Callaway Plant sz TAmeren MISSOUBI December 18,2024 ULNRC-06911 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 cFR 72.30 Ladies and Gentlemen:
DOCKET NUMBER 72.T045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF.3O SUPPLEMENT TO STATUS OF ISFSI DECOMMISSIONING FUNDING PLAN ruLNRC.O6798)
Reference:
Ameren Missouri letter ULNRC-06798, "Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan," dated March 30,2023 (ADAMS Accession No.
}'{L23089A146)
By letter dated March 30,2023, (the Reference above), Ameren Missouri submitted to the U.S.
Nuclear Regulatory Commission (NRC) the status of the decommissioning funding plans for the Callaway Plant (Callaway Energy Center) and the onsite Independent Spent Fuel Storage Installation (rsFSD.
Recently, the need to provide updated information not included in the March 30,2023, submittal was identified. This letter provides the updated information in the form of an updated/revised ISFSI decommissioning plan, which is provided as an attachment to this letter. The attached updated plan is based on a more recent funding status report provided by Ameren Missouri's contractor, TLG, in September 2023.
The failure to provide all of the needed updated information in Ameren Missouri's March 30,2023 submittal has been entered into Callaway Plant's corrective system.
This letter does not contain any new commitments. For any questions on this report, please contact the undersigned at (314) 225-1905.
8315 County Road 459 : Steedman, MO 65077 : AmerenMissouri.com
I.JLNRC-06911 Decernber 18,2024 Page2 of 4 Sincerely C}l,*13 Thomas B. Elwood Manager, Regulatory Affairs DRB
Attachment:
Updated Callaway Energy Center 10 CFR 72.30 Draft ISFSI Decommissioning Funding Plan
ULNRC-06911 December 18,2024 Page 3 of 4 cc:
Mr. John Monninger Regional Administrator U. S. Nuclear Regulatory Commission Region [V 1600 East Lamar Boulevard Arlington, TX 7601 I-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B 1A Washington, DC 20555-0001
ULNRC-069I1 December 18,2024 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Blectronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F. M. Diya K. C. Scott T. M. Hart J. G. Beck T. A. Wirt T. B. Elwood NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Mr. Lany Lehman (DNR)