Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137B478 + (Undated Memo Discussing Beco Reorganization)
- ML20203G631 + (Undated Memo Discussing Position & Guidance on Use of Alternate Feed Matl in U Mills)
- ML20127K668 + (Undated Memo Discussing Status of Field Erected Reactor Vessel Fabrication Review)
- ML20236T464 + (Undated Memo Forwarding Documents to Be Placed in PDR & Central Files Re Regulatory History AC65-1 of Proposed Rule 10CFR35, Basic QA in Radiation Therapy)
- ML20149E399 + (Undated Memo Informing That DRS Action Item 92-20 Requested Listed Info Re Check Valve Insp Program Ti 2515-110)
- ML20138A693 + (Undated Memo Listing Documents Containing Pertinent Info Re Analysis of Safeguards Needs for Transport of High Level Waste)
- ML20138A356 + (Undated Memo Requesting Experimental Determination of Sabotage Source Term for Shipments of Spent Fuel from gas-cooled Power Reactors & Nonpower Reactors.Related Info Encl)
- ML20133K354 + (Undated Memo Requesting Quantities in 590723 Memo Changed to 22.4 Kgs U-235 in 4.2% Enriched U & 24.5 Kgs U-235 in 4.6% Enriched U)
- ML20206A342 + (Undated Models for Calculating Dissolution Rates of High Level Waste to Appear in May 1987 Nuclear Safety)
- ML20134A559 + (Undated Notes Taken by V Nerses,First & Second Drafts of Meeting Summary & Handouts of Caseload Forecast Panel Visit to Facility)
- IA-85-669, Undated Notes Taken by V Nerses,First & Second Drafts of Meeting Summary & Handouts of Caseload Forecast Panel Visit to Facility + (Undated Notes Taken by V Nerses,First & Second Drafts of Meeting Summary & Handouts of Caseload Forecast Panel Visit to Facility)
- ML19325E518 + (Undated Notice Indicating That PNO-III-89-065 for Navy,Great Lakes Naval Training Ctr,Never issued.PNO-III-89-065A Is Original,Not Update)
- ML17055D247 + (Undated Notice of Withdrawal of Application for Amend to License DPR-63)
- ML19302A622 + (Undated Notification of 750821 Meeting W/Aes of Mark II Owners in Bethesda,Md to Discuss Load Combinations & Analytical Techniques for Determining Stresses in Mechanical Components of Mark II Containments)
- ML20236L932 + (Undated Notification of 860326 Daily Highlight Meeting W/ Util in Platteville,Co to Discuss Facility Equipment Qualification Program)
- ML18096A651 + (Undated Notification of Significant Licensee Meeting 92-62 W/Util on 920421 in Salem,Nj to Discuss Recent Salem/Hope Creek Reexamination Results & Future Projections)
- ML101930192 + (Undated Onsite Ground/Surface Water Monitoring Questionnaire 3 for Turkey Point Nuclear Plant)
- ML101930193 + (Undated Onsite Ground/Surface Water Monitoring Questionnaire 4 for Vogtle)
- ML20058N823 + (Undated Package Consisting of Attachment 1 to Employee Concerns Program)
- ML20237B752 + (Undated Package Consisting of Figure 9 Re Tentative geologic-chronologic Time Scale & Eight Maps.W/Three Oversize Maps)
- ML20235S922 + (Undated Package Consisting of List of Questions from Health Attache,Netherlands Embassy & R Hauber Text & Chronology)
- ML20127D502 + (Undated Package Consisting of Portion of Plant Emergency Plan,Vols 21 - 41)
- ML062220484 + (Undated Paper, Page 8, Table 2)
- ML20141J086 + (Undated Partially Deleted Package Re Allegation Mgt Sys for Plant.Functional Areas,Including Operations,Safeguards, Offsite Health & Safety & Onsite Health & Safety Discussed)
- ML19324B460 + (Undated Parts I & II to Performance Indicators for Operating Commercial Nuclear Power Reactors,Data Through June 1989)
- ML033020148 + (Undated Phase 2 SDP Analysis)
- ML20045H531 + (Undated Position Paper Entitled, Staff Comments on ABB-CE Verification & Validation Plan for Nuplex 80+ Control Complex)
- ML040090360 + (Undated Post-Inspection Debrief Slides to C. Casto Regarding Sequoyah Triennial Fire Protection Inspection IP 71111.05T)
- ML041070120 + (Undated RAM Item No. - C-38)
- ML041070123 + (Undated RAM Item No. - SUP-48)
- ML20235C407 + (Undated Request for Addl Info Re Mark I Containment During Possible LOCA Event or During S/R Valve Discharge)
- ML20210E158 + (Undated Request for Addl Info Supporting Vendor 860619 Description of QA Program for Spent Fuel Storage Casks.Date Obscurred by Handwritten Note)
- ML20235A626 + (Undated Research Into Methodologies for Evaluating Alternative Techniques & Formats for Presenting Procedures in Nuclear Power Plants,Final Rept)
- ML20085M592 + (Undated Responses to NUMARC Survey in Support of NRC License Renewal Rulemaking)
- ML041070105 + (Undated Restart Checklist Item 5B: Systems Readiness for Restart)
- ML20033F441 + (Undated Rev 1 to Document Entitled, Results & Analysis for Thermal Testing of Cesium Capsules in 1500 Series Shipping Cask. Related Info,Including Westinghouse Hanford Co Viewgraphs for NRC & DOE Briefing on Capsule Return Encl)
- ML20137L016 + (Undated Rev 2 to JPN-PSL-SENP-95-101, Engineering Evaluation,Assessment of Effects on Plant Operation of Lifting LPSI Pump Discharge Header Thermal Relief Valve)
- ML20092F576 + (Undated Rev 2 to, Diesel Generator Operation - Cluster 11 Outside Area Operator Qualification Signoff Criteria)
- IR 05000298/1995003 + (Undated SALP Rept 50-298/95-03 for Period 950322-0726)
- ML040120050 + (Undated SDP - Harris Fire Zone 1-4-ACP)
- ML040120055 + (Undated SDP - Harris Fire Zone 1-4-EPA)
- ML040120049 + (Undated SDP - Harris Fire Zone 1-A-4-CHLR)
- ML17222A687 + (Undated SER Re Surveillance Requirements for Diesel Fuel Oil at Plant)
- ML20207U144 + (Undated Safety Evaluation Re Plant.Section 9, Radwaste Sys, of FSAR Also Encl)
- IA-87-456, Undated Schedule of Exams for Regions I,Ii,Iii,Iv & V + (Undated Schedule of Exams for Regions I,Ii,Iii,Iv & V)
- ML20237H293 + (Undated Schedule of Exams for Regions I,Ii,Iii,Iv & V)
- ML20235S105 + (Undated Section B, Supplies or Svcs & Prices/Costs)
- ML042950022 + (Undated Security Plan)
- ML20132F302 + (Undated Sizewell B,Review by Hm Nuclear Installations Inspectorate:Suppl 5,Fuel Clad Ballooning)
- IA-87-750, Undated Slide Re Preoperational Testing + (Undated Slide Re Preoperational Testing)
- ML20236X086 + (Undated Slide Re Preoperational Testing)