Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "To Fire Protection Evaluation Rept". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20037C608  + (To Evaluation of In-Place Concrete, Vols I & II)
  • ML19351E566  + (To Evaluation of Liner Integrity of TMI Unit 2 EPICOR-II Radwaste Sys. Attachments I & II to Rept Encl)
  • RS-09-128, To Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure EPIP-07, Calculation of Station Noble Gas and Particulate Release Rate to Determine Dsep Classification  + (To Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure EPIP-07, Calculation of Station Noble Gas and Particulate Release Rate to Determine Dsep Classification)
  • ML19338E949  + (To Exxon Nuclear Co Setpoint Methodology for C-E Reactors)
  • ML021330163  + (To FNP-0-EIP-27.1, Alternate EOF Setup & Activation)
  • ML19350D107  + (To FPL Tqar 1-76A,QA Program for Facility)
  • L-2015-048, To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109  + (To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109)
  • ML15083A265  + (To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9)
  • ML15083A266  + (To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End)
  • ML19345G445  + (To Facility Operational QA Program)
  • ML19332A679  + (To Facility Tech Specs,App a to License NPF-7)
  • ML20010E528  + (To Factor of Safety Study for VT Yankee Nuclear Power Station Baseplate Flexibility)
  • ML19341A195  + (To Farley Unit 2 Special Low Power Tests,Safety Evaluation)
  • ML17296B212  + (To Final Deficiency Rept Re Mechanical Interlock Device on 48/125 Volt Dc Battery Charger Cabinet Supplied by Power Conservation Products,Initially Reported on 801023. Design Change Packages Issued to Implement Design Fix)
  • ML20054H915  + (To Final Deficiency Rept Re Pipe Supports Fabricated W/O Required Weld Joint Preparation,Initially Reported 810618.Dummy Stub Pipe No Longer Welded to Run Pipe.Drawings Revised.Not Reportable Per 10CFR50.55(e))
  • ML20063H487  + (To Final Deficiency Rept Re Premature Time Out Condition W/Agastat Pneumatic Timing Relays.Agastat 7000 Series Relays Will Be Bench Tested & Replaced as Specified by Amerace Corp.Also Reported Per Part 21)
  • ML20137P775  + (To Final Rept CENPD-279, Annual Rept on ABB CE ECCS Performance Evaluation Models)
  • ML090400610  + (To Final Safety Evaluation for Nuclear Energy Institute (NEI) Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute (EPRI) Topical Report (TR) 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Revision 2)
  • ML090400621  + (To Final Safety Evaluation for Nuclear Energy Institute (NEI) Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute (EPRI) Topical Report (TR) 103237, EPRI Mov (Motor-Operated Valve) Performance Prediction Program, Rev. 2)
  • ML072080391  + (To Final Status Survey Final Report Phase V, Book 1 of 13)
  • ML070450171  + (To Final Status Survey Plan for the Plum Brook Reactor Facility. Page C3-1 Through Page D-33)
  • ML070450170  + (To Final Status Survey Plan for the Plum Brook Reactor Facility. Cover Through Page C2-14)
  • CY-07-106, To Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13  + (To Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13)
  • ML072080396  + (To Final Status Survey, Final Report Phase V, Appendix A1 Survey Unit Release Record, 9520-0001, Southwest Site Storage Area, Book 2 of 13)
  • ML19323C959  + (To Fire Hazard Analysis Rept.W/Oversize Drawings)
  • ML20041C612  + (To Fire Protection Evaluation)
  • ML16272A218  + (To Flood Hazard Reevaluation Report on Oconee Nuclear Station, Appendices, Dated March 6, 2015 (Redacted))
  • ML16272A217  + (To Flood Hazard Reevaluation Report on Oconee Nuclear Station, Pp. 1-70, Dated March 6, 2015 (Redacted))
  • ML032810440  + (To Fourth-Interval Inservice Inspection (ISI) Program Plan, Submittal of Relief Request RI-01)
  • NRC 2003-0095, To Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair  + (To Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair)
  • ML110560335  + (To Fuel Storage Criticality Analysis)
  • ML050670250  + (To Furnish the Examination Outlines by April 11, 2005)
  • ML032750349  + (To GE-NE-0000-0013-3193-01a-R1, Pressure-Temperature Curves for TVA Browns Ferry, Unit 2)
  • ML032750393  + (To GE-NE-0000-0013-3193-02a-R1, Pressure-Temperature Curves for TVA Browns Ferry, Unit 3)
  • ML051520505  + (To GENE- 0000-0039-3540-01, Exelon Quad Cities Units 1 & 2 Steam Dryer Dynamic Time History Analyses: Original, 2003 Repair and 2004 Repair Dryer Configurations Using Loads from Scale Model Test Results and Plant Measurements, Enclosure 1)
  • ML051520510  + (To GENE-0000-0039-5860-01-NP, Test and Analyses Report Quad Cities New Design Steam Dryer Dryer 1 Experimental Model Analyses and Correlation with Finite Element Results, Enclosure 2)
  • ML033650188  + (To GEO.HBIP.02.03, Development of Maximum Credible Earthquake Magnitudes and Distances for the Hbip)
  • ML033650191  + (To GEO.HBIP.02.04, Development of Response Spectra for the Hbpp Isfsi)
  • ML033650192  + (To GEO.HBIP.02.05, Development of Hbip ISFSI Spectrum Compatible Time Histories)
  • ML033650194  + (To GEO.HBIP.02.06, Site Amplification Factors for Hbip)
  • ML033650198  + (To GEO.HBIP.02.07, Determination of Potential Earthquake-Induced Displacements of Critical Slides at Hbip ISFSI Site)
  • ML033650201  + (To GEO.HBIP.02.08, Determination of Potential Earthquake-Induced Displacements of Critical Slide Along Hbip ISFSI Transport Route)
  • ML033650247  + (To GEO.HBIP.03.02, Amplification Factors for Probabilistic Seismic Hazard Analysis at the Hbip ISFSI Site)
  • ML033650248  + (To GEO.HBIP.03.04, Development of Probabilistically Based Spectra for the Hbip ISFSI Site)
  • ML20052D177  + (To GTP-002, General Procedure for Inservice Testing of Valves)
  • ML19309B865  + (To Gas Tungsten Arc - Shielded Metal Arc Welding of Stainless Steel in Borated Water Piping Sys Re Id Weld Clad Procedure)
  • ML17296A472  + (To General Info Section of OL Application. Completes Response to Antitrust Info Required by Reg Guide 9.3)
  • ML20041G276  + (To General Radiation Survey Techniques)
  • ML16245A856  + (To Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events)
  • ML20052B171  + (To Grand Gulf MSIV B21-F022 & B21-F028:Addl Info Supporting Justification for Interim Operation. Justification for Interim Operation for HPCS Valves E22-F001,F004,F010,F011,F012,F015 & F023 Encl)