ML25022A004

From kanterella
Jump to navigation Jump to search

Transmittal Email Containing Audit Plan for Evinci TRISO Fuel Qualification Methodology Topical Report
ML25022A004
Person / Time
Site: 99902079
Issue date: 01/28/2025
From: Patrick Boyle
NRC/NRR/DANU/UAL2
To: Schoedel A, Spalding J
Westinghouse Electric Corp
Boyle P
Shared Package
ML25022A003 List:
References
EPID L-2024-TOP-0028
Download: ML25022A004 (1)


Text

From:

Patrick Boyle To:

Schoedel, Anthony J; Spalding, Amanda J Cc:

Lucieann Vechioli Feliciano; John Segala

Subject:

Westinghouse eVinci Reactor Audit Plan for TRISO Fuel Design Methodology Topical Report Date:

Tuesday, January 28, 2025 8:23:00 AM Attachments:

image001.png

Anthony,

By letter EVR_LTR_240176 dated July 31, 2024, Westinghouse Electric Company, LLC requested a review of the TRISO Fuel Design Methodology Topical Report related to the eVinciTM microreactor. By email dated September 13, 2024, the NRC staff issued an acceptance of the TRISO Fuel Design Methodology Topical Report. The email also stated that a regulatory audit may be beneficial to the review.

The NRC has determined that a regulatory audit would assist in review of the TRISO Fuel Design Methodology Topical Report. Since the audit plan may include proprietary information a link to the audit plan in Box has been sent to you in a separate email. The NRC staff will conduct the audit to seek clarification, gain understanding, and verify information regarding the information provided in the TRISO Fuel Design Methodology Topical Report. The audit plan kick-off meeting between NRC staff and Westinghouse was conducted on January 27, 2025.

If you have any questions, please contact me at (301) 415-3936 or via email at Patrick.Boyle@nrc.gov.

Project Number: 99902079 EPID: L-2024-TOP-0028

Sincerely, Patrick G. Boyle Project Manager NRR/DANU/UAL2 Office: Hoteling Phone: 301-415-3936