0 Date: Maren 20, 1981 POLICY STATEMENT Ocerational OJality Assurance P cgram As a matter of company policy, the Maine Yankee Atomic Power Ccmpany Operational Quality Assurance P cgram shall comply with the requirements of the Code of Federal Regulations Title 10, Part 50, Appendix B, with respect to the operation and maintenance of, and enanges to the nuclear generating facility.
The Program shall conform with the ANSI standards and regulatory position of the regulatory guides specified in Section II of the Program as modified in Appendix B of the Program.
The Vice President Manager of Operations is responsible for establishment and inclementation of the Program within the Maine Yankee Atomic Pcwer Company.
The Director of Operaticnal Quality Assurance shall be responsible for ensuring that the Program is implemented for all activities requiring quality assurance.
The Quality Assurance staff shall be responsible for auditing the program as necessary and surveying / inspecting activities required by the Program to assure compliance with its requirements.
The OJality Assurance staff shall have the authority and organizational freecem necessary to meet the requirements of 10CFR50, Appendix B.
l l
The Plant Manager shall be responsible for the day-to-day implementstien l
of the Program's preced;ral requirements at the plant.
l l
The NJf' lear Safety Audit and Review Committee (NSARC) shall review the adequacy and effectiveness of the Program semiannually. Any discrepancies in l
the implementation of this policy or the Program that are revealed during the review and that require corporate action for correction, will be reported to both the Vice President Manager of Operations and the Vice President, Yankee l
N; clear Services Division, together with appropriate recommendations.
Imolementation of this policy will enhance the reliability and safety of the nuclear generating facility.
Each person involved in activities affecting the quality of structures, systems, and ccmponents used to prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public, sna11 ce responsible for assuring quality in his cwn work, and for compliance with the requirements of the Program.
The Operational 0;ality Assurance P cgram is a docunent which shall be achered to by all responsible organizations and individuals.
/h.ll,/7' Y.d f E1 Win Vf. ThurlOW Presicent 6104 070 $T 7
Title:
Section I. Organization Page:
_1 of 11 Rev. No.: 0 Date: Maren 20, 1981 I.
ORGANIZATION A.
SCOPE This secticn o* the Operational Quality Assurance Program describes the duties and responsibilities of the personnel involved in establishing and executing the Operational OJality Assurance Program.
B.
RESPONSIBILITY The responsibility for design, evaluation, maintenance, and operation of the Pl%t rests with the Maine Yankee Atomic Power Company.
The responsibility for developing and implementing the Operational QJality Assurance Program is vested in the Vice President Manager of Operations.
He has delegated areas of authority for the development and implementation of certain phases of the Program as set forth in the following paragraphs of this section.
The Operational Quality Assurance Department has the organizaticnal l
respcnsibility for the continuing review and audit of the implementation of the Operational OJality Assurance Program.
C.
ORGANIZATIONAL RELATIONSHIPS l
Maine Yankee Atomic Power Company lines of authority of all personnel l
involved in the implementation of the Operational Quality Assurance Program are shown in Figure 1.
A Vice President of Maine Yankee Atomic Power Company is also a corporate officer of the Yankee Atomic Electric Company, NJClear Services Division (YNSD), which has a continuing contractural obligation to provide services to the Maine Yankee Atomic Power Company.
This interlocking corporate officer shall be herein identified as the Vice President (YNS0).
The Vice President (YNS0) conducts, through NSARC, an independent review of all aspects of plant safety and, by virtue of his interlocking positions, assures that YNSO provides the services assigned and requested.
l 0.
QUALITY ASSURANCE FROGRAM RESPONSIBILITIES 1.
Vice President Manager of Ocerations a.
Assumes and maintains resocnsibility for the Operational Quality Assurance Program, b.
Establishes and enforces company policies in the area of I
Cperaticnal Quality Assurance.
c.
Establishes and implements an organization capable of and directed toward a proper Operational Quality Assurance l
Program.
s
Title:
Secticn I. Orcanization Page:
2 of 11 Rev. tb. :
0 Date: Maren 20,1981 d.
Provides for a periodic review of the Operational OJality l
Assurance Prcgram to determine the adequacy and effectiveness of the Program.
e.
Ensures that perscnnel performing Quality Assurance functions have sufficient authority and organizaticnal freedom to:
1.
identify quality prculems, ii.
initiate, reccccend, or provide solutiens through designated channels, and, 111. verify implementation of soluticns.
f.
Provides for review and approval of training prcgrams, g.
Evaluates the audit " discrepancy", " discrepancy respense",
l and " Recommended Corrective Action" and prepares "Lmplementation Directives" to resolve disagreements.
l h.
Approves all changes to the Cperational Quality Assuranca
- Program, i.
Reviews the qualification requirements for the principal 0;ality Assurance management position to assure competence ccmmensurate with responsibility.
(See Appendix A) l i
j.
Provides for resolution of NSARC recommendations.
i 2.
Vice President - Yankee Nuclear Services Division a.
Provide independent review of all aspects of plant safety, via the NJclear Safety Audit and Review Ccenittee.
Appoint the memcership of the Committee, and review thair reports.
D.
Monitor response to NSAR Ccmmittee and MY Project Manager recommendations and oring to the attention of tne Maine Yankee President, all safety related discutes, disagreements or discrepancies wnien cannot ce resolved at a icwer level.
c.
Provides via the YNSO Ccerational Wality Assurance l
Cecartment for ince;endent accits of tne Maine Yankee Atcmic Pcwer Company Ccerational Quality Assurance Department to verify ccmcliance ni n tne 0;ality Assurance Program.
Title:
Section I. Organization Page:
3 of 11 Rev. No.:
O Date: Maren 20, 1981 d.
Providas via the Yt60 Engineering Department for independent engineering review oJ proposed design changes to verify the adequacy of designs and to assure the quality and consistency with safety and licensing requirements.
e.
Provides via the Yt60 Engine
- ring Department for the l
development, maintenance, and control of special process procedures, such as, POE, Welding, and heat Treating.
f.
Provides for technical, engineering, licensing, compliance, operational, and quality assurance support as recuested.
g.
Provides via the YNSD Operational 0;ality Assurance l
Department for Internal Audits, vendor surveillance, inspection, or audit as requested by the Manager of roclear Support.
h.
Provides for emergency preparedness, environmental, fuel management, and nuclear engineering support as requested.
1.
Provides via the YNSD Engineering Department for tt.t development, maintenance, and control of Yankee POclear Services Division General Specifications.
J.
Provides a qualified Fire Protection Engineer to review design changes to fire protection systems and components, k.
Review the operational quality assurance program and changes thereto.
3.
Manager - toclear Succort at Reports Directly to the Vice President Manager of Operations.
b.
Reviews all changes to the Operational Quality Assurance Program.
l c.
Provides for review of and compliance with federal and state regulations aad standards for nuclear power facilities.
d.
Provides for the conttul and storage of apprcpriate quality assurance records.
e.
Provides for the coordination of the engineering requirements necessary to support changes related to operation of the plant.
f.
Prepares " Recommended Corrective Action" to be taken on Internal Aucit Discrepancies.
Tit.e: Section I. Organization Page:
4 of 11 Rev. No.:
0 Date: Maren 20, 1981 g.
Establishes the qualification requirements for the principal OJality Assurance management position to assure competence commensurate with responsibility.
h.
Resolves disputes between Quality Assurance Cepartment and other departments / organizations, incolving quality.
i.
Acts in an advisory capacity in the areas of engineering, licensing, compliance, and quality assurance when requested by the Plant Operation Review Committee (PCRC) or the N; clear Safety Audit and Review Committee (NSARC).
4.
Plant Manager a.
Reports directly to the Vice President Manager of Operaticos.
b.
Reviews all changes to the Operational Quality Assurance Program Manual.
c.
Establishes the on-site implementation of the Operational l
Quality Assurance Program, including compliance with all State and Federal licenses and regulations.
d.
Acts as Chairman of the Plant Operations Review Committee with authority and responsibility as established in the Tecnnical Specifications of the plant operating license.
e.
Assumes overall responsibility for all activities at the plant.
f.
Acts in an advisory capacity in the areas of plant activities, such as, maintenance, operation, testing, training, when requested by NSARC.
g.
Interfaces between the Ccmpany and Yankee MJclear Services Divisicn for on-site activities.
h.
Provides via the Operations Cepartment for the review of industry operating problems with the aim of minimizing likelihood of occurrence at the plant.
1.
Coordinates activities necessary to support plant reporting requirements.
J.
Ccordinates plant activities necessary to sucport tne plant environmental surveillance programs.
k.
Provides via the Emergency Plan Ccordinator for implementaticn of the Maine Yankee ETergency Plan.
Title:
Section I. Orcanization Page:
5 of 11 Rev. No.:
0 Date: Maren 20, 1981 5.
Administrative Sucervisor a.
Reports directly to the Manager of Nuclear Support.
b.
Establishes the means for the control and distribution of the Operational Quality Assurance Prcgram and revisions
- thereto, c.
Establishes the means for the control, distribution, and storage of the Quality Assurance Documents and Records under the jurisdiction of the Manager of Nclear Support.
d.
Establishes the means for the control and distribution of the Maine Yankee audit and surveillance program.
6.
Director of Plant Enoineering a.
Reports directly to the Manager of Nclear Support.
b.
Maintains the Operational Quality Assurance Program Manual and the associated administrative implementing quality assurance procedures, c.
CooroN.ates the development, review, and implementation of plant changes and alterations.
d.
Establishes and maintal.1s the Plant I'nservice Inspection Program.
e.
Directs via the Plant Engineering Department the l
engineering reviews of material purchase requests.
f.
Directs via the Plant Engineering Department the l
engineering reviews of nonconformances and corrective actions.
g.
Directs via the Plant Engineering Department independent engineering ano quality assurance reviews of maintenance and repair activities.
h.
Maintains and disseminates information regarding codes, standards, criteria, and guidelines to applicable personnel.
i.
Coordinates interfacing plant. engineering activities between the Company, Yankee Nclear Services Divisicn, and outside agencies.
j.
Directs via the Plant Engineering Cepartment plant l
surveillance programs assigned by the Manager of Nclear Support.
Title:
Section I. Organization Page:
6 of 11 Rev. No.:
0 Date: Maren 20, 1981 k.
Directs via the Plant Engineering Department plant test l
programs assigned by the Manager of Nuclear Support.
1.
Acts in an advisory capacity in the area of plant er.gineering when requested by FCRC or NSARC.
m.
Provides via the Plant Engineering Department for technical support to the plant, n.
Provides for the documentation and maintenance of quality assurance records associated with plant engineering.
7.
Director of NJclear Engineerino and Licensing a.
Reports directly to the Manager of Nclear Support.
b.
Ac+
in an advisory capacity in the areas of licensing and nuclear enginaering when requested by FORC or NSARC.
c.
Directs the licensing activities necessary to support and maintain the Technical Specifications, Safety Analysis Report, and other licensing issues.
d.
Establishes and maintains radiological environmental surveillance programs.
e.
Provides for the documentation and maintenance of quality assurance records in licensing.
f.
Coordinates interfacing licensing activities between the Company, Yankee Nuclear Services Division, and outside agencies.
g.
Coordinates interfacing nuclear engineering activities between the Company, Yankee MJClear Services Division, and outside agencies.
h.
Establishes Emergency Plans pursuant to state and federal regulatory requirements and Company policy.
1.
Provides for the general supervision and coordination of di core ccmpenent design and fuel cycle economic activities.
j.
Coordinates activities necessary to support plant safety analysis issues.
8.
Director of Ccerational QJality Assurance a.
Reports directly to the Manager of Nuclear Sucport.
Title:
Section I. Organization Page:
7 of 11 Rev. No.:
0 Date: Marcn 20, 1981 b.
Assures that the Operational Quality Assurance Program satisfies the requirements of 10CFR50, Appendix B ANSI N18.7-1976.
c.
Directs via the Operational Quality Assurance Department l
the review of design changes and material purchase requests for adequacy of quality requirements.
d.
Directs via the Operational Quality Assurance Department l
the evaluation, inspection and/or surveillance of contractor / vendor activities at the operating plant to assure effective lines of communication and ccmpliance with the applicable criteria of 10CFR50, Appendix 8 and ANSI N18.7-1976.
e.
Directs via the Operational Quality Assurance Department the inspection, surveillance and/or audit of activities affecting the quality of structures, systems and components important to safety, f.
Ensures through verification that the Program is implemented for all activities requiring quality assurance.
g.
Directs via the Operational Quality Assurance Department i
the independent verification of plant operational I
activities to assure that applicable approved procedures, specifications, licenses and safety regulations are satisfied, h.
Reviews all changes to the Operational Quality Assurance Program.
l 1.
Ensures that the Program is modified and/or revised as
' standards, regulations and experience dictate.
j.
Directs via the Operational Quality Assurance Department l
the quality assurance reviews of nonconformances, k.
Ccordinctes interfacing quality assurance activities between the Company, Yankee Nuclear Services Division, and outsioe agencies.
1.
Acts in an advisory capacity in the area of quality assurance when requested by PORC or NSARC.
m.
Establishes and maintains the Internal Audit Program to l
verify compliance with all aspects of the Quality Assurance Program and to determine the effectiveness of the program.
n.
Provides for the documentation and maintenance of department quality assurance records.
Title:
Section I. Oroanization Page:
8 of 11 Rev. No.:
0 Date: Maren 20, 1981 c.
Responsibility and authority to stop unsatisfactory work and control further processing, delivery, or installation of nonconforming material.
p.
Provides for review and inspection of repair and maintenance activities.
q.
Approves all changes to the Operational Quality Assurance Manual.
r.
Review and concurrance with dispositions and corrective actions of ncnconformance reports.
9.
Director of Ooerational Succort a.
Reports directly to the Manager of Nuclear Support.
b.
Acts in an advisory capacity in the area of regulatory compliance when requested by PDRC or NSARC.
c.
Directs the activities necessary to support federal and state enforcement documents.
d.
Provides via Operational Support Department for the l
documentation and maintenance of quality assurance records in regulatory compliance activities.
e.
Coordinates interfacing compliance activities between the Company, Yankee Nuclear Services Division, and outside agencies.
f.
Provides via the Operational Support Department for an independent operational review.
g.
Coordinates the review of industry operating problems with the aim of minimizing likelihood of occurance at the plant.
h.
Provides for operational support to the plant.
10.
Administration Department Head a.
Reports directly to the Plant Manager.
b.
Provides via the Training Department for an approved Plant l
Training Program and the implementation of the program.
c.
Provides via the Training Cepartment for the coordination l
of activities necessary to maintain the Plant Training Manual.
Title:
Secticn I. Organization Page:
9 of 11 Rev. ft.:
0 Date: Maren 20, 1981 d.
Establishes the means for the control, distribution, and storage of the Wality Assurance Occuments and Records uncer the jurisdiction of the Plant Manager.
e.
Provides via the Fire Protection Supervisor for an approved l
Fire Protection Program and training of perscnnel therein.
f.
Provides via the Security Supervisor fcr an approved l
Security Program and training of personnel therein, g.
Provides for the preparation of requisition for purchase orcers.
h.
Provides via the Stores Cepartrent for the control and l
identificaticn of material ano equipment upon receipt, storage, and issuance.
i.
Establishes the control and storage of Quality Assurance l
documentation of purchased materials.
J.
Provides via the Stores Cepartment for the control and l
maintenance of tre plant spare parts inventory system.
i<.
Establishes the retention period for the Quality Assurance Documents and Records,
- 11. Maintenance Decartment Head a.
Reports directly to the Plant Manager.
b.
Prepares, scnedules and directs approved maintenance activities.
c.
Directs via tre Maintenance Department preparation and l
implementaticn of crocecures utilizing scund engineering policies and practices for the installation of new material, equicment cr spare parts.
d.
Estaolishes and maintains an acproved prcgram of preventive l
maintenance, calibration, and testing for f.nstruments and electrical /mecnanical equipment in conformance with approved procecures.
e.
Ensures 4.' the implementation of a centinuing surveillance l
crcgram as outlined in the Tecrnical Specificaticns.
f.
P cvices for the training and qualificaticn of cepartment perscnnel in the a;clicaticn of scecial prccesses, sucn as, PCE and welcing.
Title:
Section I. Orcanization Page:
10 of 11 Rev. No.:
0 Date: Maren ~20, 1981 g.
Provides for the documentation and maintenance of quality assurance records in Maintenance Department activities.
- 12. Oceraticas Cecartment Head a.
RepSrts directly to the Plant Manager.
b.
Assures plant operations are conducted in accorcance with approved documents and specifications.
c.
Provides via the Cperations Cecartment for system j
surveillence and operational testing.
d.
Provides via the Operations Department Maintenance Requests for the repair or replacement of defective parts and/or components, e.
Verifies the operability of systems and/or components folicwing maintenance, or changes by providing for the performance of written test documents which incorporate the requirements and acceptance criteria contained in applicable design documents, f.
Ensures for the safe handling of core and reactor l
components during refueling operations, g.
Provides for the documentation and maintenance of quality assurance records in Operation Cepartment activities.
h.
Provides via the Operations Department for the development, control, and maintenance of operating and emergency operating procecures.
13.
Technical Succort Oeoartment Head a.
Reports directly to the Plant Managar.
b.
Provices via the Reactor Engineering Cepartment for the l
- sneral supervision and cooroinaticn of reactor pnysics and nuclear tests for plant cperation ano adherence to applicscle Technical Specificaticns.
l c.
Follcws and reviews raciation protection programs and activities at the plant.
d.
Estaolishes and maintains radiological and ncnradiolcgical effluent release centrol and surveillance pregram.
e.
Provices for the maintenance of refueling procecures relative to fuel core compcnents nandling and inspection.
Title:
Section I. Orcanization Page:
11 of 11 Rev. No.:
O Cate: Maren 20, 1981 f.
Performs fuel cycle, nuclear engineering, and econcmic studies requested by plant manager.
g.
Directs the en-site activities necessary to support federal and state enforcement decurrents.
h.
Provides for the docurrentation nnd maintenanc; of quality assurance records in chemistry, health pnysics, environtrental, reactor pnysics and nuclear fuel vis :he applicaule cepartment.
i.
P cvides for the centrol and maintenan,:e of plant computer systems.
j.
Provides for the preparatien amd maintenance of prececures associated with radiological, chemistry, and reactor physics via the applicaule department.
E.
REVIEW AND AUDIT Two cor:raittees have been established for the operating plant wncse cbjectives are to insure the plant is operatec safely, utilizing accepted engineering practices.
The committees are charged with making reccecendations to modify cperational :rethccs or safety precautions wnen app;cpriate.
One Cemittee, the Plant Coerations Review Comittee, is mace up of Plant personnel.
The otner Committee, the Nuclear Safety Aucit and Review Committee, is made up of individuals not having line responsibility for the operation of the plant.
1.
Plant Ocerations Review Committee See Section 5.5, " Review and Audit" of Tecnnical Specificetiens to the Cperating License CR-36.
2.
Boclear Safety Audit and Review Conmittee See Section 5.5, " Review and f.ccit" of Technical Specifications to the Cperating License DR-36.
MAINE YANKEE ATOMIC POWER COMPANY ORGANIZATIONAL CHART PRESIDENT MAINE YANKEE ATOMIC l
YANKEE ATOMIC ELECTRIC COMPANY POWER COMPANY NUCLEAR SERVICE DIVISION (MYAPC)
(YNSD)
VICE VICE PRESIDENT VIQ NT PRESIDENT PRESIDENT MANAGER 0F-AND OPERATIONS ADMINISTRATION VICE PRESIDENTS FINANCE
-0FFSITE
- 6TISITE
--~
MAINE YANKEE NUCLEAR SAFETY MANAGER
'l PLANT AUDIT & REVIEW NUCLF".R SUPPORT MANAGER PROJECT OMMI M MANAGER I
ADMINISTRATIVE I
MAINTENANCE I
DEPARTMENT SUPERVISOR HEAD
~l ADMINISTRATION DIRECTOR l
DEPARTMENT YANKEE NUCLEAR NUCLEAR ENGINEERING HEAD SERVICES
& LICENSING DIVISION STAFF OPERATIONS DIRECTOR l
DEP ENT
- 0ne Corporate Officer of YNSD is also a OPERATIONAL l
Corporate Officer of MYAPC, and shall be QUALITY I
TECHNICAL referred to as "Vice President (YNSD)"
ASSURANCE SUPPORT
- Administrative Reporting: Technical Support I
DEPARTMENT Department Head DIRECTOR I
HEAD
- Functional Reporting: Director-Plant PLANT I
Engineering ENGINEERING
- Functional Reporting: Director-0perational l
DIRECTOR PLANT Quality Assurance ENGINEERING OPERATIONAL g AL*
_)P A SURANCE Plant Operations F%ure 1 Rev. 0 l
Review Connittee
Title:
Section II. CA Procram Page:
1 of 4 Rev. No.:
0 Date: Maren 20, 1981 II. QUALITY ASSURANCE FROGRAM A.
SCOPE The OJality Assurcace Program provides control over activities affecting the quality of identified structures, systems and components, to an extent consistent with their importance to safety.
The program takes into account the need for special controls, processes, environmental conditions, equipment, tools, and skills to l
attain the required quality and the need for verification of quality by inspections, evaluations or tests.
8.
RESRJNSIBILITIES Compliance with the requirements of the Operational Quality Assurance Program is the respcnsiollity of all personnel involved with activities affecting operational safety.
Individuals responsible for establishing aca executing the Operational Quality Assurance Program are delinmed in Section I, " Organization", of the program.
Operational Quality Assurance shall regularly review the status and adequacy of the quality assurance program.
C.
IMPLEMENTATION Establishment of an effective Operational OJality Assurance Program is assured through conformance with the ANSI Standards and the regulatory position of the regulatory guides specified in this section of the QA Program as modified by Appendix B of the Q. A.
Program.
Implementation of this program is assured through QJality Assurance procedures derived from Quality Assurance policies, goals and objectives.
1.
Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants 2.
ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Ccerational Phase of NJclear Power Plants 3.
ANSI N45.2-1971, OJality Assurance Procram Recuirements for Nuclear Power Plants 4.
ANSI N45.2.8 -1975, Succlementary Oaality Assurance Recuirements for Installa1icn, Inscection anc Testirg of Mecnanical Ecuicment and Systems f 7r tre Ccnstruction Phase of Nuclear Power Plants 5
ANSI N45.2.12, Craft 4, Revision 2, (January 1,1976),
Recuirements for 4diting of 0;ality Assurance Prccram for Nuclear Fewer Plants
l
Title:
Secticn II. CA Procram Page:
2 of a Rev. No.:
0 Date: Maren 20, 1981 l
6.
ANSI N45.2.13-1976, Quality Assu:ance Recuirements for Centrol of Procurement of Items and Services for Nuclear Fower Plants 7.
ANSI N18.17-1973, Industrial Security for Nuclear Power Plants l
l 8.
Regulatory Guide 1.8, Revision 1, (Septemcer, 1975) Personnel l
Selecticn and Training (Encorses ANSI N18.1-1971) 9.
Regulatory Guide 1.30, August 11, 1972, Quality Assurance Recuirements for the Installation, Inscection anc Testino of Instrumentation and Electric Ecuiccent (Encorses ANSI N45.2.4-1972)
- 10. Regulatory Guide 1.37, March 16,1973, Cuality Assurance Recuirements for Cleaning of Fluid Systems ano Asscciated Comocnents of water-Ccoled Nuclear Power Plants (Encorses ANSI N45. 2.1-1973)
- 11. Regulatory Guide 1.38, March 16,1973, OJality Assurance Recuirements for Packaginc, Shiccino, Receiving, Storage and Hanoling of Items for Water-Cooleo Nuclear Power Plants (Encorses ANSI N45.2.2-1972) l
- 12. Regulatory Guide 1.39, March 16,1973, Housekeeoino Recuirements i
for Water-Cooled Maclear Power Plants (Encorses ANSI N45. 2. 3-1973) 13.
Regulatory Guide 1.54, June, 1973, Quality Assurance l
Recuirements for Protective Coatings Acoliec to Water-Cooled NJClear Power Plants (Encorses ANSI N101. 4-1972) l
- 14. Regulatory Guide 1.58, August 1973, Qualificaticn of Nuclear Power Plant Inscection, Examination, and Testino Personnel l
(Encorses ANSI Na5.2.6-1973)
- 15. Regulatory Guide 1.64, Revision 1, (February, 1975), Quality Assurance Recuirements for the Cesicn of Nuclear ocwer Plants (Encorses ANSI N45.2.ll-1974)
- 16. Regulatory Guide 1.74, Feoruary, 1974, Quality Assurance Terms and Cefinitiens (Endorses ANS N45.2.10-1973)
- 17. Regulatory Guice 1.88, August, 1974, Collection, Storage and Maintenance of.% clear Power Plant Cuality assurance Recercs (Encorses ANSI N45.2.9-1974)
r
Title:
Section II. CA Procram Page:
3 of 4 Rev. No.:
O Date: Maren 20, 1981
- 18. Regulatory Guide 1.94, Revisien 1 (April, 1976), Quality Assurance Recuirements for Installation, Inscection ano Testino of Structural Cencrete ano Structural Steel Ouring tne Constructicn P7ase of roclear Power Plants (Encorses AtGI N45.2.5-1974)
NOTES:
1)
The plant Technical Specifications shall be the governing cccurent when cetermining requirements to be imposed in all areas wnich are addressed in both tecnnical specifications and the above noted guides and standards.
2)
Revisions to the above listed documents will te considered for applicability to the Maine Yankee Cperational cuality Assurance Prcgram upcn written cireccion thereof by the etclear Regulatory Ccmissicn - Office of Nuclear Reactor Regulations - 0;ality Assurance Branch.
3)
ANSI Standard N18.7-1976 is the endorsing document for all other above referencec ANSI Standards.
All suen endorsee ANSI Standarcs will be implemented to the degree of applicacility indicated in ANSI N18.7-1976.
4Property "ANSI code" (as page type) with input value "ANSI N18.7-1976.</br></br>4" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.)
This Program shall be applicable to those activities requiring quality assurance wnich occur ccmrencing 90 cays after acceptance of tne Program by the ibclear RegJ story Commissicn.
1
')
The tEC shall be notified of changes (1) for review and acceptance in the accepted cescription of the CA program prior to implementation, and (2) in organiraticnal elements within 30 days after anncuncement.
(Note - editorial Cnanges er cersennel reassignments of a ncn-sutstantive nature do nct require tEC nctification.)
+Exceptiens and alternatives to the provisicns centained in this Stancard/GJice are detailed in Accendix E.
D.
MANACEFENT EVALUATICN The vice Presicent, YNSO, cirects a trorcegn evaluaticn of tne estaclisnec Cperaticnal O.ality Assurance Prcgram by assigning tre ecclear Safety Adit and Review Cc.mittee the task cf reviewing for cccellance with and evaluating tne effectiveness of One cuality assurance orcgram.
Title:
Section II. CA Program Page:
4 of 4 Rev. No.:
O Date: Maren 20, 1981 E.
TRAINING 1.
The Plant Manager is responsible for the indoctrination t.nd training of plant staff personnel performing activities affecting operations or requiring quality assurance, a"d for ensuring that, where required by the Technical Specifications, cperators are formally licensed or qualified.
1 2.
The Manager of Nuclear Support is responsible fer the indoctrination and training of Maine Yankee personnel other than MY plant staff personnel performing activities affecting operations or requiring quality assurance.
3.
The indoctrination and training programs thall provide the following:
a.
Instruction as to the purpose, scope, and implementation of quality assurance manuals, instructions, and procedures.
b.
Training and qualification in the p'tinciples and techniques of the activity being performed.
c.
Maintenance of personnel praticiency by retraining, reexamining, and/or recertifying.
d.
Documentation of the training sessions incluoing content, attendance, dates and results.
4.
The Vice President-Yankee Niclear Services Division is responsible for the indoctrination and training of YNSD personnel, to an approved training program, when performing activities affecting operations or requiring quality assurance.
l I
Title:
Section III. Desian Control Page:
1 of 3 Rev. No.:
0 Date: Maren 20, 1981 III. DESIGN CONTROL A.
SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that the design of and changes to structures, systems, and components covered by the Operational Quality Assurance Program are controlled.
8.
RESPONSIBILITIES 1.
The Cperational Quality Assurance Department shall be responsible for:
a.
Providing for Surveillance of the implementation of design control.
b.
Review of engineering drawings and specifications to assure that appropriate design control practices, checks, and reviews are included.
c.
Review of desig. bases for inclusion of quality requirements.
2.
The Plant Engineering Oepartment shall be responsible for:
a.
The design and control of design activities (including l
design interfaces) for the change of structures, systems, or components including the requirement for independent l
review.
b.
Identification, documentation, and control of deviations from specified design requirements and/or quality standards.
c.
Delineation of acceptance criteria for inspections and l
tests.
3.
The Fire Protection Coordinator shall be responsible for:
i a.
Cesign and control of design activities for Fire Protection l
Equipment in accordance with the Yankee Nuclear Services Division General Specifications YA-GEN-9.
4.
The Plant Operaticns Review Ccmmittee shall be responsible for:
a.
Review of all propcsed plant design changes and reccamending their approval or disapproval to the Plant Manager.
Cetermination of wnetner prcposed changes involve
'u.
unreviewed safety cuestions.
Title:
Section III. Desicn Control Page:
2 of 3 Rev. No.:
0 Date: Maren 20, 1981 5.
The Plant Manager shall be responsible for:
a.
Review of the recommendations of the Plant Operations Review Committee.
b.
Review and approval of proposed plant changes.
6.
The Wclear Safety Audit and Feview Committee shall be responsible for the review of design changes.
7.
The Yankee Relear Services Division shall be responsible for:
a.
Establishment of approved policy for processing engineering design changes, b.
Independent engineering review of proposed design changes to verify the adequacy of designs and to assure the quality and consistency with safety and licensing requirements.
C.
IMPLEMENTATION 1.
Satisfaction of this criterion shall be assured through the implementation of the Maine Yankee and Yankee Nuclear Services Division actions listed below:
a.
Correct translation of applicable regulatory requirements and design bases into specifications, drawings and written documents.
1 b.
Application of suitable design controls to such activities as reactor physics; seismic, stress, thermal, hydraulic, radiation, and accident analyses; compatiblity of materials; and accessibility for inservice inspection, maintenance and repair, c.
Cesign reviews to assure that design characteristics can be centrolled, inspectec and tested.
d.
Ferformance of prcper selection and acccmplishment of design verification or checking process such as design reviews, alternate calculations, cualification testing or test programs. When a test program is used to verify the adecuacy of a design, a qualification test of a prototype unit uncer the most adverse design ccnditions shall ce used.
If the verification methed is only by test, procedures shall provide criteria that specify when verification shculd be by test and that prototype, ccmcenent or feature testing is performed as early as possible prior to installaticn of plant equipment, or prior to the point when installation would beccme irreversicle.
Title:
Section III. Desicn Control Page:
3 or 3 Rev. No.:
0 Date: Marcn 20, 1981 e.
Subjection of design and specification changes to the same design controls and approvals that were applicaole to the original design unless designated in writing to ancther responsible organization.
f.
Documentation of errors and deficiencies in the design process that adversely affect safety classified structures, systems, and components; performance of corrective action to preclude repetition, g.
Review of standard "off the shelf" commercial or previously approved materials, parts, and equipment that are essential to the safety functions of structures, systems, and components, for suitability of application prior to selection.
h.
Selection of suitable materials, parts, equipment, and processes for safety classified structures, systems, and components, i.
Fire Protection controlled in accordance with YNSD YA-EN-9.
Title:
Secticn IV. Drccurement Cccument Centrol Page:
2 of 2 Rev. to.:
0 Date: m ren 20, 1931 b.
Iceritificatien of the vendcr's cuali.ty assurance reg;irements acclicable to the items or services p ccured.
c.
Ir.entification in tne procurement cccurents of tne occurentation to be prepared, maintained, and/or seccitted to the purchaser prior tc use, sucn as:
1.
crawings, specificaticns, p ccecures 2.
inspecticn and faoricatica plans 3.
inspection and test records 4.
persennel and procedure qualificaticns 5.
chemical and physical test results of material 6.
tne cercany's right of access to the vendor's facilities and records for surveillance to precurement specifications.
d.
Review and approval of enanges and revisiens to prccurement documents at least equivalent to those for the criginal dccurent.
e.
Control of procurement dccuments for spare and replacement parts sucn that the technical requirements are equal to or better than the original and administrative centrol to the current CA Program requirerents.
Title:
Section V. Instructions, Proc. & Drawings Page: 1 of 2 Rev. No.:
0 Date: March 20, 1981 V.
INSTRUCTIONS, FROCEDURES, AND CRAWINGS l
A.
SCOPE This section of the Operational OJality Assurance Program establishes the measures for prescribing and accomplishing activities requiring quality assurance in accordance with approved drawings, instructons, or procedures.
8.
RESPONSIBILITIES Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures and drawings include appropriate quantitative or,ualitative acceptance criteria for determining that activities have been satisfactorily accomplished; assuring that the applicable criteria of 10CFR50 Appendix 8 and/or ANSI N19.7 are specified; and assuring that the documents are kept current.
In addition, the following departments have the distinct respcnsibilities delinaated below.
1.
The. Operational Quality Assurance Department shall be responsible for.
a.
Providing for surveillance of instructions, procedures, and. I drawings.
b.
Review and approv, of all Plant Operational Quality Assurance procedures.
c.-
Review of maintenance, modification and inspection l
procedures for inclusion of quality assurance requirements.
I 2.
Maine Yankee shall be responsible for the preparation, review, l
approval, maintenance, and implementation of all instructions and procedures associated with Maine Yankee activities including ccmputer programs for items important to safety controlled by Maine Yankee.
3.
The Yankee BOclear Services Division snall be respcnsible for:
a.
Updating and control of original drawings and special process proceceres and distribution of ccpies thereof.
i 4.
The Plant Ocerations Review Committee s..all ce responsible for reviewing procedures affecting nuclear safety prict to their approval by the Plant Manager.
i C.
IMPLEMENTATION 1.
Satisfaction of this criterien snall be assured through the implementation of the Maine Yankee and/or Yankee foClear Services Divisien actions listed below:
Title:
Section VI. Document Control Page:
1 of 3 Rev. No.: O Date: Maren 20,1981 VI.
DOCt.NENT CONTROL A.
SCOPE This section of the Operational Quality Assurance Program establishes the measures for controlling documents, including revision thereto, which affect quality activities.
8.
RESPONSIBILITIES 1.
All participating departments shall establish document control measures which provide for the following:
a.
Identification of departments responsible for preparation, review, approvci, and control of documents.
b.
Identification of documentation to be used in performing
- activity, c.
Coordination and control of interface documents.
d.
Establishment of distribution lists.
e.
Action to be takt.n or obsolete or superseded documents.
In addition, the following departments have the unique l
responsibilities delineated below:
l 2.
The Operational Quality Assurance Department shall be l
responsible for surveillance and/or audit of document control systems at Maine Yankee and vendors.
3.
Maine Yank,ee shall be responsible for:
a.
Controlling the issuance of operating, maintenance, reuair, refueling, change documents, computer program procedures.
b.
Distribution and maintenance of all approved and/or revised documents assuring cuality at the location where the activity is performed, c.
A system of review, approval and distribution of Maine Yankee Quality Assurance documents.
4.
The Yankee Nuclear Services Divisicn shall be rescensible for:
a.
Centrolling the issuance of engineering drawings, General Specifications, welcing and nondestructive examination prececures.-
1 l
/
Title:
Section VI. Occument Control Page:
3 of 3 Rev. No.:
0 Date: Maren 20, 1981 6.
Test dccuments 7.
Design change requests 8.
Ncnconformance reports 2.
Appendicies to the Operational Quality Assurance Pragram are considered part of the Program and are reviewed and approved per the Program.
Title:
Section VII. Centrol of Purchased Mat'1, Eculo. & Services Page:
1 of 3 Rev. No.: 0 Date: Maren 20,1981 VII. CONTROL OF PURCHASED MATERIAL, ECUIR ENT AND SERVICES A.
SCOPE This secticn of the Operational Quality Assurance Frogram establishes measures to assure that purchased material, equipment and services, whether purchased directly or thrcugh contractors and succontractors, conform to the procurement documents.
B.
RESPONSIBILITIES 1.
The Operational Quality Assurace Department shall be responsible for:
a.
Provide via YNSD, Operational Quality Assurance Dept. for h
evaluation of vendor quality assurance programs.
b.
Provide for maintenance of a listing of qualified vendors based upon (a).
c.
Surveillance of plant or vendor material and/or services centrol.
d.
Receipt inspection of material and equipment.
e.
Evaluation of bids to assure adequacy of CA requirements.
2.
Maine Yankee shall be responsible for:
a.
Control of material and equipment.
b.
Bid evaluation and control.
c.
Evaluation of purchased services during and/or after completion of the service.
3.
Stores shall be respcnsible for the control of material and ecui;; ment until issued.
4.
Each department shall be responsiole for control of equipment and material after issuance f cm stores.
C.
IMPLEMENTATICN 1.
Satisfacticn of this criterion shall ce assured rnrcegn :ne implementaticn of tne acticns listed ;41cw:
a.
Evaluaticn of vendors based on ene or more of the follcwing:
8!!P
Title:
Section VII. Centrol of Purchased Mat'1, Eculo. & Services Page:
2 of 3 Rev. No.:
0 Date: Maren 20, 1981 1.
Vendor's capability to comply with the applicable criteria of 3 0CFR50 Appendix 8 and/or ANSI N18.7.
2Property "ANSI code" (as page type) with input value "ANSI N18.7.</br></br>2" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..
Review of vendor's previous records and performances.
3.
Surveillance of vendor's facilities / services and QA program to determine his ability to produce the item to the purchase specifications.
b.
Documentation and maintenance of the results of vendor evaluations, c.
Planned vendor surveillances which provide for:
1.
Specification of processes to be witnessed or verified, the surveillance method and documentation required, and personnel responsible for performing the surveillance.
2.
Assurance that the vendor corp ies with the quality requirements by surveillance of in-process work.
d.
Transfer of the following records from the vendor to Maine Yankee:
1.
Documentation that icentifies the purchased material and the specific precurement requirements met by the item.
2.
Documentation that identifies any deviation from procurement requirements including a descripticn of those deviations dispositioned " accept as is" or
" repair".
e.
Review and acceptance of vendor documents by a respcnsible quality assurance individual, f.
Receipt inspection of vendor furnished material to assure:
1.
Material is icentified and conforms with receiving dccumentaticn identification.
2.
Material and dccumentation are inspected in accordance with predetermined instructions and are determined acceptable prior to use.
3.
Inspection records or certificates of ccnformance atesting to material acceptaollity are en-site prior to use.
Title:
Section VII. Centrol of Purchased Mat'1,
, a Eculo. & Services Page:
30,72 Rev. No.:
0 Date: Parcn 20,1981 4.
Items are identified as to their inspection status prior to release for controlled storage, installation or further work.
g.
Evaluation of the vendor's effectiveness to control quality is performed at intervals consistent with the importance, complexity and quality of the item.
Title:
Section VIII. Identification & Control of Mat '1, Parts, & Comocner.ts Page:
1 of 1 Rev. tb. : 0 Date: Maren 20, 1981 VIII. IDENTIFICATION AND CCNTROL GF MATERIAL, PARTS, AND CCMPONENTS A.
SCOPE This section of the Operational Quality Assurance Program establishes the measures for identification and centrol necessary to prevent the use of incorrect or defective ' material, parts, and components.
B.
RESPONSIBILITIES 1.
The Operaticnal Wality Assurance department shall be responsible for:
a.
Surveillance, audit and/or inspection of the control and issuance of materials, parts, a id components covered Dy the Operational @ality Assurance r,rogram.
b.
Review of vendor Quality AsFJrance programs for traceability of materials thrcugn the use of heat number, part nurber, or serial number, either on the item or on records traceable to the items.
2.
Maine Yankee shall be responsible for:
a.
Preparation, review and approval of documents for the identification and control of materials, parts, and compcnents including lubricants, consumables, chemicals and reagents (including shelf life).
b.
Maintenance of traceability of materials, parts, and components received, stored, installed, and used at the Plant.
l C.
IMPLEMENTATICN 1.
Satisfaction of this criterien shall be assured through the implementation of the actions listed belcw:
a.
Traceability of the identification of materials and parts to the apprcpriate documentation sucn as drawings, specifications, purchase orders, manufacturing and inscection dccuments, deviatien reports, and pnysical ano enemical mill test reports.
b.
Icentification of the item in a locaticn and with a method whicn cces not affect its fit, function or quality.
c.
Cccumented verification of correct icentificaticn of materials, parts, and ccmcenents prior to release for use.
L
Title:
Section X. Inscection Page: 2 or 2 Rev. No.: O Cate: Maren 20, 1981 d.
Inspection of repairs and replacements in accordance with the original cesign and inspection requirements or i
acceptable alternatives.
e.
Surveillance of processing methods, equipment, and personnel when direct inspection is not possible.
f.
QJalif1 Cation of inspectors in accordance with applicable codes, standards, and ccmpany training prcgrams; and maintenance of qualifications and certifications.
g.
Review of maintenance documents by qualified perscnnel knowledgeable in quality assurance to determine the need for inspecticn, identification of inspection personnel, and documenting inspection results.
I h.
When inspections associated with normal cperatiens of the plant (such as reutine maintenance, surveillance, ano tests) are performed by indivicuals other than these who perfor: red or directly supervised the work, cut are within the same group, the follcwing controls shall be met:
1.
The quality of the work can be demonstrated through a functional test wnen the activity involves breaching a pressure retaining item.
2.
The qualification criteria for inspection perscnnel are reviewed and fcund acceptable by the CA organizaticn prior to initiating the inspection.
Title:
Section XI. Test Control Page:
1 of 2 Rev. tb.: 0 Date: Maren 20, 1981 XI.
TEST CCNTROL A.
SCCFE This section of the Operational DJality Assurance Program establishes the reasures for a test program to demonstrate that structures, systems, and components will perform satisfactorily in service.
B.
RESPONSIBILITIES 1.
The Operational Quality Assurance Department shall be responsible for:
a.
Providing surveillance of the control of the test prcgram, b.
Surveillance of the cccumentation generated during the test program.
2.
The Plant Engineering Department shall be respcnsible for:
a.
Preparation or review of specifications, requirerents, and acceptance criteria for testing following plant cnanges and maintenance activities..
l b.
Determination of when testing is required following plant changes and maintenance activities.
3.
Each Plant Departrent shall be responsible for:
l a.
Provision of qualified personnel and calibrated equipment for testing.
b.
Develeprent of test documents, perfornance of tests, and documentation, evaluation, and approval of test results.
4.
The Plant Operations Review Committee shall review all propcsed tests and experiments that affect nuclear safety.
5.
The Nuclear Safety Audit and Review Comittee shall te responsible for reviewing prcposed tests or experiments not described in the safety analysis report whicn involve a change in the technical specifications or an voreviewed safety question as defined in section 50.59, 10CFR.
C.
IMPLEMENTATION 1.
Satisfaction of this criterion shall be assured tnrougn the implementation of the actions listed celow:
Title:
Section XI. Test Control Page: 2 of 2 Rev. No.:
0 Date: March 20, 1981 a.
Assurance that changes, repairs, and replacements are tested in accordance with Maine Yankee approved programs, codes, standards and specifications.
b.
Review of written test dccuments for incorporation or reference of the following:
1.
Requirements and acceptance limits contained in applicable design and procurement documents.
2.
Instructions for performing the test.
3.
Test prerequisites, such as:
a.
Calibrated insturmentation b.
Adequate and appropriate equipment c.
Trained, qualified, and licensed / certified personrel d.
Completeness of item to be tested e.
Suitable and centrolled environmental conditicas f.
Provisions for data collection and storage 4.
Mandatory inspection hold points for witness by owner, contractor or inspector, when applicable.
5.
Acceptance and rejection criteria.
6.
Method of documenting test data and results.
c.
Test procedures shall contain criteria for determining the accuracy requirements of test equipment.
Title:
Section XII. Control of Measurinc &
Test Ecuicment Page:
1 of 2 Rev. tb.:
0 Date: Maren 20, 1981 XII. CONTROL OF ME URING AND TEST EGJIPVENT A.
SCOPt.,
This section of the Operational OJality Assurance Program estaolished the measures for the control, calibration and periodic adjustrents of tools, gages, instruments, and other measuring and test devices used to verify conformance to established requirements.
B.
RESPONSIBILITIES 1.
The Cperational Quality Assurance Cepartment shall be responsible for:
Surveillance and/or audit of the establisned pr gram for a.
the control of measuring and test equipment.
b.
Review and approval of all implementing cocuments for l
centrol of measuring and test equipment.
2.
Each Plant department shall be responsible for:
{
a.
Development of the implementing documents for control of measuring and test equipment including identification and calibration for equipment under their centrol.
l b.
Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.
c.
Maintenance of ca?ibration records.
d.
Preparation and review of specifications for measuring and test equipnent, such that all applicable requirements are satisfied.
C.
IMPLEMENTATICN 1.
Satisfaction of this criterion snall be assured througn the implementaticn of the acticns listed belcw:
a.
Identification and traceacility of measuring and test eculpment to the calibration test data.
i b.
Latelling or tagging of me?suring and test eculpment to indicate due cate for calibraticn.
\\s(',,,,
Title:
Section XII. Control of Measurino &
Test Ecuicment Page:
2 of 2 Rev. No.:
O Cate: Maren 2U,1981 c.
Calibration of measuring and test equipment at specified intervals based on recuired accuracy, purpose degree of s
usage, stability characteristics, and other conditions affecting the measurement.
d.
Documentation of measures taken to determine the validity of previous inspections performed when measuring and test equipment is found to be cut of calibration.
e.
Measuring and test equipment shall have an accuracy of four times the required accuracy of the equipe.ent being calibrated. When accuracy requirements cannot be attained, an accuracy that assures that the equipment being calibrated will be within required tolerance and that the basis of acceptance is documented and authorized by responsible management will be used, f.
Documentation and maintenance of the status of all items under the calibration system.
g.
Traceacility of reference and transfer standards to nationally recognized standards; or, decumentation of the basis for calibration where national standards are nonexistent.
l
Title:
Section XIV. Insoection, Test 1 00erating Status Page:
1 of 1 Rev. No.: 0 Date: Maren 20,1981 XIV. INSPECTION, TEST AND OPERATING STATUS A.
SCOPE This section of the Operational Quality Assuance Program establishes the measures for indicating the status of items undergoing inspections and tests (via tags, labels, etc.), to prevent the unintentional bypass of required tests.
In addition, this section establishes measures for indicating the operating status of components and systems to prevent their inadvertent operation.
B.
RESPONSIBILITIES 1.
The Operational Quality Assurance Department shall be responsible for the surveillance of inspection, test and operational status of components and systems and their repair.
2.
The Plant shall be responsible for:
a.
Ensuring indication of the status of operating equipment or systems to be removed from service for maintenance, test, inspection, repair, or change, b.
Designation of personnel who are responsible for directing the status change of equipment and systems.
C.
IMr.EMENTATION 1.
Satisfaction of this criterion shall be assured through the implementation of the actions listed below; a.
totification of affected organizations for changes in the inspection, test and operating status of structures, systems, and components, b.
Procedural control to prevent the inadvertent bypassing of required inspections, tests and other critical operations.
c.
Procedural control to assure that the application and removal of inspection and status indicators such as tags, markings, labels, and stamps are controlled.
I
Title:
Section XV. Nonconformino Matl's, Parts v
& Comoonents Page: 1 of 2 Rev. No.: 0 Date: March 20, 1981 XV.
NONCONFORMING MATERIALS, PARTS, AND CCMPONENTS A.
SCOPE This sectice of the Operational Quality Assurance Program establishes the measures to control materials, parts, or components which do not conform to requirements, in order to prevent their inadvertent use.
B.
RESPONSIBILITIES 1.
The Vice President - Manager of Operations shall be responsible for:
a.
Review and approval of all nonconformance report dispositions.
2.
The Operational Quality Assurance Department shall be responsible for:
a.
Surveillance of the control, evaluation, and disposition of nonconforming material, parts and components.
b.
Review and concurrance of dispositions and corrective actions of nonconformance reports.
e c.
Surveillance for repetitive nonconforming materials, d.
Establishment of feedback system between Maine Yankee and vendor representatives in regard to nonconforming material.
e.
Establishment of neasures to provide for the documented control of nonconforming materials, parts, and components.
f.
Preparation of documents to be followed in the review and resolution of nonconfctming items, services, or activities.
3.
The Plant Engineering Department shall be responsible for:
a.
Review of nonconforming items which cannot be corrected by vendor action.
b.
Preparation or approval of implementing documents for repair and/or rework of nonconforming items.
Title:
Section XVII. Quality Assurance Records Page:
2 or 2 Rev. tb. : 0 Date: Maren 20, 1981 e.
Provision of a system for the review, approval and retention of plant prepared documents such as reportaole occurrences, technical reports, required records and the meeting minutes of official committees.
f.
Control and distribution of the Operational OJa1.ity Assurance Program and revisions thereto.
C.
IMPLEMENTATICN 1.
Satisfaction of this criterien shall be assured through the
!mplementation of the actions listed below:
a.
Specifying the details required for inspection and test records including the following as applicable:
1)
Description of the type of observation.
2)
Evidence of completion and verification of manufacturing, inspection, or test operations.
3)
The date and results of the inspection or test.
4)
Information related to conditions adverse to quality.
5)
Inspector or data recorder identification.
6)
Evidence as to the acceptability of the results.
7)
Identification of characteristics and activities to be inspected.
8)
Acceptance and rejection criteria.
9)
Identification of required procedures, drawings, and specifications and revisions.
l 10)
Specifying the necessary measuring and test equipment including accuracy recuirements.
b.
Providing for record acministration, receipt, storage, preservation, safekeeping, retrieval and final disposition.
c.
Constructicn, locaticn and security of record storage facilities to prevent cestruccion of the records oy fire, ficoding, theft, and deterioration by envircnmental conditions sucn as temperature or numidity. Cuplicate records shall be stored in a separate remote locaticn when the type of document is not included in the record storage facility.
Title:
Accendix A. 0;alification Recuiretients Page:
1 of 1 Rev. No.:
O Date: Maren 20, 1981 CUALIFICATION REQUIREMENTS FOR THE DIRECTC'., OPERATIONAL CUALITY ASSURANCE DEPARTMENT The Director, Operational Quality Assurance Cepartment must meet the below listed qualification requirements:
EDUCATION:
Bachelor Degree in Engineeting or related science, or the equivalent in practical experience.
EXPERIENCE:
Four (4) years experience in the field of quality assurance, or equivalent number of yeat ' of nuclear plant experience in a supervisory position prers.nbly at an operating nculear plant or a comoination of the two.
At least (1) year of this four years experience shall be nuclear power plant experience in the implementation of the quality assurance program.
Six (6) months of the one year experience shall be obtained within a quality assurance organization.
O
Title:
Accendix B. (Exceptions) Suo Cat. B-5 Page:
9 of 11 Rev. tb. : O Cate: Maren 20, 1981 ANSI N45.2.2 (Cont.)
E.
EXCEPTION:
Sr5section 5.2.3 - Soecial Inscection Maine vankee takes exception to attaching special inspection procecures to the item or container.
ALTERNATIVE:
Special inspection procedures shall be readily available to personnel performing inspections.
JJSTIFICATION:
ProceA res are subject to ltiss abuse and more stringent controls when J
maintained on file and not attached to the item.
Inspection status is maintained by tagging and procedure control.
F.
EXCEPTION.
Subsection 6.1.2 - Levels of Storage Maine Yankee takes exception to two specific requirements associated with fuel storage (classified level A).
Alternative Maine Yankee shall meet the requirements of level A storage for new fuel with the exception of special air filtering; and termperature and humidity controls.
Justification The existing storage conditions at Maine Yankee plants are consistent w ah the protection provided to the fuel while in storage at the manufacturer (vendor) and/or while in transit to the plant site and are judged to provide adequate protection to the fuel assemoly structure which is of highly corrosion resistant materials. We believe that the above listed requirements are intended for application at the manufacturing facility (vendor) where the uranium pellets may be exposed to the atmosphere ana not in its fully encapsulated, and therefore, fully protected form in a completed fuel assembly.
G,X.
EXCEPTION:
g accendix A-3 Subsection A3.5.l(l) - Cacs & Plucs Maine Yankee takes exception to the requirement tnat non-Tetallic plugs and caps snall be brightly colored.
l
m.
/
Title:
Accendix B. (Excecticns) Sue Cat. E-5 Page:
10 of 11 Rev. No.:
O Cate: Maren 20, 1981 1
ANSI NA5.2.2 (Cent.)
ALTERNATIW:
Non-cetallic plugs and caps shall be of a centrasting color.
JJ,TIFICATICNS:
The purpose of utilizing brightly colored plugs and caps is to assist in assuring costructicns are not inadvertently placed in cperating ccmpenents or systems.
By using plugs and caps of a centrasting color i
this objective ccn te achieved.
H.
EXEPTION:
l Accendix A-3 Sucsection A3.9(1) - Secend G cuo, Markincs Maine Yankee takes exception to the requirement that centaine markings shall appear en a minimum of two sides.
ALTERNATI'E:
Coritainers shall be adequately marked to provide identificaticn and retrievability.
JUSTIFICATION:
Containers are tagged to provide identificaticn and inspection status.
Employment of two tags on small centainers adds bulk and confusion and dces not provide for better identification or traceability.
I.
EXCEPTION:
Accendix A-3, Sucsection A.3.9(4) - Seccnd Grouc, Marking 1
Maine Yankee takes exception to the requirement that centaine markings shall be no less than 3/4" hign centaine permitting.
i ALTERNAT!'E:
Centaine: markings snall Oe of a size nnien permits easy recogniticn.
JST* ICATICN:
J Markings were intended to p;cvice icentificatien and instructices.
Tre criteria sh::uld ce t'at the markings clearly p;cvide One sara.
J.
EX3PTICN:
l Occercix a-3 Stesecticn A.3.9(6) - Secccc Orcto, va-wirc l
Maine Yankee takes exceptien to the infor :atien recuired for centaine:
marking.
.