Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-08-0963, Unit 1, Results of Reactor Pressure Vessel Head Inspections Required by First Revised Order EA-03-009 + (Unit 1, Results of Reactor Pressure Vessel Head Inspections Required by First Revised Order EA-03-009)
- ML25029A193 + (Unit 1, Retyped Technical Specification Pages)
- 1CAN071406, Unit 1, Revised Affidavit for the Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility + (Unit 1, Revised Affidavit for the Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility)
- RBG-47180, Unit 1, Revised Copy of Radioactive Effluent Release Report for 2010 + (Unit 1, Revised Copy of Radioactive Effluent Release Report for 2010)
- ML050660162 + (Unit 1, Revision 18 to the Updated Safety Analysis Report)
- RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases + (Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases)
- RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases + (Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases)
- RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases + (Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases)
- ML060390556 + (Unit 1, Safety Evaluation of the Risk-Informed Inservice Inspection Program)
- 05000335/LER-2025-001, Unit 1, Safety Injection Tank Above Technical Specification Limits + (Unit 1, Safety Injection Tank Above Technical Specification Limits)
- 05000335/LER-2025-001-01, Unit 1, Safety Injection Tank Above Technical Specifications Limit + (Unit 1, Safety Injection Tank Above Technical Specifications Limit)
- 05000461/LER-2025-003, Unit 1, Scram Turbine Hydraulic Oil Leak + (Unit 1, Scram Turbine Hydraulic Oil Leak)
- ML13003A237 + (Unit 1, Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Recommendations 2.1, 2.3, and 9.3)
- RBG-47120, Unit 1, Seventeenth Fuel Cycle Core Operating Limits Report (COLR) + (Unit 1, Seventeenth Fuel Cycle Core Operating Limits Report (COLR))
- RBG-47201, Unit 1, Special Report for Tritium Discovered Onsite + (Unit 1, Special Report for Tritium Discovered Onsite)
- U-604855, Unit 1, Special Report: Inoperable Drywell High Range Gamma Radiation Monitor + (Unit 1, Special Report: Inoperable Drywell High Range Gamma Radiation Monitor)
- 05000528/LER-2025-003, Unit 1, Specified System Actuation Due to Loss of Power (Lop)/Load Shed (LS) Signal + (Unit 1, Specified System Actuation Due to Loss of Power (Lop)/Load Shed (LS) Signal)
- RBG-47126, Unit 1, Spent Fuel Storage Radioactive Effluent Release Report for 2010 + (Unit 1, Spent Fuel Storage Radioactive Effluent Release Report for 2010)
- ML16074A137 + (Unit 1, Spent Fuel Storage Radioactive Effluent Release Report for 2015)
- 05000458/LER-2010-002, Unit 1, Standby Gas Treatment Filter Inoperable Due to Inadequate Surveillance Test Acceptance Criteria + (Unit 1, Standby Gas Treatment Filter Inoperable Due to Inadequate Surveillance Test Acceptance Criteria)
- 05000269/LER-2024-001, Unit 1, Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications + (Unit 1, Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications)
- ML26015A041 + (Unit 1, Startup Report Unit 1 Cycle 26)
- BW260005, Unit 1, Startup Report for the Installation of Framatome Gaia Fuel Assemblies in Braidwood Unit 1 Cycle 26 + (Unit 1, Startup Report for the Installation of Framatome Gaia Fuel Assemblies in Braidwood Unit 1 Cycle 26)
- HL-6268, Unit 1, Startup Test Report + (Unit 1, Startup Test Report)
- 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R23 + (Unit 1, Steam Generator Tube Inspection Report - 1R23)
- 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R24 + (Unit 1, Steam Generator Tube Inspection Report - 1R24)
- ML26027A343 + (Unit 1, Submittal of Application to Revise Technical Specifications to Adopt TSTF-599-A, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators (LDCN 25-022))
- ML25295A003 + (Unit 1, Submittal of Core Operating Limits Report, Braidwood Unit 1 Cycle 26)
- RBG-48356, Unit 1, Submittal of Emergency Plan Revision 50 + (Unit 1, Submittal of Emergency Plan Revision 50)
- ULNRC-06988, Unit 1, Submittal of Fitness for Duty Laboratory Drug Testing Plan + (Unit 1, Submittal of Fitness for Duty Laboratory Drug Testing Plan)
- L-06-022, Unit 1, Submittal of Information Related to the Firstenergy Nuclear Generation Corp + (Unit 1, Submittal of Information Related to the Firstenergy Nuclear Generation Corp)
- BW250054, Unit 1, Submittal of Post Accident Monitoring Instrumentation Report + (Unit 1, Submittal of Post Accident Monitoring Instrumentation Report)
- CP-201600503, Unit 1, Submittal of Revision 0 of Cycle 19 Core Operating Limits Report + (Unit 1, Submittal of Revision 0 of Cycle 19 Core Operating Limits Report)
- NL-08-0448, Unit 1, Submittal of Revision 3 of the Pressure Temperature Limits Report + (Unit 1, Submittal of Revision 3 of the Pressure Temperature Limits Report)
- RBG-46271, Unit 1, Submittal of Revisions to Emergency Implementing Procedures + (Unit 1, Submittal of Revisions to Emergency Implementing Procedures)
- U-604846, Unit 1, Submittal of the Core Operating Limits Report Cycle 23, Revision 19 + (Unit 1, Submittal of the Core Operating Limits Report Cycle 23, Revision 19)
- RS-25-013, Unit 1, Supplement No. 3 - Changes to License Renewal Application + (Unit 1, Supplement No. 3 - Changes to License Renewal Application)
- RS-25-132, Unit 1, Supplement to Clinton Response to Request for Additional Information Related to Response Time Testing License Amendment Request + (Unit 1, Supplement to Clinton Response to Request for Additional Information Related to Response Time Testing License Amendment Request)
- 05000498/LER-2024-007-01, Unit 1, Supplement to Condition Prohibited by Technical Specifications + (Unit 1, Supplement to Condition Prohibited by Technical Specifications)
- RBG-46883, Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306 + (Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306)
- RBG-46985, Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles + (Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles)
- RBG-47471, Unit 1, Supplement to License Amendment Request 2013-18, Revision of Ultimate Heat Sink Design Capacity + (Unit 1, Supplement to License Amendment Request 2013-18, Revision of Ultimate Heat Sink Design Capacity)
- RBG-48345, Unit 1, Supplement to Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 + (Unit 1, Supplement to Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002)
- ML24353A224 + (Unit 1, Supplement to Status of ISFSI Decommissioning Funding Plan (ULNRC-O6798))
- ULNRC-06920, Unit 1, Supplemental Information for Requests for Relief from Inservice Inspection Requirements of ASME Boiler Pressure Vessel Code, Section XI for the Instrument Tunnel Sump Liner + (Unit 1, Supplemental Information for Requests for Relief from Inservice Inspection Requirements of ASME Boiler Pressure Vessel Code, Section XI for the Instrument Tunnel Sump Liner)
- ML25142A405 + (Unit 1, Supplemental Submittal - Relief Request 76 - Proposed Alternative for Pressurizer Lower Shell Nozzle)
- ML032100454 + (Unit 1, Tech Spec Pages for License Amendment 219 Modifying Technical Specification 2.1.6)
- ML041740355 + (Unit 1, Technical Specification Amendment Implementation Period)
- ML25029A192 + (Unit 1, Technical Specification Page Mark-Ups)
- ML023640018 + (Unit 1, Technical Specification Pages for Amendment 42 Missed Surveillances)
- ML041530590 + (Unit 1, Technical Specifications, Reflect Ownership Change)