibration Absolute Channels Channel& Ch 2 Ch 4 Ch 6 Ch 8 Frequency 400 kHz 200 kHz 100 kHz 20 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. 100% TWH Tube Support Ring Flaws Up Flaws Up Q 40 Degrees 270 Degrees Span Setting 60% TWH 60% TWH 60% TWH Tube Support Ring Minimum @ 50% FSH @ 50% FSH @ 20% FSH @c40% FSH Calibration Process and Other Channels Channel & P1 (Ch 1/5) P2 (Ch 1/5) P3 (Ch 1/3/5 turbo) N/A Frequency 400/100 kHz Diff 400/100 kHz Diff 400/200/100 kHz Diff Configure &Adjust Suppress Suppress Save 100, 60, 20 Parameters Support Ring Support Ring Suppress TSP TSH &

TSC Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz.

Flaws start down Flaws start down Flaws start down Span Setting 100% TWH 50% Wear 100% TWH Minimum @ 75% FSH @ 50% FSH @ 50% FSH Voltage Normalization Calibration Curves CH Signal Set Normalize Type CH Set Points I 4X20% FBH 4 Vp-p All Phase 1, 3, 5, P1, 100, 60, 20 FBH Magnitude (Vmax) P2 0, 30, 50 Wear Data Screening Left Strip Chart Right Strip Chart Lissajous P1 Ch 6 Ch P1 Re orting Requirements Condition/Region Report Ch. Comment Absolute Drift ADI 6 Vert-Max (Low Row U-bend)

Freespan DFI --+ Use "Free Span Bobbin Coil Indication Flow Chart" Eggcrates DSI P1 See Note 6 Drilled Support Plates DSI P1 See Note 7 Batwings DSI P1 See Note 9 Tubesheet DTI P3 See Note 4 Dents DNT P1 All Dent Indications > 3 volts located anywhere.

Indication Not Reportable INR Indications detected are not reportable by guidelines Indication Not Found INF Resolution is require to research and resolve per guidelines Wear DSI P2 Indications with no history. See Note 9.

Wear  % P2 Vert-Max Differential At the Batwing edges only. Check contact. See Note 9.

Possible Loose Part PLP 8 Any Indication of Secondary Side Foreign Parts, See Note 12 Loose Part Indication LPI P1 See Note 12

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 Page: 4 ENTFf6f ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: I I_ _ EXAMINATION GUIDELINES I Examination Technique Specification Sheet ETSS # I - BOBBIN PROBE I 7Page: 4of4 Special Instructions I. Refer to Appendix I additional instructions regarding the data screening and evaluation of Bobbin Probe data.

2. Zoom the strip chart to a maximum value of 8 to increase visibility of small amplitude indications.
3. All areas of the tubing should be examined with both P1 and Ch6 for distortion at structure and/ or drifts that may be indicative of cracking.
4. Review tubesheet data for indications of degradation, distortion and drifts indicative of axial or circumferential cracking. Indications may be confirmed by using Ch5, Ch6 or P3. Evaluation is typical in P1 or Chl. Based upon experience at ANO-2, take care to examine the entire tubesheet entry signal at the setup span on Chl and Ch3 for distorted signals indicative of cracking. Also observe the response of P3. The requirement to screen the entire SCN tubesheet entry signal is critically important in both the hot leg and cold leg. Distorted signals, which may be

-1 indicative of a flaw on the bobbin, shall be flagged for RPC examination by reporting as DTI in the % column. If the indication is not in the expansion transition, the indication should be evaluated and reported from P1.

5. In the presence of deposits at the top of the tubesheet, if the signal has the characteristics of a flaw on P1, report these indications as an "NQI" code and test with an RPC examination.
6. Evaluate each support on the P1 process channel. Eggcrates typically have three signals representing the two edges and the center of the eggcrate. Indications can be confirmed with Chl, 3, or 5 when deposit influence is not present. Indications that are phased in the ID plane on P1 should confirm on Ch3 and/or Ch5. Indications may not always display an expected counter-clockwise rotation.
7. Dented drilled supports should be screened with P1 and P3. P3 indications must confirm as an indication on either Chl, Ch3, or Ch5.
8. Using P1 and Ch5 to scroll through the upper hot leg area from 07H through the u-bend region. Also evaluate this using the Ch6 strip chart for drift indications. Evaluation is typically on P1, Ch5 and Ch6. Monitor the 100 kHz absolute strip chart for positive drift (special attention to the low row u-bends).
9. Wear or fretting indications at the Batwings should be evaluated and called using P2. If the indication does not have history record as a DSI. If the indication has history record %TW. Confirmation of a contact point is made by using Ch8. If the indications are not on a contact point or are sharp and not typical of wear, evaluation should be made using P1 and report as DSI.
10. When using Auto Calibration features, make sure that you are using the file that matches the Standard being used.
11. Monitor the configuration widget for proper data sampling. Set the warning dialog to trigger at 33 axial samples.
12. Observe the stripchart and Lissajous presentations for indications occurring anywhere along the tube but especially on top of the tubesheet and supports. Possible loose parts shall be screened and reported as a Possible Loose Part (PLP) on 20 kHz absolute. This will signify the need for further characterization with a rotating probe technique.

-1) r.W 0052 IN STD. 075 0.067 IN STD. - 0.75 C D E F G H K LOCATION A B

.o h P . .Q*a PHYSICALLY MEAS. DEPTH _,ZL5 DEPTH IN % OF WALL _.s,* _io_0 __A9.

E T. PHASE ANGLE MEAS 0 3/16 0 7/64 E]

DIA OF DEFECT -.003 TUBE SUPPORT RING MATERIAL C S. 12L14 LOC. K LOCC LOC.F THRU H LOC. I LOC. J L'b0o LOC A & B SHOWS A WEAR SCAR

-7 500 MAX -- 0') 0 SHOWS 36

  • DENT SHOWS 360D COPPER RING SHOWS 4X EQ SPACED (9D0)APART SHOWS 4-FLAWS SHOWS 0O AXIAL EGG CRATE SIMULATION 2-416-1016 EQUALLY SPACED EOM NOTCH .250 LONG X .75 WiDE X .007-.002 DP. .250 WIDEX 003 THK, MATERIAL: C.S12L14 AROUND TUBE .006 MAX. WODE MIATERIALINCKINEL C AVERAGE MEAS WALL THK VLB -.

IOMINAL WALL THK "RIBL.,

HEAT LOT NO. Lszom-fim3&&y O1$. M!rL.

-EST FREDQ USED SERIAL NO. e - M's0 PO NO _ _10__ ___

ZEL. NO.

IUALITY REL. NO. ... '.".

)ATE MFG. L5- 't.-.

"1A.INSP.  ;* l*1 ,

,USTOMER .. t TCROEO 42..

-RB USED h C. ~ -Z -

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 Page: 5 ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1,2,4 1__ _ EXAMINATION GUIDELINES 1 10.4.2 ATTACHMENT II- ETSS #2 RPC Examination (Pancake, Ax, and Circ)

Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. Directed coils) Page: 1 of 5 Site: Entergy Operation Inc. Arkansas Nuclear One Unit #2 Examination Scope Applicability: Tubesheet examinations. Diagnostic testing and/or to confirm bobbin indications. Detection of IGA/ODSCC or PWSCC.

Instrument Tubing Manufacturer/Model: Zetec MIZ-30A/30-8 Material Type: Inconel 600 Data Recording Equipment OD/Wall (inch): 0.750" OD X 0.048" Wall Manuf./Media: HP HD 1.3GbOptical or Equiv. Calibration Standard Software Type: RPC EDM Notch Standard Manufacturer: Zetec Analog Signal Path Version/Revision: EN98 Latest Approved Version Probe Extension Manuf.: Zetec Examination Procedure Extension Type & Length: Universal 945-1760, 75 ft.

Number/Revision: HES-28 Rev. 9 Slip Ring Model Number: 508-2052 Scan Parameters Scan Direction: Push or Pull Digitization Rate, Samples Per Inch (minimum): Axial Direction I >25 Circ. Direction ___30

),CN Probe Speed Sample Rate RPM Set RPM Min RPM Max 0.45 intsec. 1280 850 700 1000 Probe/Motor Unit 3CN- Description (Model/Diameter/Coil Dimensions) Length Motor Units 810-4090-000 - .610 (.115) MRPC 3C-52PH 50' or 83' 700-4055-071 - .610 9D-MRPC-52MU D# 2651-2-A - .580 (.115) MPRC 3C-52PH 50' or 83' 810-4050-001 - .560 9D-MRPC-52MU D#3414-13-A - .600 TTS extension shaft (+2"/-2") 48" Data Acquisition Calibration 0.115 Coil Channels (Dual Probes)

Channel& Ch. 1 &4 Ch. 7& 10 Ch. 13& 17 Ch. 23&24 Frequency 300 kHz 200 kHz 100 kHz 20 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Tube Support Ring Up Flaws up first Flaws up first Flaws up first @ 90 degrees Span Setting 40% OD Axial Notch 40% OD Axial Notch 40% OD Axial Notch Tube Support Ring 0_ 3 divisions ( 3 divisions 0 3 divisions 0 3 Divisions Calibration Axial Sensitive Coil and Trigger Channels (Dual Probes)

Channel& Ch. 2 &5 Ch. 8 &11 Ch. 15 &19 Ch. 14 &18 Frequency 300 kHz 200 kHz 100 kHz 100 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Large pulse up, Flaws up first Flaws up first Flaws up first small pulse horizontal Span Setting 40% OD Axial Notch 40% OD Axial Notch 40% OD Axial Notch Large Pulse r :3 divisions divi.*inn.* S3 t13 divi.*inn.* ith 4 divi.*inn.*

a 3L diison 3 iiinI I iiin iiin Calibration Circumferential Sensitive Coil (Dual Probes)

Channel & Ch. 3 & 6 Ch. 9 & 12 Ch. 16 & 20 Ch. 21 & 22 Frequency 300 kHz 200 kHz 100 kHz 100 kHz (optional)

-J Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Pulse Flaws up first Flaws up first Flaws up first @ 90 degrees Span Setting 20% ID Circ. Notch 20% ID Circ. Notch 20% ID Circ. Notch Pulse

_, 2 divisions (@ 2 divisions ( 2 divisions Q 4 divisions

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 Page: 6 ET% ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1, 2, 4 1____ _ EXAMINATION GUIDELINES I _I Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) Page: 2 of 5

'CN- Configuration Board Settings trig: off I down Configuration # 0 Name: Dual 3-Coil Isamples / sec: 1280 rec. media = Har tester = board # 1 board # 2 board # 3 board # 4 board # 5 board # 6 board # 7 boa

  1. of channels = 24 probe # 1 probe # 1 probe # 2 probe # 2 probe # 1 probe # 1 probe # 1 prol DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE DRIVE A D B C A D B C A D B C A D B C A D B C A D B C A D B C A Drive Polarity N N NI N N N N N NIN Group Number i i 1 2 2 2 2 1 Coil Number __4_5_ _ 11_1_4 51_1 71 8 FREQ#1 Time Slot#1 D D D D D D 300kHz G:x2 12.0V FREQ#2 Time'Slot#2 D D D D D D 200kHz G:x2 12.0V FREQ#3 Time Slot#3 D D D D D D D D 100kHz G:x2 12.-0V FREQ#4 TimeSlot#4 D D 100kHz G:x2 12.0V FREQ#5 Time Slot#5 D D 20kHz G:x4 i12.OV FREQ #6 Time Slot #6 FREQ #7 Time Slot # 7 FREQ #8 Time Slot # 8 END LOCCH: 1 1 DRIVE A: D=A1-A2, P = dr:A1 pu:A2,DP =dr: DI&D2 pu: A1&A2 THRESHOLD: off off DRIVE B: D = B1-B2, A = A1-B2 (P) GAIN: x6 P = dr: B1 pu:B2, DP= dr: C1&C2 pu: BI&B2 ACTIVE PROBES: 2 DRIVE C: D = C1-C2, A = D1-C2 DRIVE D: D= DIc-D2 Special Instructions
1. Enter a message at the beginning of each calibration group indicating that the data is being acquired with either single or dual probes. Ifdual probes are being used state which calibration group is the primary probe and which is the secondary probe. The message shall include whether the data is acquired on the push or pull.
2. When acquiring data with a single probe delete boards 3 &4. The Coil 1 (A15" Panc) channels will then be Ch 1=300 kHz, Ch 4=200 kHz, Ch 7=1 00 kHz, Ch 12=20 kHz. The Coil 4 (Trigger) channel will be Ch8=100 kHz. The Coil 5 (Axial) channels will be Ch 2=300 kHz, Ch 5=200 kHz, Ch 9=100 kHz. The Coil 7 (Circ) channels will be Ch 3=300 kHz, Ch 6=200 kHz, Ch 10=100 kHz. Coil #8 will be Ch 11 100 kHz.
3. Examine each location and record a run-out. Run-out record not required for tubesheet intersection scans.
4. The TSH expansion transition shall be acquired by pushing the probe through transition and shall be adequate to cover the target location. The scan shall normally be from 2.0" below the transition to 2.0" above the top of the tubesheet. In the event that the probe stalls on the push, the data may be acquired by pulling the probe through the transition. This will require the operator to message the event prior to acquiring the data.
5. Other locations may be scanned on the PULL or PUSH and shall be adequate to cover the target location. For special interest indications located within a structure, the data shall be acquired +/-2" from the center of the structure. All other locations shall be acquired to include a minimum of one structure. Care should be taken to insure that the proper location is scanned with adequate data past the target location to account for any variations in probe speed or axial scaling.
6. One calibration standard may be recorded at the beginning and end of each cal group provided it is a successful scan of the standards complete length.
7. Tubes which have been mis-encoded should be corrected by entering a message to void that entry and re-examining the tube with the proper oCN- encode. This is required to maintain an accurate DSR database.
8. Axial Encoder is used at the operator's discretion. When not used, activate timeslot as usual, and no setup is required.

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 Page: 7 ENTERGY ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1, 2 1__ _ EXAMINATION GUIDELINES I Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) Page: 3 of 5 Data Analysis Pancake Channels Channel & Frequency Ch 1 Ch 4 Ch 7 Ch 12 (Locator) 300 kHz 200 kHz 100 kHz 20 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Tube Support Ring Up Flaws Up Flaws Up Flaws Up V- 90 degrees Span Setting 40% OD Circ. Notch 40% OD Circ. Notch 40% OD Circ. Notch Tube Support Ring Minimum I 2 divisions 0 2 divisions 0 2 divisions 0 3 Divisions Axial Sensitive Coil & Trn aer Channels Channel & Frequency Ch 2 Ch 5 Ch 9 Ch 8 (Trigger) 300 kHz 200 kHz 100 kHz 100 kHz Phase Rotation Probe Motion Horiz. Probe Motion Horiz. Probe Motion Horiz. Large Pulse Up, Flaws Up Flaws Up Flaws Up Small Pulse Horiz.

Span Setting 40% OD Axial Notch 40% OD Axial Notch 40% OD Axial Notch Large Pulse Minimum @ 2 divisions @ 2 divisions @ 2 divisions @ 4 divisions Circumferential Sensitive Channels Channel & Frequency Ch 3 Ch 6 Ch 10 Ch 11 300 kHz 200 kHz 100 kHz 100 kHz (optional)

Phase Rotation 20% ID Circ. Notch 20% IDCirc. Notch 20% ID Circ. Notch Pulse 0- 10 degrees 0 10 degrees V-, 10 degrees , 90 degrees Span Setting 40% OD Circ. Notch 40% OD Circ. Notch 40% OD Circ. Notch Pulse Minimum 0- 2 divisions 0- 2 divisions C 2 divisions 9D 4 divisions Process Channels Channel & Frequency Ch P1 Ch P2 Ch P3 300/100 kHz Panc 300/100 kHz Axial 300/100 kHz Circ Phase Rotation Probe Motion Horiz. Probe Motion Horiz. 20% IDCirc. Notch Flaws Up Flaws Up 10 10 degrees Span Setting 40% GD Circ. Notch 40% GD Axial Notch 40% GD Oirc. Notch Minimum 1 2 divisions Q 2 divisions @ 2 divisions Voltage Normalization Calibration Curves CH Signal Set Normalize Type CH Set Points 1 100% Ax notch 20 Vp-p Ch. 4,7 & P1 (Reso) Phase Curve (Note 12) 1 40, 60, 100 Ax. OD notch 2 100% Ax notch 20 Vp-p Ch. 5,9 & P2 3 100% Circ. notch 20 Vp-p Ch. 6,10 & P3 - Reso) Phase Curve (Note 12) 1 40, 60,100 Circ OD notch Data Screening Left Strip Chart Right Strip Chart Lissajous P1 Ch 6 Ch P1 Reporting Requirements Condition/Region Report Ch. Comment Single Axial Indication SAI I or P1 Any amplitude - Report on volts peak - peak Multiple Axial Indication MAI 1 or P1 Any amplitude - Report on volts peak - peak Single Circumferential Indication SCI 1 or P1 Any amplitude - Report on volts peak - peak Multiple Circumferential Indication MCI 1 or P1 Any amplitude - Report on volts peak - peak Single Volumetric Indication SVI 1 or P1 Any amplitude - Report on volts peak - peak Mixed Mode Indication MMI 1 or P1 Any amplitude - Report on volts peak - peak Possible Loose Part PLP 12 Any Indication of Secondary Side Foreign Parts Volumetric VOL 1 or P1 Any amplitude - Report on volts peak - peak Loose Part Indication LPI P1 Any Indication of tube degradation associated w/ PLP (see note16)

Wear WAR P1 Any amplitude at Batwings only Multiple Volumetric Ind. MVI 1 or P1 Any amplitude - Report on volts peak-peak

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 a_ _ __ IPage: 8 ENTEFW ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1, 2 1____ _ EXAMINATION GUIDELINES I _I Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) I I Page: 4 of 5 Special Instructions

1. Refer to Appendix II additional instructions regarding the data screening and evaluation of RPC Probe data.
2. All phase rotation settings are set with indications going up
3. Rotate data using "Data Slew Menu" so coils 5 and 7 are aligned with coil 1.
4. Span, Phase, and Volts are to be set using the center of the notch.

3CN- 5. Process Channel P1, P2 and P3 shall be created to aid in the evaluation of indications that may be masked by deposits. Suppress the tube support ring on the calibration standard. Care should be taken when choosing the area that will be suppressed to develop these process channels. After suppression check the standard to make sure all flaws are not distorted by the suppression process.

6. Evaluate the full length of the data taken.
7. Plot tubesheet interfaces with Channels 1 and 3 as a minimum.
8. Volumetric (MBM) calls at the top of the tubesheet may represent mixed mode cracking. Indications should be investigated to determine that cracking is not present prior to accepting a MBM call.
9. Monitor the configuration widget for proper data sampling. Set the warning dialog to trigger at 25 axial samples and 30 circumferential samples. When these requirements are not met in the area of interest, reject the data and notify the Lead.
10. When the c-scan plot area is set to +/-1.0" there should be a minimum of 50 scan lines and 72 data points per scan line.
11. Label channels 1,4, 7 and P1 "Panc". Label channels 2, 5, 9 and P2 as"Axial". Label channels 3, 6, 10 and P3 as"Circ". Label channel 8 as "Trigg". Label channel 11 as "AxEn". Label channel 12 as "Loc".
12. Resolution as required will size, on best effort basis, each reported indication. Two phase angle calibration curves will be required. One for axial indications and one for circumferential indications. These calibration curves will be developed inside the RPC c-scan window.

',CN- 13. For alternate voltage normalization, use the 60% ID notch and set to 7.0 volts.

14. For data acquired without the axial encoder configuration, no setup is required.
15. This configuration can be used with a single pancake coil.
16. Any bobbin PLP call shall be rotated and compared to the previous outage inspection. If the PLP was called last outage, the bobbin signal shall be compared and any change >10 degrees phase angle on P1 shall be reported as an LPI and repaired.

ARKANSAS NUCLEAR ONE No.: HES-28 ENGINEERING STANDARD Rev. No.: 9 EM0 Page: 9 ENTBRG ANO-2 STEAM GENERATOR EDDY CURRENT SCN No.: 1, 5 EXAMINATION GUIDELINES Examination Technique Specification Sheet ETSS # 2 - PANCAKE COIL (axial and circ. directed coils) Page: 5 of 5 I Resolution Sizing Methodology of Indications for Engineering Evaluation SG ROW COL VOLTS DEG PCT CHAN LOCATION FROM TO EXTENT UTIL1 UTIL2 Circumferential Indication (SCI, MCI:

Volumetric Indication (SVI, MVI)

1. Indications will be measured using the 400 kHz pancake coil. If other frequencies give a better representation of the indication it may be used. Depth measurements will be estimated from the phase angle calibration curve using the deepest hit or the most representative estimate. The most representative estimate is that derived from multiple hits, which display close correlation, and only one hit is greatly different.
2. Linear (crack-like) indications require a length measurement. The measurement will be taken from the C-SCAN strip chart using the To/From measurement feature. Multiple scan lines shall be reviewed to insure a conservative measure.
3. Volumetric indications require length and width measurement. Set the threshold just above baseline and adjust the box to the size of the positive image. Set the OD (.750") for tube diameter in C-SCAN "users select".
4. In the Circ and Axial Liss windows of the C-SCAN "set volts units" to "use main eddy voltage".
5. Report SVI, MVI, SAI, MAI from Circ Liss. Report SCI, MCI from Axial Liss.

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 4 of 114 2203.012A ANNUNCIATOR 2K01 CORRECTIVE ACTION CHANGE: 021-03-0 125 VDC/120 VAC GREEN

  • denotes reflash capability

I PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 68 of 114 2203.012A ANNUNCIATOR 2K01 CORRECTIVE ACTION CHANGE: 021-03-0 ANNUNCIATOR 2K01 A-10 CONT CENTER 2D01 UNDERVOLT 1.0 CAUSES 1.1 2D01 bus voltage *110 VDC (relay 27-2D01).

2.0 ACTION REQUIRED 2.1 Check 2D01 voltage on Computer Point (E2D01).

2.2 Check Battery Bank (2D-11) amps and voltage.

2.3 Check 2DII Battery Charger (2D-31A or 2D-31B) amps and voltage.

2.4 IF battery charger amps are high AND 2DII is discharging, THEN secure unnecessary 2D01 loads.

2.5 Refer to Loss of 125 VDC (2203.037).

2.6 Check for overloads or multiple grounds (both positive and negative).

2.7 Refer to Tech Specs 3.8.2.3 and 3.8.2.4.

2.8 IF BOTH of the following occur:

"* 2D01 Bus Undervoltage alarm valid

"* Original Steam Generators (OSGs) installed THEN direct the Dedicated Cross-tie Operator (DXO) to obtain SDS02, EMERGENCY POWER FOR UNIT 2 ECCS VENT VALVES AND proceed to Corridor 340.

2.9 IF ALL of the following occur:

"* 2D01 Bus Undervoltage alarm valid

"* Original Steam Generators (OSGs) installed

"* EITHER SG less than 70" WR

"* At least 5 available CETs above 800*F

"* A sustained Loss of ALL Feedwater has occurred THEN Control Room Staff implement SDS02, Section 2 - " Powering 2CV-4698-1 from Vital Bus 2D26".

3.0 TO CLEAR ALARM 3.1 Raise bus 2D01 voltage above setpoint.

4.0 REFERENCES

4.1 E-2451-2A

PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 86 of 114 2203.012A ANNUNCIATOR 2K01 CORRECTIVE ACTION CHANGE: 02103-0 ANNUNCIATOR 2K01 A-Il CONT CENTER 2D02 UNDERVOLT 1.0 CAUSES 1.1 2D02 bus voltage *110 VDC (relay 27-2D02).

2.0 ACTION REQUIRED 2.1 Check 2D02 voltage on Computer Point (E2D02).

2.2 Check Battery Bank (2D-12) amps and voltage.

2.3 Check 2D12 Battery Charger (2D-32A or 2D-32B) amps and voltage.

2.4 IF battery charger amps are high AND 2D-12 is discharging, THEN secure unnecessary 2D02 loads.

2.5 Refer to Loss of 125 VDC (2203.037).

2.6 Check for overloads or multiple grounds (both positive and negative).

2.7 Refer to Tech Specs 3.8.2.3 and 3.8.2.4.

2.8 IF BOTH of the following occur:

"* 2D02 Bus Undervoltage alarm valid

"* Original Steam Generators (OSGs) installed THEN direct the Dedicated Cross-tie Operator (DXO) to obtain SDS02, EMERGENCY POWER FOR UNIT 2 ECCS VENT VALVES AND proceed to Corridor 340.

2.9 IF ALL of the following occur:

"* 2D02 Bus Undervoltage alarm valid

"* Original Steam Generators (OSGs) installed

"* EITHER SG less than 70" WR

"* At least 5 available CETs above 800*F

"* A sustained Loss of ALL Feedwater has occurred THEN Control Room Staff implement SDS02, Section 1 - " Powering 2CV-4740-2 from Vital Bus 2D27".

3.0 TO CLEAR ALARM 3.1 Raise bus 2D02 voltage above setpoint.

4.0 REFERENCES

4.1 E-2451-2A

PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 3 of 58 2203.0121 ANNUNCIATOR 2K07 CORRECTIVE ACTION CHANGE: 023-01-0

=ý ,, 1 SHUTDOWN EMERGENCY COOLING FEEDWATER LOSS OF RCS 2P7B SDC LEVEL FAI LURE SUCTION HI/LO ON EFAS Page 41 Page 45 Page 49

PROC./WORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 48 of 58 2203.012G ANNUNCIATOR 2K07 CORRECTIVE ACTION CHANGE: 023-01-0 ANNUNCIATOR 2K07 D-8 CET TEMP HI NOTE This alarm set at 700'F with Original Steam Generators (OSGs) installed.

1.0 CAUSES 1.1 CET temperature greater than variable alarm setpoint (2TI-4793).

2.0 ACTION REQUIRED 2.1 Verify temperature being controlled within desired band.

2.2 Use SPDS CET Display to verify temperature.

2.3 IF ALL of the following conditions exist:

"* Original Steam Generators (OSGs) installed

"* At least 5 available CETs above 800*F

"* A sustained Loss of ALL Feedwater has occurred THEN perform the followin 2.3.1 Open ECCS Vent Valves

"* 2CV-4698-1

"* 2CV-4740-2 2.3.2 Declare Alert based on EAL 9.2 using 1903.011M, Alert Emergency Direction and Control Checklist - Shift Superintendent.

2.3.3 GO TO 2202.009, Functional Recovery 2.4 IF due to SDC failure, THEN GO TO Loss of Shutdown Cooling (2203.029).

2.5 Adjust variable alarm setpoints as necessary.

3.0 TO CLEAR ALARM 3.1 Lower CET temperature below variable alarm setpoint (2TI-4793).

4.0 REFERENCES

4.1 E-2455-4

FSAMGDEVELOPED STRATEGY SDS-02 SAMG DEVELOPED STRATEGY TITLE:

SAMG DEVELOPED STRATEGY 02 EMERGENCY POWER FOR UNIT 2 ECCS VENT VALVES PAGE: 1 of 3 TABLE OF CONTENTS SECTION PAGE

1. Powering 2CV-4740-2 from Vital Bus 2D27 .............................. 2
2. Powering 2CV-4698-l from Vital Bus 2D26 .............................. 3 Reference ER002624N201

ISAMG DEVELOPED SAMG DEVELOPED STRATEGY TITLE: PAGE: 2 of 3 STRATEGY SAMG DEVELOPED STRATEGY 02 SDS-02 EMERGENCY POWER FOR UNIT 2 ECCS VENT VALVES SECTION 1 Powering 2CV-4740-2 from Vital Bus 2D27 Page 1 of 1 NOTES 0 Operator actions should NOT be delayed for Health Physics, Security, or any other concerns.

0 Elevators should NOT be used when performing this procedure.

  • Prompt completion of these actions overrides all other procedures, technical specifications, or verbal directions other than those from operations Management.

0 Communications to DXO should use radio or telephone (extension 6091 for Corridor 340 and 6093 for 2B53 Room).

1.0 Entry

  • Performance of this attachment is directed by TSC or Control Room 2.0 ACTIONS 2.1 Open Valve 2CV-4698-1 (ECCS Vent Valve) from Control Room.

2.2 Open Breaker 2D02-21 (2D26 MCC Supply).

2.3 Retrieve DC Bus connection cable from cabinet/lob box outsid e 2B53 Room and proceed to 2B53 Room (Door 257).

2.3 Open Breaker 2D27-A2 (Upstream Feeder Breaker to 2CV-4698-I).

I CAUTION Breaker 2D26-A2 (Upstream Feeder Breaker to 2CV-4740-2) MUST be opened to prevent energizing the entire 2D26 Bus.

2.4 Open Breaker 2D26-A2.

2.5 Open raceway between rows 1 and 2 of the following MCCs:

  • MCC cabinet 2D26
  • MCC cabinet 2D27.

2.6 Connect DC Bus connection cable to plugs in each raceway.

2.7 Close Breaker 2D27-A2.

2.8 Inform Control Room power restored to 2CV-4740-2.

2.9 Open valve 2CV-4740-2 from Control Room.

SECTION 2 Powering 2CV-4698-1 from Vital Bus 2D26 Page 1 of 1 NOTES 0 Operator actions should NOT be delayed for Health Physics, Security, or any other concerns.

  • Elevators should NOT be used when performing this procedure.
  • Prompt completion of these actions overrides all other procedures, technical specifications, or verbal directions other than those from Operations Management.
  • Communications to DXO should use radio or telephone (extension 6091 for Corridor 340 and 6093 for 2B53 Room).

1.0 Entry

  • Performance of this attachment is directed by TSC or Control Room 2.0 ACTIONS 2.1 Open Valve 2CV-4740-2 (ECCS Vent Valve) from Control Room.

2.2 Open Breaker 2D01-21 (2D27 MCC Supply) 2.3 Retrieve DC Bus connection cable from cabinet/job box outsid*e 2B53 Room and proceed to 2B53 Room (Door 257).

2.3 Open Breaker 2D26-A2 (Upstream Feeder Breaker to 2CV-4740-2).

0 I

CAUTION Breaker 2D27-A2 (Upstream Feeder Breaker to 2CV-4698-1) MUST be opened to prevent energizing the entire 2D27 Bus.

2.4 Open Breaker 2D27-A2.

2.5 Open raceway between rows 1 and 2 of the following MCCs:

  • MCC cabinet 2D26
  • MCC cabinet 2D27.

2.6 Connect DC Bus connection cable to plugs in each raceway.

2.7 Close Breaker 2D26-A2.

2.8 Inform Control Room power restored to 2CV-4740-2.

2.9 Open valve 2CV-4698-1 from Control Room.

Emergency DC Crossconnect Watch Study Guide In the event of a loss of a total loss of feedwater, it may become necessary to depressurize the RCS to initiate feed and bleed cooling. Additionally, if high pressure safety injection and low pressure safety injection are unavailable in conjunction with a total loss of feedwater, it is critical that the RCS be depressurized to avoid the potential of steam generator tube failure due to the severe accident conditions.

The ECCS vent valves can be used to depressurize the RCS. These valves relieve steam from the pressurizer to the quench tank. The ECCS vent path has two DC powered valves in series, so they may be operated with a complete loss of AC power. The ECCS vent valves are powered from opposite 125 volt vital DC power. A problem exists, looking at single failure criteria, if one train of DC power is lost.

A contingency action has been developed to deal with the loss of one train of vital 125 volt DC. Pigtails with female connectors will be connected to the 2D26 and 2D27 buses and hung in the raceway next to the affected valves. Outside the 21-53 room will be a locked JOBOX with a procedure and a 30' connecting wire with male connectors on each end.

When a loss of a DC bus occurs, the annunciator corrective action procedure will direct the control room to dispatch the Emergency DC Crossconnect Watch to the access to 2B-53 room to obtain instructions sheet and then to STANDBY in the ESF Switchgear corridor (corridor 340) for further instruction. When the control room gives the order, the Crossconnect Watch will verify he is using the correct section of the procedure and proceed to completion.

To accomplish this task the procedure guides the control room operator to open the ECCS vent valve on the still energized bus prior to electrically isolating the pigtails. The Crossconnect Watch will then open the DC bus supply breaker to the deenergized MCC as directed by the control room operator (2D26 or 2D27) and proceed to the 2B53 room.. The Crossconnect Watch will then open the upstream feeder breakers to both ECCS vent valves. The Crossconnect Watch will then connect the extension cable. Once the cable connectors are locked in place, the feeder breaker to the ECCS vent valve on the energized bus is closed sending DC power to the opposite train vent valve. The second ECCS vent valve is then opened from the control room commencing depressurization of the RCS.

THE OPERATOR MUST REMAIN ON STATION AND IN CONSTANT COMMUNICATION WITH THE CONTROL ROOM.

The evolution is expected to take less than 15 minutes (and has been time-validated at less than 10 minutes), but the need for proper self-checking can not be ignored. This evolution is considered vital for plant operation. DO NOT STOP for anyone (including HP and security) unless the operator's life or health is at immediate risk.

Since the response needs to be timely, the Emergency DC Crossconnect Watch shall carry a radio, flashlight, and set of spare AO keys with them at all times. The AO keys will be tracked using the key log in the shifty's office. Proper turnover needs to include the updating of the key log. The qual card for this watch will be given to RO's, NLO's, and trainees. It is the shift manager's responsibility to ensure that he has a qualified person available each shift. The person manning the Emergency DC Crossconnect Watch (DXO) is entered on the Shift Turnover Checklist.

Attached are sections of resources that may be helpful.

Name SSN Emergency DC Crossconnect Watch Objective: The objective of the Unit 2 Emergency DC Crossconnect Watch qualification card is to ensure that operators possess the knowledge and skills necessary to independently perform the assigned duty in a safe and efficient manner.

1.0

References:

1.1 STM 2-3, Reactor Coolant System 1.2 STM 2-32-5, 125 Vdc Electrical Distribution System 1.3 COPD001, Self-Verification/Additional Verification 1.4 COPD-15, Communication Standards 1.5 SDS-02, SAMG Developed Strategy 02 2.0 Knowledge Requirements:

2.1 Discuss the function and importance of ECCS vent valves during Severe Accident Mitigation.

2.2 Discuss the type of valve ECCS vents are and where their controls are located.

2.3 Discuss the affect of a loss of 2D0 1 or 2D02 on the ECCS vent valves.

2.4 Discuss the duties and responsibilities of the Emergency DC Crossconnect Watch.

2.4.1 What actions are required 2.4.2 Use of self-verification 2.4.3 Operation of a DC breaker 2.4.4 Operation of a molded case breaker 2.4.5 Response time required 2.4.6 Expectation to remain on station 2.5 Equipment required for watchstanding.

2.6 Purpose and use of key log.

2.7 Proper communication and radio use.

2.8 Turnover of watchstanding duties.

OPS Supervisor 3.0 Performance Tasks:

3.1 Crossconnect 2D26 and 2D27 to power 2CV-4740-2 from 2D27 (SDS-02, Section 1)

T / E /

OPS Supervisor OPS Supervisor 3.2 Crossconnect 2D26 and 2D27 to power 2CV-4698-1 from 2D26 (SDS-02, Section 2)

T I E /

OPS Supervisor OPS Supervisor 4.0 Final Certification:

Shift Superintendent

6.7 Auxiliary Operator 6.7.1 The Auxiliary Operator reports to the CRS of their respective Unit and is responsible for all operational activities executed outside the Control Room associated with secondary auxiliary components and systems.

6.7.2 Specific responsibilities and authorities assigned to the Auxiliary Operator are the same as those stated in Section 6.6.2 and 6.6.3 for the Waste Control Operator.

CAUTION Dedicated Cross-tie Operator (DXO) is a Unit 2 specific watchstation and Steam Generators (OSGs) are installed.

SHALL be manned when Unit 2 Original 6.8 Dedicated Cross-tie Operator (DXO) 6.8.1 The Dedicated Cross-tie Operator (when manned) reports to the CRS of Unit 2 and is responsible for implementation of Severe Accident Management Guideline (SAMG) Developed Strategy 02 (SDS02), "EMERGENCY POWER FOR UNIT 2 ECCS VENT VALVES".

6.8.2 Specific responsibilities and authority assigned to the Dedicated Cross-tie Operator include the following:

"* Maintain manned status when Original Steam Generators (OSGs) are installed on Unit 2.

" Maintain response capability with appropriate equipment

- Radio

- Flashlight

- Key to Door 257 (Room 2091 AKA 2B53 Room)

" Implement SDS02 when directed by the CRS or the Technical Support Center (TSC). A copy of SDS02 is housed with the DC Bus connection cable at cabinet/job box outside Door 257.

6.9 Shift Engineer (SE)/Shift Technical Advisor (STA) 6.9.1 The SE/STA is responsible to be within operable communication range and available to the Control Room within ten minutes of call by the Control Room personnel.

{3.3.13}

6.9.2 The SE/STA is responsible to maintain respirator qualifications, and if corrective eyewear is normally needed, maintain appropriate SCBA eyewear (spectacles or contact lenses) readily available.

PAGE 6 OF 42 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 1 OF 12 INSTRUCTIONS:

1.0 Circle YES, NO or N/A for each item in any desired order.

2.0 N/A items not applicable due to mode or being aligned to other train.

3.0 If NO is circled, then explain in the Remarks section.

4.0 If NO is circled on a Tech Spec (TS) required component, then refer to associated Tech Spec Action Statement and notify opposite unit, as applicable.

Mc)de: Date: Time:

A. SDBCS ALIGNMENT (2C02)

1. 2CV-1002 (A S/G Upstream ADV Isol) closed YES NO
2. 2CV-1052 (B S/G Upstream ADV Isol) closed YES NO
3. 2CV-1001 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO
4. 2CV-1051 (Upstream ADV) closed, HIC in Manual, permissive in Off YES NO
5. 2CV-0301 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO
6. 2CV-0305 (DDV) closed, HIC in Auto and permissive HS in Auto YES NO
7. 2CV-0302 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO
8. 2CV-0303 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO
9. 2CV-0306 (Bypass Vlv) closed, HIC in Auto, permissive HS in Auto YES NO B. SHUTDOWN COOLING (2C04)

Two independent ECCS subsytems required operable in Mode 1, 2 & 3 with PZR pressure Ž1700 psia. (TS 3.5.2)

1. 2CV-5091 (LPSI Disch Header) open. YES NO N/A
2. 2HS-5091 in ESF with the key removed. YES NO N/A
3. 2FIC-5091 (LPSI Disch Hdr Flow) in Auto & set at -2500 gpm. YES NO N/A
4. IF 2TI-4793 NOT in use for SDC, YES NO N/A THEN 2TI-4793 energized AND CET alarms set at 700'F 1015.016 B 021-02-0 Iform no. change no-..

form title:TURNOVER CHECKLIST MODES 1 -

I SHIFT 4

PAGE 17 OF 42 SHIFT TURNOVER CHECKLIST MODES 1 - 4 PAGE 12 OF 12 W. MSIS

1. IF a MSIS actuation channel becomes inoperable in 2C39 or 2C40, THEN restore the actuation channel within one hour or be in Hot Standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
2. IF a component required for MFW isolation becomes inoperable (i.e., a Condensate, MFW, or Heater Drain pump will not trip on MSIS),

THEN restore the component within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place it in its MSIS actuated state. Otherwise be in Hot Standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

COMMENTS:

If position manned, then list on shift personnel:

S/S CRS CRSA TRO CBOR CBOT WCO AO EOP SE DXO*

  • IF Original Steam Generators (OSGs) installed, THEN Dedicated Cross-tie Operator (DXO) manned.

PERFORMED BY:

REVIEWED BY:

form title: form no. changee SHIFT TURNOVER CHECKLIST MODES 1 - 4 1015.016 B 021-02-0

INSTRUCTIONS CONTINGENCY ACTIONS N19.IF EITHER of the following conditions exist:

A. EITHER SG with level less than 70 inches.

B. RCS TC rising in an uncontrolled manner.

THEN establish Heat Removal via Once Through Cooling as follows:

A. Close MSIVs from Control Room.

B. Manually actuate SIAS and CCAS.

C. Verify ALL HPSI Cold Leg Injection MOVs open.

D. Verify ALL available Charging pumps running.

E. Check 4160v Vital buses 2A3 and 2A4 E. Perform the following:

energized from offsite power.

1) IF EITHER 4160v Vital bus energized from offsite power, THEN perform the following:

a) Commence aligning third HPSI pump to associated bus.

b) WHEN third HPSI pump alignment complete, THEN verify third HPSI pump running.

2) IF ANY 41 60v Vital bus energized from DG, THEN perform the following:

a) Verify ONE HPSI pump running on train supplied by DG.

b) GO TO Step 19.G.

(Step 1 9 continued on next page)

PROC NO TITLE REV DATE PAGE 2202.006 LOSS OF FEEDWATER 004-02-0 6/13/00 16 of 33

INSTRUCTIONS CONTINGENCY ACTIONS

19. (continued)

F. Verify three HPSI pumps running.

  • G. Verify at least ONE HPSI pump *G. IF NO HPSI pumps running, THEN running. perform the following:
1) Verify MSIVs closed
2) GO TO step 19.J.

H. Open ECCS PZR Vent valve H. Open LTOP Relief Isolation valve (2CV-4698-1). (2CV-4741 -1).

1. Open LTOP/ECCS Relief Isolation valve I. Perform the following:

(2CV-4740-2).

1) Open LTOP Relief Isolation valve (2CV-4731-2).
2) Open LTOP Relief Isolation valve (2CV-4730-1).

J. Maintain BOTH SG pressures 950-1050 psia using upstream ADVs or upstream ADV isolation MOVs.

K. GO TO 2202.009, Functional Recovery.

  • 20. Check FW flow restored to at least ONE *20. IF FW flow NOT restored, THEN RETURN SG by ANY of the following: TO Step 11.

"* EFW

" AFW

"* MFW

"* Condensate

"*21. Maintain SG pressure less than 1050 psia:

A. Control SG pressure using SDBCS Bypass valves or ADVs.

B. Check at least ONE Condensate pump B. Start ONE Condensate pump using running. 2106.016, Condensate and Feedwater Operations.

(Step 21 continued on next page)

PROC NO TITLE REV DATE PAGE 2202.006 LOSS OF FEEDWATER 004-02-0 6/13/00 17 of 33