Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A305 + (Trip Rept on 800930 to View Intake Canal Sys & Discharge Area.Nrc Preparing EIS Re Proposed Steam Generator Repair of Facility.Ets Will Include Coverage of Endangered Species Plant Effluents During Repair Program)
- ML20133G114 + (Trip Rept on 841128-29 Visit to Charleston,Sc Area to Inspect Apparent Seismically Induced liquefaction-flowage Features Near Middleton & Hollywood,Sc)
- ML20136H612 + (Trip Rept on 850729-0801 Site Visit to Richland,Wa Re Potential Environ Impacts Associated W/Operation of Dry Process for Conversion of UF6 to UO2 & Upcoming Renewal of SNM License)
- ML20148D765 + (Trip Rept on 871001-04 Symposium/Field Trip Re Late Tertiary Ogallala & Quaternary Blackwater Draw Formations in Lubbock, Tx & Vicinity)
- ML20135D906 + (Trip Rept on 961104-05 Visit to Taejon Republic of Korea to Attend 1996 Symposium on Safety of Radwaste Mgt Meeting. Agenda Encl)
- ML20147C359 + (Trip Rept on ASME Radwaste Sys Comm Meeting Held in Dallas on 780911-12)
- ML20107B473 + (Trip Rept to Facility on 730221 to Obtain Split Sample of off-gas Stack Gas Particulates & Charcoal Canisters & Monthly Composite of Liquid Radwaste.Discussed Iodine Release After Startup Which Seemed Larger than Normal)
- ML18037A417 + (Trip Rept: On-Site Analysis of Human Factors of Event at Browns Ferry 2 on May 11, 1993, Ari/Rpt ESF Actuation Due to Shutdown Overpressurization)
- ML20091S087 + (Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure)
- ML20071A637 + (Trip Rept: Onsite Analysis of Human Factors of Event at Millstone 3 on 901231 (Turbine Bldg Pipe Break))
- ML20045D589 + (Trip Rept:Onsite Analysis of Human Factors of Event at North Anna 2 on 930416,Disabling Afs During Reactor Trip Recovery)
- ML20106A936 + (Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant))
- ML20097H316 + (Trip Rept:Onsite Analysis of Human Factors of Event at LaSalle 2 920420 (Reactor Water Cleanup Sys Isolation Bypass))
- ML20065U419 + (Trip Rept:Onsite Analysis of Human Factors of Event at Quad -Cities 2 on 901027 (Hi-Hi IRM Scram from Hot Standby))
- ML20085C433 + (Trip Rept:Onsite Analysis of Human Factors of Event at Monticello on June 6,1991)
- ML20096G516 + (Trip Rept:Onsite Analysis of Human Factors of Event at Prairie Island 2 on 920220 (Loss of Shutdown Cooling))
- ML20082S937 + (Trip Rept:Onsite Analysis of Human Factors of Event at Waterford 3 on 910624 (Manual Reactor Trip W/Excess Steam Demand))
- ML20204C696 + (Trip Rept:Plant Visit & Meeting W/Applicant on 780905 to Discuss Remaining Open Issues Re Subj Facil.W/Summary of Remaining Unresolved Issues)
- ML20024D923 + (Trip Repts of 830517-18 Visit to Region III Re Pilot Program Review of Regionalized Matls Licensing Activities & 830519-20 Visit to Cheyenne,Wy to Discuss Technical Issues Re Licensing & Regulation of Solution U Mining)
- ML20057E486 + (Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry)
- 05000395/LER-2013-003, Trip Setpoint Renders Chiller and Control Room Emergency Filtration Inoperable + (Trip Setpoint Renders Chiller and Control Room Emergency Filtration Inoperable)
- ML061380621 + (Trip Summary - Vogtle/Southern Nuclear Operating Company Early Site Permit Pre-Application Alternate Site Visits April 25 and 26, 2006)
- ML17255A557 + (Trip Summary Encl 1 Agenda)
- ML062200018 + (Trip Summary Vogtle/Southern Nuclear Operating Company Early Site Permit Pre-Application Team Visit and Savannah River Site Visit July 10 Through 12, 2006)
- ML20262J293 + (Trip Test Cable Panel Assembly)
- ML20262K087 + (Trip Unit Bin Assembly (Perspective), as-built)
- ML20262J296 + (Trip Unit Bin Assembly Perspective)
- ML20262J326 + (Trip Unit Interconnection Module Assy)
- ML20262J309 + (Trip Unit Interconnection Module Wiring Diagram)
- ML20262K083 + (Trip Unit Interconnection Module Wiring Diagram, as-built)
- ML17212A218 + (Trip Unit Interconnection Module Wiring Diagram, as-built. Revision Date Illegible)
- ENS 44388 + (Trip from 50% Power Following Low Pressure Heater String Isolation)
- ENS 45528 + (Trip from Intermediate Range Due to Rod Group Demand Counter Discrepancy)
- 05000316/LER-2077-016, Trip of 600V AC Circuit Breaker (11D6) + (Trip of 600V AC Circuit Breaker (11D6))
- ML18065A872 + (Trip of High Pressure Safety Injection Pump While Filling Safety Injection Tank. New Commitments Contained in LER Listed)
- 05000412/LER-2001-002 + (Trip of One Service Water Pump Caused Automatic Actuation of Emergency Service Water System)
- 05000354/FIN-2016004-01 + (Trip of Protected RWCU Pump during Maintenance Activity)
- HL-4864, Trip of Reactor Protection Sys Bus Power Supply Results in Actuations of ESFs + (Trip of Reactor Protection Sys Bus Power Supply Results in Actuations of ESFs)
- 05000254/FIN-2009003-04 + (Trip of Unit 2 Fuel Pool Cooling Water Pumps During Scorpion Platform Removal)
- 05000313/FIN-2009003-04 + (Trip of a Main Feed Pump Due to Electromagnetic Interference)
- 05000416/FIN-2008005-05 + (Trip of a Reactor Recirculation Pump During Pump Up-shift to Fast Speed Due to Ineffective Corrective Actions)
- ENS 42193 + (Trip of a Startup Bus Breaker Results in Start of Emergency Diesel Generators)
- 05000456/LER-2024-001, Trip on Low Steam Generator Level Ddue to Failure to Verify Isolation Valves Were Open + (Trip on Low Steam Generator Level Ddue to Failure to Verify Isolation Valves Were Open)
- BW250042, Trip on Over Temperature Delta Temperature Due to Lightning Strike (Letter) + (Trip on Over Temperature Delta Temperature Due to Lightning Strike (Letter))
- ML25269A163 + (Trip on Over Temperature Delta Temperature Due to Lightning Strike)
- 05000269/LER-2005-002, Trip with Es Actuation Due to CRD Modification Deficiencies + (Trip with Es Actuation Due to CRD Modification Deficiencies)
- ML18232A307 + (Triple Inc., Dba Nixon, Letter Transmitting Terminated Ssd NR-1412-D-101-E and Exempt License 04-35240-01E, Docket No. 03038834, Mail Control 609313, Ssd Case No. 18-31)
- ML18191B257 + (Triple Inc., Dba Nixon, NRC Form 532, Receipt of Correspondence)
- ML18218A041 + (Triple Inc., Dba Nixon, Request for Additional Information, NR-1412-D-101-E, 04-35240-01E, Docket No. 03038834, Mail Control 609313, Ssd Case No. 18-31)
- ML18232A324 + (Triple Inc., Dba Nixon, Terminated Exempt License 04-35240-01E, Docket No. 03038834, Mail Control 609313)
- Information Notice 1993-22, Tripping of Klockner-Moeller Molded-Case Circuit Breakers Due to Support Lever Failure + (Tripping of Klockner-Moeller Molded-Case Circuit Breakers Due to Support Lever Failure)