Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129E022 + (Temporary Mod Requests T-8750,T-8749 & T-8748 to Rev 5 to Sys Procedure Sp 1106.24, Main Steam Sys Operating Procedure)
- ML20129D657 + (Temporary Mod Requests T-8955,T-8942 & T-8077 to Sys Procedure Sp 1105.03, Safety Features Actuations Sys)
- ML20126K591 + (Temporary Mod Requests T-9023,T-8524 & T-8351 to Sys Procedure Sp 1104.04, Decay Heat & Low Pressure Injection Operating Procedure)
- ML20126K579 + (Temporary Mod Requests T-9026 & T-8913 to Rev 8 to Sys Procedure Sp 1106.07, Main Feedwater Sys)
- ML20126K559 + (Temporary Mod Requests T-9096,T-9042,T-9045,T-9064,T-8983, T-8945,T-8591,T-8592,T-8594,T-8593 & T-7110 to Rev 20 to Sys Procedure Sp 1104.02, Makeup & Purification Sys)
- ML20126K630 + (Temporary Mod Requests T-9187,T-9105,T-9073 & T-8783 to Rev 22 to Sys Procedure Sp 1106.06, Auxiliary Feedwater Sys)
- ML20235U409 + (Temporary Mod Sheet to Rev 2 to Conduct of Operations Procedure 2.0.7, Plant Temporary Mod Control)
- ML032731438 + (Temporary Modification of Implementation of Orders Dated February 25, 2002 and October 16, 2002)
- ML070530467 + (Temporary NMC Management Changes)
- ML18058B898 + (Temporary Non-Code Repair for Pipe Leak/Wall Thinning Downstream of Cv 0826,SWS,Line HB-23-16)
- ML20008F618 + (Temporary Operating Procedure SD-OP-004, for Chem-Nuclear Sys,Inc Mobile Cement Solidification Unit 1)
- ENS 46123 + (Temporary Outage of Public Prompt Notification System Due to a Bomb Threat Offsite)
- ML053130310 + (Temporary PM Assignment)
- ML050190287 + (Temporary Permit to Operate a Temporary Filter Truck Peach Bottom Atomic Power Station, PWS 7670905)
- ML020360110 + (Temporary Personnel Assignment)
- ML030520281 + (Temporary Personnel Assignment - Beaver Valley Power Station, Units 1 & 2)
- ML030290209 + (Temporary Personnel Assignment. Informs That Effective 01/27/2003, Until Further Notice, Guy S. Vissing Will Replace Donna Skay as Project Manager for Calvert Cliffs Nuclear Power, Unit Nos. 1 & 2)
- ML20127G571 + (Temporary Procedure Change 84-371 to Rev 2 to Procedure 27.304.01, NSST & Reserve Station Svc Transformer Transfer Checks)
- ML20204J139 + (Temporary Procedure Change 88-504 to Rev 4 to Procedure E-0, Reactor Trip or Safety Injection)
- ML20072K024 + (Temporary Procedure Change,Conduct of Operations - Operations Group)
- ML20099B974 + (Temporary Procedure Secondary Containment Preventative Maint Program)
- ML20096E415 + (Temporary Procedure Tp 21.001.02, On-Shift Advisor Training,Duties & Responsibilities)
- ML20092G747 + (Temporary Procedure to Rev 0 to Temporary Procedure T-ENG-90-14, Unit One Train B DCP 88-VIN0070 Sequencer Functional)
- ML18122A318 + (Temporary Project Manager Assignment)
- ML053180249 + (Temporary Project Manager Assignment)
- ML053140323 + (Temporary Project Manager Assignment)
- ML18123A337 + (Temporary Project Manager Assignment to Lisa Regner, Effective May 13, 2018)
- ML19205A126 + (Temporary Project Manager Change Letter)
- ML16298A153 + (Temporary Project Manager Reassignment)
- ML18054A651 + (Temporary Project Manager Reassignment)
- ML18054A613 + (Temporary Project Manager Reassignment)
- ML18058B637 + (Temporary Project Manager Reassignment)
- ML18058B631 + (Temporary Project Manager Reassignment)
- ML19017A158 + (Temporary Project Manager Reassignment)
- ML17110A069 + (Temporary Project Manager Reassignment from April 24, 2017, Through Approximately September 29, 2017)
- ML17110A062 + (Temporary Project Manager Reassignment from April 24, 2017, Through Approximately September 29, 2017)
- ML17128A097 + (Temporary Project Manager Reassignment from May 8, 2017, Through Approximately September 29, 2017)
- ML062410189 + (Temporary Reassignment Letter for M. Murphy)
- ML062090007 + (Temporary Reassignment of Project Manager)
- 3F0804-07, Temporary Relaxation of the Implementation of NRC Security Order Dated February 25, 2002 (EA-02-026) + (Temporary Relaxation of the Implementation of NRC Security Order Dated February 25, 2002 (EA-02-026))
- ML072540550 + (Temporary Relief from 5-year Test Requirement for Safety Relief Valves)
- ML24282A973 + (Temporary SW Piping LAR Acceptance Email)
- 05000456/FIN-2010004-02 + (Temporary Scaffold Quality Control Process)
- Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment + (Temporary Scaffolding Affects Operability of Safety-Related Equipment)
- ENS 42869 + (Temporary Scaffolding for Upcoming Outage Renders 'A' and 'B' Msiv Inoperable)
- ML20261L414 + (Temporary Security Fence Relocation Plan)
- ML20261J684 + (Temporary Service Water TIE-IN from Bearing Cooling Water System North Anna Power Station Virginia Power.Sheet 1 of 1)
- TSG-DOR-2020-01, Temporary Staff Guidance - COVID-19 Related Exemptions from NRC Part 26 Regulations + (Temporary Staff Guidance - COVID-19 Related Exemptions from NRC Part 26 Regulations)
- Information Notice 2015-07, Temporary Suspension of e-QIP System to Affect Pending Background Investigations + (Temporary Suspension of e-QIP System to Affect Pending Background Investigations)
- ML20148K822 + (Temporary Use of Atlas Copco Diesel Compressor PTMS900 at Millstone Nuclear Power Station Unit 3 Maint of Svc Air Sys)
- ML20092C681 + (Temporary Waste Handling Bldg:Radiological Specs/Evaluations)
- ML20079H755 + (Temprorary Exemption from 10CFR50,App J,Section III.D.2(a) Re Type B & C Testing of Containment Penetrations & Containment Isolation Valves)
- ML20094R372 + (Ten Commandments of Computer Ethics)
- 05000316/LER-2076-015, Ten Hydraulic Snubbers Failed Acceptance Criteria for Bleed or for Lockup + (Ten Hydraulic Snubbers Failed Acceptance Criteria for Bleed or for Lockup)
- ML20266A363 + (Ten Inch IPS Sealable Liner. Sheet 1 of 3)
- ML20266A368 + (Ten Inch IPS Sealable Liner:GE-700. Sheet 2 of 3)