Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19308C723 + (Tentative Schedule for Subcommittee on Waste Mgt 791031 Closed Meeting in Washington,Dc)
- ML19290A220 + (Tentative Schedule of ACRS Bailly Subcommittee 790709 Meeting in Portage,In to Discuss History of Project & Soil Tests)
- ML19340D888 + (Tenth Discovery Status Rept.Answers Filed on 781130 to Intervenors 780803 Interrogatories,Completing All Outstanding Discovery Obligations.Response Submitted on 781117 to ASLB 781024 Order.Certificate of Svc Encl)
- ML20083H340 + (Tenth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 8401105. B&W Rept on Analysis Indicates Results Acceptable W/O Mod to Plant Hardware or Setpoint.Also Reportable Per Part 21)
- ML20091M295 + (Tenth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping.Initially Reported on 801230.Util Issued Physical Drawings & Insulation & Mode Analysis Drawings Per Engineering Change Notice 1457.Next Rept Expected by 840718)
- ML20077B861 + (Tenth Interim Deficiency Rept Re Failure of Main Steam Lines Due to Main Feedwater Overfill.Initially Reported on 800319. Final Analysis & Verification of Main Steam Line Piping Overfill Event Not Complete.Also Reportable Under Part 21)
- ML20085G489 + (Tenth Interim Deficiency Rept Re Potential Design Deficiency in Valve Yoke to Motor Maint Weld.Initially Reported on 740514.Spargers & Orifice Plate for Torus Line Installed)
- ML20066E950 + (Tenth Interim Deficiency Rept Re QA Breakdown for Fillet Welds in safety-related Sys.Initially Reported on 800507.NRC 1563 Written to Disposition Inaccessible Welds.Next Rept Will Be Submitted by 830823)
- ML20090B226 + (Tenth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in Free Standing,Open,Local Instrument Panels. Initially Reported on 801124.Equipment Will Be Seismically Tested to Higher G Values.Next Rept Expected by 841219)
- ML20054E539 + (Tenth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported on 800415. Corrective Actions Being Finalized.Next Rept to Be Provided by 820726)
- ML20094A695 + (Tenth Interim Significant Const Deficiency 88 Rept Re American Bridge Structural Steel.Investigation Incomplete. Next Rept Will Be Submitted by 840810)
- ML20095H985 + (Tenth Interim Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems T & B.Initially Reported on 840719.Walkdowns & Rework Incomplete.Final Rept Will Be Submitted by 840831)
- ML20087Q120 + (Tenth Interim Significant Const Deficiency Rept 37 Re Temp Detector (Rtds) Failures.Closure of Subj Const Deficiency Dependent Upon Successful Completion of Response Time Testing of Hot & Cold Leg Rtds.Next Rept Expected by 840713)
- ML20093J044 + (Tenth Part 21/deficiency Rept Re Inconsistency Between Pipe Breaks in LOCA Analysis & Structural Analysis of Connecting Pipes in Broken Loop.Initially Reported on 801121.Next Rept Will Be Submitted by 850628)
- ML20236D609 + (Tenth Partial Response to FOIA Request for Documents Re Facility.Forwards App K Document.Apps J & K Documents Available in PDR & Lpdr in San Luis Obispo,Ca)
- ML20134K131 + (Tenth Partial Response to FOIA Request for Documents. Forwards App X & Y Documents.Documents Available in Pdr.App X Documents Withheld in Part (Ref FOIA Exemptions 3 & 5).App Z Documents Withheld in Entirety (Ref FOIA Exemption 5))
- ML20134K135 + (Tenth Partial Response to FOIA Request for Documents. Forwards App X & Y Documents.Documents Available in Pdr.App X Documents Withheld in Part (Ref FOIA Exemptions 3 & 5).App Z Documents Withheld in Entirety (Ref FOIA Exemption 5))
- ML20133G886 + (Tenth Partial Response to First Set of QA Interrogatories & Request to Produce.Qa Program Complies W/Criteria of 10CFR50,App B.Supporting Documents & Certificate of Svc Encl.Related Correspondence)
- CNL-15-197, Tenth Progress Update on Improved Flood Mitigation System Project + (Tenth Progress Update on Improved Flood Mitigation System Project)
- ML20245A148 + (Tenth Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network Jan-Mar 1989)
- ML20247H767 + (Tenth Quarterly Update to Startup Rept)
- ML031360617 + (Tenth Refuel Outage Steam Generator In-Service Inspection Report)
- BW030110, Tenth Refuel Outage Steam Generator In-Service Inspection Report + (Tenth Refuel Outage Steam Generator In-Service Inspection Report)
- CPSES-200401982, Tenth Refueling Outage (1RF10) Steam Generator Twelve Month Report + (Tenth Refueling Outage (1RF10) Steam Generator Twelve Month Report)
- ML20117F675 + (Tenth Refueling Outage ISI Summary Rept)
- L-03-217, Tenth Refueling Outage Inservice Inspection Report + (Tenth Refueling Outage Inservice Inspection Report)
- ML032190155 + (Tenth Refueling Outage Steam Generator Inservice Inspection Summary Report)
- BW040017, Tenth Refueling Outage Steam Generator Inservice Inspection Summary Report + (Tenth Refueling Outage Steam Generator Inservice Inspection Summary Report)
- ML20079F611 + (Tenth Request for Admissions from Applicants.Related Correspondence)
- ML20079F601 + (Tenth Request for Admissions to Nrc.Related Correspondence)
- ML20126G064 + (Tenth Set of First Round Questions Covering Power Sys Branch Area of Review)
- ML20094H802 + (Tenth Set of General Interragotories.Related Correspondence)
- ML20052A437 + (Tenth Set of Interrogatories & Requests to Produce. Certificate of Svc Encl.Related Correspondence)
- ML20083J408 + (Tenth Set of Interrogatories on Diesel Generators. Certificate of Svc Encl)
- ML20005B711 + (Tenth Significant Deficiency Rept Re Heating,Ventilation & Air Conditioning Damper Qualification,Initially Reported on 801226.Completion of Rework by Vendor & Shipment to Facility Scheduled for Feb 1982)
- ML18053A774 + (Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Without Enclosure 2)
- RS-18-011, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events . + (Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events .)
- RS-18-012, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) + (Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049))
- RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events + (Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events)
- CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ND-18-0986, Tenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (Tenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
- ML19305D634 + (Tenth Status Rept Per Aslab 790607 Indefinite Extension for NRC to Respond to Suffolk County Motion to File Supplemental Brief.Task Action Plan Underway.No Written Decision on Coal Plant Issued by Ny Board on Electric Generation Siting)
- L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 + (Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3)
- ML20086F707 + (Ter,Pump & Valve Inservice Testing Program,Davis-Besse Nuclear Power Station,Unit 1)
- ML20091J162 + (Ter,River Bend Station,Unit 1,Station Blackout Evaluation, Final Rept)
- ML19163A237 + (Teresa Knickerbocker, Mayor-Village of Buchanan, Ny Letter Indian Point Ndcap - Region I Response)
- ML12080A232 + (Teresa Marnzi, Non-Disclosure Agreement and Acknowledgment)
- ML20262J484 + (Terminal & Pull Box Schedule. Sheet 1)
- ML20262J485 + (Terminal & Pull Box Schedule. Sheet 2)
- ML20266C694 + (Terminal Wiring W Screw.Sheet 1 of 1)
- ML20129G043 + (Terminated Matls Licensing Package for Amend 5 to License SNM-1635 for Stevens Inst of Technology.Control:123625)