Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Transmittal Copy of Noncompliance: Notification". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18152B142  + (Transmittal - Final Deliverable Associated with User Need NRR-2016-009)
  • ML22313A128  + (Transmittal - Framatome September 14, 2022 Meeting Presentation on Alternative Rehabilitation of Class 3 Buried Piping with Structural Spray-In-Place Liner System)
  • ML20317A157  + (Transmittal - License Amendment Request September 18, 2020)
  • ML22174A396  + (Transmittal - Requests for Additional Information Regarding Framatome Topical Report, ANP-10311P-A, Revision 1, Supplement 1P, Revision 0, COBRA-FLX: ORFEO-HMP Critical Heat Flux Correlation)
  • ML22174A403  + (Transmittal - U.S. NRC Requests for Additional Information Regarding Framatome Topical Report, EMF-2310, Revision 1 Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors)
  • ML22005A326  + (Transmittal - Verification and Withholding Determination for Publication of Framatome Topical Report, ANP-10349P-A - Galileo Implementation in LOCA Methods)
  • ML21019A013  + (Transmittal - Verification for Accepted Versions of Framatome TR ANP-10337 Rev. 0 Supplement 1P-A Rev. 0)
  • ML25237A272  + (Transmittal - Verification for Publication of Terrapower Topical Report, NAT-9391-A, Revision 0, Radiological Release Consequence Methodology)
  • ML21088A426  + (Transmittal - Verification for Publication of Framatome Topical Report, ANP-10297, Rev. 0, Suppl. 1P-A, Rev. 1 the Arcadia Reactor Analysis for PWRs Methodology Description and Benchmarking Results (EPID L-2020-TOP-0053) (Email))
  • ML25181A159  + (Transmittal - Withholding Determination for Framatomes EMF-93-177, Revision 1, Supplement 3P, Revision 0, Mechanical Design for BWR Fuel Channels: Atrium BWR Enhanced Accident Model Topical Report)
  • ML23012A132  + (Transmittal - Withholding Determination for Response to Request for Comment on Draft SE Regarding Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0)
  • ML23207A028  + (Transmittal - Withholding Determination Regarding Response to Request for Review of Draft Safety Evaluation for ANP-10340P-A Incorporation of Chromia-doped Fuel Properties in Framatome PWR Methods)
  • ML23065A313  + (Transmittal - Withholding Determination Regarding Response to Request for Comment on Draft Safety Evaluation for Topical Report, ANP-10311P-A, Revision 1, Supplement 1P, Revision 0, Cobra-FLX; ORFEO-HMP Critical Heat Flux)
  • ML21343A006  + (Transmittal - Withholding Determination for Nov. 10, 2021 Chromium-Coated Cladding)
  • ML021070809  + (Transmittal 04/16/2002 Meeting Handouts from Meeting Re Framatome Fuel Transition Program at North Anna Power Station)
  • ML21061A103  + (Transmittal 04062020_DTRA Trip Report)
  • ML19080A060  + (Transmittal 19-008 M190061 GEH-GNF-A NRC Financial Assurance Update - 03192019)
  • NL-16-018, Transmittal 2015 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report  + (Transmittal 2015 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report)
  • ML18306A811  + (Transmittal Call Summary of October 23, 2018 with University of Texas)
  • ML18303A059  + (Transmittal Call Summary of October 23, 2018 W/The National Institute of Standards and Technology (NIST))
  • ML20058G475  + (Transmittal Cra Form to OCA for Regulatory Guide (RG) 1.236, Pressurized-Water Reactor Control Rod Ejection and Boiling-Water Reactor Control Rod Drop Accidents)
  • ML16155A052  + (Transmittal Discharge Monitoring Report for the Salem Generating Station for the Month of April 2016)
  • ML22042A004  + (Transmittal E-Mail for Final SE EPRI Technical Report 3002019621, Susceptibility of Valve Applications to Failure of the Stem-To-Disk Connection)
  • ML25059A049  + (Transmittal E-mail for Completeness Determination for Appalachian Power TR Quality Assurance Program Description for Nuclear Quality Assurance Program Apco ESP QAPD Revision 0)
  • ML24325A545  + (Transmittal E-mail of NRC 897 Withholding Determination Forms for the GE-Hitachi Nuclear Energy Americas and Global Nuclear Fuel Americas August 2024 Tech Update and September 2024 ACRS Technology Update Meetings Slides)
  • ML20301A833  + (Transmittal E-mail of the Draft Safety Evaluation for the Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2)
  • ML21270A132  + (Transmittal Email (External Sender - NEI) NEI 17-06 - NEI Response to NRC Comments)
  • ML22035A003  + (Transmittal Email - Draft Safety Evaluation for Framatome Topical Report, BAW-10227P, Revision 2, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel)
  • ML23342A197  + (Transmittal Email - Westinghouse Electric Co. U.S. NRC Staff Feedback Regarding Evinci Radiation Protection and Contamination Control White Paper)
  • ML22194A948  + (Transmittal Email - X Energy, LLC - Draft Safety Evaluation of Xe-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3)
  • ML21060B514  + (Transmittal Email -Completeness Determination Form for Sargent & Lundy Nuclear Quality Assurance Program Topical Report SL-TR -1, Revision 26)
  • ML20168A006  + (Transmittal Email BWRVIP-321 RAI Responses Withholding Determination)
  • ML20294A136  + (Transmittal Email BWRVIP-329 RAI Responses Withholding Determination)
  • ML20030A142  + (Transmittal Email Background Information for Feb 13, 2020 Pre-submittal Meeting EPRI Data Validation Topical Report)
  • ML23354A075  + (Transmittal Email Completeness Determination and Withholding Determination for the Westinghouse Electric Company Topical Report WCAP-18904-P/NP, Revision 0, Critical Power Experiments and D6 CPR Correlation for Triton11 Fuel)
  • ML23241A015  + (Transmittal Email Completeness Determination and Withholding Determination for the Westinghouse Electric Company Topical Report WCAP-18773-P/NP, Higher Enrichment for Westinghouse and Combustion Engineering Fuel Designs)
  • ML24123A029  + (Transmittal Email Completeness and Withholding Forms for Westinghouse Electric Company Topical Report WCAP-18869-P/NP, High Performance Cladding for Use in Boiling Water Reactor Fuel)
  • ML24018A166  + (Transmittal Email Completeness and Withholding Forms for the Global Nuclear Fuel Topical Report Proposed Administrative Amendment 52 to NEDE-24011-P-A-31, General Electric Standard Application for Reactor Fuel (Gestar II))
  • ML24123A054  + (Transmittal Email Completeness and Withholding Forms for Westinghouse Electric Company Topical Report WCAP-18850-P/NP, Adaptation of the Full Spectrumtm LOCA (Fslocatm) Evaluation Methodology to Perform Analysis of Cladding Rupture for High)
  • ML25022A004  + (Transmittal Email Containing Audit Plan for Evinci TRISO Fuel Qualification Methodology Topical Report)
  • ML25058A357  + (Transmittal Email Dated 11/21/24 from Ngarcia Santos (NRC) to Mrose (Inc), Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev)
  • ML19295C979  + (Transmittal Email Draft Proprietary Safety Evaluation for WCAP-16096, Rev 4)
  • ML24051A115  + (Transmittal Email Draft SE for Topical Reports Advanced Logic System v2 Platform Topical Report and Advanced Logic System v2 Development Process)
  • ML22005A063  + (Transmittal Email Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18482-P/WCAP-18482-NP, Revision 0, Westinghouse Advanced Doped Pellet Technology (Adopttm) Fuel)
  • ML20294A074  + (Transmittal Email EPRI Remote Verification -A Topical Report)